Attachment I - Price Proposal Schedule.xlsx

XLSX spreadsheet 38 KB Posted

Attached to
DESIGN-BUILD (DB) BARRACKS INITIATIVE (PACKAGE #1), MARINE CORPS AIR STATION (MCAS) CHERRY POINT, NC
Solicitation number
N4008526R0053
Issued by

About this file

This is a Price Proposal Schedule for a Design-Build Barracks Initiative project at Marine Corps Air Station Cherry Point, North Carolina. The solicitation (N4008526R0053) seeks proposals for the demolition of five Bachelor Enlisted Quarters buildings and construction of replacement billeting facilities with 720 two-person rooms to support 1,440 personnel. The total evaluated price includes Base Bid Item 0001 (design and construction of replacement barracks), demolition of existing facilities, removal and disposal of contaminated soils, and treatment of construction dewatering effluent, along with multiple unit-priced options for additional contaminated soil work, geotechnically unsuitable soil remediation, asbestos-containing material removal, and an Electronic Security System (ESS) option. All pricing must be entered in the yellow-highlighted cells with a maximum of two decimal places.

Award will be evaluated on the total proposed price for all line items (0001-0010), combining the base bid and all options in accordance with FAR 52.217-5. The Government reserves the right to award Option Item 0002 within 120 days of contract award and Unit Price Option Items 0003-0009 within 365 days. The ESS Option Item 0010 is exempt from the 365-day restriction and must be awarded at least six months prior to project completion, with contractors permitted to propose a Handling and Administration Rate not to exceed 5% of the ESS budget. Proposals must be valid for 120 days from receipt, all amendment acknowledgments must be included, and all applicable pricing cells must be completed or the proposal will be rejected as non-responsive. Performance bonds must reflect 100 percent of the aggregate amount of all items if options are exercised, with additional bonding required at the time of ESS option award.

View the file

Other files

File Type Posted
N4008526R0053 Site Visit Log.pdf PDF
Amendment 0010.pdf PDF
AMENDMENT 0009.pdf PDF
Amendment 0008 - D16 - Ladder 251 - Pierce Turning Performance Analysis.pdf PDF
AMENDMENT 0008.pdf PDF
Amendment 0008 - C9 - Storm Drain Replacement Exhibit.pdf PDF
Amendment 0008 - C8 - Cherry Point Site 1 Sanitary Plan.pdf PDF
Amendment 0008 - D15 - ITG A2L Refrigerants For Navy and MC Facilities.pdf PDF
Amendment 0008 PPI Responses.pdf PDF
AMENDMENT 0007.pdf PDF
Amendment 0007 PPI Responses.pdf PDF
AMENDMENT 0006.pdf PDF
Amendment 0006 PPI Responses.pdf PDF
AMENDMENT 0005.pdf PDF
Amendment 0005 B2 Hazardous Materials Report Bldgs 4201 4294 4295 4296 4312.pdf PDF
Amendment 0005 Wage Determination NC20260018 05 18 26.pdf PDF
Amendment 0005 D14 - Excerpt from Cherry Point Area Development Plan.pdf PDF
AMENDMENT 0004.pdf PDF
AMENDMENT 0003.pdf PDF
Attachment H - 1895345 MCAS CP DBRFP VOL3of4.pdf PDF
Attachment F - Small Business Participation Commitment Document (SBPCD).docx DOCX document
CJA ML-25-03 Class FRCS Cherry Point - Redacted.pdf PDF
Attach H - MCASCP Sites Subsurface Soil Geotech Report.pdf PDF
Attachment H - 1895345 MCAS CP DBRFP VOL1of4.pdf PDF
Attachment G - SBSP.docx DOCX document
Attachment E - Historical Small Business Utilization.docx DOCX document
Attachment H - 1895345 MCAS CP DBRFP VOL4of4.pdf PDF
Attachment H - 1895345 MCAS CP DBRFP VOL2of4.pdf PDF
AMENDMENT 0002.pdf PDF
AMENDMENT 0001 Attachment C - Experience Project Data Sheet.docx DOCX document
AMENDMENT 0001 Pre-Proposal Inquiries.pdf PDF
AMENDMENT 0001.pdf PDF
Attachment C - Construction and Design Experience Project Data Sheet.docx DOCX document
N4008526R0053.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary & Bid Notes

MARINE CORPS BARRACKS INITIATIVEEnclosure (1)
OFFEROR:Contractor's Name Here
DATE:Date Here

The offeror shall enter prices and rates in the yellow highlighted cells. Price entries shall be limited to 2 decimal places. See Definitions tab for questions relating to specific line items.

