Amendment 0006 PPI Responses.pdf
PDF 367 KB Posted
- Attached to
- DESIGN-BUILD (DB) BARRACKS INITIATIVE (PACKAGE #1), MARINE CORPS AIR STATION (MCAS) CHERRY POINT, NC
- Solicitation number
- N4008526R0053
About this file
This document is a Pre-Proposal Inquiry (PPI) Responses table for a federal Design-Build contract at Marine Corps Air Station (MCAS) Cherry Point for construction of Barracks/Enlisted Housing (BEQ). The responses address 108 questions submitted by prospective offerors regarding the Request for Proposals (RFP) and associated technical specifications.
The RFP solicitation encompasses demolition of existing barracks and construction of new unaccompanied housing facilities with a period of performance of 1,461 calendar days. Key technical requirements include IBC Construction Type 1 or 2 noncombustible construction, pile foundation systems (precast pre-stressed concrete or auger cast piles), packaged terminal heat pumps (PTHPs) for plan unit conditioning, fire sprinkler systems with black steel piping, lightning protection systems, and ligature-resistant features where commercially available. The government clarifies that industrialized construction (IC) solutions referenced in Factor 5 of the technical proposal are acceptable provided they maintain overall functionality, habitability, and area equivalent to baseline layouts, with alternative materials permitted if they meet equivalent lifecycle durability and performance criteria. Critical open questions marked "PENDING RESPONSE" address deep foundation requirements, A2L refrigerant HVAC system compatibility with UFC 4-721-01 standards, emergency power provisions for fire pump and elevator systems given unreliable site power, revised thermal envelope testing procedures, and utility extension requirements. Multiple responses cross-reference underlying design standards including UFC 4-721-10N and FC 4-721-10N military construction criteria, with the government confirming both Part 3A and Part 3B specifications hold equal precedence without hierarchy.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2. PRE-PROPOSAL INQUIRY RESPONSES: (ATTACHED SEPARATELY)
Question
Reference Question Government Response
Page Section Paragraph pdf page 15 pdf page
440, numbered
'Page 1'
462, numbered
'Page 5'
401, numbered
'Page 3'
RFP
Factor 5
Attachm ent H, Vol 1 of
4, Part
3A, Ch.
6, B20
Vol 1 of
4, Part
6, C30
Vol 1 of
4, Part
2a. and 2b.
B201002
C302010
4.2 / 2+0
Room layout
On page 15 of the original RFP dated 04
March 2026, on page 15 in "Factor 5 –
Technical Solution, Narrative (2)
Construction Methodology" suggests examples of non-traditional construction techniques (modular, pre-fabricated, industrialized construction) in Paragraph
a. Paragraph b., suggests examples including "...panelized wall systems, ... and full volumetric modules", implying that they will be acceptable methodologies.
Please confirm that consideration of these options will supersede prescriptive language in Attachment H - Final RFP
Submittal 1 of 4, where relevant
(examples below).
We respectfully request a quick answer to this RFI, because of the short time frame before the submission is due.
For instance in Attachment H Volume
1of 4, pdf page 440 of 605, "Part 3A, Ch.
6, ESR B20 — Exterior Enclosure, §B201002 Exterior Wall Backup
Construction" asks for CMU or CIP concrete backup walls for exterior walls.
However, that will exclude many modular or IC solutions listed on page 15 of the original RFP / Factor 5 / Paragraph b.
(examples: panelized wall system, full volumetric modules) that could achieve a comparable level of performance with other types of construction. Will the government accept solutions that align with original RFP / Factor 5 / Paragraph b?
(specifically load bearing studs that are part of a panelized or volumetric modular system)
Similarly, in Attachment H Volume 1of
4, pdf page 462 of 605, "Part 3A, Ch. 6, ESR C30, §C302010 Hardeners and
Sealers" calls for "polished, stained, concrete" floors on many spaces throughout the project, which assumes a concrete based structure. Many IC solutions would look to propose alternative flooring materials that have similar performance criteria to concrete.
Will the government accept alternative finishes?
Lastly in Attachment H Volume 1of 4, pdf page 401 of 605, "Part 3A - Ch. 4 -
Section 4.2" provides specific module minimum dimensions and layout for the
• Example 1: Exterior
Enclosure / Walls (ESR B20
— Exterior Enclosure, §B201002):
The Government will consider alternative solutions that align with Factor 5 (such as load-bearing studs in panelized or volumetric systems) in lieu of the prescribed CMU/CIP concrete backup walls, provided the project conforms to FC 4-721-10. Offerors are advised that it is better to explicitly detail and confirm your approach and understanding of these requirements within your proposal rather than assume an alternative methodology will automatically be deemed acceptable.
