Amendment 0006 PPI Responses.pdf

PDF 367 KB Posted

Attached to
DESIGN-BUILD (DB) BARRACKS INITIATIVE (PACKAGE #1), MARINE CORPS AIR STATION (MCAS) CHERRY POINT, NC
Solicitation number
N4008526R0053
Issued by

About this file

This document is a Pre-Proposal Inquiry (PPI) Responses table for a federal Design-Build contract at Marine Corps Air Station (MCAS) Cherry Point for construction of Barracks/Enlisted Housing (BEQ). The responses address 108 questions submitted by prospective offerors regarding the Request for Proposals (RFP) and associated technical specifications.

The RFP solicitation encompasses demolition of existing barracks and construction of new unaccompanied housing facilities with a period of performance of 1,461 calendar days. Key technical requirements include IBC Construction Type 1 or 2 noncombustible construction, pile foundation systems (precast pre-stressed concrete or auger cast piles), packaged terminal heat pumps (PTHPs) for plan unit conditioning, fire sprinkler systems with black steel piping, lightning protection systems, and ligature-resistant features where commercially available. The government clarifies that industrialized construction (IC) solutions referenced in Factor 5 of the technical proposal are acceptable provided they maintain overall functionality, habitability, and area equivalent to baseline layouts, with alternative materials permitted if they meet equivalent lifecycle durability and performance criteria. Critical open questions marked "PENDING RESPONSE" address deep foundation requirements, A2L refrigerant HVAC system compatibility with UFC 4-721-01 standards, emergency power provisions for fire pump and elevator systems given unreliable site power, revised thermal envelope testing procedures, and utility extension requirements. Multiple responses cross-reference underlying design standards including UFC 4-721-10N and FC 4-721-10N military construction criteria, with the government confirming both Part 3A and Part 3B specifications hold equal precedence without hierarchy.

View the file

Other files

File Type Posted
N4008526R0053 Site Visit Log.pdf PDF
Amendment 0010.pdf PDF
AMENDMENT 0009.pdf PDF
Amendment 0008 - C9 - Storm Drain Replacement Exhibit.pdf PDF
Amendment 0008 - C8 - Cherry Point Site 1 Sanitary Plan.pdf PDF
Amendment 0008 - D16 - Ladder 251 - Pierce Turning Performance Analysis.pdf PDF
AMENDMENT 0008.pdf PDF
Amendment 0008 - D15 - ITG A2L Refrigerants For Navy and MC Facilities.pdf PDF
Amendment 0008 PPI Responses.pdf PDF
Amendment 0007 PPI Responses.pdf PDF
AMENDMENT 0007.pdf PDF
AMENDMENT 0006.pdf PDF
Amendment 0005 B2 Hazardous Materials Report Bldgs 4201 4294 4295 4296 4312.pdf PDF
Amendment 0005 Wage Determination NC20260018 05 18 26.pdf PDF
AMENDMENT 0005.pdf PDF
Amendment 0005 D14 - Excerpt from Cherry Point Area Development Plan.pdf PDF
AMENDMENT 0004.pdf PDF
AMENDMENT 0003.pdf PDF
AMENDMENT 0002.pdf PDF
CJA ML-25-03 Class FRCS Cherry Point - Redacted.pdf PDF
Attach H - MCASCP Sites Subsurface Soil Geotech Report.pdf PDF
Attachment H - 1895345 MCAS CP DBRFP VOL1of4.pdf PDF
Attachment G - SBSP.docx DOCX document
Attachment E - Historical Small Business Utilization.docx DOCX document
Attachment H - 1895345 MCAS CP DBRFP VOL3of4.pdf PDF
Attachment F - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Attachment I - Price Proposal Schedule.xlsx XLSX spreadsheet
Attachment H - 1895345 MCAS CP DBRFP VOL4of4.pdf PDF
Attachment H - 1895345 MCAS CP DBRFP VOL2of4.pdf PDF
AMENDMENT 0001.pdf PDF
AMENDMENT 0001 Attachment C - Experience Project Data Sheet.docx DOCX document
AMENDMENT 0001 Pre-Proposal Inquiries.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment C - Construction and Design Experience Project Data Sheet.docx DOCX document
N4008526R0053.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. PRE-PROPOSAL INQUIRY RESPONSES: (ATTACHED SEPARATELY)

Question

Reference Question Government Response

Page Section Paragraph pdf page 15 pdf page

440, numbered

'Page 1'

462, numbered

'Page 5'

401, numbered

'Page 3'

RFP

Factor 5

Attachm ent H, Vol 1 of

4, Part

3A, Ch.

6, B20

Vol 1 of

4, Part

6, C30

Vol 1 of

4, Part

2a. and 2b.

B201002

C302010

4.2 / 2+0

Room layout

On page 15 of the original RFP dated 04

March 2026, on page 15 in "Factor 5 –

Technical Solution, Narrative (2)

Construction Methodology" suggests examples of non-traditional construction techniques (modular, pre-fabricated, industrialized construction) in Paragraph

a. Paragraph b., suggests examples including "...panelized wall systems, ... and full volumetric modules", implying that they will be acceptable methodologies.

