This document is Section F of multiple federal contract solicitations, specifying deliverables and performance requirements across several service categories: Base Operations and Maintenance (0200000), Facility Investment (1502000), Pest Control (1503020), Electrical Power Generation/Transmission/Distribution (1602000), and Base Support Vehicles and Equipment (1700000).
For Base Operations and Maintenance (0200000), the contractor must submit numerous reports and plans within specified timeframes prior to and during contract performance. Key deliverables include permits and licenses (before work commences), gas-free certifications (within 15 calendar days of award), certificates of insurance (within 15 calendar days prior to start), cybersecurity incident reports (immediately upon discovery), work schedules (monthly submissions), quality management plans (within 15 calendar days prior to start), safety-related documents including accident prevention plans and activity hazard analyses, environmental protection plans, personnel lists with security clearances, and daily contractor reports. Submissions are distributed to the Contracting Officer (KO) and Contracting Officer's Representative (COR), with frequencies ranging from daily to annually depending on the deliverable type. For Facility Investment (1502000), deliverables include as-built drawings, preventive maintenance and integrated maintenance program plans, monthly summary reports, water treatment test results, boiler testing programs, security system repair reports, cathodic protection system reports (monthly and quarterly), HVAC reports (twice daily), inspection and certification schedules, and numerous specialized system reports (exterior lighting, grease traps, airfield lighting, storm drainage, fuel storage tanks, bachelor quarters, aircraft hangars, ice storage, oil-water separators, solar panels, galley hoods, propane air blenders, UPS batteries, and HERO systems). Most submissions are distributed to KO/COR/Project Administrative Representative (PAR) with copies ranging from one to three. Pest Control (1503020) requires state certifications for contractor personnel (15 calendar days prior to work), local/state business licenses, permits (5 days prior to work), ULV equipment calibration reports (15 days prior and every 50 hours thereafter), planned pesticide use sheets with labels and safety data sheets (submitted with proposal), work plans, and monthly summary reports of pest management operations and termite/wood decay inspections. Electrical Power Generation (1602000) deliverables include certifications and training (5 days prior to commencement), critical spare parts inventory (15 days after award), monthly summary reports, preventive maintenance plans for electrical distribution systems, PM and IMP schedules and status reports, utility outage reports, operating records and logs, and meter reading reports. Base Support Vehicles and Equipment (1700000) requires monthly summary reports, vehicle accident reports (SF-91 form), GSA mileage and fuel usage reports, maintenance schedules, testing and certification qualifications, crane maintenance inspection records, and fuel truck calibration reports, with most submissions due by the 25th of the preceding month.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section F
Section F 0200000
Deliveries of Performance
DELIVERABLES
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.2.1.2 N/A Request to Work
Outside
Government’s
Regular Working
Hours
At least seven calendar days prior to requested day.
KO and
COR
1 As required
2.3.4 N/A Permits and
Licenses
Before work commences and as requested by the KO.
KO and
COR
1 As specified
2.3.4.2 N/A Gas Free
Certifications
Within 15 calendar days after contract award
KO and
COR
1 As specified
2.3.5 N/A Certificate of
Insurance
Within 15 calendar days prior to contract start.
KO and
COR
1 As specified
2.3.5 N/A Written Notice of
cancellation or material change in policy coverage
At least 30 calendar days prior to cancellation or material change in policy coverage
KO and
COR
1 As required
2.5.1 N/A Material Safety
Data Sheets
Within 30 calendar days after contract award and upon changes
KO and
COR
1 As specified
2.6.1 N/A Cybersecurity
Incident
Immediately upon discovery during regular working hours and by
0800 the following work day for discoveries after regular working hours
KO, COR,
and
Command
Security
Manager
1 As required
DELIVERABLES
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.6.4 N/A Scheduling and
Work Status
Updates
Weekly, within
30 minutes of the inquiry during regular working hours, and by
08:00 the following work day for inquiries after regular working hours
KO and
COR
1 As
Specified
2.6. N/A Work Schedules Within 15
calendar days prior to contract start, 10 days prior to the beginning of the month in which services are scheduled to be performance, and within two calendar days of changes.
