This is a Questions and Answers (Q&A) document from federal contract solicitation N4008526R0033, addressing clarifications on a Building Services and Facilities Management contract for a military installation. The document contains 70 numbered questions with government responses covering three primary service areas: Facilities Management (Annex 1502000), Building Systems/Electrical (Annex 1602000), and Rolling Stock/Vehicle Maintenance (Annex 1700000), along with administrative and management requirements (Annex 0200000).
Key clarifications addressed include: removal of Building 426 references and missing attachment J-0200000-04 from Government Furnished Equipment requirements; revisions to Direct Digital Controls System and Compressed Air Systems inventories to provide customer-specific allocations; confirmation that the Laurel Bay Pool (273,606 gallons) is the only pool facility and that Navy instructions govern swimming pool testing frequencies; clarification that sun shade inventory (77 units per J-1502000-07) governs over conflicting PWS reference (63 units); confirmation that Bachelor Quarters maintenance frequency is contractor-determined based on performance standards with historical data provided for reference; and removal of Building 619 from Government-Furnished Facilities list. The government confirmed that tire repair and replacement applies only to Government-owned vehicles listed in Attachment J-1700000-02-01 (USMC Fleet Inventory) and not GSA-leased vehicles, requiring offerors to use professional expertise and industry standards for fleet maintenance planning. Additional responses clarified evaluation criteria definitions, confirming that "feasibility" will be evaluated qualitatively based on completeness, logical soundness, and resource realism; that adjectival ratings follow DoD Source Selection Procedures; and that Blanket Task Orders will be used only for non-recurring work with no application to recurring services.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question No. Question Government Response Page Section Paragraph
25 C Annex 0200000, Spec Item 2.4.4
PWS 2.4.4 Government Furnished Equipment references J‑0200000‑04, but this attachment is missing from the solicitation package. Please provide J‑0200000‑04 so the offeror can verify the Government‑Provided Equipment and Vehicles.
Reference to J‑0200000‑04 has been removed from C Annex 0200000, Spec Item 2.4.4. See N4008526R0033 Section C Amendment 0005.
26 C Annex 1502000, Spec Item 3.1.2.1
3.2.2.1 Facility Related Control
Systems - Is the contractor required to provide an onsite technician to monitor the FRCS system at Building 426 during normal hours or 24 hours/7 days/week? If this is in the inventory, it needs to up removed and a new copy provided.
Reference to Building 426 has been removed from C Annex 1502000, Spec Item 3.1.2.1. See N4008526R0033 Section C Amendment 0005.
27 J Annex 1502000 J-1502000-10 Direct Digital Controls System Inventory - Please provide an inventory or allocation of the DDC systems per customer so the offeror can accurately price each ELIN.
J-1502000-10 and J-1502000-10-01 have been revised. See J-1502000-04 - J-1502000-40 Facilities Investment Inventory Amendment 0005.
28 J Annex 1502000 J-1502000-13 Compressed Air Systems Inventory -Please provide an inventory or allocation of Compressed Air Systems per customer so the offeror can accurately price each ELIN.
J-1502000-13 has been revised. See J-1502000-04-J- 1502000-40 Facilities Investment Inventory Amendment 0005.
29 C Annex 1502000, Spec Item 3.2.10
3.2.10 Swimming Pools - Please
clarify whether the contractor is required to perform water testing every 2 hours during operational hours at each pool.
See Section C, 1502000 Spec Item 3.2.10 in revised N4008526R0033 Section C Amendment 0005 and review and adhere to Navy instructions.
30 J Annex 1502000 J-1502000-18 Swimming Pool Facilities - Please provide the historical chemical usage or the size of each pool so the offeror can accurately develop pricing and workload estimates for the applicable ELINs.
The requested historical chemical usage data is not available.