Please confirm that consideration of these options will supersede prescriptive language in Attachment H - Final RFP

Submittal 1 of 4, where relevant

(examples below).

We respectfully request a quick answer to this RFI, because of the short time frame before the submission is due.

For instance in Attachment H Volume

1of 4, pdf page 440 of 605, "Part 3A, Ch.

6, ESR B20 — Exterior Enclosure, §B201002 Exterior Wall Backup

Construction" asks for CMU or CIP concrete backup walls for exterior walls.

However, that will exclude many modular or IC solutions listed on page 15 of the original RFP / Factor 5 / Paragraph b.

(examples: panelized wall system, full volumetric modules) that could achieve a comparable level of performance with other types of construction. Will the government accept solutions that align with original RFP / Factor 5 / Paragraph b?

(specifically load bearing studs that are part of a panelized or volumetric modular system)

Similarly, in Attachment H Volume 1of

4, pdf page 462 of 605, "Part 3A, Ch. 6, ESR C30, §C302010 Hardeners and

Sealers" calls for "polished, stained, concrete" floors on many spaces throughout the project, which assumes a concrete based structure. Many IC solutions would look to propose alternative flooring materials that have similar performance criteria to concrete.

Will the government accept alternative finishes?

Lastly in Attachment H Volume 1of 4, pdf page 401 of 605, "Part 3A - Ch. 4 -

Section 4.2" provides specific module minimum dimensions and layout for the

• Example 1: Exterior

Enclosure / Walls (ESR B20

— Exterior Enclosure, §B201002):

The Government will consider alternative solutions that align with Factor 5 (such as load-bearing studs in panelized or volumetric systems) in lieu of the prescribed CMU/CIP concrete backup walls, provided the project conforms to FC 4-721-10. Offerors are advised that it is better to explicitly detail and confirm your approach and understanding of these requirements within your proposal rather than assume an alternative methodology will automatically be deemed acceptable.

• Example 2: Flooring

Finishes (ESR C30, §C302010

Hardeners and Sealers):

The prescriptive requirement for polished, stained concrete was intended specifically for the main ground floor slab in the common areas. For other areas throughout the project, the Government will consider alternative flooring finishes to accommodate IC solutions, provided the proposed alternative materials meet similar lifecycle durability and performance criteria.

• Example 3: Room

Dimensions / Layout (Part 3A

- Ch. 4 - Section 4.2):

The Government understands that IC techniques are subject to transportation and manufacturing constraints.

Adjustments to specific module dimensions and layouts to facilitate the delivery and installation of IC

2+0 room. IC techniques (such asvolumetric modular), which are influenced by transportation considerations and varied element dimensions, would likely need modified dimensions and layouts to maintain efficiency. Will the government accept proposed adjustments to the dimensions and layouts that maintain the same functionality and area as the current layout?

The above are not an exhaustive list, but examples of the exceptions we are looking to confirm would be considered if proposing certain Industrialized

Construction solutions referenced in the original RFP (Factor 5, paragraphs 2.a and

2.b.)

methods are acceptable.

However, any proposed adjustments to the layout must maintain the same overall functionality, habitability, and area as the current baseline layout.

General Guidance for Future

Exceptions:

The Government acknowledges that the items addressed above are examples and not an exhaustive list.

Offerors proposing IC solutions under Factor 5 should apply this same standard to any other prescriptive deviations: you must clearly indicate the proposed change in the proposal and demonstrate how the alternative maintains the overall performance and functionality required by the contract.

14 Survey Please provide a copy of the CAD files for the Survey/Civil Scopes

PENDING RESPONSE

15 RFP

Please confirm if the project has a

DD1391

This project has five associated DD1391s

Solicitati on

The solicitation includes references to two different periods of performance:

several for 1,461 Calendar Days and another for 1,825 calendar days in the

Project Schedule Narrative portion.

Please confirm the period of performance for the Project is 1,461

Calendar Days.

Period of Performance is

1,461 calendar days.

RFP

Room

Require ments

Confirm that the circulation corridors required ceiling height can be reduced from 10'-0" to 9'-4". The 10' min.

requirement will increase the overall building height of the buildings.

This is acceptable. There isn’t any prescribed ceiling height in either FC 4-721-10N or

UFC 4-721-01.

3.2.1.2

Provide the fire truck model of the

Cherry Point Ladder 251. Or provide its dimensions and wheelbase.

See included PDF for details.

B202001

Confirm that the aluminum windows are to not be operable. In this climate an operable window at the sleeping rooms combined with the packaged terminal air conditioners and heat pumps will create a risk for high humidity and mold inside the building.

The packaged units only have a limited capacity to dehumidify high

Correct.

latent loads which the outside air would introduct.