• Example 2: Flooring
Finishes (ESR C30, §C302010
Hardeners and Sealers):
The prescriptive requirement for polished, stained concrete was intended specifically for the main ground floor slab in the common areas. For other areas throughout the project, the Government will consider alternative flooring finishes to accommodate IC solutions, provided the proposed alternative materials meet similar lifecycle durability and performance criteria.
• Example 3: Room
Dimensions / Layout (Part 3A
- Ch. 4 - Section 4.2):
The Government understands that IC techniques are subject to transportation and manufacturing constraints.
Adjustments to specific module dimensions and layouts to facilitate the delivery and installation of IC
2+0 room. IC techniques (such asvolumetric modular), which are influenced by transportation considerations and varied element dimensions, would likely need modified dimensions and layouts to maintain efficiency. Will the government accept proposed adjustments to the dimensions and layouts that maintain the same functionality and area as the current layout?
The above are not an exhaustive list, but examples of the exceptions we are looking to confirm would be considered if proposing certain Industrialized
Construction solutions referenced in the original RFP (Factor 5, paragraphs 2.a and
2.b.)
methods are acceptable.
However, any proposed adjustments to the layout must maintain the same overall functionality, habitability, and area as the current baseline layout.
General Guidance for Future
Exceptions:
The Government acknowledges that the items addressed above are examples and not an exhaustive list.
Offerors proposing IC solutions under Factor 5 should apply this same standard to any other prescriptive deviations: you must clearly indicate the proposed change in the proposal and demonstrate how the alternative maintains the overall performance and functionality required by the contract.
14 Survey Please provide a copy of the CAD files for the Survey/Civil Scopes
PENDING RESPONSE
15 RFP
Please confirm if the project has a
DD1391
This project has five associated DD1391s
Solicitati on
The solicitation includes references to two different periods of performance:
several for 1,461 Calendar Days and another for 1,825 calendar days in the
Project Schedule Narrative portion.
Please confirm the period of performance for the Project is 1,461
Calendar Days.
Period of Performance is
1,461 calendar days.
RFP
Room
Require ments
Confirm that the circulation corridors required ceiling height can be reduced from 10'-0" to 9'-4". The 10' min.
requirement will increase the overall building height of the buildings.
This is acceptable. There isn’t any prescribed ceiling height in either FC 4-721-10N or
UFC 4-721-01.
3.2.1.2
Provide the fire truck model of the
Cherry Point Ladder 251. Or provide its dimensions and wheelbase.
See included PDF for details.
B202001
Confirm that the aluminum windows are to not be operable. In this climate an operable window at the sleeping rooms combined with the packaged terminal air conditioners and heat pumps will create a risk for high humidity and mold inside the building.
The packaged units only have a limited capacity to dehumidify high
Correct.
latent loads which the outside air would introduct.
3.2.1.4
Provide sizing information on the drying areas and the number of separate sections noted in this paragraph. The FC 4-721-10N is referenced. Under FC 4-471-10N 5-
3.5 Exterior wash areas the drying
area section does not give any area requirement or give a number of required separate sections.
PENDING RESPONSE
RFP 2.4
Appropri ate
Design
Provide clarification on the required
Ligature Resistant Features of the project. Section D201005 Showers clearly notes ligature resistant type.
The RFP also references UFC 4-721-
01 Permanent Party Unaccompanied
Housing. Within that UFC section 3-
10 Ligature Resistant Features includes a long list of notes that are written in a loose language such as:
"where technically practicable, "encourage occupant wellness, "greatest extent possible, thoughtful detailing". This section leaves scope in the design open to many different reviewers interpretations.
Ligature resistant products of a residential nature are to be provided when they are commercially available.
Construction features of the building are to be designed to provide ligature resistance.
Electrical
Service
POC - A3-
A4
Changes -
AFTER
DEMO
Attachm ents C.7
Confirm that splices of existing MV cable in manholes following demolition of building transformers is allowed as indicated in attachment C.7
PENDING RESPONSE
23 D50 Chapter 6
Chapter 6, section D50 of the RFP indicates that a lightning protection system must be installed as required.
Based on NFPA 780, a lightning protection system is recommended for this site. However, since NFPA 780 is a standard and not a code, this does not mean one is strictly required.
Please confirm if a lightning protection system is desired at this site.
Yes, include lightning protection system
24 1
Part 3
Chapter
6 ESR
B10
Floor
Constructio n, Wall
Constructio n
Please confirm that wood construction
Type is not permitted per RFP ESR
B10. Please confirm that wood modular or IC components consisting of Wood shall not be used. Please confirm that products or materials utilized within the facility must be non-combustible and compatible with
IBC Construction Type 1 or 2.