COR 1 Monthly
2.6.5 N/A Notification of any
Difficulty in
Scheduling Work
By the end of each workday
KO and
COR
1 As required
2.6.6 N/A Status of
Deliverables
Within 30 minutes of the inquiry during regular working hours, and by
0800 the following work day for inquiries after regular working hours
KO and
COR
1 As required
2.6.7 N/A Service
Interruptions
At least five working days in advance
KO and
COR
1 As required
2.6.7 N/A Excavation
Request Form
Within 10 calendar days of excavation
KO and
COR
1 As required
2.6.9.2 N/A Pipe Delimited
Flat-File
By the end of each workday
KO or a representat ive designated by the KO
1 Daily
DELIVERABLES
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.6.9.2 N/A Sample Pipe
Delimited Flat-File
Within 30 calendar days prior to contract start.
KO or a representat ive designated by the KO
1 As required to demonstrat e the ability to properly format the flat-file
2.6.9.2 J-0200000-18 Asset and
Specification Data
When an asset is repaired, replaced, installed, or otherwise affected
KO or a representat ive designated by the KO
1 As required
2.6.9.3 N/A List of personnel
requiring access to
Government’s
USMCMAX
Within 30 calendar days prior to contract start.
KO and
COR
1 As specified
2.6.10.1 N/A Quality
Management Plan
Within 15 calendar days prior to contract start.
KO and
COR
1 As specified
2.6.10.1 N/A Revised Quality
Management Plan
Within seven calendar days of changes.
KO and
COR
1 As specified
2.6.10.2 N/A QC Inspection File Within five
calendar days of completion/ termination of the contract.
KO and
COR
1 As specified
2.6.10.3 N/A Contractor Quality
Inspection and
Surveillance
Report
First work day of each month.
KO and
COR
1 Monthly
2.6.11 N/A Property
Management Plan
Within 45 calendar days after award.
KO and
COR
1 As specified
2.7.1 N/A List of Key
Personnel and
Qualifications
Within 15 calendar days prior to contract start
KO and
COR
1 As specified
2.7.1 N/A Organizational
Chart
Within 15 calendar days prior to contract start
KO and
COR
1 As specified
2.7.2.6 N/A Proof of Legal
Residency
Prior to be admitted to site of work.
KO and
COR
specified
DELIVERABLES
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.7.2.6 N/A Proof of United
States of America
Citizenship
Prior to be admitted to site of work.
KO and
COR
1 As specified
2.7.3 N/A Service Contract
Reporting (SCR)
No later than 31
October
KO and
COR
1 Annually for labor executed during the period of performanc e during each
Governmen t fiscal year
(FY)
2.8.1 N/A Employee List Within 15
calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As required
2.8.8 N/A OF-306
Declaration for
Federal
Employment and
Digital
Fingerprints
Prior to commencement of work
KO, COR,
and
Security
Manager
1 As required
2.8.9 N/A List of personnel
requiring access to and the justification for their access to
Government IT, OT, and FRCS
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR,
and
Security
Manager
1 As required
2.9.2 N/A Accident
Prevention Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
2.9.3 N/A Activity Hazard
Analysis
Together with the
Accident
Prevention Plan and within seven calendar days of and changes.
KO and
COR
DELIVERABLES
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.9.4 N/A Compliance Plans, Programs, and
Procedures
Together with the
Accident
Prevention Plan and within seven calendar days of and changes.
KO and
COR
1 As specified
2.9.4.6 N/A Control of
Hazardous Energy
(lockout/tagout)
Within 30 calendar days after annual inspection.
KO and
COR
1 Annually
2.9.6 J-0200000-05-
NAVFAC
Contractor Incident
Reporting System
(CIRS)
Within five calendar days of accident.
KO and
COR
1 As required
2.9.6 J-0200000-05-
Weight Handling
Equipment
Accident Report
Within 15 working days of accident.
KO and
COR
1 As required
2.9.6 J-0200000-05-
Crane and Rigging
Gear Near Miss
Report
Within 15 working days of accident.
KO and
COR
1 As required
2.9.8 N/A Monthly On-Site
Labor Report
First work day of each month.
KO and
COR
1 Monthly
2.9.9 N/A OSHA Citations
and Violations
Corrective Action
Report
Within 48 hours after receiving a citation.
KO and
COR
1 As required
2.9.10 N/A Safety Inspection
and Monitoring
Report
Upon request. KO and
COR
1 As required
2.9.11 N/A Safety
Certifications
Within 15 calendar days prior to contract start and as old certifications, expire.
