N4425519R6006_PWS_Attachment_G,_Adak_rev.1.doc

DOC document 150 KB Posted

Attached to
LTMOM
Solicitation number
N4425519R6006
Issued by

About this file

This statement of work describes long-term monitoring, operations and maintenance services for free product recovery at petroleum contaminated sites within Operable Unit A at the Former Adak Naval Complex on Adak Island, Alaska. The contractor will be required to recover free product from select wells using passive and manual means, maintain oil-absorbent booms on local waterways, conduct monthly inspections and reporting, manage all waste, and prepare an annual summary report. The performance period is 608 calendar days with free product recovery and boom maintenance occurring for 12 months. The contractor must comply with all applicable directives and regulations and develop project plans, conduct field work, and submit required deliverables such as monthly reports, an annual report, and if applicable, a closure report in accordance with the specified schedule and quality standards. The Navy, Alaska Department of Environmental Conservation, and U.S. Environmental Protection Agency will monitor performance on this contract.

N4425519R6006_PWS_Attachment_G,_Adak_rev.1.doc

View the file

Other files

File Type Posted
N4425519R6006_N4425519R6006_Amendment_0008.pdf PDF
N4425519R6006_Attachment_J.B-1_BidSked-rev.4.xlsx XLSX spreadsheet
N4425519R6006_N4425519R6006_Amendment_0007.pdf PDF
N4425519R6006_Attachment_J.C-1_PWS_rev.2.pdf PDF
N4425519R6006_Attachment_J.B-1_BidSked_rev.3.xlsx XLSX spreadsheet
N4425519R6006_N4425519R6006_Amendment_0006.pdf PDF
N4425519R6006_PWS_Attachment_H,_Adak_rev.1.doc DOC document
N4425519R6006_N4425519R6006_Amendment_0005.docx DOCX document
N4425519R6006_PWS_Attachment_M__JPHC-NHB_rev.1.doc DOC document
N4425519R6006_PWS_Attachment_K.2_NBK-Brem.xlsx XLSX spreadsheet
N4425519R6006_PWS_Attachment_K_NBK-Brem_rev.1.docx DOCX document
N4425519R6006_PWS_Attachment_J_Barrow_rev.1.docx DOCX document
N4425519R6006_PWS_Attachment_F_NAS_Whidbey_rev.1.docx DOCX document
N4425519R6006_PWS_Attachment_I_Pt._McIntyre_rev.1.doc DOC document
N4425519R6006_Attachment_J.B-1_BidSked_rev.2.xlsx XLSX spreadsheet
N4425519R6006_N4425519R6006_Amendment_0004.pdf PDF
N4425519R6006_Attachment_J.C-1_PWS_rev.1.docx DOCX document
N4425519R6006_N4425519R6006_Amendment_0003.pdf PDF
N4425519R6006_Attachment_J.G-1,_Proposal_Template.xlsx XLSX spreadsheet
N4425519R6006_Attachment_J.B-1_Sub_Line_Item_Numbers_Bid_Schedule_rev.1.xlsx XLSX spreadsheet
N4425519R6006_N4425519R6006_Amendment_0002.pdf PDF
Website Link —
N4425519R6006_N4425519R6006_Amendment_0001.pdf PDF
N4425519R6006_Attachment_J.L-1,_Pre-Proposal_Inquiry_rev.1.pdf PDF
N4425519R6006_PPC_Attendance_and_Slides.pdf PDF
N4425519R6006_Attachment_J.B-1_Sub_Line_Item_Numbers_(SLINs)_Bid_Schedule.xlsx XLSX spreadsheet
N4425519R6006_Attachment_J.M-3,_Past_Performance_Questionnaire.pdf PDF
N4425519R6006_Attachment_J.M-1,_Relevant_Contract_Experience_Data_Sheet.pdf PDF
N4425519R6006_Attachment_J.L-1,_Pre-Proposal_Inquiry.pdf PDF
Attachment_J.M-2,_Safety_Past_Performance.pdf PDF
Attachment_J.F-1,_Schedule_of_Deliverables.pdf PDF
Attachment_J-1,_SCA_Wage_Determintation.pdf PDF
Attachment_J.B-1_Sub_Line_Item_Numbers_(SLINs)_Bid_Schedule.pdf PDF
N4425519R6006_N4425519R6006.pdf PDF
N4425519R6006_Attachment_J.C-1,_Performance_Work_Statement.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N44255-19-R-6006 PWS Attachment G