Facility must be non-combustible and compatible with IBC Construction Type 1 or 2.
25 1 Part 3
Chapter
Exterior
Walls
The RFP mentions "Exterior bearing walls consisting of metal studs as the See response to PPI #16
6 ESR
B2010 primary floor or roof supporting structural element are not permitted."
Please confirm that light gauge steel modular is not permitted.
26 6
Part 3
Chapter
6 ESR
B201003
Insulation
& Vapor
Retarded
The RFP mentions "Provide thermal envelope performance testing through infrared thermography in accordance with RFP Part 4." No reference in Part
4 was found, please provide the requirements for thermal envelope performance testing.
Part 4 is included by reference and available on wbdg.org
27 1
PART 2
Spec
Section
01 35 13
3.1.1
Model Unit
Description
The RFP mentions "Provide a model unit" and omits the location. Please advise where the model unit should be provided.
Bid per RFP. Refer to Part 2, Spec 01 35 13, Paragraph
3.1.1, and coordinate with
Contracting Officer.
28 1
Part 3
Chapter
B10
Superstruct ure
The RFP mentions "Precast concrete tilt-up construction is not allowed."
Please confirm that non-structural concrete precast is allowed.
PENDING RESPONSE
29 1
Part 3
Chapter
6 ESR
B2010
Exterior
Walls
The RFP currently requires “cavity wall exterior wall systems” composed of an Exterior Closure and Exterior
Wall Backup Construction, with backup construction identified as cast-in-place concrete or concrete unit masonry. This reference refers to double wythe CMU & brick construction, which is no longer typical construction or cost-effective.
Further, this is not a requirement for structural code, BEAP, or UFC compliance. Please confirm that any exterior enclosure that complies with the BEAP mentioned in RFP Part 3
Chapter 4.3 Exterior Character and applicable UFCs may be provided.
Any exterior enclosure that complies with the BEAP mentioned in RFP Part 3
Chapter 4.3 Exterior Character and applicable UFCs may be provided.
30 2
Part 3B
Chapter
6 ESR
A101002
Deep
Foundation s
RFP Part 3A states "For east coast sites refer to specific requirements in chapter 3B." RFP Part 3B is labeled as
Part Three "A". Please confirm the bookmarked Part 3B ESR A10 takes precedence which states, "The building and first floor slab must be entirely supported by a pile foundation system consisting of either precast pre-stressed concrete piles or auger cast piles. "
PENDING RESPONSE
31 18
RFP Part
2 Spec
Section
01 33
10.05 20
3.3.2 Order
of
Precedence
The RFP contains Part 3A and Part
3B. Which takes precedence?
They are both Part 3 and equal with no precedence.
32 1
Part 3B
Chapter
3.1
Existing
Site
Conditions
The Part3B shows a single site and denotes approximate limits. RFP Part
6 Attachments show two sites, please
Confirmed. Site limits are as shown in Part 3B Chapter 3.1
Figure 1 - Site Limits confirm the site limits are shown correctly in Part 3B Chapter 3.1
Figure 1 - Site Limits
33 1
Part 3B
Chapter
3.1
Existing
Site
Conditions
Please confirm that facilities not listed for demolition within the Part 3B
Chapter 3.1 Figure 1 - Site Limits shall be protected in place. Please advise if access to them must be maintained through construction.
Confirmed. Facilities not listed for demolition are to be protected in place and access must be maintained to these facilities at all times per Div
01 specifications.
34 1
Part 3B
Chapter
3.1
Existing
Site
Conditions
Please confirm that facilities not listed for demolition within the Part 3B
Chapter 3.1 Figure 1 - Site Limits shall be protected in place. Please advise if access to them must be maintained through construction.
See response to PPI #33.
35 1
Part 6
Attachm ents
C.1
Existing
Conditions
Plan
Volume 4 Part 6 notes that CADD files and Survey notes are provided via separate attachment. Please send these documents.
PENDING RESPONSE
36 1
Part 6 ents
RFP Part 6 provides as-built drawings for 4296 and 4881 but does not include scope of work for the facilities. Please confirm there is no scope of work.
Propose per RFP. There is no scope for Buildings 4296 or
37 1
Part 3B
Chapter
3.1
Existing
Site
Conditions
RFP states "The existing site does not contain any vehicle parking areas or treatment related Stormwater Control
Measures (SCMs). However, full depth replacement of asphalt paving and underlying storm sewer associated with the existing parking lot to the northeast of the site is included in this project." Please provide the extents of the paving. Please confirm that DB
Team is exempt from providing UFC required parking spaces for this project.