KO and
COR
1 As specified
2.10 N/A EMS Goals and
Policy
Measurement
Information
Upon request. KO and
COR
1 As required
2.10.2 N/A Environmental
Protection Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
2.10.2.1 N/A List of equipment Upon request. KO and
COR
DELIVERABLES
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.10.2.1 N/A Software data Files Provide Quarterly KO and
COR
1 As specified
2.10.2.1 N/A Leak rate
calculations
Upon request. KO and
COR
1 As specified
2.10.2.1 N/A Class I and II ODS
Report
Within 24 hours following delivery of refrigerant to
DLA
KO and
COR
1 As required
2.10.2.2 N/A Solid Waste
Management and
Recycling Reports
First work day of each month.
KO and
COR
1 Monthly
2.10.2.2 N/A Summary Solid
Waste
Management and
Recycling Report
By October 10th KO and
COR
1 Annually
2.10.2.5 N/A Emergency
Planning and
Community Right-
To-Know Act
(EPCRA) Report
Within 15 calendar days prior to contract start and not less than 10 working days prior to planned use of hazardous material.
KO and
COR
1 As specified
2.10.2.5 J-0200000-08 Contractor
Hazardous
Material Inventory
Log
Within 15 calendar days after the end of each calendar year and at termination of the contract.
KO and
COR
1 Annually
2.10.2.9 N/A Asbestos
Containing
Material (ACM)
Verbally notify the KO and COR within one hour and follow-up with written
Notification within 24 hours
KO and
COR
1 As specified
2.10.3 N/A Sustainable
Procurement and
Practices Plan
Within 15 calendar days prior to contract start and within
15 calendar days after exercised option periods.
KO and
COR
1 Annually
DELIVERABLES
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.10.3 N/A Sustainable
Delivery of
Services Report
Within five calendar days after each contract period.
KO and
COR
1 Annually
2.10.3.2 N/A Recovered
Material
Certification
As specified KO and
COR
1 When a product containing recovered materials is equal to or better than the original and could be used.
2.11 N/A Mission
Critical/Mission
Essential Personnel
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
2.12 N/A Technical Library
Table of Contents
Within 15 calendar days after contract start and within seven calendar days of changes
KO and
COR
1 As specified
2.12.1 N/A Facility History
File
Within 30 calendar days of contract completion
KO and
COR
1 As specified
2.13.1 N/A Warranty
Information File
Within 15 calendar days of work completion
KO and
COR
1 As specified
2.14 N/A Contractor Daily
Report
Daily KO and
COR
1 Daily
2.15.1 N/A Recurring Work
Proposals
Within five calendar days following receipt of request
KO and
COR
1 As required
2.15.2 N/A Notification to the
Government for
Work Above the
Recurring Work
Limitations and
Rough Order of
Magnitude
Within two hours of identification
KO and
COR
1 As required
DELIVERABLES
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.16.1.1 N/A Non-Recurring
Work Quantities
Ordered via
FedMall
By the fifth day of the following month
KO and
COR
1 Monthly
2.16.2.1 N/A Non-Recurring
Work Proposals
Within two working days following receipt of request
KO 1 As required
1502000 – Facility Investment
SECTION F: DELIVERIES OR PERFORMANCE
DELIVERABLES
Annex/
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of
Copies
(including original)