Note: Attachment J-1502000-18 (Swimming Pool Facilities) contains only one (1) pool, the Laurel Bay Pool with an operating capacity of 273,606 gallons. J- 1502000-18 has been revised. See J-1502000-04-J- 1502000-40 Facilities Investment Inventory Amendment 0005.
Reference
31 C Annex 1502000, Spec Item 3.2.10
J-1502000-18 Swimming Pool Facilities - Please provide the hours of operation for each pool and identify any seasonal shutdown periods.
See Section C, 1502000 Spec Item 3.2.10 in revised N4008526R0033 Section C Amendment 0005 and review and adhere to Navy instructions.
32 J Annex 1502000 PWS 3.2.14 Sun Shades states there are 63 Sun Shades, while J‑1502000‑07 identifies 77 Sun Shades. Please clarify the correct number of Sun Shades required under this solicitation.
The reference to the number of sun shades has been removed from Spec Item 3.2.14; J‑1502000‑07 governs. See Section C, 1502000 Spec Item 3.2.14 in revised N4008526R0033 Section C Amendment 0005 and review J‑1502000‑07 in J-1502000-04-J-1502000- 40 Facilities Investment Inventory Amendment 0005 for sun shade inventory.
33 J Annex 1502000 3.5.7 Bachelor Quarters - Please clarify the minimum frequency the contractor is required to perform Bachelor Quarters Maintenance under the PWS.
Samples of historical work are provided in J-1502000- 06 (-06, -06-01 through -06-03). Historical data and supporting information provided is intended to illustrate the volume of work issued and examples of work that has been performed in the past and is not to be construed as a limiting factor to services ordered and performed in the future. See Revised Attachments J-1502000-06 (-06, -06-01 through -06-03). This is a Performance-Based Service Contract. The Government does not dictate a minimum frequency for Bachelor Quarters Maintenance.
The Contractor is solely responsible for determining the appropriate maintenance frequency, schedule, and methodologies required to meet all performance objectives, metrics, and quality standards specified in PWS Section 3.5.7.
Offerors shall utilize their professional expertise and proposed technical approach to determine the level of effort necessary to ensure continuous, fully operational, and compliant Bachelor Quarters facilities.
34 J Annex 1502000 3.5.9 Off-Peak Ice Storage System - Please identify the Off‑Peak Ice Storage System inventory or provide the building number(s) of the facility where these systems are located so the offeror can accurately verify quantities.
See Attachment J-1502000-09 in J-1502000-04-J- 1502000-40 Facilities Investment Inventory Amendment 0005
35 J Annex 1700000 3.3.1.1 Rolling Stock Rubber Tire and Associated Equipment for Spare Tire Install - Please provide the historical workload for tire replacements.
The Contractor's responsibility for tire repair and replacement applies only to the Government-owned vehicles listed in Attachment J-1700000-02-01 (USMC Fleet Inventory). It does not apply to the GSA-leased vehicles.
Offerors should use their professional expertise, industry standards for fleet maintenance, and the specific age and type of vehicles listed in the USMC Fleet Inventory to develop pricing.
36 J Annex 1700000 3.3.1.1 Rolling Stock Rubber Tire and Associated Equipment for Spare Tire Install - Please provide the historical data for the amount of tire replacements annually.
The Contractor's responsibility for tire repair and replacement applies only to the Government-owned vehicles listed in Attachment J-1700000-02-01 (USMC Fleet Inventory). It does not apply to the GSA-leased vehicles.
Offerors should use their professional expertise, industry standards for fleet maintenance, and the specific age and type of vehicles listed in the USMC Fleet Inventory to develop pricing.
37 J Annex 1700000 3.3.1.1 Rolling Stock Rubber Tire and Associated Equipment for Spare Tire Install - Requesting the historical annual quantities and types of tires the contractor is required to repair and replace under Rolling Stock Rubber Tire and Associated Equipment for Spare Tire Installation program.
The Contractor's responsibility for tire repair and replacement applies only to the Government-owned vehicles listed in Attachment J-1700000-02-01 (USMC Fleet Inventory). It does not apply to the GSA-leased vehicles.