3.2.1.4

Provide sizing information on the drying areas and the number of separate sections noted in this paragraph. The FC 4-721-10N is referenced. Under FC 4-471-10N 5-

3.5 Exterior wash areas the drying

area section does not give any area requirement or give a number of required separate sections.

PENDING RESPONSE

RFP 2.4

Appropri ate

Design

Provide clarification on the required

Ligature Resistant Features of the project. Section D201005 Showers clearly notes ligature resistant type.

The RFP also references UFC 4-721-

01 Permanent Party Unaccompanied

Housing. Within that UFC section 3-

10 Ligature Resistant Features includes a long list of notes that are written in a loose language such as:

"where technically practicable, "encourage occupant wellness, "greatest extent possible, thoughtful detailing". This section leaves scope in the design open to many different reviewers interpretations.

Ligature resistant products of a residential nature are to be provided when they are commercially available.

Construction features of the building are to be designed to provide ligature resistance.

Electrical

Service

POC - A3-

A4

Changes -

AFTER

DEMO

Attachm ents C.7

Confirm that splices of existing MV cable in manholes following demolition of building transformers is allowed as indicated in attachment C.7

PENDING RESPONSE

23 D50 Chapter 6

Chapter 6, section D50 of the RFP indicates that a lightning protection system must be installed as required.

Based on NFPA 780, a lightning protection system is recommended for this site. However, since NFPA 780 is a standard and not a code, this does not mean one is strictly required.

Please confirm if a lightning protection system is desired at this site.

Yes, include lightning protection system

24 1

Part 3

Chapter

6 ESR

B10

Floor

Constructio n, Wall

Constructio n

Please confirm that wood construction

Type is not permitted per RFP ESR

B10. Please confirm that wood modular or IC components consisting of Wood shall not be used. Please confirm that products or materials utilized within the facility must be non-combustible and compatible with

IBC Construction Type 1 or 2.

Facility must be non-combustible and compatible with IBC Construction Type 1 or 2.

25 1 Part 3

Chapter

Exterior

Walls

The RFP mentions "Exterior bearing walls consisting of metal studs as the See response to PPI #16

6 ESR

B2010 primary floor or roof supporting structural element are not permitted."

Please confirm that light gauge steel modular is not permitted.

26 6

Part 3

Chapter

6 ESR

B201003

Insulation

& Vapor

Retarded

The RFP mentions "Provide thermal envelope performance testing through infrared thermography in accordance with RFP Part 4." No reference in Part

4 was found, please provide the requirements for thermal envelope performance testing.

Part 4 is included by reference and available on wbdg.org

27 1

PART 2

Spec

Section

01 35 13

3.1.1

Model Unit

Description

The RFP mentions "Provide a model unit" and omits the location. Please advise where the model unit should be provided.

Bid per RFP. Refer to Part 2, Spec 01 35 13, Paragraph

3.1.1, and coordinate with

Contracting Officer.

28 1

Part 3

Chapter

B10

Superstruct ure

The RFP mentions "Precast concrete tilt-up construction is not allowed."

Please confirm that non-structural concrete precast is allowed.

PENDING RESPONSE

29 1

Part 3

Chapter

6 ESR

B2010

Exterior

Walls

The RFP currently requires “cavity wall exterior wall systems” composed of an Exterior Closure and Exterior

Wall Backup Construction, with backup construction identified as cast-in-place concrete or concrete unit masonry. This reference refers to double wythe CMU & brick construction, which is no longer typical construction or cost-effective.

Further, this is not a requirement for structural code, BEAP, or UFC compliance. Please confirm that any exterior enclosure that complies with the BEAP mentioned in RFP Part 3

Chapter 4.3 Exterior Character and applicable UFCs may be provided.

Any exterior enclosure that complies with the BEAP mentioned in RFP Part 3

Chapter 4.3 Exterior Character and applicable UFCs may be provided.

30 2

Part 3B

Chapter

6 ESR

A101002

Deep

Foundation s

RFP Part 3A states "For east coast sites refer to specific requirements in chapter 3B." RFP Part 3B is labeled as

Part Three "A". Please confirm the bookmarked Part 3B ESR A10 takes precedence which states, "The building and first floor slab must be entirely supported by a pile foundation system consisting of either precast pre-stressed concrete piles or auger cast piles. "

PENDING RESPONSE

31 18

RFP Part

2 Spec

Section

01 33

10.05 20

3.3.2 Order

of

Precedence

The RFP contains Part 3A and Part

3B. Which takes precedence?

They are both Part 3 and equal with no precedence.

32 1

Part 3B

Chapter

3.1

Existing

Site

Conditions

The Part3B shows a single site and denotes approximate limits. RFP Part

6 Attachments show two sites, please

Confirmed. Site limits are as shown in Part 3B Chapter 3.1

Figure 1 - Site Limits confirm the site limits are shown correctly in Part 3B Chapter 3.1

Figure 1 - Site Limits

33 1

Part 3B

Chapter

3.1

Existing

Site

Conditions

Please confirm that facilities not listed for demolition within the Part 3B

Chapter 3.1 Figure 1 - Site Limits shall be protected in place. Please advise if access to them must be maintained through construction.