Adak FPR Booms

STATEMENT OF WORK

LONG-TERM MONITORING, OPERATIONS AND MAINTENANCE,

Free Product Recovery (FPR), Operable Unit (OU) A, Former Naval Complex, Adak, Alaska

N44255-19-R-6006, PWS Attachment G, Adak FPR Booms

Date: 7 July 2018

NAVAL FACILITIES ENGINEERING COMMAND NORTHWEST

1101 TAUTOG CIRCLE SUITE 203

SILVERDALE WA 98315 1101

Free-Product Recovery

Former Naval Complex, Adak, Alaska

1.0 INTRODUCTION

The work involves recovery of free product at petroleum contaminated sites within Operable Unit A (OU A) on Adak Island at the Former Adak Naval Air Facility, Adak, Alaska. In addition, oil-absorbent booms shall be maintained at several locations on East Canal, West Canal and Sweeper Creek. Work shall involve removal of free-product from select wells on island using passive and manual means (hand bailing, absorbent socks, recovery canisters, etc.), maintenance of the oil-absorbent booms, monthly reports documenting the work, waste management, and preparation of an annual summary report.

The period of performance for this task is 608 days with free-product recovery and boom maintenance occurring for 12 months.

2.0 BACKGROUND

The Operable Unit-A (OU-A) Record of Decision (ROD) was executed in April 2000 (Reference 1). The ROD and the State-Adak Environmental Restoration Agreement (SAERA) (Reference 2) are the primary regulatory authority for petroleum sites on Adak. Sixty-two of the 128 petroleum sites in the ROD were removed via a 2003 ROD amendment (Reference 3). Fourteen of these sites were identified as having interim remedies (free-product recovery) but did not have final remedies; this has been documented in the Final Closure Report in Reference (4).

A decision document was executed in May 2005, which memorialized final remedies for 10 of the 14 sites (sites with no unacceptable risk) (Reference 5). The remaining four sites, NMCB, South of Runway 18-36, SWMU 62, and SWMU 17 decision documents were approved with all but SWMU 17 having free-product recovery as part of the final remedy (References 6, 7, 8, and 9).

Area 303 was defined after the OU A ROD was signed, and is characterized in a Focused Feasibility Study prepared by the Navy in 2011 (Reference 10). A decision document for Area 303 was approved in 2012 (Reference 11), which identifies the selected remedies of monitored natural attenuation, institutional controls, and free-phase product recovery.

In the summer of 2006, additional recovery/monitor wells were installed at NMCB, South of Runway 18-36 Area, and SWMU 62 sites. Recovery trenches were also installed at South of Runway 18-36 Area and SWMU 62. The Final Decision Documents for each site required that product recovery be continued until the technically practicable endpoint for free-product recovery is achieved, as defined in the OU-A ROD.

Recovery from the free-product collection/containment trenches shall continue until free product has been reduced to thicknesses less than 0.01 foot, or no sounding of the oil/water interface probe has been experienced for 1-year or more.

During the 2007 field season (October 2006 through September 2007) all three sites met the technically practical endpoint criteria for product recovery systems not dependent on water table depression, however, the collection/containment trenches did not meet the end point criteria.

Since 2007, NMCB, the South of Runway 18-36 Area, and Area 303 have met the technically practicable endpoint for free-product recovery and have been removed from the free-product recovery program. The Navy’s most recent findings and recommendations are summarized in the Final Remedial Action Summary Report Free Product Recovery dated December 19, 2017 is the baseline of this task order, Reference (12).

Soil removal actions were conducted at Building T451 and SWMU 62 by the Navy in 2011 and 2016 to address the petroleum seepage occurring into East Canal in the area of the (now former) recovery trench and recovery sumps (References 13 and 14). The removal action consisted of removal of the recovery trench, excavation of petroleum-contaminated soil, replacement with amended clean fill, and installation of seven monitoring wells.