Offerors should use their professional expertise, industry standards for fleet maintenance, and the specific age and type of vehicles listed in the USMC Fleet Inventory to develop pricing.
38 C Annex 1700000, Spec Items 3.3.1.2 and
3.3.1.3
3.3.1.2 Rolling Stock Rubber Tire
and Associated Equipment for Spare Tire Install - Please clarify whether the vehicles listed in Attachment J‑1700000‑02 and Attachment J‑1700000‑02‑01 are included in the Rolling Stock Rubber Tire and Associated Equipment for Spare Tire Install program described in Section C, Annex 1700001, Paragraph 3.3.1.2.
See Spec Items 3.3.1.2 and 3.3.1.3 in Section Section C, 1700000 of N4008526R0033 Section C Amendment 0005.
39 J Annex 1502000 Attachment J-1502000 does not divide the inventory between the three customers receiving this service. Please provide this workload division.
See Attachments J-1502000 in J-1502000-04-J- 1502000-40 Facilities Investment Inventory Amendment 0005.
40 J Annex 1502000 Attachment J-1502000-10 does not divide the inventory between the three customers receiving this service. Please provide this workload division.
See Attachment J-1502000-10 in J-1502000-04-J- 1502000-40 Facilities Investment Inventory Amendment 0005.
41 J Annex 1502000 Sub-ELINs A001AS, A002AB, A003AC, and A005AC require air compressor service. However, Attachment J-1502000-13 only delineates inventory for one customer (Townsend Bombing Range) -- and that customer does not have Sub-ELIN. Please resolve this discrepancy.
See Attachment J-1502000-13 in J-1502000-04-J- 1502000-40 Facilities Investment Inventory
42 J Annex 1502000 Attachment J-1502000-26 has a field for "Type" that is completely blank for all locations. As different light fixture types require different levels of maintenance, this information is critical to accurately estimating the effort required for maintenance of the inventory items. Please provide the types for each location.
See Attachment J-1502000-26 in J-1502000-04-J- 1502000-40 Facilities Investment Inventory Amendment 0005. An aggregate list of all current bulb and fixture types utilized across the installation is provided at the bottom of Attachment J-1502000-26 (under 'Current Inventory of Lights'). Offerors are responsible for utilizing this aggregate list and their professional expertise to estimate the distribution of these fixture types across the locations listed.
43 J Annex 1502000 In Attachment J-1502000-26 there is only one Sub-ELIN (A001DY) for exterior light maintenance.
Please confirm that the entire inventory in referenced attachment is to be charged to this one Sub-
ELIN.
Yes, see Attachment J-1502000-26 in J-1502000-04- J-1502000-40 Facilities Investment Inventory Amendment 0005.
44 J Annex 1502000 There are four customers (comprising 54 Sub-ELINs) who should be covered by Attachment J- 1502000-21-01. However, said attachment has no delineation of inventory by customer or Sub- ELIN. Please resolve this discrepancy.
See Attachment J-1502000-21-01 in J-1502000-04-J- 1502000-40 Facilities Investment Inventory Amendment 0005
45 J Annex 1502000 Attachment J-1502000-28-01 is titled "Airfield Lighting Inventory". However, the contents of the file appear to be for street lights rather than airfield lighting.
Please clarify to which Sub- ELIN(s) the effort for these items should be charged. Also, the data provides categories of "Pre- Retrofit" and "Post-Retrofit". We cannot price both conditions, so which set of data should be use?
See Attachment J-1502000-28-01 in J-1502000-04-J- 1502000-40 Facilities Investment Inventory Amendment 0005
46 J Annex 0200000 Where do we find Attachment J-
1700000-04 GOVERNMENT-
FURNISHED PROPERTY?
Per the Table of Contents for Annex 1700000, Attachment J-1700000-04 directs offerors to the attachments listed under J-0200000-06.