Confirmed. Facilities not listed for demolition are to be protected in place and access must be maintained to these facilities at all times per Div

01 specifications.

34 1

Part 3B

Chapter

3.1

Existing

Site

Conditions

Please confirm that facilities not listed for demolition within the Part 3B

Chapter 3.1 Figure 1 - Site Limits shall be protected in place. Please advise if access to them must be maintained through construction.

See response to PPI #33.

35 1

Part 6

Attachm ents

C.1

Existing

Conditions

Plan

Volume 4 Part 6 notes that CADD files and Survey notes are provided via separate attachment. Please send these documents.

PENDING RESPONSE

36 1

Part 6 ents

RFP Part 6 provides as-built drawings for 4296 and 4881 but does not include scope of work for the facilities. Please confirm there is no scope of work.

Propose per RFP. There is no scope for Buildings 4296 or

37 1

Part 3B

Chapter

3.1

Existing

Site

Conditions

RFP states "The existing site does not contain any vehicle parking areas or treatment related Stormwater Control

Measures (SCMs). However, full depth replacement of asphalt paving and underlying storm sewer associated with the existing parking lot to the northeast of the site is included in this project." Please provide the extents of the paving. Please confirm that DB

Team is exempt from providing UFC required parking spaces for this project.

Extents of paving are as shown on Topographic Survey

Plans V-102, V-103, and V-

104 in Part 6. DB Team is exempt from providing UFC required parking spaces in that area.

Who is responsible for asbestos testing, air monitoring, and final clearance letters?

The contractor is responsible for all air monitoring.

Contractor to hire a State

Licensed Asbestos Project

Monitor that will serve as the

Governments Project Monitor.

Contractor is responsible for all cost.

Who is responsible for the cost of hazardous materials project design, demolition specifications, or abatement plans (if applicable).

The contractor is responsible.

Is the contractor required to provide temporary water and power during asbestos abatement activities and for dust control, or will these utilities be provided by the Owner/GC?

Spec section 01 50 00 paragraph 3.2.2.b rates for

Electricity, Sanitary, and potable water should be provided in the spec. Those were provided to the NAVFAC team via email.

The hazardous materials report identifies lead-containing materials.

Can these materials remain in place and be demolished with the structure for disposal as construction and demolition debris, or are they required to be removed and disposed of separately prior to demolition activities?

Propose per the RFP. Follow all applicable OSHA, EPA, and state regulations.

Will the demolition contractor be required to provide backfill for excavated areas, including basements, foundations, utility trenches, or other below-grade removals? If backfill is required and testing of the backfill material and/or compaction is required, who is responsible for the associated testing and costs?

Propose per the RFP. The contractor is responsible for all associated testing and costs of backfill material.

Is the contractor required to obtain all demolition permits, close out permits upon completion, and provide final inspection approvals/sign-offs?

Propose per the RFP. Follow all applicable OSHA, EPA, and state regulations and

Navy/Marine Corps policies.

Are there any work-hour restrictions or site access limitations that must be considered?

Refer to Div 01 specifications in Part 2 for working hours.

What duration is being allotted to the selected firms for completion of the project, and specifically what duration is being allotted for the demolition scope of work?

Period of performance is included with the solicitation to include all scope of work with this contract.

Who is responsible for providing and maintaining perimeter fencing, barricades, and site security?

Contractor is responsible to maintain a secure site at all times. Refer to Div 01 specifications.

Will demolition contractors be permitted to damage existing pavement, curb and gutter, sidewalks, or other impervious surfaces during demolition operations, or will repairs be required at the contractor's expense?

Damage to existing facilities or supporting facilities by the contractor are required to be repaired at the contractor’s expense. Refer to Div 01 specifications. Limits are area of disturbance.

With the current plans, it is unclear exactly what is included in the demolition scope outside of the building footprint. Should demolition contractors assume demolition of the structure and all improvements within five (5) feet of the building, or is removal of additional pavement, sidewalks, curb and gutter, utilities, or other site improvements required?

PENDING RESPONSE

Do the mechanical/power brick enclosures associated with each

PENDING RESPONSE

structure (housing HVAC equipment, electrical equipment, and other mechanical systems) fall within the demolition scope, or are they to remain in place?

What closeout documentation is required from the demolition contractor upon completion of the demolition scope of work

(photographs, waste manifests, disposal tickets, certifications, reports, etc.)?

Propose per RFP. All waste manifest must be reviewed, approved, and signed by the installation's environmental department. Completed waste manifest must be included in closeout submittals.

51 5

Part 3

"A" -

Chapter

6/ESR

D40

D4040

D4040 Sprinkler Systems notes Fire

Sprinkler System Piping must be black steel. Is it acceptable to use

CPVC on the branch lines to the dwelling units as this has been acceptable on NFPA 13R projects.

