This is a Scope of Work document for Phase IV Barracks repair project at Marine Corps Air Station Beaufort, South Carolina, covering Buildings 1245 and 1246 (project numbers BE1813M and BE1814M). The project encompasses 28,531 square feet across both buildings, which were constructed in 2001 and represent part 2 of a four-building repair complex, following completion of part 1 repairs on Buildings 1244 and 1247.

The scope of work includes ten major work categories: (1) extensive shower wall repairs requiring removal of 11,000 square feet of water-resistant gypsum board, repair of 2,880 linear feet of rusted metal framing, installation of cementitious backer board and solid surface shower panels per Navy specifications, and installation of 120 terrazzo shower pans with curbs; (2) infill of 1,800 square feet of gypsum wallboard in kitchenettes behind cabinets; (3) replacement of 1,960 linear feet of exterior guardrails on second and third deck walkways; (4) replacement of 28,000 square feet of metal roof deck per current structural code standards with rigid insulation and six-inch increased fascia sizing; (5) repair of 800 square feet of ceiling offset from misaligned pre-tensioned concrete attic floor slabs; (6) installation of 72 new 14-gauge metal exterior door frames with door slabs and hardware (hinges, keypad locks, kick plates, weatherstripping, thresholds, closers) with factory priming and two-coat field painting; (7) moving, storing, and reinstalling furniture and appliances from the air station supply warehouse; (8) fire alarm control panel upgrades including two PMI-RC panels, replacement of secondary components and annunciators, and system programming by two technicians for full building communication; (9) removal and replacement of 120 window blinds; and (10) pavement milling and resurfacing of parking lots and basketball court area (500 square yards) with restriping of approximately 7,500 linear feet. All work will be performed and installed per manufacturer's instructions.

View the file

Other files

File Type Posted
Amendment 0011 PPI response.pdf PDF
Amendment 0011.pdf PDF
Amendment 0010.pdf PDF
Amendment 0009.pdf PDF
Amendment 0009 PPI Responses.pdf PDF
2501 2026.08.25 Revised Documents for PPIs.pdf PDF
Amendment 0008.pdf PDF
2501 2026.08.25 Continuation Sheet.pdf PDF
PI B332 RFP - Revised FP Sheets.pdf PDF
Amendment 0007.pdf PDF
_CIVIL.B332 RFP Revised.pdf PDF
Amendment 0006 PPI Responses.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0005 PPI Responses.pdf PDF
Amendment 0004.pdf PDF
Beaufort Site Visit Sheet 1245 and 1246.pdf PDF
Parris Island B332 Site Visit Sheet.pdf PDF
Amendment 0003 Revised Price Proposal Schedule.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0002 Revised Price Proposal Schedule.pdf PDF
Attachment K - PI2501M Bldg 332.pdf PDF
Attachment J6 - 18918-18954.pdf PDF
Attachment J7 - Bldg 1244-1248 Fl-Dim-Evac.pdf PDF
Attachment J5 - 18619-18954-ASBUILT.pdf PDF
Attachment J3 - 13943-14077Part1.pdf PDF
Amendment 0001.pdf PDF
Attachment J1 - Drawings 1246.pdf PDF
Attachment J2 - Drawings 1245.pdf PDF
Attachment J4 - 13943-14077Part2.pdf PDF
Attachment D - Davis-Bacon Act WD SC20260008.pdf PDF
N4008526R0187 General Requirements.pdf PDF
Attachment G - Contractor Base Access Request Form Bldg 1245 and 1246.docx DOCX document
Attachment I - MCRD VISIT REQUEST.xlsx XLSX spreadsheet
Attachment C - Price Proposal Schedule.pdf PDF
Attachment H - SECNAV 5512.pdf PDF
Attachment F - PIEE Vendor Access Instructions.pdf PDF
Attachment E - Pre-Proposal Inquiry Log.xlsx XLSX spreadsheet
Attachment A - Drawings and Specs Bldg 1245 and 1246.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work Phase IV Barracks, Buildings 1245 & 1246 BE1813M and BE1814M

MCAS BEAUFORT, SC

All work listed below will be provided, and installed, per manufacturer’s instrucƟons.

PROJECT INFORMATION

This project is located at MCAS Beaufort, SC at the corner of Geiger Boulevard and S. Kavieng Street.

The current square footage is 28,531 SF for buildings 1245 and 1246. These buildings were built in 2001 and are two of four structures within the Phase IV Barracks complex. Buildings 1244 and 1247 are currently being repaired under the BE1818M repair project as part 1. Part 2 is the repairs of buildings 1245 and 1246. Considering issues that have occurred in the Part 1 phase of repairs, the following list has been developed.

PROJECT SCOPE

From the list of items developed the following items will likely to be discovered in these buildings as well and need to be addressed. The quantities below are for one building and must be doubled for to account for both buildings.

1. The shower walls require major repairs:

• Remove 11,000 SF of water-resistant gypsum wall board.

• Remove and/or repair 2,880 LF of rusted/missing metal framing.

• Install 11,000 SF of cemenƟƟous backer board or an equal product.

• InstallaƟon of 11,000 SF of solid surface shower wall panels per FC 4 721 10N Navy and

Marine Corps Unaccompanied Housing. Include 2 recessed soap and shampoo solid surface shelves for each shower (120 Total).

• Install 120 36” x 36” solid terrazzo shower pans with curb, or an equal product.

2. Gypsum was not installed in the kitcheneƩe, behind the cabinets. Infill 1,800 SF of gypsum wallboard tape, mud, and paint to match new wall paint.

3. Replace 1,960 LF of exterior guardrails on the walkways of the second and third decks.

4. Replace 28,000 SF of the metal roof deck, per current structural (hurricane and seismic) code, and install rigid insulaƟon on top of the roof deck. This will require the new fascia size to increase by 6”.

5. Repair 800 SF of offset in the ceiling from misaligned pre-tensioned concrete aƫc floor slabs.

This needs to be repaired to provide a uniform, smooth ceiling. This occurs in every room on the third deck.

6. New exterior door slabs are included in the current scope of work, but installaƟon is difficult because the exisƟng frames are not plumb, and hinges are not lining up. Include 72 14Ga metal frames to the 72 with new exterior door slabs, provide pre-bored for hardware holes and new hardware (Hinges, keypad lock set, kick plates, weatherstripping, threshold, and closers). Door and frames will be factory primed, and field painted (2 coats).

7. This project will included the moving, storing, and reinstalling of furniture from each room.

Currently the furniture and appliances are stored in the air sta ons supply warehouse.

8. The current fire alarm control panels (FACP) are outdated, and an update was not included in this project. This project will require an upgrade and all buildings in this complex need to communicate. The panel upgrade will include: 2 PMI-RC panels, replace all secondary components (pulls, lights, etc.), replace all annunciators, and provide system programming for both buildings (2 technicians needed for programming).

9. Remove 120 exisƟng window blinds and install 120 new blinds.

10. Mill 1” of paving on the parking lots and basketball court area (500SY), install 1” thick of new wearing course (500SY), restripe approximately 7500 LF.