Amendment 0008 - C9 - Storm Drain Replacement Exhibit.pdf

PDF 2 MB Posted

Attached to
DESIGN-BUILD (DB) BARRACKS INITIATIVE (PACKAGE #1), MARINE CORPS AIR STATION (MCAS) CHERRY POINT, NC
Solicitation number
N4008526R0053
Issued by

About this file

This file is a Storm Drain Replacement Exhibit consisting of three technical drawings (sheets SD101, SD102, and SD103) prepared by Naval Facilities Engineering Systems Command (NAVFAC) for the FY 26 USMC Barracks 2030 project at Cherry Point Site 1 in Havelock, North Carolina. The drawings are dated 19 December 2025 and document the location, configuration, and specifications of storm sewer infrastructure requiring replacement.

The exhibits depict existing storm drain systems across the Naval Station Norfolk facility, including multiple subsurface storm drain manholes (SDMH #1-3, SSMH #2-7), catch basins (CB #10-23), and connecting pipe networks ranging from 4 inches to 24 inches in diameter using materials including PVC and reinforced concrete pipe (RCP). The drawings indicate rim elevations, invert elevations, and pipe specifications for each structure. Multiple concrete storm drains are noted for in-kind replacement based on available GIS data. The site plan encompasses three buildings (4197, 4198, 4294, 4295, 4296, 4311, 4312, 4313) with associated parking lots, sidewalks, and utility infrastructure. The drawings reference matchlines between sheets and provide north orientation, scale notation (1" = 20'), and key plan identifiers for cross-referencing with other design sheets in the overall project documentation.

View the file

Other files

File Type Posted
N4008526R0053 Site Visit Log.pdf PDF
Amendment 0010.pdf PDF
AMENDMENT 0009.pdf PDF
Amendment 0008 - D16 - Ladder 251 - Pierce Turning Performance Analysis.pdf PDF
AMENDMENT 0008.pdf PDF
Amendment 0008 - C8 - Cherry Point Site 1 Sanitary Plan.pdf PDF
Amendment 0008 - D15 - ITG A2L Refrigerants For Navy and MC Facilities.pdf PDF
Amendment 0008 PPI Responses.pdf PDF
AMENDMENT 0007.pdf PDF
Amendment 0007 PPI Responses.pdf PDF
Amendment 0006 PPI Responses.pdf PDF
AMENDMENT 0006.pdf PDF
AMENDMENT 0005.pdf PDF
Amendment 0005 B2 Hazardous Materials Report Bldgs 4201 4294 4295 4296 4312.pdf PDF
Amendment 0005 Wage Determination NC20260018 05 18 26.pdf PDF
Amendment 0005 D14 - Excerpt from Cherry Point Area Development Plan.pdf PDF
AMENDMENT 0004.pdf PDF
AMENDMENT 0003.pdf PDF
AMENDMENT 0002.pdf PDF
Attachment H - 1895345 MCAS CP DBRFP VOL3of4.pdf PDF
Attachment F - Small Business Participation Commitment Document (SBPCD).docx DOCX document
CJA ML-25-03 Class FRCS Cherry Point - Redacted.pdf PDF
Attach H - MCASCP Sites Subsurface Soil Geotech Report.pdf PDF
Attachment H - 1895345 MCAS CP DBRFP VOL1of4.pdf PDF
Attachment G - SBSP.docx DOCX document
Attachment E - Historical Small Business Utilization.docx DOCX document
Attachment I - Price Proposal Schedule.xlsx XLSX spreadsheet
Attachment H - 1895345 MCAS CP DBRFP VOL4of4.pdf PDF
Attachment H - 1895345 MCAS CP DBRFP VOL2of4.pdf PDF
AMENDMENT 0001.pdf PDF
AMENDMENT 0001 Attachment C - Experience Project Data Sheet.docx DOCX document
AMENDMENT 0001 Pre-Proposal Inquiries.pdf PDF
Attachment C - Construction and Design Experience Project Data Sheet.docx DOCX document
N4008526R0053.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MH 150

DI

TC

H ℄

T.

