About this file

This is Amendment 0010 to Solicitation N4008526R0053, issued by NAVFAC SYSCOM MID-ATLANTIC on 10 July 2026, with an effective date of 10 July 2026. The amendment modifies the Design-Build (DB) Marine Corps Barracks Initiative (Package #1) for Marine Corps Air Station Cherry Point, North Carolina. The Phase II proposal due date of 14 July 2026 at 1400 EDT remains unchanged and is not extended. Offerors must acknowledge receipt of this amendment prior to the proposal submission deadline through one of three methods: completing and returning items 8 and 15 of the amendment, acknowledging receipt on each copy of the offer submitted, or submitting a separate letter or electronic communication referencing the solicitation and amendment numbers. Failure to acknowledge receipt at the designated location by the specified date and time may result in rejection of the offer.

The amendment updates clause 52.211-12 Liquidated Damages-Construction (September 2000) under Section 00 70 00 - Conditions of the Contract. The revised clause specifies that if the Contractor fails to complete the work within the time specified in the contract, liquidated damages of $19,149.52 per calendar day of delay shall accrue until work completion or acceptance. If the Government terminates the Contractor's right to proceed, liquidated damages continue to accrue until the work is completed, in addition to excess costs of repurchase under the Termination clause. All other terms and conditions of the referenced solicitation remain unchanged and in full force and effect.

View the file

Other files

File Type Posted
N4008526R0053 Site Visit Log.pdf PDF
AMENDMENT 0009.pdf PDF
Amendment 0008 - D16 - Ladder 251 - Pierce Turning Performance Analysis.pdf PDF
AMENDMENT 0008.pdf PDF
Amendment 0008 - C9 - Storm Drain Replacement Exhibit.pdf PDF
Amendment 0008 - C8 - Cherry Point Site 1 Sanitary Plan.pdf PDF
Amendment 0008 - D15 - ITG A2L Refrigerants For Navy and MC Facilities.pdf PDF
Amendment 0008 PPI Responses.pdf PDF
AMENDMENT 0007.pdf PDF
Amendment 0007 PPI Responses.pdf PDF
Amendment 0006 PPI Responses.pdf PDF
AMENDMENT 0006.pdf PDF
AMENDMENT 0005.pdf PDF
Amendment 0005 B2 Hazardous Materials Report Bldgs 4201 4294 4295 4296 4312.pdf PDF
Amendment 0005 Wage Determination NC20260018 05 18 26.pdf PDF
Amendment 0005 D14 - Excerpt from Cherry Point Area Development Plan.pdf PDF
AMENDMENT 0004.pdf PDF
AMENDMENT 0003.pdf PDF
AMENDMENT 0002.pdf PDF
Attachment H - 1895345 MCAS CP DBRFP VOL3of4.pdf PDF
Attachment F - Small Business Participation Commitment Document (SBPCD).docx DOCX document
CJA ML-25-03 Class FRCS Cherry Point - Redacted.pdf PDF
Attach H - MCASCP Sites Subsurface Soil Geotech Report.pdf PDF
Attachment H - 1895345 MCAS CP DBRFP VOL1of4.pdf PDF
Attachment G - SBSP.docx DOCX document
Attachment E - Historical Small Business Utilization.docx DOCX document
Attachment I - Price Proposal Schedule.xlsx XLSX spreadsheet
Attachment H - 1895345 MCAS CP DBRFP VOL4of4.pdf PDF
Attachment H - 1895345 MCAS CP DBRFP VOL2of4.pdf PDF
AMENDMENT 0001.pdf PDF
AMENDMENT 0001 Attachment C - Experience Project Data Sheet.docx DOCX document
AMENDMENT 0001 Pre-Proposal Inquiries.pdf PDF
Attachment C - Construction and Design Experience Project Data Sheet.docx DOCX document
N4008526R0053.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

Created On:

10 Jul 2026, 17:59 PM Greenwich Mean Time

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section 00 22 16 - Supplementary Instructions to Proposers

Miscellaneous text in this section has been added to:

The purpose of this amendment is to incorporate the following:

1. Phase II proposal due date of 14 July 2026 NLT 1400 EDT remains unchanged.

2. The following clause has been updated: 52.211-12 Liquidated Damages-Construction.

Section 00 70 00 - Conditions of the Contract

Additional Information/Notes

The following clauses were modified:

52.211-12Liquidated Damages-Construction.Sep 2000 hereby reads as follows:

Liquidated Damages-Construction (Sept 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of for each calendar day of delay until the work is completed or accepted.$19,149.52

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

N4008526R00530010

IDCode: J
Page: 1
Pages: 2
AmendNo: 0010
EffDate: 10 Jul 2026
ReqNo: See Continuation Sheet
ProjNo:
IssCode: N40085
AdmCode:
IssuedBy: NAVFACSYSCOM MID-ATLANTIC

9324 VIRGINIA AVENUE, NORFOLK VA 23511-0395

NORFOLK, VA 23511-0395

UNITED STATES

Brittany Cristelli, Email: brittany.n.cristelli.civ@us.navy.mil Telephone: 757-341-1978 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: N4008526R0053
SolDate: 04 Mar 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: See Section 00 70 00 - Conditions of the Contract
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: DESIGN-BUILD (DB) MARINE CORPS BARRACKS INITIATIVE (PACKAGE #1), MARINE CORPS AIR STATION (MCAS) CHERRY POINT, NORTH CAROLINA

The Phase II proposal due date of 14 July 2026 NLT 2:00 P.M. EDT remains unchanged.

SEE CONTINUATION PAGE(S)

ContNameTitle:
CoNameTitle:
ContDate:
CODate: