Amendment 0008 - C8 - Cherry Point Site 1 Sanitary Plan.pdf
PDF 2 MB Posted
- Attached to
- DESIGN-BUILD (DB) BARRACKS INITIATIVE (PACKAGE #1), MARINE CORPS AIR STATION (MCAS) CHERRY POINT, NC
- Solicitation number
- N4008526R0053
About this file
This document is a Sanitary Sewer Replacement Exhibit drawing set for a federal construction project. The project involves the removal and replacement of sanitary sewer infrastructure at Cherry Point Site 1 in Havelock, North Carolina, as part of the FY26 USMC Barracks 2030 construction initiative under Naval Facilities Engineering Systems Command (NAVFAC) Mid-Atlantic, with Naval Station Norfolk, Virginia serving as the core activity.
The drawings (Sheets S-100 and S-101) depict the sanitary sewer system layout with multiple sanitary sewer manholes (SSMH #3 through #16) and indicate replacement of 15-inch and 21-inch diameter sanitary sewer lines. The technical specifications include rim elevations and invert elevations for each manhole, with pipe sizes ranging from 4 inches to 24 inches in PVC material. The project includes connection points to existing sanitary sewer infrastructure at C Street and E Street, with defined limits of field survey shown on both sheets. The drawings are scaled at 1 inch equals 40 feet and were revised as of December 19, 2025, with plotting dated March 20, 2026. The construction contract number is referenced as 1890969, Project Number 11, and the drawings are maintained by NAVFAC's Civil Engineering division under the supervision of identified design, review, and approval authorities.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
S
SS
S S S
S
S
S
S
CO
CO
CO
CO
CO
CO
CO
COCO
CO
CO
CO CO
CO
CO
CO
CO
CO CO CO
COCOCO
CO
SAN SAN SAN
SAN
SA
N
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
SA
N
SA
N
SA
N
SA
N
SAN SAN SANSAN SAN SAN SANSANSANSAN
X
X X
X X
X
X
X X
X X X X X X
X X X X X X X
X
X
X X
X
X X X X X X X X X
X
X
X X X X X X X
X
X
X
SSMH #2
SA
N
SA
N
SA
N
SA
N
SA
N
SAN SAN
S-100
S A
N
IT
A R
Y S
E W
E R
R E
P
LA
C E
M E
N T
E X
H
IB
IT
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
N A
V
FA
C D
C C
O R
E N
A V
A L
S
TA
TI
O
N
N O
R
FO
LK
, V
A
C H
E R
R Y
P O
IN
T
S
IT
E
H A
V E
LO
C
K , N
C
FY
U
S M
C B
A R
R A
C K
S
1890969
N/A SDP KJK
AS NOTED
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
DES DRW
M A
R K
D E
S C
R
IP
TI
O
N D
A
TE
DRAWFORM REVISION: 19 DEC 2025
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
FI
LE
N
AM
E:
K
:\2
8 U
SM
C
Ba rra ck s D
B
RF
P
FY
\05
_W or kin g F ile s\0
1_ Dr aw ing s\0 5_
Ci vil
\05 _S he et file s\C he rry
P oin t S ite
Sa nit ar y P lan
.dw g
LA
YO
UT
N
AM
E:
S -1
P
LO
TT
ED
: F rid ay
, M ar ch
, 2
6 - 4:
pm
U
SE
R:
Ja re d.N eil l
MA
TC
H
LIN
E
- S
EE
S
HE
ET
S -1
STRUCTURES
NORTH