3.0 SCOPE OBJECTIVE

The objective of this task order is to continue with the free-product recovery portion of the remedies presented in the Decision Documents (References 5, 6, 7, 8, 9 and 11), ROD and ROD Amendment (References 1 and 3) and the SAERA (Reference 2) for the subject site. This work shall be accomplished by removal of free-product from select wells on island using passive and manual means (hand bailing, absorbent socks, recovery canisters, etc.), maintaining oil-absorbent booms on affected waterways, inspecting wells for presence or thickness of free-product on groundwater, documenting activities in monthly reports, and completing a closure report that summarizes and documents the product recovery activities over the course of the year.

4.0 APPLICABLE DIRECTIVES AND DOCUMENTS

Reference Number
Title
Date
1
U.S. Navy, Alaska Department of Environmental Conservation (ADEC), and U.S. Environmental Protection Agency (EPA). 2000. Final Record of Decision, Operable Unit A, Former Adak Naval Complex, Adak Island, Alaska. Prepared by URS Greiner, Inc., for Engineering Field Activity, Northwest, under CLEAN Contract No. N62474-89-D-9295. Poulsbo, Washington.
Apr 2000
2
State-Adak Environmental Restoration Agreement (SAERA) Petroleum Sites
Jan 1994 as Amended

Mar 2002

3
Adak Naval Air Station, Adak, Alaska Operable Unit A Record of Decision Amendment No. 1
Sep 2003
4
Final Closure Report, Interim Action Free-Product Recovery, South of Runway 18-36 Area, Tanker Shed Area, NORPAC Hill Seep Area, and Yakutat Hangar, Former Naval Air Facility Adak, Adak Island, Alaska.
Jan 2006
5
U.S. Navy and Alaska Department of Environmental Conservation (ADEC). Final Decision Document for Petroleum Sites with No Unacceptable Risk, Former Adak Naval Complex, Adak, Alaska. Prepared by URS Group, Inc., for Naval Facilities Engineering Command, Northwest, under Contract No. N44255-02-D-2008.
May 2005
6
U.S. Navy and ADEC. Final Decision Document NMCB Building Area T-1416 Expanded Area, Former Adak Naval Complex, Adak, Alaska. Prepared by URS Group, Inc., for Naval Facilities Engineering Command, Northwest, under Contract No. N44255-05-D-5100, Delivery Order 0003.
Mar 2006
7
U.S. Navy and ADEC. Final Decision Document South of Runway 18-36 Area, Former Adak Naval Complex, Adak, Alaska. Prepared by URS Group, Inc., for Naval Facilities Engineering Command, Northwest, under Contract No. N44255-05-D-5100, Delivery Order 0003.
Sep 2006
8
U.S. Navy and ADEC. Final Decision Document SWMU 62, New Housing Fuel Leak Site, Former Adak Naval Complex, Adak, Alaska. Prepared by URS Group, Inc., for Naval Facilities Engineering Command, Northwest, under Contract No. N44255-05-D-5100, Delivery Order 0003.
Aug 2006
9
U.S. Navy and ADEC. Final Decision Document SWMU 17, Power Plant No. 3 Area, Former Adak Naval Complex, Adak, Alaska. Prepared by URS Group, Inc., for Naval Facilities Engineering Command, Northwest, under Contract No. N44255-05-D-5100, Delivery Order 0003.
Dec 2006
10
Final Focused Feasibility Study Report, Revision 1, Area 303, Former Adak Naval Complex, Adak Island, Alaska. Prepared by URS Group, Inc., for Naval Facilities Engineering Command Northwest under Contract No. N44255-09-D-4001, Delivery Order 0007.
Aug 2011
11
U.S. Navy. Final Decision Document, Area 303, Former Adak Naval Complex, Adak, Alaska. Prepared by URS Group, Inc., for Naval Facilities Engineering Command, Northwest, under Contract No. N44255-09-D-4001.
Mar 2012
12
Final Remedial Action Summary Report, Free Product Recovery, SWMU 62 New Housing Fuel Leak Area and Additional Sites, Former Naval Complex, Adak, Alaska.
Dec 2017
13
Final Interim Removal Action Report for Building T-1451 & East Canal Site Investigation/Characterization, Former Adak Naval Complex, Adak, Alaska. Prepared by ERS Joint Venture under Contract N62473-07-D-3219, JP01.
Apr 2013
14
Final Completion Report, 2016 & 2017 Field Seasons, Removal Action at the East Canal/SWMU 62 Product Recovery Trench & Building T-1451 Areas, Former Adak Naval Complex, Adak, Alaska. Prepared by APTIM Federal Services, LLC under Contract N62473-12-D-2005, Task Order JP02.
Apr 2018
15
Final Operation and Maintenance Plan, Free-Product Recovery at Former Adak Naval Facility, Adak Island, Alaska.
Sep 2017 or most current version
16
Final Waste Management Plan, 2017 Long-Term Monitoring and Inspections, Operable Unit A, Former Naval Complex, Adak, Alaska. Prepared by Sealaska Environmental Services for Naval Facilities Engineering Command Northwest under Contract No. N44255-14-D-9011, Task Order 47.
Jun 2017 or most current version
17
Final Remedial Design and Project Plans, Three Petroleum Sites: NMCB Expanded Area, South of Runway 18-36 Area, and SWMU 62 New Housing Fuel Leak, Former Adak Naval Air Facility, Adak Island, Alaska.
Apr 2006
18
Accident Prevention Plan with Site Safety and Health Plan (APP/SSHP) and Activity Hazard Analyses Appendices for the 2018 Annual Long-Term Monitoring, Former Naval Complex, Adak, Alaska. Prepared by Sealaska Environmental Services for Naval Facilities Engineering Command Northwest under Contract No. N44255-14-D-9011, Task Order N6247318F4303.
July 2018
19
NAVFAC Northwest SOPs
Most current version

5.0 PERFORMANCE REQUIREMENTS

The contractor shall complete all work in accordance with the performance requirements indicated in Table 1: "Performance Requirements Summary (PRS). This PRS serves as the basis for the Government evaluation to be entered into the Contractor Performance Assessment Reporting System (CPARS). The contractor shall also comply with the following:

The contractor shall provide all necessary personnel, equipment, security, transportation, and technical oversight to complete the required work. The contractor shall coordinate all field activities with NAVFAC Northwest.

The following tasks shall be completed for this Task Order:

Task 5.1:

Project Management

Task 5.2:

Work Plan

Task 5.3:

Mobilization/Demobilization

Task 5.4:

Monitoring/Operation and Maintenance

Task 5.5:

Waste Management

Task 5.6:

Monthly Reporting

Task 5.7:

Closure Report

Task 5.8:

Electronic Deliverables

5.1 Project Management

The Contractor shall conduct all necessary program management actions to ensure this delivery order remains on schedule and within budget. Project management tasks shall include activities associated with communication, billing, staff assignments, materials approvals and overall management of the project. The project manager shall provide on-going team coordination, and plan and schedule project activities. The Program Manager is responsible for communicating with the Contracting Officer’s Representative (COR) of any problems that arise and to identify corrective solutions. A draft project schedule in MS Project shall be submitted within 7 days of Task Order award to the Navy PRM and COR for review and approval. An updated copy of the Task Order Schedule in MS Project shall be provided to the Navy RPM and COR via email on a monthly basis.

5.2 Work Plans

The Contractor shall complete project plans in draft and final versions that addresses all work to be accomplished under the task order. The contractor shall provide comment response to all comments and incorporate approved changes in to the subsequent document version. The work plans shall include a Work Plan (O&M Plan) and Quality Control Plan. Plans shall be developed in accordance with References 12, 15, 16, 17, 18, and 19 and all requirements of the basic contract. Note: The APP/SSHP and the Waste Management Plan required for this task order are included in the PWS Attachment H, Adak LTMOM SLIN.

The Quality Control Plan shall address all elements of the work being performed under this task order.