O.

B T.

O.

B

" P

VC

20" PVCS

S

CO

CO

D

" R

CP

" R

CP

1032 1033

1036 1037

BUILDING 4312

3 STORY BRICK

FFE: 22.24

CO

NC

. S

ID

EW

AL

K

CONC. SIDEWALK

E

ST

RE

ET

(A

SP

HA

LT

19 19

PARKING LOT

(ASPHALT)

BUILDING 4311

3 STORY BRICK

BUILDING AND PARKING LOT

DIGITIZED USING BING AERIAL

SATELLITE IMAGERY

BUILDING

ROOF LINE (TYP.)

SUPPORT

COLUMN (TYP.)

BUILDING 4197

3 STORY BRICK

FFE: 22.05

SD

SD

SD

W W

W W

STE

STE

UGE

STE

STE

ST

E

UGE

UGE

UGE

STE

STE

STE

STE

STE

UGE

SD

SD

UGE UGE UGE UGE UGE UGE UGE

UGC UGC UGC UGC UGC

UGE

STE

STE

STE

STE

STE

STE

STE

W W W W W W W W W W W

SAN SAN SAN

SAN SAN

SD

SD

SD

X

X X X X

X

X X X

X X

X

X

X

X X X

X

SSMH #2

3RD AVE.

U G

C U

G C

U G

C

UGC (BY RECORD)

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E

U G

E U

G E

UGE UGE UGE UGE UGE

W W

W W

W W

W SD SD SD SD SD

SAN SAN

SA

N

SA

N

SA

N

SA

N

" P

VC

ST

E

ST

E

ST

E

ST

E

STE

STE

ST

E

ST

E

ST

E

ST

E

ST

E

ST

E

CHAIN LINK FENCE (HT. 6')

MH 283

SD (BY RECORD)

22.09

21.21

21.56

21.71

21.72 21.77

21.85

21.89

21.78

21.7221.84

21.71 21.76

18.6

18.5

18.7

18.7

18.9

SSMH #3

SDMH #1

SD SD

SD

SD

SD

SD

SD

CONCRETE STORM DRAIN TO REPLACED

IN KIND(STORM SEWER SHOWN BASED

ON AVAILABLE GIS DATA)

CONCRETE STORM DRAIN TO REPLACED

IN KIND (STORM SEWER SHOWN BASED

ON AVAILABLE GIS DATA)

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

N A

V

FA

C D

C C

O R

E N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

C H

E R

R Y

P O

IN

T

S

IT

E

H A

V E

LO

C

K , N

C

FY

U

S M

C B

A R

R A

C K

S

1890969

N/A SDP KJK

AS NOTED

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

DES DRW

M A

R K

D E

S C

R

IP

TI

O

N D

A

TE

DRAWFORM REVISION: 19 DEC 2025

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

FI

LE

N

AM

E:

K

:\2

8 U

SM

C

Ba rra ck s D

B

RF

P

FY

\05

_W or kin g F ile s\0

1_ Dr aw ing s\0 5_

Ci vil

\05 _S he et file s\S tor m

Se we r E xh ibi t.d wg L

AY

OU

T

NA

ME

: S

D1

P

LO

TT

ED

: T hu rsd ay

, J uly

, 2

6 -

:05 am U

SE

R:

A nth on y.C ler ici

KEY PLAN

SHEET NOTES

NORTH

0 20' 40'

SCALE: 1" = 20'

