This document is a Pre-Proposal Inquiry (PPI) Responses summary for a federal roofing services Indefinite Delivery Indefinite Quantity (IDIQ) contract. The file contains 104 questions submitted by potential contractors with corresponding government responses addressing clarifications on scope, pricing, specifications, and administrative requirements.

The contract covers roofing maintenance, repair, and replacement services at three Navy locations: NSA Philadelphia PA, PNY-Philadelphia PA, and NSA-Mechanicsburg PA. Services include roof surveys and assessments (priced by square footage ranges), removal and replacement of various roofing systems (EPDM, TPA, modified bitumen, slate/asphalt shingles), insulation work, membrane systems, metal accessories (scuppers, copings, flashing), and related labor. Key pricing clarifications indicate that labor should be included in each unit cost ELIN (Estimated Line Item Number), with additional labor captured in ELIN A0132. Materials not covered in specific ELINs are negotiated separately. The government confirmed a 1-year warranty and 1-year mil thickness assumption for roof systems. Critical administrative details include: this is a Total Small Business Set-Aside requiring VETS 4212 certification; one contractor will be awarded; bid guarantee is 20% of total contract value including base and four option years or $3M whichever is less; US citizenship is required onsite; and the SSHO (Site Safety and Health Officer) must be separate from other management roles per EM385 requirements. The bid date was extended to March 10, 2026. Amendment 0005 provided revised ELINs separating Philadelphia and Mechanicsburg locations due to significant wage rate differences, a revised roof inventory, an NSA-Mechanicsburg site map, and general specification clarifications. Multiple questions remain pending response regarding specific material specifications, manufacturing requirements, disposal procedures, safety/mobilization line items, and clarification on labor category prevailing wage selection.

View the file

Other files

File Type Posted
N4008526B0006 Bid Abstract.pdf PDF
Amendment 0010.pdf PDF
Amendment 0010 - Attachment ELINs Roofing IDIQ Revised.xlsx XLSX spreadsheet
Amendment 0009.pdf PDF
Amendment 0008 Pre-Proposal Inquiries.pdf PDF
Amendment 0008 - Attachment ELINs Roofing IDIQ Revised.xlsx XLSX spreadsheet
AMENDMENT 0008.pdf PDF
Amendment 0007 - Attachment E NWSS B1 NSAP.pdf PDF
Amendment 0007 - Attachment ELINs Roofing IDIQ Revised.xlsx XLSX spreadsheet
AMENDMENT 0007.pdf PDF
Amendment 0007 Pre-Proposal Inquiries.pdf PDF
Amendment 0007 UFGS 07 54 23 TPA.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005 - Attachment C NSWC PNYA Roofs (Revised).xlsx XLSX spreadsheet
Amendment 0005 - Attachment A General Specification.docx DOCX document
Amendment 0005 - Attachment B Roof Survey Check List.doc DOC document
Amendment 0005 - Attachment D PNYA CNIC Bldg. 44 Roof (Revised).xlsx XLSX spreadsheet
AMENDMENT 0005.pdf PDF
Amendment 0005 - Attachment P NSA-M Base Map.pdf PDF
Amendment 0005 - Attachment ELINs Roofing IDIQ Revised.xlsx XLSX spreadsheet
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
AMENDMENT 0001.pdf PDF
Amendment 0001 - Sign In Sheet Philadelphia.pdf PDF
Amendment 0001 - Sign In Sheet Mechanicsburg.pdf PDF
Attachment G NSA-P Site Map.pdf PDF
Attachment L Table 07 62 13 Copper Sheet Metal.pdf PDF
Attachment D PNYA CNIC Roofs.xlsx XLSX spreadsheet
Attachment O - SECNAV 5512.pdf PDF
Attachment N - PIEE Vendor Access Instructions.pdf PDF
Attachment F Lessons Learn Roof Fire.pptx PPTX presentation
Attachment J Table 07 60 00 Flashing Sheet Metal.pdf PDF
Attachment H PNYA Site Map.pdf PDF
Attachment A - IDIQ Specifications.pdf PDF
Attachment E Roof Survey Check List.pdf PDF
N4008526B0006.pdf PDF
Attachment I NSWC Roof Drawings.pdf PDF
Attachment B - Roofing IDIQ ELINs.xlsx XLSX spreadsheet
Attachment M - Pre-Proposal Inquiry (PPI) Form.xlsx XLSX spreadsheet
Attachment C NSWC PNYA Roofs.xlsx XLSX spreadsheet
Attachment K Table 07 61 14.00 20 Standing Seam Roof.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. PRE-PROPOSAL INQUIRY RESPONSES:

Question

Reference

Question Government Response Page Section

Paragra ph

Attachment

B

Base

Option A0134

Can you provide clarification-

Perform Roof Survey / Assessment up to 50,000 SF in accordance with

Attachment B- this is the same attachment where it is being price and there is not additional information