Extents of paving are as shown on Topographic Survey
Plans V-102, V-103, and V-
104 in Part 6. DB Team is exempt from providing UFC required parking spaces in that area.
Who is responsible for asbestos testing, air monitoring, and final clearance letters?
The contractor is responsible for all air monitoring.
Contractor to hire a State
Licensed Asbestos Project
Monitor that will serve as the
Governments Project Monitor.
Contractor is responsible for all cost.
Who is responsible for the cost of hazardous materials project design, demolition specifications, or abatement plans (if applicable).
The contractor is responsible.
Is the contractor required to provide temporary water and power during asbestos abatement activities and for dust control, or will these utilities be provided by the Owner/GC?
Spec section 01 50 00 paragraph 3.2.2.b rates for
Electricity, Sanitary, and potable water should be provided in the spec. Those were provided to the NAVFAC team via email.
The hazardous materials report identifies lead-containing materials.
Can these materials remain in place and be demolished with the structure for disposal as construction and demolition debris, or are they required to be removed and disposed of separately prior to demolition activities?
Propose per the RFP. Follow all applicable OSHA, EPA, and state regulations.
Will the demolition contractor be required to provide backfill for excavated areas, including basements, foundations, utility trenches, or other below-grade removals? If backfill is required and testing of the backfill material and/or compaction is required, who is responsible for the associated testing and costs?
Propose per the RFP. The contractor is responsible for all associated testing and costs of backfill material.
Is the contractor required to obtain all demolition permits, close out permits upon completion, and provide final inspection approvals/sign-offs?
Propose per the RFP. Follow all applicable OSHA, EPA, and state regulations and
Navy/Marine Corps policies.
Are there any work-hour restrictions or site access limitations that must be considered?
Refer to Div 01 specifications in Part 2 for working hours.
What duration is being allotted to the selected firms for completion of the project, and specifically what duration is being allotted for the demolition scope of work?
Period of performance is included with the solicitation to include all scope of work with this contract.
Who is responsible for providing and maintaining perimeter fencing, barricades, and site security?
Contractor is responsible to maintain a secure site at all times. Refer to Div 01 specifications.
Will demolition contractors be permitted to damage existing pavement, curb and gutter, sidewalks, or other impervious surfaces during demolition operations, or will repairs be required at the contractor's expense?
Damage to existing facilities or supporting facilities by the contractor are required to be repaired at the contractor’s expense. Refer to Div 01 specifications. Limits are area of disturbance.
With the current plans, it is unclear exactly what is included in the demolition scope outside of the building footprint. Should demolition contractors assume demolition of the structure and all improvements within five (5) feet of the building, or is removal of additional pavement, sidewalks, curb and gutter, utilities, or other site improvements required?
PENDING RESPONSE
Do the mechanical/power brick enclosures associated with each
PENDING RESPONSE
structure (housing HVAC equipment, electrical equipment, and other mechanical systems) fall within the demolition scope, or are they to remain in place?
What closeout documentation is required from the demolition contractor upon completion of the demolition scope of work
(photographs, waste manifests, disposal tickets, certifications, reports, etc.)?
Propose per RFP. All waste manifest must be reviewed, approved, and signed by the installation's environmental department. Completed waste manifest must be included in closeout submittals.
51 5
Part 3
"A" -
Chapter
6/ESR
D40
D4040
D4040 Sprinkler Systems notes Fire
Sprinkler System Piping must be black steel. Is it acceptable to use
CPVC on the branch lines to the dwelling units as this has been acceptable on NFPA 13R projects.
Propose per RFP, ESR D4040
52 Part 3 "B"
Chapter
6/ESR
F20
F201006
F201006 Mechanical Systems notes to salvage and turnover to the gov't
"steam components" and "TEC's".
Please provide specific list and quantity of "steam components" and
"TEC's" the demolition contractor is to capture. Please also verify TEC is
Terminal Equipment Controller.
Information listed was provided for inclusion in RFP by GOV/Installation. Correct
TEC is Terminal Equipment
Controller. Refer to as-built drawings.
53 Part 3 "A" Chapter
D4020
D4020 notes Camp Lejeune and
MCAS New River do not have reliable power. If a fire pump is determined to be required in a facility with unreliable primary power, an emergency backup generator must be provided for the fire pump as a secondary power sources. D509002 then notes Camp Lejeune and MCAS
Cherry Point site do not have reliable power. Please confirm MCAS Cherry
Point does not have reliable power and generator is required.
PENDING RESPONSE
54 Part 3 "B" Chapter
3.1.2.4.4
Per Part three "B" - Chapter 3-
3.1.2.4.4 Natural Gas Service is
available and is to be used in lieu of steam. Vol 4, MCAS Cherry Point
Mechanical policies dated 8/30/23 note 31 states the primary heating source should utilize centralized steam, or if unavailable, utilize hot water boiler. Please verify Natural
Gas is to be used for heating.