Propose per RFP, ESR D4040

52 Part 3 "B"

Chapter

6/ESR

F20

F201006

F201006 Mechanical Systems notes to salvage and turnover to the gov't

"steam components" and "TEC's".

Please provide specific list and quantity of "steam components" and

"TEC's" the demolition contractor is to capture. Please also verify TEC is

Terminal Equipment Controller.

Information listed was provided for inclusion in RFP by GOV/Installation. Correct

TEC is Terminal Equipment

Controller. Refer to as-built drawings.

53 Part 3 "A" Chapter

D4020

D4020 notes Camp Lejeune and

MCAS New River do not have reliable power. If a fire pump is determined to be required in a facility with unreliable primary power, an emergency backup generator must be provided for the fire pump as a secondary power sources. D509002 then notes Camp Lejeune and MCAS

Cherry Point site do not have reliable power. Please confirm MCAS Cherry

Point does not have reliable power and generator is required.

PENDING RESPONSE

54 Part 3 "B" Chapter

3.1.2.4.4

Per Part three "B" - Chapter 3-

3.1.2.4.4 Natural Gas Service is

available and is to be used in lieu of steam. Vol 4, MCAS Cherry Point

Mechanical policies dated 8/30/23 note 31 states the primary heating source should utilize centralized steam, or if unavailable, utilize hot water boiler. Please verify Natural

Gas is to be used for heating.

Propose per RFP Part 3B.

Natural Gas is to be provided

Part 3B, 3.2.1.8.1

Section states to replace sewer mains to C Street, but survey does not extend that far. Please provide utility maps showing sewer line and manholes beyond survey limits

Part 3B, 3.2.1.8.1

Section states to replace sewer mains to manholes in E street. The survey does not show manholes in the street.

If there are not existing manholes, do they have to be added? Or can work start at existing manholes southeast of

E street?

PENDING RESPONSE

Part 3B, 3.1.2.1

Section refers to existing fire lanes 12' wide. If existing fire lanes need to be replaced, or for new fire lanes, what is the required paved width?

Per NFPA 1, fire truck access lane is 20-ft in width.

Part 3B, 3.1.2.1

Section states that we are replacing the storm drainage under the northeast parking lot. However, no survey was provided in that area. Please provide utility maps showing existing storm drainage in the parking lot.

PENDING RESPONSE

Survey

Sheet V-

There is existing pavilion shown within the work area south of buildings 4197 and 4198. Can this be removed? If needed for occupants of those buildings, can a new pavilion be provided to the north outside work area?

Pavilion outside of limits must remain.

Attachment

H; Vol 1 of

4, Page 103 of 605

01 33

10.05 20 2.2.1

The demolition of the existing barracks is on the critical path design and would like to submit as a fast track with only a prefinal and final design submissions. Then have a Site

Work volume and a Building Design volume that complies with Paragraph

2.2.2.

All required design submission milestones must be adhered to.

Attachment

H; Vol 4 of

4; page 3 of

Part Six -

Attachm ents

C. Site /

Utility

Informatio n

Please provide sanitary and storm piping including invert elevations

Invert elevations are shown on

Topographic Survey Plans.

Attachment

H; Vol 1 of

4, Page 536 of 605

3.0 Site

Analysis 3.2.1.8.1

Can the sanitary sewer replacement route, that is located off-site to C

Street, be provided, as discussed in

Sec. 3.2.1.8.1?

PENDING RESPONSE

Attachment

H; Vol 1 of

4, Page 547 of 605

Chapter

6.

Engineer ing

Systems

Require ments

A101002

Deep

Foundation s

Part Three A Chapter 6 section

A101002 Deep Foundations states

“The building and first floor slab must be entirely supported by a pile foundation system consisting of either precast pre-stressed concrete piles or auger cast piles”, will the government allow alternative foundation systems?

PENDING RESPONSE

Attachment

H; Vol 1 of

4, Page 600 of 605

Section

23 81 00 2.3.1.6.1

UFC 4-721-01, part 3-12 does not allow A2L refrigerants in the occupied space. All PTACs and PTHPs come with A2L refrigerants. Does this preclude PTACs and PTHPs from the project?

Attachment

H; Vol 1 of

4, Page 470 of 605

Chapter

6.

Engineer ing

Systems

Require ments

System

Description

The documents state a requirement for

PTHP which similar to a PTAC but incorporates for reversing valve to provide efficient heating. For serviceability and maintenance, other

DOW branches are moving away

PTAC units and the HP reversing valves adds an additional layer of complexity. Is this a specific base requirement or can betterment option be offered?

This is a specific base requirement for service and maintainability. See BCA for

PTHP.

Attachment

H; Vol 1 of

4, Page 603 of 605

Section

23 81 00 3.2.1

Air cooled chiller are utilized through the Cherry Point campus. Is that installation requirement or is a cooling tower an option? Cooling Towers are references in Section 23 81 00. D3030 does reference air cooled chillers.

Propose per RFP D3030.