Total Evaluated Price$ 87,738.00
Base Bid Item 0001$ - 0
Option Item 0002$ - 0
Unit Price Option Items 0003-0009$ - 0
ESS Option Item 0010$ 87,738.00
GENERAL BID NOTES
a.Award will be evaluated on the total proposed price for Line Items 0001-0010; base price and the sum of all options.

b. The Government reserves the unilateral right to award Line Items 0002 to the Contractor at the proposed price within 120 calendar days after the contract award and in accordance with all bid notes. The Government reserves the unilateral right to award Line Items 0003-0009 to the Contractor at the proposed price within 365 days and in accordance with all bid notes.

c. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s), Line Items 0002-0010 to the total price for the Base Bid, Line Item 0001. Evaluation of options will not obligate the Government to exercise the Option(s). (FAR 52.217-5).

d. In accordance with FAR 52.217-7; Option for Increased Quantity-Separately Priced Line Item (Mar 1989), the Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

e. The Government may reject an offer as non-responsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

f. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.

g. If Line Items 0002-0009 are exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all items.

EVALUATION OF PRICE
In accordance with the Price Factor, the Total Evaluated Price will be in accordance with FAR 52.217-5 Evaluation of Options, which includes the total of Base Item(s), all Option Items, and the HAR Amount of the ESS item(s).
The Government reserves the right to verify the calculations in this spreadsheet. In the event that an error in the Contractor's calculations are found, the Government will use the actual amounts entered in for the Base Item, the HAR Percentage, and the Option Item(s) (if applicable) as the intended price. The Government will use these proposed amounts to determine the Total Evaluated Price.
All applicable cells must be completed. Failure to propose on all items shall result in proposal being rejected as nonresponsive. Failure to acknowledge all amendments may result in proposal being rejected as nonresponsive.

SUBMITTED PROPOSALS SHALL BE VALID FOR 120 DAYS FROM THE DATE OF RECEIPT.

THIS OFFEROR ACKNOWLEDGES RECEIPTS OF AMENDMENTS TO THE SOLICITATION:

AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________

OFFEROR NAME: DUNS:

STREET ADDRESS: EIN (TAX ID):

CITY, STATE, ZIP CODE:

EMAIL ADDRESS: PHONE:

SIGNATURE OF PERSON AUTHORIZED TO SIGN OFFER:

SIGNATURE:

PRINTED NAME: DATE:

**************************************************************************************************************
SURETY COMPANY:PHONE:

SURETY POC/BONDING AGENT:

EMAIL ADDRESS:

Base Items Cherry Point

MARINE CORPS BARRACKS INITIATIVEEnclosure (1)
OFFEROR:Contractor's Name Here
DATE:Date Here

The offeror shall enter prices and rates in the yellow highlighted cells. Price entries shall be limited to 2 decimal places. See Definitions tab for questions relating to specific line items.

CLINBASE BID ITEMS
00010001AFirm Fixed Price for a DESIGN-BUILD PROJECT, (FY26) P273RR REPLACE BEQ 4295, P292RR REPLACE BEQ 4201, P293RR REPLACE BEQ 4294, P294RR REPLACE BEQ 4296, P295RR REPLACE BEQ 4312, MCAS Cherry Point, includes design and construction of barracks and all related Management, supervision, quality control, labor, equipment, and materials to provide a complete and usable facility. Price includes all incidental related work to support the design and construction including permits, utility connection fees, taxes, bond cost, overhead and profit, complete in accordance with the RFP and all Amendments, but not including work indicated or specified to be provided under any other bid items.$ - 0
Sub-Total PriceUnit of Measure
Design Consultant Service$ - 0LS
General Conditions$ - 0LS
PRIMARY FACILITIES
Substructure$ - 0
Building Shell$ - 0
Interiors$ - 0
Conveying$ - 0
Plumbing$ - 0
HVAC$ - 0
Fire Protection$ - 0
Speciality Construction$ - 0
Electrical$ - 0
Equipment$ - 0
SUPPORTING FACILITIES
Site Preparations$ - 0
Site Improvements$ - 0
Civil/Mechanical Utilities$ - 0
Electrical Utilities$ - 0
Other Site Construction$ - 0
DescriptionQuantityUnit of MeasureUnit PricePrice
0001BDemolition of Existing Facilities: Firm Fixed Price for the demolition and hazardous materials remediation of barracks and all related Management, supervision, quality control, labor, equipment, and materials to provide a complete and usable facility. Price includes all incidental related work to support the design and construction including permits, utility connection fees, taxes, bond cost, overhead and profit, complete in accordance with the RFP and all Amendments, but not including work indicated or specified to be provided under any other bid items.5EA$ - 0