47 5 RFP Section B B16 Will NAVFAC clarify whether BTOs will be used only for Non- Recurring work, or whether recurring work may also be grouped under BTOs? If Recurring work is included, how will deductions under FAR 52.246-4 be applied?
Per Section B, B.16. Government reserves the right to issue Blanket Task Orders (BTOs) with bulk funding for non-recurring work. BTOs are not contemplated for recurring work.
48 The BSVE Annex 1700000 requires maintenance of government vehicles and equipment, but does not provide condition, maintenance history, or OEM service requirements. Will NAVFAC provide an updated list to include current condition and maintenance history/mileage?
Maintenance history, detailed condition assessments, and specific mileage/hour logs for the vehicles and equipment listed in the solicitation are not available.
Offerors are responsible for developing their pricing based on the provided inventory (which includes make, model, and year) and their professional expertise in maintaining a fleet of this specified age and composition. It is the offeror's responsibility to estimate the level of effort and materials required to meet all performance requirements of the PWS.
The Government makes no warranty, express or implied, as to the condition of the equipment at the time of contract turnover.
49 C Annex 1602000, Spec Item 3
The Electrical Annex 1602000 does not define:
- Where contractor responsibility ends
- Which systems are government owned vs privatized
- Whether medium voltage switching is included Will NAVFAC provide a system boundary diagram, or confirm whether medium-voltage switching, feeder isolation, and substation maintenance are included in the contractors scope?
See Spec Items 3 in Section Section C, 1602000 of N4008526R0033 Section C Amendment 0005.
50 C Annex 0200000, Spec Item 2.4
Will NAVFAC provide condition assessments, age, and serviceability status for all GFIs listed in J‑0200000‑06‑01 through 06‑05? If not, should offerors assume all GFIs are fully functional, or must we price inspection/repair of GFIs as part of phase‑in?
See Section C, Annex 0200000, Spec Items 2.4 in Amendment 0005.
51 C Annex 1700000, Spec Item 3.2.1
Will NAVFAC confirm whether specialty fuel, DEF, propane, and charging infrastructure are government‑provided or contractor‑provided?
See Section C, Annex 1700000, Spec Items 3.2.1 in Amendment 0005.
52 C Annex 1502000, Spec Item 3.3.1
The solicitation does not specify whether daily reporting is required for all HVAC assets. Is this the case?
See Section C, Annex 1502000, Spec Items 3.3.1 in Amendment 0005 and attachment J-1502000-21-04.
53 C Annex 1602000, Spec Item 3.3.2
Will the government confirm that all meters listed in J-1602000-07 require physical monthly readings, or if some meters are remotely monitored and a percentage (or number) of how many are remotely monitored?
See spec item 3.3.2 in Section Section C, 1602000 of N4008526R0033 Section C Amendment 0005.
54 The Government- Furnished Facilities list identifies Building 619 (Motor T Storage S- 4PW) but does not provide an approximate square footage. Can the Government clarify whether this facility remains within the contract scope and, if so, provide the approximate square footage?
See Amendment 0005. Government -Furnished Facilities has been revised and Building 619 is removed.
55 Will NAVFAC provide full schematic, regular maintenance requirements and airfield access procedures for all airfield lighting circuits and regulators?
1. Full system schematics will not be provided.
Offerors are responsible for developing their maintenance approach based on the provided equipment inventory and the offeror’s professional expertise.
2. The required maintenance tasks, frequencies, and performance standards are detailed in PWS, and the associated J-attachments.
3. The Contractor shall comply with all MCAS Beaufort security regulations, including personnel vetting, badging, and communication protocols with the control tower and Airfield Manager.
56 Please provide rim and tire sizes for accurate pricing.
Offerors are responsible for determining the required tire and rim specifications based on the make, model, and year of the vehicles listed in J attachments.
57 Do they require monthly service / testing on the closed loop systems or would quarterly be sufficient?
The Government does not dictate testing frequency for all closed-loop systems.