40' 80'0
SCALE: 1" = 40'
SSMH #3: BEGIN SANITARY SEWER
REMOVAL AND REPLACEMENT
SSMH #4 SSMH #5 SSMH #6 SSMH #7
SSMH #11 SSMH #16
SSMH #10: BEGIN SANITARY SEWER
REMOVAL AND REPLACEMENT
LIMITS OF FIELD SURVEY
15-INCH SANITARY SEWER TO BE
REMOVED AND REPLACED
21-INCH SANITARY SEWER TO BE
REMOVED AND REPLACED
LIMITS OF FIELD SURVEY
SSMH #3
RIM: 21.21
INV. (10" PVC) 13.04
INV. (18" PVC) 12.41
INV. (20" PVC) 12.33
SSMH #4
RIM: 21.52
INV. (8" PVC) 11.95
INV. (20" PVC) 11.37
INV. (20" PVC) 11.53
SSMH #5
RIM: 21.59
INV. (8" PVC) 11.44
INV. (20" PVC) 11.28
INV. (20" PVC) 11.27
SSMH #6
RIM: 20.97
INV. (8" PVC) 11.07
INV. (20" PVC) 11.05
INV. (20" PVC) 11.03
SSMH #7
RIM: 19.86
INV. (4" PVC) 17.62
INV. (20" PVC) 11.20
INV. (20" PVC) 11.01
SSMH #10
RIM: 21.41
INV. (4" PVC) 14.41
INV. (10" PVC) 14.42
SSMH #11
RIM: 21.62
INV. (8" PVC) 14.19
INV. (10" PVC) 12.69
INV. (12" PVC) 12.31
SSMH #16
RIM: 20.20
INV. (8" PVC) 11.78
INV. (8" PVC) 11.35
INV. (15" PVC) 11.34
INV. (15" PVC) 11.14
E
ST
RE
ET
S
CO
CO
SAN
SANSANSAN
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SAN
SA
N
SAN SAN SAN SAN SAN
S
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SANSA
N
SA
N
SA
N
SAN SAN SAN SAN SAN
SA
N
SA
N
SA
N
SAN SAN SAN SAN SAN
S-101
S A
N
IT
A R
Y S
E W
E R
R E
P
LA
C E
M E
N T
E X
H
IB
IT
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
N A
V
FA
C D
C C
O R
E N
A V
A L
S
TA
TI
O
N
N O
R
FO
LK
, V
A
C H
E R
R Y
P O
IN
T
S
IT
E
H A
V E
LO
C
K , N
C
FY
U
S M
C B
A R
R A
C K
S
1890969
N/A SDP KJK
AS NOTED
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
DES DRW
M A
R K
D E
S C
R
IP
TI
O
N D
A
TE
DRAWFORM REVISION: 19 DEC 2025
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
FI
LE
N
AM
E:
K
:\2
8 U
SM
C
Ba rra ck s D
B
RF
P
FY
\05
_W or kin g F ile s\0
1_ Dr aw ing s\0 5_
Ci vil
\05 _S he et file s\C he rry
P oin t S ite
Sa nit ar y P lan
.dw g
LA
YO
UT
N
AM
E:
S -1
P
LO
TT
ED
: F rid ay
, M ar ch
, 2
6 - 4:
pm
U
SE
R:
Ja re d.N eil l
NORTH
40' 80'0
SCALE: 1" = 40' 2
MA
TC
H
LIN
E
- S
EE
S
HE
ET
S -1
STRUCTURES
SSMH #15
CONNECTION TO EXISTING
SANITARY SEWER AT C STREET
LIMITS OF FIELD SURVEY
SSMH #14
SSMH #13
SSMH #13
RIM: 20.72
INV. (8" PVC) 11.18
INV. (24" PVC) 10.27
INV. (15" PVC) 10.17
SSMH #14
RIM: 20.97
INV. (8" PVC) 15.37
INV. (15" PVC) 10.10
INV. (15" PVC) 10.38
SSMH #15
RIM: 20.56
INV. (15" PVC) 10.76
INV. (15" PVC) 10.70
15-INCH SANITARY SEWER TO BE
REMOVED AND REPLACED
21-INCH SANITARY SEWER TO BE
REMOVED AND REPLACED
21-INCH SANITARY SEWER TO BE
REMOVED AND REPLACED
SANITARY SEWER TO BE
REMOVED AND REPLACED
SANITARY SEWER TO BE
REMOVED AND REPLACED
C
ST
RE
ET
| Sheets and Views |
| Cherry Point Site 1 Sanitary Plan-S-100 |
| Cherry Point Site 1 Sanitary Plan-S-101 |
File details come from the government source that posted it. Updated .