Propose per RFP Part 3B.
Natural Gas is to be provided
Part 3B, 3.2.1.8.1
Section states to replace sewer mains to C Street, but survey does not extend that far. Please provide utility maps showing sewer line and manholes beyond survey limits
Part 3B, 3.2.1.8.1
Section states to replace sewer mains to manholes in E street. The survey does not show manholes in the street.
If there are not existing manholes, do they have to be added? Or can work start at existing manholes southeast of
E street?
PENDING RESPONSE
Part 3B, 3.1.2.1
Section refers to existing fire lanes 12' wide. If existing fire lanes need to be replaced, or for new fire lanes, what is the required paved width?
Per NFPA 1, fire truck access lane is 20-ft in width.
Part 3B, 3.1.2.1
Section states that we are replacing the storm drainage under the northeast parking lot. However, no survey was provided in that area. Please provide utility maps showing existing storm drainage in the parking lot.
PENDING RESPONSE
Survey
Sheet V-
There is existing pavilion shown within the work area south of buildings 4197 and 4198. Can this be removed? If needed for occupants of those buildings, can a new pavilion be provided to the north outside work area?
Pavilion outside of limits must remain.
Attachment
H; Vol 1 of
4, Page 103 of 605
01 33
10.05 20 2.2.1
The demolition of the existing barracks is on the critical path design and would like to submit as a fast track with only a prefinal and final design submissions. Then have a Site
Work volume and a Building Design volume that complies with Paragraph
2.2.2.
All required design submission milestones must be adhered to.
Attachment
H; Vol 4 of
4; page 3 of
Part Six -
Attachm ents
C. Site /
Utility
Informatio n
Please provide sanitary and storm piping including invert elevations
Invert elevations are shown on
Topographic Survey Plans.
Attachment
H; Vol 1 of
4, Page 536 of 605
3.0 Site
Analysis 3.2.1.8.1
Can the sanitary sewer replacement route, that is located off-site to C
Street, be provided, as discussed in
Sec. 3.2.1.8.1?
PENDING RESPONSE
Attachment
H; Vol 1 of
4, Page 547 of 605
Chapter
6.
Engineer ing
Systems
Require ments
A101002
Deep
Foundation s
Part Three A Chapter 6 section
A101002 Deep Foundations states
“The building and first floor slab must be entirely supported by a pile foundation system consisting of either precast pre-stressed concrete piles or auger cast piles”, will the government allow alternative foundation systems?
PENDING RESPONSE
Attachment
H; Vol 1 of
4, Page 600 of 605
Section
23 81 00 2.3.1.6.1
UFC 4-721-01, part 3-12 does not allow A2L refrigerants in the occupied space. All PTACs and PTHPs come with A2L refrigerants. Does this preclude PTACs and PTHPs from the project?
Attachment
H; Vol 1 of
4, Page 470 of 605
Chapter
6.
Engineer ing
Systems
Require ments
System
Description
The documents state a requirement for
PTHP which similar to a PTAC but incorporates for reversing valve to provide efficient heating. For serviceability and maintenance, other
DOW branches are moving away
PTAC units and the HP reversing valves adds an additional layer of complexity. Is this a specific base requirement or can betterment option be offered?
This is a specific base requirement for service and maintainability. See BCA for
PTHP.
Attachment
H; Vol 1 of
4, Page 603 of 605
Section
23 81 00 3.2.1
Air cooled chiller are utilized through the Cherry Point campus. Is that installation requirement or is a cooling tower an option? Cooling Towers are references in Section 23 81 00. D3030 does reference air cooled chillers.
Propose per RFP D3030.
Cooling towers are not included.
67 Solicitation Due Date
Please provide a 4 week bid extension to allow adequate time for design based on the level of bridging documents provided and for subsequent subcontractor pricing efforts.
PENDING RESPONSE
68 Solicitation Factor 5
Factor 5 Technical Solution requests a narrative inclusive of the Design
Methodology, Construction
Methodology, and Management Team sections. Factor 5 states that this narrative is limited to 8 pages. This is not nearly enough space to address all criteria requested in Factor 5 under each section. Please increase Factor 5 narrative page limit to 20 pages.
Propose per RFP.
69 Solicitation Factor 5
Factor 5 Technical Solution requests a
Management Team sections with a synopsis of key individuals. Please provide direction on what specific individuals are being requested and evaluation criteria for key individuals.
This will provide a level understanding of NAVFAC's expectations and evaluation criteria for this portion of the Management
Team narrative request.