Per PWS, the Contractor is responsible for maintaining all systems in accordance with the Original Equipment Manufacturer (OEM) recommendations and accepted industry standards.
The Contractor must use its professional expertise to develop a testing schedule that, at a minimum, meets the OEM requirements for each specific system and is sufficient to maintain the water chemistry within the performance parameters required by the PWS.
58 Is there current control equipment in place on the cooling towers (controller, pumps, bleed valves?)
or do we have to provide at start up for all condenser (cooling towers) systems?
Existing operational systems listed in the solicitation's J attachment inventories include all existing components of those systems, such as controllers, pumps, and valves.
59 Are there shot feeders on all closed loops (glycol, Dual Temperature Water, geothermal, chilled and hot)?
Existing operational systems listed in the solicitation's J attachment inventories include all existing components of closed-loop systems; it does not provide an itemized list of every sub-component, such as shot feeders. The Contractor is responsible for maintaining the systems as they are currently installed. Per PWS, the Contractor is responsible for maintaining all systems in accordance with the OEMs recommendations and industry standards.
60 Are all the chilled, hot, geothermal and Dual Temperature Water loops currently treated with a nitrite based corrosion inhibitor?
The Government does provide the specific type of corrosion inhibitor currently in use in any system.
Per PWS, the Contractor is responsible for testing all systems at the start of performance and implementing a chemical treatment program that meets all performance requirements for corrosion, scale, and biological growth.
The Contractor must use its professional expertise to develop a testing schedule that, at a minimum, meets the OEM requirements for each specific system and is sufficient to maintain the water chemistry within the performance parameters required by the PWS.
61 Are the glycol loops treated with an inhibited glycol? Is there a preference for ethylene or propylene glycol when systems need to be treated back to within range. What is the % glycol required for the glycol systems.
The Contractor is responsible for testing all systems and maintaining them in accordance with Original Equipment Manufacturer (OEM) recommendations and all PWS requirements. This includes selecting the appropriate type and percentage of glycol to ensure adequate freeze protection for the installation's geographic location.
62 The Solicitation makes several mentions of "feasibility" in the Basis of Evaluation for Factor 1, Management Approach. However, the Solicitation does not define the term "feasibility". What definition will be used during evaluation of proposals, and how does the Government intend to quantify this?
For the purposes of evaluating Factor 1 (Management Approach), 'feasibility' is not specifically defined;
however, the solicitation sets forth specific criteria regarding the evaluation of ‘feasibility.’ The Government does not intend to evaluate feasibility using a mathematical or strictly quantitative formula.
Instead, feasibility will be evaluated qualitatively based on the following criteria:
- Completeness: The extent to which the proposed approach addresses all tasks and deliverables outlined in the Performance Work Statement (PWS) / Statement of Work (SOW).
- Logical Soundness: The degree to which the proposed workflows, scheduling, and milestone dependencies are realistic and logically ordered.
- Resource Realism: The adequacy and appropriateness of the proposed labor mix, staffing levels, and key personnel to execute the management plan without introducing undue performance risk.
63 The Solicitation mentions "ratings" throughout the Basis of Evaluation.
However, the Solicitation does not provide a list of potential ratings an Offeror can receive, nor does it provide the definitions for any ratings. Will the government please provide the specific adjectival rating scale (e.g., Outstanding, Good, Acceptable, Marginal, Unacceptable) and definitions that will be used for each evaluation factor?
The Solicitation uses the definitions for the ratings found on the Acquisition and Sustainment Officer of the Under Secretary of War website, https://www.acq.osd.mil/ Source Selection Procedures (https://www.acq.osd.mil/dpap/policy/policyvault/US A000740-22-DPC.pdf). See Section 3 - Evaluation and Decision Process of the Source Selection Procedures for Combined Technical/Risk Rating Method, Past Performance Relevancy Rating Method and Performance Confidence Assessments Rating Method.
