About this file

This is Standard Form 30 (SF 30), Amendment 0001 to a Request for Proposals (RFP) for a Design-Build Barracks Initiative at Marine Corps Air Station (MCAS) Cherry Point, North Carolina.

The amendment, issued on 27 March 2026 by NAVFACSYSCOM Mid-Atlantic (Norfolk, VA), modifies RFP N4008526R0053 originally dated 04 March 2026. The proposal submission deadline of 03 April 2026 at 1400 EDT remains unchanged. The amendment updates Evaluation Factor 2 (Experience) requirements, revising the recency threshold for construction experience projects from thirteen (13) years to fifteen (15) years from the RFP issuance date. For construction projects, offerors must submit projects completed within the past fifteen years that are at least 90% complete as of the RFP issuance date; projects completed prior to fifteen years are deemed "Not Relevant." For design experience, projects meeting the recency requirement must have design completion dates within fifteen years of RFP issuance, even if construction is ongoing. The amendment also provides responses to pre-proposal inquiries (PPIs) and updates Attachment C (Construction and Design Experience Project Data Sheet), both attached separately. No additional Phase I PPIs will be accepted. The document is signed by Contracting Officer Brittany N. Cristelli on 27 March 2026. Offerors must acknowledge receipt of this amendment prior to the proposal deadline using one of three methods specified in Item 11 of the SF 30.

View the file

Other files

File Type Posted
N4008526R0053 Site Visit Log.pdf PDF
Amendment 0010.pdf PDF
AMENDMENT 0009.pdf PDF
Amendment 0008 - D16 - Ladder 251 - Pierce Turning Performance Analysis.pdf PDF
AMENDMENT 0008.pdf PDF
Amendment 0008 - D15 - ITG A2L Refrigerants For Navy and MC Facilities.pdf PDF
Amendment 0008 PPI Responses.pdf PDF
Amendment 0008 - C9 - Storm Drain Replacement Exhibit.pdf PDF
Amendment 0008 - C8 - Cherry Point Site 1 Sanitary Plan.pdf PDF
AMENDMENT 0007.pdf PDF
Amendment 0007 PPI Responses.pdf PDF
Amendment 0006 PPI Responses.pdf PDF
AMENDMENT 0006.pdf PDF
AMENDMENT 0005.pdf PDF
Amendment 0005 D14 - Excerpt from Cherry Point Area Development Plan.pdf PDF
Amendment 0005 B2 Hazardous Materials Report Bldgs 4201 4294 4295 4296 4312.pdf PDF
Amendment 0005 Wage Determination NC20260018 05 18 26.pdf PDF
AMENDMENT 0004.pdf PDF
AMENDMENT 0003.pdf PDF
AMENDMENT 0002.pdf PDF
Attachment H - 1895345 MCAS CP DBRFP VOL3of4.pdf PDF
Attachment F - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Attachment I - Price Proposal Schedule.xlsx XLSX spreadsheet
Attachment H - 1895345 MCAS CP DBRFP VOL4of4.pdf PDF
Attachment H - 1895345 MCAS CP DBRFP VOL2of4.pdf PDF
CJA ML-25-03 Class FRCS Cherry Point - Redacted.pdf PDF
Attach H - MCASCP Sites Subsurface Soil Geotech Report.pdf PDF
Attachment H - 1895345 MCAS CP DBRFP VOL1of4.pdf PDF
Attachment G - SBSP.docx DOCX document
Attachment E - Historical Small Business Utilization.docx DOCX document
AMENDMENT 0001 Attachment C - Experience Project Data Sheet.docx DOCX document
AMENDMENT 0001 Pre-Proposal Inquiries.pdf PDF
Attachment C - Construction and Design Experience Project Data Sheet.docx DOCX document
N4008526R0053.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Block 14 (Description of Amendment/Modification): DESIGN-BUILD (DB) BARRACKS INITIATIVE (PACKAGE #1), MARINE CORPS AIR