Cooling towers are not included.

67 Solicitation Due Date

Please provide a 4 week bid extension to allow adequate time for design based on the level of bridging documents provided and for subsequent subcontractor pricing efforts.

PENDING RESPONSE

68 Solicitation Factor 5

Factor 5 Technical Solution requests a narrative inclusive of the Design

Methodology, Construction

Methodology, and Management Team sections. Factor 5 states that this narrative is limited to 8 pages. This is not nearly enough space to address all criteria requested in Factor 5 under each section. Please increase Factor 5 narrative page limit to 20 pages.

Propose per RFP.

69 Solicitation Factor 5

Factor 5 Technical Solution requests a

Management Team sections with a synopsis of key individuals. Please provide direction on what specific individuals are being requested and evaluation criteria for key individuals.

This will provide a level understanding of NAVFAC's expectations and evaluation criteria for this portion of the Management

Team narrative request.

Propose per RFP.

70 1

Part 3

Chapter

6 ESR

B10

Floor

Constructio n, Wall

Constructio n

Please confirm that wood construction

Type is not permitted per RFP ESR

B10. Please confirm that wood modular or IC components consisting of Wood shall not be used. Please confirm that products or materials utilized within the facility must be non-combustible and compatible with

IBC Construction Type 1 or 2.

See response to PPI #24

71 1 Part 3

Chapter

Exterior

Walls

The RFP mentions "Exterior bearing walls consisting of metal studs as the primary floor or roof supporting

See response to PPI #25

B2010 structural element are not permitted."

Please confirm that light gauge steel modular is not permitted.

72 6

Part 3

Chapter

6 ESR

B201003

Insulation

& Vapor

Retarded

The RFP mentions "Provide thermal envelope performance testing through infrared thermography in accordance with RFP Part 4." No reference in Part

4 was found, please provide the requirements for thermal envelope performance testing.

See response to PPI #26

73 1

PART 2

Spec

Section

01 35 13

3.1.1

Model Unit

Description

The RFP mentions "Provide a model unit" and omits the location. Please advise where the model unit should be provided.

See response to PPI #27

74 1

Part 3

Chapter

B10

Superstruct ure

The RFP mentions "Precast concrete tilt-up construction is not allowed."

Please confirm that non-structural concrete precast is allowed.

See response to PPI #28

75 1

Part 3

Chapter

6 ESR

B2010

Exterior

Walls

The RFP currently requires “cavity wall exterior wall systems” composed of an Exterior Closure and Exterior

Wall Backup Construction, with backup construction identified as cast-in-place concrete or concrete unit masonry. This reference refers to double wythe CMU & brick construction, which is no longer typical construction or cost-effective.

Further, this is not a requirement for structural code, BEAP, or UFC compliance. Please confirm that any exterior enclosure that complies with the BEAP mentioned in RFP Part 3

Chapter 4.3 Exterior Character and applicable UFCs may be provided.

See response to PPI #29

76 2

Part 3B

Chapter

6 ESR

A101002

Deep

Foundation s

RFP Part 3A states "For east coast sites refer to specific requirements in chapter 3B." RFP Part 3B is labels as

Part Three "A". Please confirm the bookmarked Part 3B ESR A10 takes precedence which states, "The building and first floor slab must be entirely supported by a pile foundation system consisting of either precast pre-stressed concrete piles or auger cast piles. "

PENDING RESPONSE

77 18

RFP Part

2 Spec

Section

01 33

10.05 20

3.3.2 Order

of

Precedence

The RFP contains Part 3A and Part

3B. Which takes precedence?

See response to PPI #31

78 1

Part 3B

Chapter

3.1

Existing

Site

Conditions

The Part3B shows a single site and denotes approximate limits. RFP Part

6 Attachments show two sites, please confirm the site limits are shown

See response to PPI #32 correctly in Part 3B Chapter 3.1

Figure 1 - Site Limits

79 1

Part 3B

Chapter

3.1

Existing

Site

Conditions

Please confirm that facilities not listed for demolition within the Part 3B

Chapter 3.1 Figure 1 - Site Limits shall be protected in place. Please advise if access to them must be maintained through construction.

See response to PPI #33

80 1

Part 3B

Chapter

3.1

Existing

Site

Conditions

Please confirm that facilities not listed for demolition within the Part 3B

Chapter 3.1 Figure 1 - Site Limits shall be protected in place. Please advise if access to them must be maintained through construction.

See response to PPI #34

81 1

Part 6

Attachm ents

C.1

Existing

Conditions

Plan

Volume 4 Part 6 notes that CADD files and Survey notes are provided via separate attachment. Please send these documents.

PENDING RESPONSE

82 1

Part 6 ents

RFP Part 6 provides as-built drawings for 4296 and 4881 but does not include scope of work for the facilities. Please confirm there is no scope of work.