V-101

V-104V-103V-102

V-105 V-106 V-107

M A

TC

H

LI

N

E

S E

E S

H E

E T

S D

SD101

SDMH #1

RIM: 21.98

INV. (15" RCP) 15.69

INV. (15" RCP) 15.55

SSMH #2

RIM: 21.06

INV. (18" PVC) 12.56

INV. (18" PVC) 12.35

SSMH #3

RIM: 21.21

INV. (10" PVC) 13.04

INV. (18" PVC) 12.41

INV. (20" PVC) 12.33

S

TO

R M

D R

A

IN

R E

P

LA

C E

M E

N T

E X

H

IB

IT

2222 22

20" PVC 20" PVCSSMH #4

SSMH #5 SSMH #6

S S S

CC C

E E E

CB #10

CB #11 CB #12 CB #13

CB #14

CB #15

CB #16

1039 1040 1041 1042

1048 1049

1051 1052

X X X

PAVILION

BUILDING 4198

3 STORY BRICK

FFE: 22.00

BUILDING 4197

3 STORY BRICK

FFE: 22.05

CONC. SIDEWALK

CONC. SIDEWALK

SIGN

BUILDING 4311

3 STORY BRICK

PARKING LOT

(ASPHALT)

BUILDING 4313

3 STORY BRICK

BUILDINGS AND PARKING LOT

DIGITIZED USING BING AERIAL

SATELLITE IMAGERY

BUILDING

ROOF LINE (TYP.)

SUPPORT

COLUMN (TYP.)

SUPPORT

COLUMN (TYP.)

FENCE BROKEN

CHAIN LINK FENCE (HT. 6')

CHAIN LINK FENCE (HT. 6')

3 TRUNKS

1046, 1045 & 1046

SAN SAN SAN SAN SAN SAN

UGC UGC UGC

UGE UGE UGE UGE UGE UGE

U G

C U

G C

UGE UGE UGE UGE UGE

STE STE STE STE STE STE STE STE STE STE STE STE STE STE STE STE STE STE STE STE

SA

N

SA

N

SA

N

UGE

W W

W

UGE UGE UGE UGE UGE

STE

STE

UGE

UGE

STE

UGE UGE UGE UGE

STE

UGE

UGE

U G

E U

G E

U G

E U

G E

SDSDSDSDSDSDSDSD

UGE

UGE

UGE

UGE UGE UGE UGE UGE UGE UGE

UGE

UGE

U G

E U

G E

U G

E U

G E

ST

E

STE STE STE STE STE STE STE STE STE STE STE STE STE STE STE STE STE STE STE STE

UGE UGE UGE UGE UGE UGE UGE UGE

SD

SD

UGE UGE UGE UGE UGE UGE UGE UGE UGE

UGE

UGE UGE UGE

W W

W W

SD

SD

UGC UGC UGC UGC UGC UGC

UGC UGC UGC UGC UGC

U G

E

UGE

UGC UGC

UGC

UG

E

U G

E

U G

E

UGE

UGE

UGE

UGE

ST

E

ST

E

ST

E

ST

E

ST

E

ST

E

W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W

SD SD SD SD

SAN SANSAN SAN SAN SAN SAN SAN SAN SAN

SD SD SD SD SD SD

X X

X

XX

X X X X X X X X X X X

X

X X X X X X X X X X X X X XX X

X X

3RD AVE. 3RD AVE. CONC. SIDEWALK

CB CBCB CB

CB

CBCB

TELECOM POINT OF CONNECTION

UGE UG

E

E

SD SD SD SD SD SD SD SD SD SD SD SD SD SD

(BY RECORD) (BY RECORD) (BY RECORD)

SAN SAN

8" P

VC

MH 70

MH 285

21.61

21.68

21.77

21.68

22.13

21.61

21.70

21.64

21.74

21.61

21.72 21.68

21.60

21.55

21.38

21.43

21.32

21.35 21.49

21.48

21.30

21.37

21.7021.79

SD SD SD SD SD SD SD SD SD SD

SD

SD

SD

SD

SD

SD

SD SD SD SD SDSD SD SD SD SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

CONCRETE STORM DRAIN TO REPLACED

IN KIND (STORM SEWER SHOWN BASED

ON AVAILABLE GIS DATA)

CONCRETE STORM DRAIN

TO REPLACED IN KIND

(STORM SEWER SHOWN

BASED ON AVAILABLE GIS

DATA)

CONCRETE STORM DRAIN TO

REPLACED IN KIND (STORM

SEWER SHOWN BASED ON

AVAILABLE GIS DATA)