2.2.1 N/A
Certification and
Licenses
Within 15 days after award or as requested by the
KO
KO/COR/
PAR
1 Once for initial submittal, then as requested
2.5.1 N/A As Built Drawings Within 5
business days after project completion
KO/COR/
PAR
3 Maintain current and provide to KO as requested.
2.5.2 N/A New Facilities
Inventory
Within 30 calendar days after project completion
KO/COR/
PAR
3 Maintain current and provide to KO as requested
3 N/A Maintenance, repair, alteration data
Within 24 hours of KO request
KO/COR/
PAR
1 Maintain current and provide to KO as requested
3, 3.2, 3,4, and 3.5
N/A Monthly Summary
Report
Within 3 business days of the beginning of each month and as requested
KO/COR/
PAR
3 Monthly/As
Requested
3.2 N/A
Preventive
Maintenance
Program Plan
30 calendar days after contract award
KO/COR/
PAR
3 Annually
3.2 N/A PM Work Schedule Within 30
calendar days before the following month
KO/COR/
PAR
3 Monthly
3.2 N/A PM Maintenance
and Repair Status
Report
Within 5 business days of the beginning of each month
KO/COR/
PAR
3 Monthly
3.2.1 N/A Water Treatment
Test Results
As required KO/COR/
PAR
1 Monthly prior to invoicing
3.2.1 N/A Dip Slide Results Within 7 days of
sampling
KO/COR/
PAR
1 Monthly
3.2.1 N/A Corrosion Coupons Within one
month of pulling coupons
KO/COR/
PAR
1 Semi annually
3.2.2.1 N/A Override/Bypass/
Manual Report
Daily/As
Required
KO/COR/
PAR
3 Daily/As
Required
3.2.2.1 N/A System Alarm
Report
As required KO/COR/
PAR
3 As required
3.2.3 N/A Boiler Water
Testing and
Treatment Program
30 calendar days after contract award
KO/COR/
PAR
3 As Required
3.2.3 N/A Boiler Water
Treatment Test
Report
As required KO/COR/
PAR
1 Monthly prior to invoicing
3.2.4 N/A Security Systems
and Equipment
Repair Report
Within 5 business days after repair completion
KO/COR/
PAR
3 As Required
3.2.6 J-15020000-
Cathodic Protection
Systems Monthly
Report
Monthly KO/COR/
PAR
3 Monthly
3.2.6 J-15020000-
14-01
Cathodic Protection
Systems Quarterly
Report
Quarterly KO/COR/
PAR
3 Quarterly
3.2.10 N/A Water Quality
Testing Report
First work day of each month
KO/COR/
PAR
1 Monthly
3.2.11 N/A Repairs to Arresting
Gear
As required KO/COR/
PAR
1 Monthly
3.2.12 N/A Generator testing
schedule
As required KO/COR/
PAR
2 Within 30 days after award
3.2.12 J-1502000-
31-16
Air Quality Report First work day of each month
KO/COR/
PAR
1 Monthly
3.2.16 N/A Backflow
Prevention Testing and Certification
Report
As required KO/COR/
PAR
1 As required
3.3 N/A
Integrated
Maintenance
Program Plan
30 calendar days after contract award
KO/COR/
PAR
2 Annually
3.3 N/A IMP Work Schedule Within 10
calendar days before the following month
KO/COR/
PAR
3 Monthly
3.3 N/A IMP Maintenance
and Repair Status
Report
Within 5 business days of the beginning of each month
KO/COR/
PAR
3 Monthly
3.3.1 J-1502000-
21-04
Daily AM/PM
HVAC report
Twice daily KO/COR/
PAR
1 Daily
3.3.2 N/A Fuel Usage and
Readings
As required KO/COR/
PAR
1 Weekly
3.4 N/A
Inspection, Testing, and Certification
Program Summary
Report
First work day of each month
KO/COR/
PAR
2 Monthly
3.4 N/A
Inspection, Testing and Certification
Schedule and
Equipment
Certifications
First work day of each month
KO/COR/
3.4 N/A Defect Report As required KO/COR/
2 2 working days following inspection
3.4.1 and
3.4.4
N/A VTE is ready
Notification for
Certification
As required KO/COR/
PAR
2 30 calendar day prior to certification
3.4.1 and
3.4.4
N/A VTE Inspection and
Test Report
As required KO/COR/
PAR
2 2 working days following inspection
3.4.2 N/A Fall Protection
System Inspection and Test Report
As required KO/COR/
PAR
2 2 working days following inspection
3.4.3 N/A WHE is ready
Notification for
Certification
As required KO/COR/
PAR
2 5 calendar day prior to certification
3.4.3 N/A Certification of
Load Test and
Crane Condition
Inspection Record
As required KO/COR/
PAR
2 2 working days following inspection
3.4.5 N/A Boiler is ready
Notification for
Certification
As required KO/COR/
PAR
2 5 calendar day prior to certification
3.4.5 N/A Interruption of
services and repair schedule.