See revised ELINs provided via Amendment 0005

Attachment

B

Base

Option A0135

Can you provide clarification-

Perform Roof Survey / Assessment over 50,000 SF and up to 100,000 SF in accordance with Attachment B. this is the same attachment where it is being price and there is not additional information

See revised ELINs provided via Amendment 0005

Attachment

B

Base

Option A0136

Can you provide clarification-Perform

Roof Survey / Assessment over

100,000 SF in accordance with

Attachment B.- this is the same attachment where it is being price and there is not additional information

See revised ELINs provided via Amendment 0005

Attachment

B

Base

Option A0134

Perform Roof Survey / Assessment up to 50,000 SF in accordance with

Attachment B- the amount is 1,000 SF but the line item calls out 50,000 SF does this mean 1000 Units or the total divided by 50?

See revised ELINs provided via Amendment 0005

Attachment

B

Base

Option A0135

Perform Roof Survey / Assessment over 50,000 SF and up to 100,000 SF in accordance with Attachment B.- the amount is 1,000 SF but the line item calls out 50,000 SF does this mean

1000 Units or the total divided by 50?

See revised ELINs provided via Amendment 0005

Attachment

B

Base

Option A0136

Perform Roof Survey / Assessment over 100,000 SF in accordance with

Attachment B.- the amount is 1,000

SF but the line item calls out 50,000

SF does this mean 1000 Units or the total divided by 50?

See revised ELINs provided via Amendment 0005

Attachment

B

Base

Option A0131

Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Material costs shall BE NEGOTIATED BY KO -

What does this line item mean as far as pricing?

This is for all materials not covered in specific ELIN

Attachment

B

Base

Option A0131

Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Material costs shall BE NEGOTIATED BY KO - Is this a coefficient for materials?

See Response to PPI#7.

Attachment

B

Base

Option A0132

Provide labor to perform all Unit

Priced Labor work per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY

KO - Does this mean for hours outside of these line items?

Confirmed.

Attachment

B

Base

Option

A006-

A007

What is the difference between these line items? They both state removing and replacing tarped insulation.

A0006 provides for the removal and replacement of polyisocyanurate tapered insulation panels, A0007 provides for the removal and replacement of tapered roof insulation

Attachment

B

Base

Option

A006-

A007

What is the attachment method we should assume- mechanical or low-rise insulation adhesive

Contractors’ means and methods should adhere to the

EM385 state and local bldg.

codes.

Attachment

B

Base

Option

A006-

A007

This line item is in SQs. If there are multiple layers of insulation, are they included or would they each be able to be added? For example, 100 SQs of two layers of 2.6 inch insulation would that be 200 SQs or 100 SQs. If it is only 100 SQs what should we assume is the thickness of insulation that would be added to the roof systems. Or could this become a BF price?

See revised ELINs provided via Amendment 0005

Attachment

B

Base

Option

A006-

A007

Are cover boards- HD iso/ Densdeck included in this cost- or if they are apart of the system an additional SQ amount can be added to the total?

PENDING RESPONSE

Attachment

B

Base

Option

A0039-

A0049

Do the line items here cover insulation removal and replacement or is that covered by the A006-A007 and this is only for the EPDM or TPA and the accessories for the membrane systems

Roof System would mean all together

Attachment

B

Base

Option

A0039-

A0049

What is the warranty to be assumed for these systems?

1 year

Attachment

B

Base

Option

A0039-

A0049

What is the mil to be assumed for these systems?

1 year

Attachment

B

Base

Option A0132

Provide labor to perform all Unit

Priced Labor work per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY

KO.- What does this line item mean?

Do none of the other line items include labor?

This Line item is for any labor not captured in the other

ELINs.

Attachment

B

Base

Option A0023

Coat roofing with aluminum pigmented slate shingles (All or

Partial) slate shingles (All or Partial)

PENDING RESPONSE

fibered bitumen roof coating- What does it mean by coating roofing with aluminum slate shingles? Is this a typo and the line item is for coating aluminum slate and slate shingles with fibered coating?

Attachment

B

Base

Option

A0105-

A0109

Strainers - the same two types are strainers are called out twice- why aren't the line items combined?

A0105 is for Remove existing metal scupper lining and replace with new metal scupper lining and A0109

Install new metal splash pans

Attachment

B

Base

Option

A0046-

Remove existing roof system and replace with new Thermoplastic alloy roof system (TPA) - There are no specs in the IDIQ specifications book for TPA- there is for PVC, can this line item be changed to PVC and if not can a TPA section be added - and basis of design manufacturer?

PENDING RESPONSE

Attachment

B

Base

Option

A0036-

A0038

E.P.D.M. (RUBBER ROOF

SYSTEM) (Install new E.P.D.M. Roof

System over Existing Built-up Roof)-

Is this for an overlay system? If so does this price include a cover board?

PENDING RESPONSE

Attachment

B

Base

Option

A0036-

A0038

E.P.D.M. (RUBBER ROOF

SYSTEM) (Install new E.P.D.M. Roof

System over Existing Built-up Roof)-

What is the mil to be assumed?