See response to PPI #36

83 1

Part 3B

Chapter

3.1

Existing

Site

Conditions

RFP states "The existing site does not contain any vehicle parking areas or treatment related Stormwater Control

Measures (SCMs). However, full depth replacement of asphalt paving and underlying storm sewer associated with the existing parking lot to the northeast of the site is included in this project." Please provide the extents of the paving. Please confirm that DB

Team is exempt from providing UFC required parking spaces for this project.

See response to PPI #37

Existing

Site

Conditions

General Question: Please confirm if the existing building piles are required to be removed?

Per 3.2.1.12 Site/Building

Demolition - Any deep foundations will be saw cut a minimum of four feet below existing grade.

Existing

Site

Conditions

General Question: If contaminated soils are discovered do they need to be removed from the limits of construction or can they be capped by the slab with an air/vapor barrier under the slab?

PENDING RESPONSE

Existing

Site

Conditions

General Question: Do contaminated soils need to be taken off the base or if there is available storage for them on the base?

Remove contaminated soils from base.

General Question: Is there available space on the installation that can be used as a laydown area? If so, where

Contractor to submit for site approval and laydown area size request. Additional area may or may not be approved.

and what would be the approximate size of area?

General Question: Is there an area for office trailer complex near the construction site?

See response to PPI #87.

General Question: Is there available parking nearby for construction workers? There is limited space within the site boundary for this.

See response to PPI #87.

90 5

Part 3A

Chapter

6 / ESR

C30

C3030

C3030 mentions to see Part 3 Chapter

5 Room Requirements. When looking at that section, Part 3A Chapter 5 page

7, line item C303002 Gypsum wallboard ceiling finishes the far right column under "Specific

Requirements" is left blank. If drywall ceilings are required does it need to be impact resistant? Or can paint concrete ceiling be utilized?

Propose per RFP, utilize regular Gypsum Board as described in Part 3A, Chapter

6, ESR C303002 Gypsum

Wallboard Ceilings. Paint finish as described in Part 3A, Chapter 6, ESR C3010 Wall

Finishes.

91 53 BEAP 4.1.3.2

This paragraph mentions bricks that are red and modular in size. Can thin set brick be utilized in lieu of full modular brick?

No.

RFP illustrates PTAC units in the rooms. PTACs don't meet the STC rating of 55. Please clarify the expectation.

Contractor to provide PTACs and build walls to meet RFP sounds requirements.

93 2

Part 3A

Chapter

6 / ESR

C30

C301004

It is mentioned to provide full height wall tile on walls in restrooms, bathrooms and shower rooms. For restrooms and bathrooms tile required on just the wet walls or all walls?

Provide full height wall tile on all walls in restrooms, bathrooms, and shower rooms

(to exclude shower stalls).

94 2

Part 3A

Chapter

6 / ESR

C30

C301004

It is mentioned to provide full height wall tile on walls in restrooms, bathrooms and shower rooms. For the shower rooms (stalls in units) can we utilize cultured marble panels with a tile look? This will reduce maintenance, leak potential and will be easier to clean.

Propose per RFP.

95 3

Part 3A

Chapter

6 ESR

C10

C103016

It is mentioned that we are to provide a ceiling fan in each Living Unit. Can we confirm this requirement because with lower ceilings these could be an issue when it comes to improper use by some soldiers.

Each living unit must have a ceiling fan.

Amendm ent #5

Attachment

Figure 5.1

Items “I” and “J” refer to building height. Does Figure 5.1 apply to this project? It references Admin/Mixed-

Use/HQ BES under the chart. Please clarify.

Yes Figure 5.1 applies. Item

"L" should state "Refer to

BEAP"

Amendm ent #5

Attachment

Figure 5.1

Assuming that Figure 5.1 issued with

Amendment 5 does now apply to this

Project please advise if all parts of

Figure 5.1 now apply, and if not, advise which parts are intended to apply?

Amendm ent #5

Attachment

Figure 5.1

AM 005 states that Figure 5.1 is an excerpt from the "Cherry Point Area

Development Plan". Assuming Figure

5.1 now applies, at least in part, to this project will the GOVT be issuing the full/complete "Cherry Point Area

Development Plan" via Amendment and if so advising which parts of the document will be made a part of this

Project.

PENDING RESPONSE

Section

23 81 00

A2L

Refrigera nt

Section 23 81 00 cites ASHRAE 15 and 34 (2022) but does not specify an acceptable refrigerant for PTHPs.

AIM Act phasedown has effectively eliminated new R-410A PTHP production. A2L PTHPs (e.g., R-32) serving sleeping quarters are high-probability systems under ASHRAE

15, requiring refrigerant leak detection and occupant notification not addressed in the current spec.

Confirm: (1) A2L PTHPs are acceptable; (2) whether ASHRAE

15.2 compliance is required; (3) whether refrigerant leak detection integrated with MNS/fire alarm is in the DB contractor scope.