As required KO/COR/
PAR
2 Within 10 working days prior to interruption.
3.4.6 N/A Back Flow is ready
Notification for
Certification
As required KO/COR/
PAR
2 5 calendar day prior to certification
3.4.7 N/A Storm Drainage
Reports
As required/
Quarterly
KO/COR/
PAR
2 1 week prior to the end of every quarter
3.5.1 N/A Exterior Lighting
Systems Monthly
Work Summary
Monthly KO/COR/
PAR
2 Monthly
3.5.2 N/A Grease Traps
Monthly Work
Summary
Monthly KO/COR/
PAR
2 Monthly
3.5.3 J-1502000-28 Airfield Lighting
Systems Log Book
As required KO/COR/
PAR
2 As required
3.5.3 N/A Airfield Lighting
Systems Monthly
Work Summary
Monthly KO/COR/
PAR
2 Monthly
3.5.4 N/A 400 HZ Converters
Monthly Work
Summary
Monthly KO/COR/
PAR
2 Monthly
3.5.5 J-1502000-
31-15
Storm Water Best
Practices Check List
Quarterly KO/COR/
PAR
2 Quarterly
3.5.5 N/A Storm Drainage
Systems Monthly
Work Summary
Monthly KO/COR/
PAR
2 Monthly
3.5.6 J-1502000-
31-01 through
Fuel Storage
Tanks/Facilities
As required KO/COR/
2 As required
J-1502000-
31-13
Inspections and
Reports
3.5.6 N/A Fuel Tank/Facilities
Monthly Work
Summary
Monthly KO/COR/
PAR
2 Monthly
3.5.6.1 N/A Boom
Condition/Repair
Report
As required KO/COR/
PAR/
NREAO
2 Within 5 working days after repairs and inspection
3.5.7 N/A Bachelor Quarters
Monthly Work
Summary
Monthly KO/COR/
PAR
2 Monthly
3.5.8 N/A Aircraft Hangar and
Squadron Monthly
Work Summary
Monthly KO/COR/
PAR
2 Monthly
3.5.9 N/A Ice Storage Systems
Monthly Work
Summary
Monthly KO/COR/
PAR
2 Monthly
3.5.10 N/A Oil Water Seperator
Monthly Work
Summary
Monthly KO/COR/
PAR
2 Monthly
3.5.11 N/A Solar Panel (Hot
Water) Monthly
Work Summary
Monthly KO/COR/
PAR
2 Monthly
3.5.12 N/A Galley Hood
Monthly Work
Summary
Monthly KO/COR/
PAR
2 Monthly
3.5.13 N/A Propane Air Blender
Calibration Report
As required KO/COR/
PAR
2 As required
3.5.13 N/A Propane Air Blender
Monthly Work
Summary
Monthly KO/COR/
PAR
2 Monthly
3.5.14 N/A UPS Battery
Systems Monthly
Work Summary
Monthly KO/COR/
PAR
2 Monthly
3.5.15 N/A HERO System
Monthly Work
Summary
Monthly KO/COR/
1503020 – Pest Control
DELIVERABLES
Annex/Spec
Item
Form
Attachment
Number
Deliverable Title Date(s) of
Submission
Distribution Frequency
Original/
Copies
Number of Copies
(including original)
2.2.1 N/A Copy of State
Certification for
Contractor
Personnel
15 calendar days prior to start of work.
Copies of renewed certifications shall also be submitted.
KO, COR,
PAR,
PMC
3 As required
2.3, 3.3 N/A Pest Management
Operations Report
As required. KO, COR, PAR, PMC
3 As required
2.3.1 N/A Copy of Local/State
Business License
Prior to contract award. Copies of renewed licenses shall also be submitted.
KO, COR,
PAR
2 1 per state
2.3.2 N/A Permits 5 days prior to
the start of work requiring permits.
KO, COR,
PAR
2 As required
2.3.4 N/A Ultra-Low Volume
(ULV) Equipment
Calibration and
Droplet Analysis
Report
15 days prior to the start of work and thereafter every 50 hours of ULV equipment use.
KO, COR,
PAR
2 As required
2.3.5 J-1503020-02 Planned Pesticide
Use Sheets including Pesticide
Labels and Material
Safety Data Sheets
(MSDS)
With the proposal.
Note: Any proposed changes in pesticide usage shall be submitted for approval at least 5 business days in advance of pesticide use.
KO, COR,
PAR,
PMC
3 1 for each pesticide per pest as required
2.3.5.1, 3 N/A Contractor's Work
Plan
With the proposal.
KO, COR,
PAR
2 1 per proposal
Item
Form
Attachment
Number
Deliverable Title Date(s) of
Submission
Distribution Frequency
Original/
Copies
Number of Copies
(including original)
2.3.5.2.1 N/A Report of
Conditions
Conducive to Pest
Infestation
1 working day after citing conditions.