STATION (MCAS) CHERRY POINT, NC

The purpose of this amendment is to:

1. Proposal due date of 03 April 2026 NLT 14:00 EDT remains unchanged.

2. Revised Factor 2, Experience (revisions shown in red text)

3. Provide responses to Pre-Proposal Inquiries (PPI's) (Attached separately)

4. Provide updated Attachment C - Construction and Design Project Data Sheet (Attached separately)

Section 00 00 00 - Procurement and Contracting Requirements

The following changes have been made:

Miscellaneous text in this section has been added to:

AMENDMENT 0001

The purpose of this amendment is to incorporate the following:

1. Proposal due date of 03 April 2026 NLT 14:00 EDT remains unchanged.

2. Provide updated Evaluation Factor 2, Experience Submittal Requirements (revisions shown in text). red

3. Provide Pre-Proposal Inquiry (PPI) responses (attached separately)

4. Provide an updated Attachment C - Experience Project Data Sheet (attached separately)

1. Proposal due date of 03 APRIL 2026 at 1400 EDT remains unchanged.

*Please note: No additional PPI's are Phase I will be accepted.

2. Provide updated Evaluation Factor 2, Experience Submittal Requirements

EVALUATION FACTORS FOR AWARD

Non-Price Factors:

:Factor 2, Experience

(i) Solicitation Submittal Requirements:

DELETE:

Construction Experience:

Projects submitted for the Offeror shall be completed within the past years of the date of issuance of this RFP. Projects which are thirteen (13) not complete as of the date of issuance of this RFP will be considered "Not Relevant." Additionally, projects completed prior to thirteen (13) years from the date of issuance of this RFP will be considered "Not Relevant."

Design Experience:

A project submitted under design experience will meet the recency requirement if the construction effort is ongoing, but the design completion date was reached within the years of the date of issuance of this RFP. Each relevant completion date shall be clearly stated on the thirteen (13) Construction & Design Experience Project Data Sheet.

REPLACE WITH:

N4008526R00530001

Construction Experience:

Projects submitted for the Offeror shall be completed within the past years of the date of issuance of this RFP. fifteen (15) Projects which are not at least 90% complete as of the date of issuance of this RFP will be considered "Not Relevant." Additionally, projects completed prior to fifteen

(15) years from the date of issuance of this RFP will be considered "Not Relevant."

Note: On the Construction & Design Experience Project Data Sheet, if final project completion has not been achieved by date of issuance of RFP, provide % of completion under completion date in Block 4.

Design Experience:

A project submitted under design experience will meet the recency requirement if the construction effort is ongoing, but the design completion date was reached within the years of the date of issuance of this RFP. Each relevant completion date shall be clearly stated on the fifteen (15) Construction & Design Experience Project Data Sheet.

3. Provide responses to Pre-Proposal Inquiry Responses (ATTACHED SEPARATELY)

(ATTACHED SEPARATELY)4. Updated Attachment C - Experience Project Data Sheet

(End of Summary of Changes)

Section 00 73 00 - Supplementary Conditions

The following attachments were added:

Amendment 0001 Pre-Proposal Inquiries

N4008526R00530001

IDCode: J
Page: 1
Pages: 3
AmendNo: 0001
EffDate: 27 Mar 2026
ReqNo: See Continuation Sheet
ProjNo:
IssCode: N40085
AdmCode:
IssuedBy: NAVFACSYSCOM MID-ATLANTIC

9324 VIRGINIA AVENUE, NORFOLK VA 23511-0395

NORFOLK, VA 23511-0395

UNITED STATES

Brittany Cristelli, Email: brittany.n.cristelli.civ@us.navy.mil Telephone: 757-341-1978 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: N4008526R0053
SolDate: 04 Mar 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: See Section 00 70 00 - Conditions of the Contract
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Schedule
ContNameTitle:
CoNameTitle: BRITTANY N. CRISTELLI
ContDate:
CODate: 27 Mar 2026

File details come from the government source that posted it. Updated .