Attachment_J.F-1,_Schedule_of_Deliverables.pdf

PDF 28 KB Posted

Attached to
LTMOM
Solicitation number
N4425519R6006
Issued by

About this file

This document outlines a schedule of deliverables required under Solicitation Number N4425519R6006 for long-term monitoring and maintenance services. The contractor must submit various plans and reports to the Procuring Contracting Officer, Contracting Officer's Representative, Resident Program Manager, and Native Tribal Representatives on a recurring basis. Key deliverables include a corporate health and safety plan, accident prevention plans, site health and safety plans, quality management plans, sampling and analysis plans, laboratory quality plans, quality control reports, production reports, progress reports, and an annual awarded SLINs report. Submission deadlines range from within five days of award to monthly, weekly, and annually throughout the contract period. The schedule also requires miscellaneous deliverables as specified in individual task orders.

View the file

Other files

File Type Posted
N4425519R6006_N4425519R6006_Amendment_0008.pdf PDF
N4425519R6006_Attachment_J.B-1_BidSked-rev.4.xlsx XLSX spreadsheet
N4425519R6006_N4425519R6006_Amendment_0007.pdf PDF
N4425519R6006_Attachment_J.C-1_PWS_rev.2.pdf PDF
N4425519R6006_Attachment_J.B-1_BidSked_rev.3.xlsx XLSX spreadsheet
N4425519R6006_N4425519R6006_Amendment_0006.pdf PDF
N4425519R6006_PWS_Attachment_G,_Adak_rev.1.doc DOC document
N4425519R6006_PWS_Attachment_H,_Adak_rev.1.doc DOC document
N4425519R6006_N4425519R6006_Amendment_0005.docx DOCX document
N4425519R6006_PWS_Attachment_M__JPHC-NHB_rev.1.doc DOC document
N4425519R6006_PWS_Attachment_K.2_NBK-Brem.xlsx XLSX spreadsheet
N4425519R6006_PWS_Attachment_K_NBK-Brem_rev.1.docx DOCX document
N4425519R6006_PWS_Attachment_J_Barrow_rev.1.docx DOCX document
N4425519R6006_PWS_Attachment_F_NAS_Whidbey_rev.1.docx DOCX document
N4425519R6006_PWS_Attachment_I_Pt._McIntyre_rev.1.doc DOC document
N4425519R6006_Attachment_J.B-1_BidSked_rev.2.xlsx XLSX spreadsheet
N4425519R6006_N4425519R6006_Amendment_0004.pdf PDF
N4425519R6006_Attachment_J.C-1_PWS_rev.1.docx DOCX document
N4425519R6006_N4425519R6006_Amendment_0003.pdf PDF
N4425519R6006_Attachment_J.G-1,_Proposal_Template.xlsx XLSX spreadsheet
N4425519R6006_Attachment_J.B-1_Sub_Line_Item_Numbers_Bid_Schedule_rev.1.xlsx XLSX spreadsheet
N4425519R6006_N4425519R6006_Amendment_0002.pdf PDF
Website Link —
N4425519R6006_N4425519R6006_Amendment_0001.pdf PDF
N4425519R6006_Attachment_J.L-1,_Pre-Proposal_Inquiry_rev.1.pdf PDF
N4425519R6006_PPC_Attendance_and_Slides.pdf PDF
N4425519R6006_Attachment_J.B-1_Sub_Line_Item_Numbers_(SLINs)_Bid_Schedule.xlsx XLSX spreadsheet
N4425519R6006_Attachment_J.M-3,_Past_Performance_Questionnaire.pdf PDF
N4425519R6006_Attachment_J.M-1,_Relevant_Contract_Experience_Data_Sheet.pdf PDF
N4425519R6006_Attachment_J.L-1,_Pre-Proposal_Inquiry.pdf PDF
Attachment_J.M-2,_Safety_Past_Performance.pdf PDF
Attachment_J-1,_SCA_Wage_Determintation.pdf PDF
Attachment_J.B-1_Sub_Line_Item_Numbers_(SLINs)_Bid_Schedule.pdf PDF
N4425519R6006_N4425519R6006.pdf PDF
N4425519R6006_Attachment_J.C-1,_Performance_Work_Statement.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N44255-19-R-6006, ATTACHMENT J.F-1