0001C Removal and Disposal of Contaminated Soils: Firm Fixed Price for sampling, removal and disposal of contaminant impacted excavation spoils (including, but not limited to, metals, petroleum, PAHs, and PFAS) and replacement with imported Structural Fill. Price includes all incidental related work to support the design and construction including permits, utility connection fees, taxes, bond cost, overhead and profit, complete in accordance with the RFP and all Amendments, but not including work indicated or specified to be provided under any other bid items. 60,000 TON $ - 0

0001D Contaminant Impacted Construction Dewatering Effluent: Firm Fixed Price for handling, testing and treatment of contaminant impacted (including, but not limited to, metals, petroleum, PAHs, and PFAS) construction dewatering effluent. Price for providing work in connection with labor, material, equipment, permits, transportation, spend treatment media characterization, transport, and disposal, and supervision in accordance with the RFP, but excluding work provided in another line item. Discharge quantities in gallons must be certified and approved by the Contracting Officer. 2,000,000 GAL $ - 0

TOTAL CLIN 0001 (A-D) $ - 0

OPTION ITEMSDescriptionQuantityUnit of MeasureUnit PricePrice
0002Option Item for CLIN 0001 - Terrazzo Flooring in lieu of existing floor: FFP (Lump Sum) includes the difference of cost in all labor, equipment, and materials to provide terrazzo flooring in lieu of existing flooring for the following rooms of each BEQ building: 002 Lobby, 003 Circulation Corridor, 005 Elevator Lobby, 103 Duty Desk, 106 Multipurpose, 108 MCX24, and 109 Centralized Kitchen. This work must be performed in accordance with the RFP and all amendments, but not including work indicated or specified to be provided under any other line items.EA$ - 0

TOTAL OPTION ITEMS (0002) $ - 0

&"Aptos"&12&K008000 UNCLASSIFIED&1#_x000D_

_x000D_&1#&"Aptos"&12&K008000 UNCLASSIFIED

Unit Price Options

MARINE CORPS BARRACKS INITIATIVEEnclosure (1)
OFFEROR:Contractor's Name Here
DATE:Date Here

The offeror shall enter prices and rates in the yellow highlighted cells. Price entries shall be limited to 2 decimal places. See Definitions tab for questions relating to specific line items.

Option ItemsDescriptionQuantityUnit of MeasureUnit PricePrice
0003FFP (Unit price) for contaminant impacted soil: Unit Price for providing all work in connection with excavation, handling, hauling, temporary stockpiling, sampling, analysis and disposal of contaminant (including, but not limited to, petroleum, PAHs, and metals) impacted excavation spoils (Not PFAS/POL) media at a licensed facility, complete in accordance with the RFP, but excluding work provided in another Priced line item. Includes all labor, equipment, and materials.8,000[TON]

0004 FFP (Unit Price) for Geotechnically Unsuitable Soil: Unit Price for providing for undercut of geotechnically unsuitable subgrade soils and replacement with imported Structural Fill in accordance with the RFP, but excluding work provided in another line item. Includes all labor, equipment, and materials. Disposal is included in CLIN 0003 and 0006. 7,000 [TON]

0005 FFP (Unit Price) for contaminant impacted construction dewatering effluent: Unit Price for handling, testing and treatment of contaminant impacted (including, but not limited to, metals, petroleum, PAHs, and PFAS) construction dewatering effluent. Price for providing work in connection with labor, material, equipment, transportation, spend treatment media characterization, transport, and disposal, and supervision in accordance with the RFP, but excluding work provided in another line item. Discharge quantities in gallons must be certified and approved by the Contracting Officer. 500,000 [GAL]