Propose per RFP.
70 1
Part 3
Chapter
6 ESR
B10
Floor
Constructio n, Wall
Constructio n
Please confirm that wood construction
Type is not permitted per RFP ESR
B10. Please confirm that wood modular or IC components consisting of Wood shall not be used. Please confirm that products or materials utilized within the facility must be non-combustible and compatible with
IBC Construction Type 1 or 2.
See response to PPI #24
71 1 Part 3
Chapter
Exterior
Walls
The RFP mentions "Exterior bearing walls consisting of metal studs as the primary floor or roof supporting
See response to PPI #25
B2010 structural element are not permitted."
Please confirm that light gauge steel modular is not permitted.
72 6
Part 3
Chapter
6 ESR
B201003
Insulation
& Vapor
Retarded
The RFP mentions "Provide thermal envelope performance testing through infrared thermography in accordance with RFP Part 4." No reference in Part
4 was found, please provide the requirements for thermal envelope performance testing.
See response to PPI #26
73 1
PART 2
Spec
Section
01 35 13
3.1.1
Model Unit
Description
The RFP mentions "Provide a model unit" and omits the location. Please advise where the model unit should be provided.
See response to PPI #27
74 1
Part 3
Chapter
B10
Superstruct ure
The RFP mentions "Precast concrete tilt-up construction is not allowed."
Please confirm that non-structural concrete precast is allowed.
See response to PPI #28
75 1
Part 3
Chapter
6 ESR
B2010
Exterior
Walls
The RFP currently requires “cavity wall exterior wall systems” composed of an Exterior Closure and Exterior
Wall Backup Construction, with backup construction identified as cast-in-place concrete or concrete unit masonry. This reference refers to double wythe CMU & brick construction, which is no longer typical construction or cost-effective.
Further, this is not a requirement for structural code, BEAP, or UFC compliance. Please confirm that any exterior enclosure that complies with the BEAP mentioned in RFP Part 3
Chapter 4.3 Exterior Character and applicable UFCs may be provided.
See response to PPI #29
76 2
Part 3B
Chapter
6 ESR
A101002
Deep
Foundation s
RFP Part 3A states "For east coast sites refer to specific requirements in chapter 3B." RFP Part 3B is labels as
Part Three "A". Please confirm the bookmarked Part 3B ESR A10 takes precedence which states, "The building and first floor slab must be entirely supported by a pile foundation system consisting of either precast pre-stressed concrete piles or auger cast piles. "
PENDING RESPONSE
77 18
RFP Part
2 Spec
Section
01 33
10.05 20
3.3.2 Order
of
Precedence
The RFP contains Part 3A and Part
3B. Which takes precedence?
See response to PPI #31
78 1
Part 3B
Chapter
3.1
Existing
Site
Conditions
The Part3B shows a single site and denotes approximate limits. RFP Part
6 Attachments show two sites, please confirm the site limits are shown
See response to PPI #32 correctly in Part 3B Chapter 3.1
Figure 1 - Site Limits
79 1
Part 3B
Chapter
3.1
Existing
Site
Conditions
Please confirm that facilities not listed for demolition within the Part 3B
Chapter 3.1 Figure 1 - Site Limits shall be protected in place. Please advise if access to them must be maintained through construction.
See response to PPI #33
80 1
Part 3B
Chapter
3.1
Existing
Site
Conditions
Please confirm that facilities not listed for demolition within the Part 3B
Chapter 3.1 Figure 1 - Site Limits shall be protected in place. Please advise if access to them must be maintained through construction.
See response to PPI #34
81 1
Part 6
Attachm ents
C.1
Existing
Conditions
Plan
Volume 4 Part 6 notes that CADD files and Survey notes are provided via separate attachment. Please send these documents.
PENDING RESPONSE
82 1
Part 6 ents
RFP Part 6 provides as-built drawings for 4296 and 4881 but does not include scope of work for the facilities. Please confirm there is no scope of work.
See response to PPI #36
83 1
Part 3B
Chapter
3.1
Existing
Site
Conditions
RFP states "The existing site does not contain any vehicle parking areas or treatment related Stormwater Control
Measures (SCMs). However, full depth replacement of asphalt paving and underlying storm sewer associated with the existing parking lot to the northeast of the site is included in this project." Please provide the extents of the paving. Please confirm that DB
Team is exempt from providing UFC required parking spaces for this project.
See response to PPI #37
Existing
Site
Conditions
General Question: Please confirm if the existing building piles are required to be removed?
Per 3.2.1.12 Site/Building
Demolition - Any deep foundations will be saw cut a minimum of four feet below existing grade.