Schedule of Deliverables

Section/Spec Item Report Title Quantity Submit to

Due Date/Frequency

J.C-1 C2.2.4b Key Person Resumes 1 ea PCO/COR Within 5 days of Award

JC-1 C1.2.1 b Work Plans As required RPM/NTR Per TO. Approved prior to TO mobilization

JC-1 C4.9.1, UFP-QS

(reference m)

Contractor Quality Management Plan 1 ea PCO/COR 30 days after contract start and 10 days after prior to any changes

JC-1 C4.9.1, UFP-QS

and UFP-QAPP (reference m, n)

Contractor Site Specific Quality Control Management Plan

As required by task order

COR/RPM/NTR Per TO. Approved prior to TO mobilization

JC-1 C4.9.1, UFP-QS

and UFP-QAPP (reference n)

Contractor Quality Assurance Project Plan

1 PCO/COR 30 days after contract start and 10 days after prior to any changes

JC-1 C4.9.1, and

C4.11, UFP-QAPP

(NAVFAC SOPs and reference n)

Project-specific Quality Assurance Project Plan (Sampling and Analysis Plan)

As required by task order

COR/RPM/NTR Per TO. Approved prior to TO environmental sampling event

JC-1 C4.9.1, UFP-QS

(reference m)

Laboratory Quality Management Plan As required COR/RPM Per TO. Approved prior to TO environmental sampling event

JC-1 C4.9.1,

Declaration of Conformance PWS Attachment B

Laboratory Declaration of Conformance to DoD QSM

As required COR/RPM Per TO. Approved prior to TO environmental sampling event

JC-1 C4.9.2 Contractor Quality Control Report 1 ea COR/RPM/NTR Weekly (Daily for construction1 work)

JC-1 C4.9.2 Contractor/Production Report 1 ea COR/RPM/NTR Weekly (Daily for construction1 work)

JC-1 C5, 29 CFR

1910.1200

Safety Data Sheet (SDS)and Material Submittals. Material Inventory Sheet.

1 ea RPM/NTR Upon Request

JC-1 C5.1.1 Corporate Health and Safety Plan 1 ea /COR 30 days following award/annually/and 15 days following change in work condition

N44255-19-R-6006, ATTACHMENT J.F-1

Schedule of Deliverables

Section/Spec Item Report Title Quantity Submit to

Due Date/Frequency

JC-1 C5.1.2, JC-1

C5.1.4f, (reference h)

Accident Prevention Plan including Activity Hazard Analysis

As required by task order

RPM/NTR/COR Per TO. Approved prior to TO mobilization and 15 days following change in work condition or as required

JC-1 C5.1.3a Site Health and Safety Plan As required by task order

RPM/NTR/COR Per TO. Approved prior to TO mobilization and 15 days following change in work condition or as required

JC-1 C5.1.4f, (reference h)

Activity Hazard Analysis As required by task order

RPM/NTR/COR Per TO. Approved prior to TO mobilization and 15 days following change in work condition or as required

JC-1 C5.3.1 Preconstruction Meeting Minutes 1 ea Meeting attendees &

RPM/NTR/COR

Within three working days

JC-1 C5.3.2 (reference h)

Safety Meeting Minutes 1 ea Meeting attendees including NTR

Within three working days

JC-1 C7.3 (reference g)

Progress Reporting 1 ea RPM/NTR/COR Monthly with assigned TO

JC-1 C7.3.c Annual Awarded SLINs Report 1 ea PCO/COR Annually 30 days following the end of the base or option contract years

(Reserved) GFP Lost, Damaged, Destroyed Report 1 ea Property Administrator

5 days from discovery

(Reserved) GFP Annual Inventory 1 ea Property Administrator

31 October each Year

TO specific Misc RPM/NTR As required per TO

1Construction work is defined as work that requires excavation, new building, lifting equipment, heavy equipment, elevation more than six feet above ground surface, etc. (examples include: well drilling, push probes, pipe laying, building repair/construction, etc.)