Attachment C - Construction and Design Experience Project Data Sheet.docx
DOCX document 41 KB Posted
- Attached to
- DESIGN-BUILD (DB) BARRACKS INITIATIVE (PACKAGE #1), MARINE CORPS AIR STATION (MCAS) CHERRY POINT, NC
- Solicitation number
- N4008526R0053
About this file
This is a Construction and Design Experience Project Data Sheet template used to document prior project experience relevant to the Design-Build Barracks Initiative at Marine Corps Air Station Cherry Point, North Carolina. Contractors and design-build teams must complete this form to demonstrate their qualifications for the solicitation N4008526R0053.
The form captures essential project information including the firm name, UEI number, contract role (prime contractor, subcontractor, or joint venture), and the percentage of work performed. Respondents must document the project's award date, completion date, contract type (firm-fixed price, cost/time and material), and the nature of work performed (new construction, renovation, repair, or alteration). For construction projects, the form requires the award amount, final price, and delivery method (design-build, design-bid-build, or IDIQ task order). For design projects, the form requests the A-E design fee, total construction value, and contract type (design-build, RFP development, designer of record, engineering services, or full plans and specifications). Additionally, respondents must provide detailed descriptions of project scope and relevance to the barracks initiative requirements, including unique features, square footage, construction methods, sustainable certifications, and specific work self-performed by the firm. This template serves as an appendix to establish contractor experience and capability for a project involving demolition of five Bachelor Enlisted Quarters Buildings and replacement billeting capacity for 1,440 personnel.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT B
CONSTRUCTION & DESIGN EXPERIENCE PROJECT DATA SHEET
Project No. (check one) : |_| CON #1 |_| CON #2 |_| CON #3 |_| CON #4 |_| CON #5
|_| DESIGN #1 |_| DESIGN #2 |_| DESIGN #3 |_| DESIGN #4 |_| DESIGN #5
1. Experience for: |_| Offeror |_| Joint-Venture |_| Other (Explain)
Firm Name:
Address:
Phone Number:
Unique Entity Identifier (UEI) Number:
Point of Contact: Contact Phone Number:
2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain)
Percent of project work performed:
If subcontractor, who was prime (Name/Phone #):
3. Contract Number: Delivery/Task Order Number:
Title:
Location:
4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):
5. Type of work:
|_| New Construction |_| Renovation |_| Repair |_| Alteration |_| Other (explain):
6. Type of Contract/Task Order: (Check ALL that apply)
|_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):
Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.
7. Construction Project:
Award Amount: Final Price:
Type of Contract/Task Order: (Check ALL that apply)
|_| Design-Build |_| Design-Bid-Build |_| Delivery/Task Order (IDIQ) |_| Other (explain):
If Design-Build, identify the Lead Design Firm:______________________________________________
8. Design Project:
A-E Design Fee: Total Construction Value:
Type of Contract/Task Order: (Check ALL that apply)
|_| Design-Build |_| RFP Development |_| Designer of Record |_| Engineering Services |_| Full Plans & Specs
|_| Other (explain):
9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or Third Party sustainable certifications. If design-build, include a description of the design-effort.
10. Provide a detailed description of what work your firm self-performed on this project:
11. Other Information:
File details come from the government source that posted it. Updated .