Existing
Site
Conditions
General Question: If contaminated soils are discovered do they need to be removed from the limits of construction or can they be capped by the slab with an air/vapor barrier under the slab?
PENDING RESPONSE
Existing
Site
Conditions
General Question: Do contaminated soils need to be taken off the base or if there is available storage for them on the base?
Remove contaminated soils from base.
General Question: Is there available space on the installation that can be used as a laydown area? If so, where
Contractor to submit for site approval and laydown area size request. Additional area may or may not be approved.
and what would be the approximate size of area?
General Question: Is there an area for office trailer complex near the construction site?
See response to PPI #87.
General Question: Is there available parking nearby for construction workers? There is limited space within the site boundary for this.
See response to PPI #87.
90 5
Part 3A
Chapter
6 / ESR
C30
C3030
C3030 mentions to see Part 3 Chapter
5 Room Requirements. When looking at that section, Part 3A Chapter 5 page
7, line item C303002 Gypsum wallboard ceiling finishes the far right column under "Specific
Requirements" is left blank. If drywall ceilings are required does it need to be impact resistant? Or can paint concrete ceiling be utilized?
Propose per RFP, utilize regular Gypsum Board as described in Part 3A, Chapter
6, ESR C303002 Gypsum
Wallboard Ceilings. Paint finish as described in Part 3A, Chapter 6, ESR C3010 Wall
Finishes.
91 53 BEAP 4.1.3.2
This paragraph mentions bricks that are red and modular in size. Can thin set brick be utilized in lieu of full modular brick?
No.
RFP illustrates PTAC units in the rooms. PTACs don't meet the STC rating of 55. Please clarify the expectation.
Contractor to provide PTACs and build walls to meet RFP sounds requirements.
93 2
Part 3A
Chapter
6 / ESR
C30
C301004
It is mentioned to provide full height wall tile on walls in restrooms, bathrooms and shower rooms. For restrooms and bathrooms tile required on just the wet walls or all walls?
Provide full height wall tile on all walls in restrooms, bathrooms, and shower rooms
(to exclude shower stalls).
94 2
Part 3A
Chapter
6 / ESR
C30
C301004
It is mentioned to provide full height wall tile on walls in restrooms, bathrooms and shower rooms. For the shower rooms (stalls in units) can we utilize cultured marble panels with a tile look? This will reduce maintenance, leak potential and will be easier to clean.
Propose per RFP.
95 3
Part 3A
Chapter
6 ESR
C10
C103016
It is mentioned that we are to provide a ceiling fan in each Living Unit. Can we confirm this requirement because with lower ceilings these could be an issue when it comes to improper use by some soldiers.
Each living unit must have a ceiling fan.
Amendm ent #5
Attachment
Figure 5.1
Items “I” and “J” refer to building height. Does Figure 5.1 apply to this project? It references Admin/Mixed-
Use/HQ BES under the chart. Please clarify.
Yes Figure 5.1 applies. Item
"L" should state "Refer to
BEAP"
Amendm ent #5
Attachment
Figure 5.1
Assuming that Figure 5.1 issued with
Amendment 5 does now apply to this
Project please advise if all parts of
Figure 5.1 now apply, and if not, advise which parts are intended to apply?
Amendm ent #5
Attachment
Figure 5.1
AM 005 states that Figure 5.1 is an excerpt from the "Cherry Point Area
Development Plan". Assuming Figure
5.1 now applies, at least in part, to this project will the GOVT be issuing the full/complete "Cherry Point Area
Development Plan" via Amendment and if so advising which parts of the document will be made a part of this
Project.
PENDING RESPONSE
Section
23 81 00
A2L
Refrigera nt
Section 23 81 00 cites ASHRAE 15 and 34 (2022) but does not specify an acceptable refrigerant for PTHPs.
AIM Act phasedown has effectively eliminated new R-410A PTHP production. A2L PTHPs (e.g., R-32) serving sleeping quarters are high-probability systems under ASHRAE
15, requiring refrigerant leak detection and occupant notification not addressed in the current spec.
Confirm: (1) A2L PTHPs are acceptable; (2) whether ASHRAE
15.2 compliance is required; (3) whether refrigerant leak detection integrated with MNS/fire alarm is in the DB contractor scope.
PENDING RESPONSE
Section
23 81 00
A2L
Refrigera nt -
ASHRA
E 15.2
Applicab ility
Section 23 81 00 cites ASHRAE 15 and 34 (2022) but does not cite
ASHRAE 15.2 (2022). A2L PTHPs serving occupied sleeping rooms are high-probability systems under
ASHRAE 15.2, which imposes refrigerant leak detection and occupant notification requirements not addressed in the current specification.
Confirm whether ASHRAE 15.2
(2022) compliance is required for plan unit PTHPs.