KO, COR,
PAR
2 As required
2.3.5.2.2 J-1503020-04 Pest Control
Operation
Electronic
Reporting
Requirements
1 working day after citing conditions.
KO, COR,
PAR
2 As required
2.3.5.2.3 N/A Report of
Inspection by
Regulatory
Agencies
1 working day after citing conditions.
KO, COR,
PAR
2 As required
3, 3.2.1 N/A Monthly Summary
Report
Within 3 business days of the beginning of each month
KO/COR/
PAR
2 Monthly
3.1.3 J-1503020-10 Termite and Wood
Decay
Inspection
1 working day after citing conditions.
KO, COR,
2 As required
1602000 – Electrical Power Generation, Transmission and Distribution
Item
Form
Attachment
Number
Deliverable
Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of Copies
(including original)
2.2.1 N/A Certification
and Training
5 days prior to contract commencement
KO/COR/PAR 3 Annually and as required upon changes
3 N/A Critical Spare
Parts
Inventory
15 days after award
KO/COR/PAR 3 Once. Update if the requirements change.
3 N/A Monthly
Summary
Report
Within 3 business days of the beginning of each month
KO/COR/
PAR
3 Monthly
3.1 N/A Preventive
Maintenance
Plan Electrical
Distribution
Systems
15 days after award
KO/COR 2 Annually and any time a change is made to the schedule
3.1 J-1602000-08 Utility Outage
Report
As Required KO/COR 2 As Required
3.1 N/A PM Schedule First work day
of each month
KO/COR/
PAR
3 Monthly
3.1 N/A PM
Maintenance and Repair
Status Report
5 days after following the end of the month during which work is performed
KO/COR/
PAR
3 Once for initial submittal, as requested, and as revised
3.1.2 N/A Operating
Records, Logs, Reports, and
Procedures
3 days after following the end of the month during which work is performed
KO/COR/
PAR
3 Monthly
3.2 N/A IMP Jenbach
Co-Gen Plant
Within 30 days after contract start and within five days of any changes
KO/COR/
PAR
3 Once for initial submittal, as requested, and as revised
3.2 N/A IMP Schedule First work day
of each month
KO/COR/
PAR
3 Monthly
3.2 N/A IMP
Maintenance and Repair
Status Report
5 days after following the end of the month during which work is performed
KO/COR/
PAR
3 Once for initial submittal, as requested, and as revised
Item
Form
Attachment
Number
Deliverable
Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of Copies
(including original)
3.3.2 N/A Meter
Reading
Report
3 days after following the end of the month during which work is performed
KO/COR/
3 Monthly
1700000 – Base Support Vehicles and Equipment
Annex/
Spec Item
Form
Attachment
Number
Report Title Date (s) of
Submission
Distribution Frequency
Original/
Copies
Number of Copies
(including original)
2.3.3.4 N/A Temporary
Suspension of
Downtime
Accumulation
Within two hours of notice to the
Contractor that the material delays will cause the downtime standard to be missed.
KO/COR 2 As required
2.3.3.8, 3 N/A Monthly Summary
Report
Within 3 business days of the beginning of each month
KO/COR/
PAR
4 Monthly
3.2.1, 3.3.1
SF-91 Vehicle Accident
Reports
Monthly KO 2 Within five calendar days of the start of the month
3.2.2.1 N/A GSA Mileage and
Fuel Usage Report
Monthly KO/COR 2 By the 25th day of the preceding month
3.3 N/A Maintenance Schedule Monthly KO/COR 2 By the 25th day of the preceding month
3.3.1.1 N/A Schedule for Testing
and Certification
As required KO/COR 2 Annually and as required after repairs
3.3.1.1 N/A Testing and
Certification
Qualifications
As required KO/COR 2 Prior to start of contract, annually and, prior to a new employee starting work.
3.3.1.1 N/A Category 1 through 4
Crane Maintenance
Inspection
Specification and
Record
As required KO/COR 2 As required in accordance with
NAVFAC P-
300 and P-307.
3.3.1.2 N/A Preventive
Maintenance
Schedule/Checklist
Annually KO/COR 2 15 calendar days prior to the start of work and annually.
Annex/
Spec Item
Form
Attachment
Number
Report Title Date (s) of
Submission
Distribution Frequency
Original/
Copies
Number of Copies
(including original)
3.3.1.4 N/A Fuel Truck
Calibration Report
Monthly KO/COR 2 By the 25th day of the preceding month