5.3 Mobilization/Demobilization

This task includes all labor, materials, and subcontractor costs for mobilizing and demobilizing to the site to complete free-product monitoring, fuel recovery and boom maintenance, and waste disposal activities.

5.4 Monitoring/Operation and Maintenance

The wells to be monitored will be identified during development of the O&M Plan prepared under Task 5.2. Approximately 35 well locations are monitored six times a year for depth to water and product thickness measurements. Free product from these wells is recovered using socks or canisters, following SOPs established in the O&M Plan prepared under Task 5.2.

The Navy will provide the list of well locations that is determined based on field observations during monthly O&M activities, recommendations following long term monitoring, and Alaska Department of Environmental Conservation (ADEC) requests. Typical depth to water is less than 20 feet. Wells are either 2 inch or 4 inch in diameter. Recommendations for changes to well locations shall be made to the Navy as appropriate, and the Navy will provide technical direction as to which wells are to be monitored. If monitoring of more than 35 wells is required for any field event, additional SLINs will be awarded.

Based on monthly or annual monitoring findings and ADEC requests, the wells to be monitored may vary. The number of wells anticipated to be added should not increase the level of effort substantially and may be balanced by reductions in wells monitored based on lack of free-product.

5.4.1 The contractor shall conduct monitoring on ad-hoc wells as necessary on wells that are requested by ADEC or NAVFAC Northwest. Such monitoring may include direct measurement of water quality parameters (such as dissolved oxygen, oxidation reduction potential, pH, temperature or conductivity) to demonstrate remedy performance.

5.4.2 The contractor shall maximize recovery of free-product from affected wells, with a focus on reducing the total volume of free-phase hydrocarbon present at each site and in individual wells. The contractor shall recover free product each day they are on Adak for the intent of executing this PWS. Free product shall be recovered until free product thickness drops below 0.10 feet at each location daily.

5.4.3 The contractor shall gather and maintain documentation of free-product recovery operations, maintenance and waste management sufficient to complete the reports described in Section 5.6 and 5.7

5.4.4 The contractor shall maintain booms in accordance with the requirements in References 12 and 15. In addition, the contractor shall provide an inspection log sheet documenting boom condition and presence of sheen along with photographs. Booms shall be inspected on a monthly basis.

5.4.5 Booms shall be disposed in an appropriate manner in accordance with all local, state and federal regulations (Reference 16.

Boom Maintenance History/Summary

Area
Boom No.*
Length (feet)
Diameter (inches)
Number of 10’ sections replaced

Oct-16 to Sep-17

East Canal – SWMU 62 Culvert
2
30
5
4
East Canal – SWMU 62
3
80
5
7
South Sweeper Creek – Main Road Culvert
6
90
5
9
East Canal – Building T-1451 Culvert
9
40
5
7
South Sweeper Creek – SWMU 60 Lagoon
10
120
5
12
East Canal – Downgradient of Building T-1451
12
90
5
9
East Canal - Downgradient of Building T-1451
13
40
5
NA – Installed in October 2017

* Boom numbering is not sequential as several booms have been removed in locations where remedial goals have been met.

5.5 Waste Management

The contractor shall collect, manage and dispose of all waste generated during this task order. This task includes all labor, materials, and subcontract costs to complete the waste disposal/recycling activities associated with the O&M activities. At the end of the project, if needed, the contractor shall ready the drums and load them for transport to the recycling facility. The used absorbent booms shall be burned in accordance to Reference 16 using a smart ash burner. Any excess waste material generated during the O&M period shall be burned as well or disposed off-island as outlined in Reference 16. All work shall be completed in accordance with all applicable local, state and federal requirements.

5.6 Monthly Reporting

The contractor shall prepare 12 monthly reports; these shall be electronic reports that document the work accomplished. The intent of the report is to keep the ADEC regulators informed of O&M activities and remedy performance throughout the year.

The contractor shall complete the reports to the satisfaction of the stakeholders (Navy, and ADEC).

The monthly reports shall include, but may not be limited to, the following:

· Site description;

· Wells monitored and date and time of monitoring;

· Changes in operation and maintenance to optimize the free-product recovery;

· Depth to water and product measurements for each well;

· Volume of product recovered from each well (monthly and cumulative);

· Tables to summarize the above;

· Figures showing boom locations;

· Product thickness in trenches (monthly and cumulative);

· Boom inspection log with photos; and

· Conclusions and recommendations for each site to optimize free-product recovery.

5.7 Annual Reporting

The contractor shall prepare an annual report summarizing O&M activities completed over the prior 12-month period. When site conditions and documentation supports site closure and after consultation with the Navy RPM, a Closure Report shall be prepared in lieu of an Annual Summary Report.

5.7.1 Annual Summary Report

The Annual Summary Report shall include, but may not be limited to, the following:

· Executive summary;

· Site description;

· Summary of free-product recovery activities including free-product recovery history, comparison of product recovery to endpoint criteria described in the OU-A ROD, and the estimated extent of remaining free-product;

· All available groundwater elevation, depth-to-water, and product thickness data;

· All apparent free-product thickness measurements;

· All free-product thickness measurement plots;

· Site location and vicinity map showing location of all wells, wells with product and the location of any free-product recovery system(s);

· Groundwater flow map;

· Estimate of remaining recoverable free-product volume;

· Description of waste management activity (recycling, staging, labeling, accounting and disposal); and

· Conclusions and recommendations for the free product recovery and boom maintenance program.

5.7.2 Closure Report

The Closure Report shall include, but may not be limited to, the following:

· Executive summary;

· Site description;

· Summary of free-product recovery activities including free-product recovery history, comparison of product recovery to endpoint criteria described in the OU-A ROD, and the estimated extent of remaining free-product;

· All available groundwater elevation, depth-to-water, and product thickness data;

· All apparent free-product thickness measurements;

· All free-product thickness measurement plots;

· Site location and vicinity map showing location of all wells, wells with product and the location of any free-product recovery system(s);

· Groundwater flow map;

· Estimate of remaining recoverable free-product volume;

· Description of waste management activity (recycling, staging, labeling, accounting and disposal); and

· Conclusion with supporting documentation supporting site closure as defined in the Decision Documents (References 5, 6, 7, 8, 9 and 11), ROD and ROD Amendment (References 1 and 3) and the SAERA (Reference 2).

5.8 Electronic Deliverables

Documents and Technical data shall be submitted in accordance with the NAVFAC Northwest Standardized Operating Procedures (SOPs) (Reference 19). Each final electronic deliverable shall be submitted separately along with the associated hardcopy document per the schedule listed in Section 6.0.

6.0 DELIVERABLES

All deliverables shall undergo a technical review for technical accuracy of text, data tables, figures, photos, graphics and appendices, and trend analyses and appropriateness of conclusions and recommendations prior to submittal to the Navy and Agencies (if applicable) for review.

In addition, all deliverables shall undergo technical editing for consistency, organization, concise presentation of data, figures, photos, graphics, and information in appendices, and the accuracy of the table of contents and acronyms and abbreviations list prior to submittal to the Navy and Agencies (if applicable) for review.

TASK REF.
DELIVERABLE ITEM / EVENT
DURATION

(days from award*) No. Hard / Electronic Copies

5.1
Initial Schedule
7
0/2 by email to Navy RPM and COR
5.1
Monthly Task Order Schedule Updates
Monthly
0/2 by email to Navy RPM and COR
5.2
Site Plans O&M Plan and Quality Control Plan,)
Draft Plans
30
3/3

Navy RPM (2/2) and ADEC PM (1/1)

Navy Review
44
--
Final Plans
65
4/4 Navy RPM (3/3) and ADEC PM (1/1)
Notice to Proceed
79
5.3/5.4
Begin Free-Product Recovery
111
End Free-Product Recovery
447
5.6
Monthly Reports
Monthly reports after the 1st month shall be due on the 10th of each month.
0/1 by email

Navy RPM

5.7/5.8
Annual/Closure Report
Internal Draft Annual Report
477
2/2

Navy RPM

Navy Comments
491
Response to Comments
498
0/1 by email to Navy RPM
Draft Annual Report
512
3/3

Navy RPM (2/2)

ADEC PM (1/1)

ADEC and Navy Comments
545
--
Response to Comments
559
0/2 by email

Navy RPM (0/1)

ADEC PM (0/1

Comment Resolution
573
Final Annual Report
587
4/4

Navy RPM (3/3)

ADEC PM (1/1)

Closeout
608

*Days are calendar days

Electronic file submitted via email (if indicated) or on CD/DVD

Delivery of hard copy documents with accompanying CD/DVDs to recipients shall be by standard overnight delivery.