0006 FFP (Unit Price) for removal and disposal of contaminated soils: Unit Price for sampling, removal and disposal of contaminat impacted excavation spoils (including, but not limited to, metals, petroleum, PAHs, and PFAS), complete in accordance with the drawings and specifications, but excluding work provided in another line item. 8,000 [TON]

0007 FFP (Unit Price) for replacement of contaminated soils: Unit Price for replacement of contaminated excavated soils with imported Structural Fill, complete in accordance with the drawings and specifications, but excluding work provided in another line item. Disposal is included in CLIN 0003 and 0006. 11,000 [TON]

0008 FFP (Unit Price) for removal of 6" Asbestos Containing Material (ACM) Pipe Insulation: Unit Price for providing for removal and disposal of Asbestos Containing Material Pipe Insulation in accordance with the RFP, but excluding work provided in another line item. Includes all labor, equipment, and materials. 1,000 [LF]

0009 FFP (Unit Price) for removal of 18" OD Buried Utility insulated with ACM: Unit Price for providing for removal and disposal of buried utility insulated with ACM in accordance with the RFP, but excluding work provided in another line item. Includes all labor, equipment, and materials. 1,000 [LF]

TOTAL OPTION ITEMS (0003 - 0009) $ - 0

ESS

MARINE CORPS BARRACKS INITIATIVEEnclosure (1)
OFFEROR:Contractor's Name Here
DATE:Date Here

The offeror shall enter prices and rates in the yellow highlighted cells. Price entries shall be limited to 2 decimal places. See Definitions tab for questions relating to specific line items.

ESS Item 0010
(ESS OPTION)ELECTRONIC SECURITY SYSTEM (ESS) EQUIPMENT for:

Base Item 0001

Price for providing Electronic Security System (ESS) equipment, testing, and associated training, but excluding work provided in another Priced line item. Includes all labor, equipment, and materials.Unit of MeasureSubtotalTotal Price
EA$ 87,738.00$ 87,738.00
HAR Percent (NTE 5%)
TOTAL EVALUATED PRICE$ 87,738.00
Electronic Security System (ESS) Option
1) The total estimated budget amount for ESS Options has been identified to provide Offerors with the projected magnitude of effort for ESS. The total estimated budget amount for the ESS Option includes the actual cost of the ESS including freight, insurances, taxes and installation charges and the Prime Contractor's proposed Handling and Administration Rate (HAR). The Total ESS Budget Amount (Estimated) shall be entered by the Government. The ESS Budget Amount is only an estimated amount. The contractor will be given the final budget amount to design the ESS package to during the design phase for the ESS.
2) Offerors may propose a Handling and Administration Rate (HAR) for the ESS Option not to exceed 5%. This fee will account for all administrative costs, overhead, administration of subcontracts, profit, and any other costs associated with and related to the coordination and processing of the procurement and installation of ESS. The proposed HAR percentage will be incorporated into the contract/task order award and will not be adjusted regardless of fluctuations from the estimated budget amount for ESS. The proposed HAR is a fixed rate.
3) If awarded, this line item will be funded separately after completion of ESS design review, acceptance of ESS package, and receipt of appropriate funding. The design for the ESS itself is performed under the Base Item or other applicable option item. See performance specifications for details on the ESS Option.
4) The Government is not obligated to award the ESS line items. Should the Government choose to award the ESS options, the line item will be awarded as a negotiated modification to the contract/task order. The contractor's proposed HAR will be applied to all vendor/supplier costs for the ESS option.
5) The ESS Option Item (and any Specialty Equipment) are exempt from the NPGI 17.202(a)(ii) restriction to award options within 365 days of contract award. The ESS option shall be awarded at least six months prior to the contract/task order completion date. A minimum of six months is required for the contractor to purchase, deliver and install the ESS without impacting the overall completion date of the project. The contractor’s schedule should assume the award of the ESS option will occur. No schedule extensions shall be granted if the Option is awarded at least six months prior to the contract/task order completion date. If the Government decides to negotiate and award the ESS option with less than six months prior to the contract/task order completion date, the contractor may be entitled to a contract/task order extension and extended field overhead. A contract/task order extension and extended field overhead will only be granted in those cases where the prime contractor demonstrates that sufficient lead time for the ESS is not available and the Government’s award of the option is in the last six months of the contract/task order.
6) Performance & Payment Bonds -

a. No Bond Requirement for ESS at Time of Construction Contract/Task Order Award:

FAR 28.102-1(a) requires that performance and payment bonds be included in all construction contracts/task orders exceeding the Simplified Acquisition Threshold (SAT), except under the conditions listed. Since the ESS option is not part of the original contract/task order award, the Construction Contractor will not be required to secure bond for the ESS at the time the basic contract/task order is awarded.

b. Additional Bond at ESS Option Award Award: FAR 28.102-2(d) requires the Government to secure additional bond from the Construction Contractor for any contract/task order price increases. Therefore, an increase to the original contract/task order bond is required at the time of the ESS Option award. The increased cost of the bond must come from the ESS funding source and is not a part of the Construction Contractor's HAR.

c. Bonds Required by the Construction Contractor: If the Construction Contractor requires bonding from the ESS subcontractor(s), the cost must be covered in the Construction Contractor's HAR.

CLINs 0010 (ESS Options) cannot be awarded without CLIN 0001 (Base Bid) being awarded.

&"Aptos"&12&K008000 UNCLASSIFIED&1#_x000D_

_x000D_&1#&"Aptos"&12&K008000 UNCLASSIFIED

Definitions

Work ItemWork Description
General ConditionsGeneral Conditions includes the costs and activities, aside from direct labor and materials, required to manage and complete the project. This includes project management personnel, temporary site facilities like trailers and utilities, equipment rentals, security, insurance, permits, and site cleanup but excluding work provided in another line item
SubstructureSubstructure includes foundations, basement construction and other associated construction complete to the 5-foot line outside of the building in accordance with the RFP, but excluding work provided in another line item
ShellShell includes Superstructure, Exterior Enclosure, Roofing and other associated construction in accordance with the RFP, but excluding work provided in another line item
InteriorsInteriors includes Interior Construction, Stairs, Interior Finishes and other associated construction in accordance with the RFP, but excluding work provided in another line item
Specialty ConstructionSpecial Construction and Demolition includes Special Structures, Special Construction Systems, Special Facilities, Building Elements Demolition, Hazardous Components Abatement and other associated construction in accordance with the RFP, but excluding work provided in another line item
EquipmentEquipment includes Commercial Equipment, Fixed Furnishings and Movable Furnishings in accordance with the RFP, but excluding work provided in another line item
Site PreparationSite Preparation includes Site Clearing, Site Demolition, Site Earthwork and Hazardous Waste Remediation outside the facility 5-foot line, complete in accordance with the RFP, but excluding work described in another line Item.
Site ImprovementsSite Improvements include Roadways, Parking Lots, Pedestrian Paving, Site Development, and Landscaping outside the facility 5-foot line, complete in accordance with the RFP, but excluding work described in another line Item.
Civil/Mechanical UtilitiesSite Civil / Mechanical Utilities includes Water Supply, Sanitary Sewer, Storm Sewer, Heating Distribution, Cooling Distribution, Fuel Distribution and Other Site Mechanical Utilities outside the facility 5-foot line, complete in accordance with the RFP, but excluding work described in another line Item.
Electrical UtilitiesSite Electrical Utilities includes Electrical Distribution, Site Lighting, Site Communications & Security and Other Site Electrical Utilities outside the facility 5-foot line, complete in accordance with the RFP, but excluding work described in another line Item.
Other Site ConstructionOther Site Construction includes Service and Pedestrian Tunnels and Other Site Systems & Equipment outside the facility 5-foot line, complete in accordance with the RFP, but excluding work described in another line Item.
Electronic Security System (ESS)ESS includes, but is not limited to, Intrusion Detection System (IDS), Access Control System (ACS), and Video Systems complete in accordance with the RFP. Equipment includes items such as Premise Control Units (PCU), central processing units, field panels, sensors, card readers, keypads, cameras, switches, video recorders, workstations, and the communication cabling connecting these devices together. Include the price for supporting, permanent infrastructure under the Base Price. Interior supporting infrastructure includes items such as conduit, junction boxes, electronic door strikes, door-hardware, mounting hardware, and power connections. Exterior supporting infrastructure includes items such as exterior duct banks, manholes, utility poles, utility connections, and power connections.

&"Aptos"&12&K008000 UNCLASSIFIED&1#_x000D_

_x000D_&1#&"Aptos"&12&K008000 UNCLASSIFIED

File details come from the government source that posted it. Updated .