64 Can the Government clarify how it will distinguish between proposals that are considered "essentially equal" under the non-price evaluation factors for purposes of increasing the importance of price during the best-value tradeoff?
As stated in the Solicitation, a best-value tradeoff process will be used. Under this process, the Government may select a source whose proposal offers a higher technical rating or lower risk if the Source Selection Authority (SSA) determines that the technical superiority of that proposal warrants the additional cost.
Proposals will not be considered 'essentially equal' based solely on identical adjectival ratings. Rather, 'essential equality' is a qualitative determination made by the SSA based on a detailed, comparative assessment of the specific strengths, weaknesses, and risks associated with each proposal under the non-price factors.
If the SSA determines that the non-price aspects of the competing proposals are, in fact, essentially equal (i.e., neither proposal offers a distinct technical advantage or lower risk to the Government), then price will become the determining factor in the source selection decision.
65 Beyond the stated evaluation criteria, are there any mission priorities, performance risks, or operational outcomes that the Source Selection Authority considers particularly important during the best-value tradeoff?
No. The Government will evaluate proposals strictly and exclusively based on the evaluation factors, subfactors, and criteria explicitly set forth in the solicitation.
There are no unstated mission priorities, performance risks, or operational outcomes that will be considered during the evaluation or the best-value tradeoff process. Offerors are advised that the stated evaluation criteria reflect the Government's entire requirement and all areas of importance to the Source Selection Authority (SSA).
66 Can the Government clarify whether strengths assigned across multiple technical evaluation factors will be considered cumulatively during the best-value tradeoff, or whether each factor will be evaluated independently?
For the purposes of the initial evaluation and rating assignment, each technical evaluation factor will be evaluated independently against the specific criteria set forth in the solicitation. Strengths assigned under one factor will not influence the adjectival rating of another factor.
67 Does the Government intend to distinguish between proposals that merely meet the solicitation requirements and those that offer measurable benefits, efficiencies, or innovative approaches beyond the stated requirements?
Yes. In accordance with the best-value tradeoff process outlined in the solicitation, the Government intends to distinguish between proposals that merely meet baseline requirements and those that offer additional value. For example, in Factor 2, Corporate Experience, offerors may be rated higher if they demonstrate experience without relying on corporate affiliates (e.g., subsidiaries, sister subsidiaries, sister companies, or parent companies) or first-tier small business subcontractors.
68 If technical proposals are rated essentially equal, how will price be weighted in the final decision?
As stated in the Solicitation, a best-value tradeoff process will be used. Under this process, the Government may select a source whose proposal offers a higher technical rating or lower risk if the Source Selection Authority (SSA) determines that the technical superiority of that proposal warrants the additional cost.
Proposals will not be considered 'essentially equal' based solely on identical adjectival ratings. Rather, 'essential equality' is a qualitative determination made by the SSA based on a detailed, comparative assessment of the specific strengths, weaknesses, and risks associated with each proposal under the non-price factors.
If the SSA determines that the non-price aspects of the competing proposals are, in fact, essentially equal (i.e., neither proposal offers a distinct technical advantage or lower risk to the Government), then price will become the determining factor in the source selection decision.
69 J Annex 1502000 There are three customers (comprising ten Sub-ELINs) who should be covered by Attachment J- 1502000-25. However, said attachment has no delineation of inventory by customer or Sub- ELIN. Please resolve this discrepancy.
See Attachment J-1502000-25-01 in J-1502000-04-J- 1502000-40 Facilities Investment Inventory Amendment 0005
70 J Annex 0200000, J-0200000-19
In response to Question #5 released in the PPIs, the Government refers to an updated Corporate Experience Data Sheet posted with Amendment 2.
However, we are unable to locate this document in the posted Amendment 0002 files, and it was not referenced in the SF30. Can you please confirm it was posted?
Correction, the revised Corporate Experience Data Sheet is included with Amendment 0005, see 0200000 J Management and Administration