Electronic and hard copy (paper) data deliverables shall be prepared and submitted in accordance with the Navy’s Electronic Data Deliverable (NEDD) standard. Documents shall be submitted in accordance with NAVFAC Northwest SOPs (Reference 19). The contractor shall acquire a PKI (soft-cert) and complete the Navy’s Information Assurance (IA) training prior to uploading the NEDD files.

7.0 POINTS OF CONTACT

Specific NAVFAC contacts be identified under separate correspondence after task order award.

Naval Facilities Engineering Command Northwest 1101 Tautog Circle

Silverdale, WA 98315

Fax: (360) 396-0857

Specific Stakeholder Points of Contact will be identified under separate correspondence after contract award.

Project Manager

Alaska Department of Environmental Conservation (ADEC)

Contaminated Sites Program

555 Cordova Street

Anchorage, AK 99501-2617

Project Manager

U. S. EPA Region 10

1200 6th Ave, Suite 900, ECL-122

Seattle, WA 98101-3140 Table 1: Performance Requirements Summary

Evaluation Criteria
Unsatisfactory

(Did not Meet AQL) Marginal

(Met AQL, but with difficulty) Satisfactory

(Met AQL) Very Good

(Exceeded AQL) Exceptional

(Greatly Exceed AQL)

Quality
Inferior quality of service/deliverables such that deficiencies were a detriment to the Navy mission.
Marginal quality of service/deliverables with a substantial number of deficiencies without detriment to the Navy mission.
Acceptable quality of service/deliverable.
Quality of service/deliverable was such that it enhanced the Navy’s mission beyond AQL.
Quality of service/deliverable was such that it greatly benefited the Navy’s mission beyond the AQL.
Schedule
Missed scheduled events/deliverable dates.
Meet scheduled events/deliverable dates but required Navy intervention.
Meet scheduled events and deliverables as specified in task.
Scheduled event/deliverable requirements occurred earlier than scheduled.
Early scheduled event/deliverable requirements with beneficial results for the government.
Management
Contractor management and/or Project Management were not able to fulfill contract/task performance requirements.
Contractor management and/or Project Management were able to fulfill contract/task performance requirements, but required Navy intervention.
Contractor management and/or Project Management caused fulfillment of contract/task performance requirements.
Contractor management and/or Project Management caused fulfillment of contract/task performance requirements and did so with actions/ideas that benefited the Navy beyond AQLs.
Contractor management and/or Project Management caused fulfillment of contract/task performance requirements and did so using actions/ideas that greatly benefited the Navy beyond the AQLs.
Regulatory Compliance
Lack of regulatory compliance resulted in the Navy receiving a notice of non-compliance or violation.
Lack of regulatory compliance threatened the Navy’s compliance or placed the Navy at risk of non-compliance or violation.
Complied with Regulations and Codes.
Exceeded Regulatory Compliance requirements to the benefit of the Navy.
Exceeded Regulatory Compliance requirements such that it greatly benefited the Navy’s mission and/or relationship with Regulatory Agency.
Safety
Loss time incidents occur without reporting MISHAP; demonstrated blatant disregard for safety of employees.
Required excessive safety oversight and failed to fully implement EM-385-1-1.
Complied with EM 385-1-1 and contract requirements regarding safety.
Contractor management and employees take active role in identifying, preventing and reporting safety mishaps, near misses, and good catches.
Safety Program exceeds expectations to the point where it greatly benefited the Navy’s mission.

File details come from the government source that posted it. Updated .