PENDING RESPONSE

Section

23 81 00

A2L

Refrigera nt -

ASHRA

E 15.2

Applicab ility

Section 23 81 00 cites ASHRAE 15 and 34 (2022) but does not cite

ASHRAE 15.2 (2022). A2L PTHPs serving occupied sleeping rooms are high-probability systems under

ASHRAE 15.2, which imposes refrigerant leak detection and occupant notification requirements not addressed in the current specification.

Confirm whether ASHRAE 15.2

(2022) compliance is required for plan unit PTHPs.

PENDING RESPONSE

Section

23 81 00

A2L

Refrigera nt - Leak

Detectio n and

MNS

Integrati on Scope

ASHRAE 15.2 (2022), applicable to high-probability A2L systems in occupied sleeping spaces, requires refrigerant leak detection and occupant notification. At 720 plan units, integration with the MNS/fire alarm system may be required. Section

23 81 00 does not address this scope.

Confirm whether refrigerant leak detection and MNS integration for

A2L plan unit PTHPs is included in the DB contractor scope.

PENDING RESPONSE

FC 4-

721-10N

§3-14.9

FC 4-721-10N Section 3-14.9 states

CCTV systems are not allowed at

Navy UH without prior authorization

Confirmed, this is in scope.

CCTV

Authoriz ation per CNIC M 11103.2 (pending final signature). The D50 ESR and

D503005 include CCTV conduit rough-in scope throughout the building. Confirm whether CNIC authorization for CCTV at MCAS

Cherry Point BEQ has been obtained, and whether the D503005 rough-in scope is authorized for design and installation.

FC 4-

721-10N

§3-14.9

CCTV

Rough-In

Scope

Authoriz ation

D503005 requires CCTV conduit and

Category 6A rough-in throughout the building, including hallways, lobbies, stairwells, building exterior, and other common areas. Confirm whether the

D503005 CCTV rough-in scope is authorized for design and installation under this contract.

Confirmed, this is in scope.

UFC 4-

721-01

§3-12

A2L

Refrigera nt

Section 23 81 00 prescribes PTHPs for plan units. UFC 4-721-01, Change 1

(12 March 2026), Section 3-12 states that HVAC systems using Class A2L refrigerants must keep all refrigerant lines and containment vessels exterior to occupied spaces. All current PTHP production uses A2L refrigerants (R-

32, R-454B) following the AIM Act phasedown of R-410A. A PTHP has its indoor coil (containment vessel) inside the occupied sleeping room by design. The prescriptive system and the UFC requirement are directly incompatible given current market conditions. Confirm: (1) whether the

PTHP prescription is superseded by

UFC 4-721-01 Change 1; (2) what compliant HVAC system type is acceptable for plan units; and (3) whether the government will issue a revised prescriptive specification.

Follow CHENG INTERIM

TECHNICAL GUIDANCE -

ALIGNING TO INDUSTRY

STANDARDS FOR CLASS

A2L REFRIGERANTS dated

30 April 2026.

UFC 4-

721-01

§3-12

Cherry

Point DX

Prohibiti on

Acceptab le Plan

Unit

System

If UFC 4-721-01 Change 1 Section 3-

12 renders A2L PTHPs non-compliant for plan units, and the Part 3B Cherry

Point supplement prohibits DX split systems, VRF, and DX VAV at this installation, no currently available DX system type satisfies both constraints.

Confirm what HVAC system type is acceptable for plan unit conditioning at MCAS Cherry Point.

Follow CHENG INTERIM

TECHNICAL GUIDANCE -

ALIGNING TO INDUSTRY

STANDARDS FOR CLASS

A2L REFRIGERANTS dated

30 April 2026.

UFC 4-

721-01

§3-12

Revised

Prescripti

UFC 4-721-01 Change 1 (12 March

2026) was issued prior to this solicitation. The prescriptive PTHP requirement in Section 23 81 00 appears to conflict with §3-12 of that ve

Specifica tion for

Plan

Units change. Confirm whether the government will issue a revised prescriptive specification for plan unit

HVAC that resolves this conflict.

UFC 4-

721-01

§3-17

FC 4-

721-10N

§3-14.5 -

Emergen cy Power

D50 ESR states MCAS Cherry Point does not have reliable power and implies a standby generator requirement where driven by code.

UFC 4-721-01 Section 3-17 states emergency power is not authorized in

UH. FC 4-721-10N Section 3-14.5 states emergency power is not required in UH. These criteria appear to conflict with the unreliable power statement in D50. Confirm: (1) whether a standby generator is required for this project notwithstanding the UFC/FC prohibition; and (2) how utility unreliability is to be addressed for fire pump reliability (NFPA 20) and elevator recall.

PENDING RESPONSE

UFC 4-

721-01

§3-17

Unreliabl e Power

Fire

Pump and

Elevator

Recall

NFPA 20 requires 120 minutes of backup power for fire pump rooms, and building code requires elevator recall power. UFC 4-721-01 Section

3-17 states emergency power is not authorized in UH. Confirm the acceptable means of achieving fire pump reliability and elevator recall at

MCAS Cherry Point given these conflicting requirements.