CONCRETE STORM DRAIN

TO REPLACED IN KIND

(STORM SEWER SHOWN

BASED ON AVAILABLE GIS

DATA)

CONCRETE STORM DRAIN

TO REPLACED IN KIND

(STORM SEWER SHOWN

BASED ON AVAILABLE GIS

DATA)

CONCRETE STORM DRAIN TO

REPLACED IN KIND (STORM

SEWER SHOWN BASED ON

AVAILABLE GIS DATA)

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

N A

V

FA

C D

C C

O R

E N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

C H

E R

R Y

P O

IN

T

S

IT

E

H A

V E

LO

C

K , N

C

FY

U

S M

C B

A R

R A

C K

S

1890969

N/A SDP KJK

AS NOTED

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

DES DRW

M A

R K

D E

S C

R

IP

TI

O

N D

A

TE

DRAWFORM REVISION: 19 DEC 2025

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

FI

LE

N

AM

E:

K

:\2

8 U

SM

C

Ba rra ck s D

B

RF

P

FY

\05

_W or kin g F ile s\0

1_ Dr aw ing s\0 5_

Ci vil

\05 _S he et file s\S tor m

Se we r E xh ibi t.d wg L

AY

OU

T

NA

ME

: S

D1

P

LO

TT

ED

: T hu rsd ay

, J uly

, 2

6 -

:05 am U

SE

R:

A nth on y.C ler ici

KEY PLAN

SHEET NOTES

NORTH

0 20' 40'

SCALE: 1" = 20'

V-101

V-104V-103V-102

V-105 V-106 V-107

M A

TC

H

LI

N

E

S E

E S

H E

E T

S D

M A

TC

H

LI

N

E

S E

E S

H E

E T

S D

SD102

CB #10

RIM: 20.28

FILTER BAG IN PLACE

CB #11

RIM: 21.18

FILTER BAG IN PLACE

CB #12

RIM: 20.60

FILTER BAG IN PLACE

CB #13

RIM: 20.30

FILTER BAG IN PLACE

CB #14

RIM: 20.18

INV. (12" RCP) 15.13

INV. (15" RCP) 14.70

CB #15

RIM: 20.24

INV. (12" RCP) 14.85

INV. (15" RCP) 14.78

CB #16

RIM: 20.53

INV. (8" RCP) 15.31

INV. (15" RCP) 14.52

SSMH #4

RIM: 21.52

INV. (8" PVC) 11.95

INV. (20" PVC) 11.37

INV. (20" PVC) 11.53

SSMH #5

RIM: 21.59

INV. (8" PVC) 11.44

INV. (20" PVC) 11.28

INV. (20" PVC) 11.27

SSMH #6

RIM: 20.97

INV. (8" PVC) 11.07

INV. (20" PVC) 11.05

INV. (20" PVC) 11.03

S

TO

R M

D R

A

IN

R E

P

LA

C E

M E

N T

E X

H

WV

20 20

20" PVC

SSMH #7

PIPE CULVERT

INV. 16.30 (18" RCP)

PIPE CULVERT

INV. 16.71 (18" RCP)

PIPE CULVERT

INV. 16.91 (18" RCP)

PIPE CULVERT

INV. 16.20 (18" RCP)

D S

C

C

CO

CO COCO

D

E

E

E

C

E

E

C

G G

CB #18

CB #19

CB #20

CB #21

CB #22

SDMH #2

SDMH #3

CB #23

" R

CP

" R

CP

24" RCP

1063 1064

1074 1075

X

PARKING LOT

(ASPHALT)

PAVILION

BUILDING 4294

3 STORY BRICK

FFE: 22.00

BUILDING 4295

3 STORY BRICK

FFE: 22.05

BUILDING 4296

3 STORY BRICK

FFE: 21.85

BUILDING 4313

3 STORY BRICK

CO

NC

. S

ID

EW

AL

K

CO

NC

. S

ID

EW

AL

K

CO

NC

. S

ID

EW

AL

K

CONC. SIDEWALK

CONC. SIDEWALK

CHAIN LIN

K FENCE

(HT. 6'

BRICK WALL

(HT. 9')

BRICK WALL

(HT. 9')

BRICK WALL

(HT. 9')TS

PARKING LOT

(ASPHALT)

BUILDING AND PARKING LOT

DIGITIZED USING BING AERIAL

SATELLITE IMAGERY

BASIN

SUPPORT

COLUMN (TYP.)