PENDING RESPONSE
Section
23 81 00
A2L
Refrigera nt - Leak
Detectio n and
MNS
Integrati on Scope
ASHRAE 15.2 (2022), applicable to high-probability A2L systems in occupied sleeping spaces, requires refrigerant leak detection and occupant notification. At 720 plan units, integration with the MNS/fire alarm system may be required. Section
23 81 00 does not address this scope.
Confirm whether refrigerant leak detection and MNS integration for
A2L plan unit PTHPs is included in the DB contractor scope.
PENDING RESPONSE
FC 4-
721-10N
§3-14.9
FC 4-721-10N Section 3-14.9 states
CCTV systems are not allowed at
Navy UH without prior authorization
Confirmed, this is in scope.
CCTV
Authoriz ation per CNIC M 11103.2 (pending final signature). The D50 ESR and
D503005 include CCTV conduit rough-in scope throughout the building. Confirm whether CNIC authorization for CCTV at MCAS
Cherry Point BEQ has been obtained, and whether the D503005 rough-in scope is authorized for design and installation.
FC 4-
721-10N
§3-14.9
CCTV
Rough-In
Scope
Authoriz ation
D503005 requires CCTV conduit and
Category 6A rough-in throughout the building, including hallways, lobbies, stairwells, building exterior, and other common areas. Confirm whether the
D503005 CCTV rough-in scope is authorized for design and installation under this contract.
Confirmed, this is in scope.
UFC 4-
721-01
§3-12
A2L
Refrigera nt
Section 23 81 00 prescribes PTHPs for plan units. UFC 4-721-01, Change 1
(12 March 2026), Section 3-12 states that HVAC systems using Class A2L refrigerants must keep all refrigerant lines and containment vessels exterior to occupied spaces. All current PTHP production uses A2L refrigerants (R-
32, R-454B) following the AIM Act phasedown of R-410A. A PTHP has its indoor coil (containment vessel) inside the occupied sleeping room by design. The prescriptive system and the UFC requirement are directly incompatible given current market conditions. Confirm: (1) whether the
PTHP prescription is superseded by
UFC 4-721-01 Change 1; (2) what compliant HVAC system type is acceptable for plan units; and (3) whether the government will issue a revised prescriptive specification.
Follow CHENG INTERIM
TECHNICAL GUIDANCE -
ALIGNING TO INDUSTRY
STANDARDS FOR CLASS
A2L REFRIGERANTS dated
30 April 2026.
UFC 4-
721-01
§3-12
Cherry
Point DX
Prohibiti on
Acceptab le Plan
Unit
System
If UFC 4-721-01 Change 1 Section 3-
12 renders A2L PTHPs non-compliant for plan units, and the Part 3B Cherry
Point supplement prohibits DX split systems, VRF, and DX VAV at this installation, no currently available DX system type satisfies both constraints.
Confirm what HVAC system type is acceptable for plan unit conditioning at MCAS Cherry Point.
Follow CHENG INTERIM
TECHNICAL GUIDANCE -
ALIGNING TO INDUSTRY
STANDARDS FOR CLASS
A2L REFRIGERANTS dated
30 April 2026.
UFC 4-
721-01
§3-12
Revised
Prescripti
UFC 4-721-01 Change 1 (12 March
2026) was issued prior to this solicitation. The prescriptive PTHP requirement in Section 23 81 00 appears to conflict with §3-12 of that ve
Specifica tion for
Plan
Units change. Confirm whether the government will issue a revised prescriptive specification for plan unit
HVAC that resolves this conflict.
UFC 4-
721-01
§3-17
FC 4-
721-10N
§3-14.5 -
Emergen cy Power
D50 ESR states MCAS Cherry Point does not have reliable power and implies a standby generator requirement where driven by code.
UFC 4-721-01 Section 3-17 states emergency power is not authorized in
UH. FC 4-721-10N Section 3-14.5 states emergency power is not required in UH. These criteria appear to conflict with the unreliable power statement in D50. Confirm: (1) whether a standby generator is required for this project notwithstanding the UFC/FC prohibition; and (2) how utility unreliability is to be addressed for fire pump reliability (NFPA 20) and elevator recall.
PENDING RESPONSE
UFC 4-
721-01
§3-17
Unreliabl e Power
Fire
Pump and
Elevator
Recall
NFPA 20 requires 120 minutes of backup power for fire pump rooms, and building code requires elevator recall power. UFC 4-721-01 Section
3-17 states emergency power is not authorized in UH. Confirm the acceptable means of achieving fire pump reliability and elevator recall at
MCAS Cherry Point given these conflicting requirements.
(End Summary of Changes)