BUILDING

ROOF LINE(TYP.)

SUPPORT

COLUMN (TYP.)

SUBSURFACE

PROPANE TANK (TYP.)

BUILDING 4198

3 STORY BRICK

FFE: 22.00

JERSEY BARRIER (TYP.)

CONC. CURB & GUTTER CONC. CURB & GUTTER

BARRIER

JERSEY BARRIER (TYP.)

SD SD

UGE

SD

SD

U N

K U

N

KU

G C

U G

C

U G

C U

G C

U G

E

UGE

W W W W W W

UGE

GATE

UGE UGE

STE

STE

STE

STE STE STE

STE

U G

E

W W

W

WSTE

STE

STE

STE STE STE

STE

W

U G

E

U G

E U

G E

U G

E U

G E

U G

E UGE UGE

UGE

SD

SD

UGE UGE UGE UGE UGE

SD

UGC UGC UGC

U G

C

UG

E

SD

SD

SD

UGE

UGE

UGE

UGE

U G

E U

G E

U G

E

UG

E

UGE

W W W W W W

U N

K U

N K

U N

K U

N K

U N

K U

N K

U N

K U

N K

U N

K U

N K

W W

SD

SD

SD

SD

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E

WWWW

UGE

U G

C U

G C

U G

C

STE

STE

STE STE STE STE STE

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

STE

STE

UGE

UGE

UGE

UGE

UGE UGE UGE

SD

SD

SD

SD

SD

U G

E U

G E

U G

E U

G E

U G

E

STE

U G

E U

G E

U G

E U

G E

U G

E

U G

E U

G E

U G

E U

G E

U G

E

SD

SD

SD

STE STE STE STE STESA

N

SA

N

UGE

W

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

UG

E

U G

E U

G E

U G

E

UGE UGE

UGE

U G

C

U G

C

UGC

UGC

UGC

UGC

U G

E U

G E

U G

E U

G E

UGE

U G

E U

G E

UG

ESD

SD

SD

W W

W W

W

W W W W W W W W

W W

W W

W W

STE

U G

E U

G E

U G

E

UGE

UGE

UGE

UGE

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E

UNK UNK UNK UNK

U N

K

U N

K U

N K

UNK

SD

SD

SD

SD

SD

UGE

SAN SAN SAN SAN

SD

SD

SD

SD

SD

SD

G

SD

SD

SD

SD

U G

E U

G E

U G

E U

G E

U G

E

SAN

SA

N

SA

N

SA

N

SA

N

STE

STE

STE

STE

STE

G G

G G

G

STE

STE

STE

STE

STE

SD

SD

SD

SD

U N

K

SD

SD

SD

SD

SD

SD

SD

G

STESTESTESTESTESTESTESTESTE

STESTESTESTESTESTESTESTESTE

SD

SD

UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE

U G

E U

G E

U G

E

X

X

X

X X

TP-1

3RD AVE. 3RD AVE.

D

ST

RE

ET

D

ST

RE

ET

" R

CP

CB

CB

CB

CB

CB

CB

E

E

UGE

UG

E

UGE

UGE

UGE

U G

E U

G E

U G

E (B

Y

RE

CO

RD

UGE

UGE

UGE

UGE UGE

UGE

UGE

UGE

UGE

UGE

UGE

(BY RECORD)

(BY RECORD)

SD SD SD SD

SD

24" RCP

SD SD SD SD SD SD SD SD SD SD SD24" RCP

SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN20" PVC

12" STEAM LINE FOUND

2.96' BELOW SURFACE

MH 286

21.33

21.32

21.28

21.11

21.20 19.87

19.76

19.16

19.18

19.61

19.51

19.57

19.55

20.64

20.69 20.72

20.70

20.70

20.66

21.86

21.25

21.86

20.59

21.87 21.98 21.87

21.98

21.74

21.70

21.68

21.73

21.75

21.6019.56 21.59 19.51

19.54

19.55

19.54

19.55

19.48

19.43

19.40 19.43

19.52

19.52

19.55

19.56

19.58

20.73

20.13 20.0620.10

20.38 20.28 19.72

20.13 20.04

20.28 20.19

19.94 20.16

20.27 20.07

20.49

20.67 20.42

BC 20.27

TC 20.72

BC 20.29

BC 20.27

BC 19.82

BC 19.21

BC 18.91

BC 18.77

BC 19.20

BC 19.24TC 20.71

TC 20.75

TC 20.58

TC 19.71

TC 19.63

TC 19.84

TC 19.74

TC 18.81

18.70

21.47 21.63

SD

SD SD SD SD SD

SD

SD

SD

SD

SD

SD

SD

CONCRETE STORM DRAIN TO

REPLACED IN KIND (STORM

SEWER SHOWN BASED ON

AVAILABLE GIS DATA)

CONCRETE STORM

DRAIN TO REPLACED

IN KIND (STORM

SEWER SHOWN

BASED ON

AVAILABLE GIS DATA)

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

N A

V

FA

C D

C C

O R

E N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

C H

E R

R Y

P O

IN

T

S

IT

E

H A

V E

LO

C

K , N

C

FY

U

S M

C B

A R

R A

C K

S

1890969

N/A SDP KJK

AS NOTED

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

DES DRW

M A

R K

D E

S C

R

IP

TI

O

N D

A

TE

DRAWFORM REVISION: 19 DEC 2025

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

FI

LE

N

AM

E:

K

:\2

8 U

SM

C

Ba rra ck s D

B

RF

P

FY

\05

_W or kin g F ile s\0

1_ Dr aw ing s\0 5_

Ci vil

\05 _S he et file s\S tor m

Se we r E xh ibi t.d wg L

AY

OU

T

NA

ME

: S

D1

P

LO

TT

ED

: T hu rsd ay

, J uly

, 2

6 -

:06 am U

SE

R:

A nth on y.C ler ici

KEY PLAN

SHEET NOTES

NORTH

0 20' 40'

SCALE: 1" = 20'

V-101

V-104V-103V-102

V-105 V-106 V-107

M A

TC

H

LI

N

E

S E

E S

H E

E T

S D

SD103

CB #17

RIM: 18.33

INV. (15" RCP) 16.36

CB #18

RIM: 18.65

INV. IN (8 IN PVC) 16.99

INV. (12" RCP) 16.55

CB #19

RIM: 19.03

FLOWLINE INV. 10.24

CB #20

RIM: 18.48

FLOWLINE INV. 9.96

CB #21

RIM: 19.82

INV. (6 IN PVC) 18.11

INV. (18" RCP) 17.24

CB #22

RIM: 18.14

INV. (12" RCP) 14.48

CB #23

RIM: 17.89

INV. (6 IN PVC) 15.52

INV. (12" RCP) 14.39

SDMH #2

RIM: 19.29

INV. (12" RCP) 14.35

INV. (12" RCP) 12.25

INV. (24" RCP) 12.26

INV. (24" RCP) 12.07

SDMH #3

RIM: 20.04

INV. (12" RCP) 14.18

INV. (24" RCP) 11.89

INV. (24" RCP) 11.53

SSMH #7

RIM: 19.86

INV. (4" PVC) 17.62

INV. (20" PVC) 11.20

INV. (20" PVC) 11.01

S

TO

R M

D R

A

IN

R E

P

LA

C E

M E

N T

E X

H

Sheets and Views
SD101

File details come from the government source that posted it. Updated .