PENDING RESPONSE

Attachment

B

Base

Option

A0036-

A0038

E.P.D.M. (RUBBER ROOF

SYSTEM) (Install new E.P.D.M. Roof

System over Existing Built-up Roof)-

What is the warranty to be assumed?

PENDING RESPONSE

Attachment

B

Base

Option

A0028-

Remove existing roof system and replace with new single ply reinforced modified bitumen sheet roofing system- Can you provide a basis of design for this system?

PENDING RESPONSE

Attachment

B

Base

Option

A0028-

Remove existing roof system and replace with new single ply reinforced modified bitumen sheet roofing system- What is the warranty assumed for this system?

1 year

Attachment

B

Base

Option

A0028-

Remove existing roof system and replace with new single ply reinforced modified bitumen sheet roofing system- Please let me know if our interpretation is correct- These line items do not include wall flashing, coping, pipes, walk pads, insulation removal and install, etc. and is the cost to remove the membrane system and to install the new membrane system-this would be used in conjunction with other line items to get full price?

Att. B -

Roofing

IDIQ

ELINs

ELIN

A0027

System

Gas

Please provide additional detail on the scope of work required

PENDING RESPONSE

Att. B -

Roofing

IDIQ

ELINs

ELIN

A0104

Power washing

The "unit" calls for LF. Should this be measured and priced in SF vs. LF?

PENDING RESPONSE

Att. B -

Roofing

IDIQ

ELINs

ELIN

A0131

Unit

Priced

Labor

Please provide additional clarification for this CLIN. Is this to only represent the hourly rate for Overhead when labor is paid at a fixed rate (Unit

Priced Labr) and direct materials are negotiated per specific work order?

PENDING RESPONSE

Att. B -

Roofing

IDIQ

ELINs

ELIN

A0132

Labor

Category

Please provide additional clarification as to which labor category from the prevailing wage category this CLIN should be quoted. Projects typically have multiple applicable prevailing wages (roofer, equipment operator, general laborer...). Each project has a blended rate depending on the specific work required. In order to fairly assess, a specific prevailing wage category should be used for comparison purpose.

PENDING RESPONSE

Att. B -

Roofing

IDIQ

ELINs

ELIN 0133

Perform

Service

Call

Please clarify. Service calls have a material and labor cap of $2,500. Is this CLIN to include the $2,500 cap or only capture the cost to dispatch a crew for a service call.

PENDING RESPONSE

"Page No.:

03 of 04”

Attachment

"B" ELIN

List

A0109

ELIN No.: A0109 Remove existing metal scupper lining and replace with new metal scupper lining (Copper) mentions a quantity of 300 EA. In past experience the scupper repairs are usually 1 to 4 at a time for a task order not the 300 EA at one time. Can the quantities be adjusted to reflect more accurate past performance requirements. Example if you did 300 at one time there would be a cost savings VS doing 4 at one time. There is most likely not 300 scuppers being replaced at one time. Can we adjust the quaintly to a more realistic number like 30?

See revised ELINs provided via Amendment 0005

Page No.:

RFP 1.2

General Overview of Contract mentions the work site to be NSA-

Philadelphia PA. / PNY-Philadelphia

PA. / NSA-Mechanicsburg PA. The prevailing wage rates for Philadelphia

(PNY & NSA) are about 25%

HIGHER than NSA Mechanicsburg, PA. With that being said there is only

ONE (1) ELIN sheet for all three

See revised ELINs provided via Amendment 0005 bases. Will NAVY consider giving a separate ELIN sheet for NSA

Mechanicsburg, PA. since the rates are much lower at that base. The rates for both Philadelphia Bases can go on the current ELIN summary since the rates are the same in Philadelphia, PA. This impacts ALL ELINS and also specifically ELIN No.: A0132.

Provide Labor to perform all Unit

Priced Labor work per the scope and delivery schedule specified in the order. MUST BE NEGOITATED

WITH KO.

Page No.:

Attachment

"B" ELIN

List

A0131

ELIN No.: A0131 Provide all materials and equipment to perform

Unit Priced Labor work per the scope and delivery schedule specified in the order. Material costs shall BE

NEGOTIATED BY KO. Since there could be a few equipment needs for different roofs would the government considering adding some equipment as listed below that have be used on previous NAVY roofs from past experience. This will help create a fair balanced bid with the primes.

Example:

A0131.01: Hydraulic Crane 60 TON

(120 FT)

A0131.02: Hydraulic Crane 80 TON

(180 FT)

A0131.03: Hydraulic Crane 120 TON

(250 FT) A0131.04: Boom

Lift Articulating 60'

A0131.05: Boom Lift Articulating 80'

A0131.06: Boom Lift Articulating

120' A0131.07:

Forklift Telescopic 5K (35')

A0131.08: Forklift Telescopic 8K

(50')

A0131.09: Forklift Telescopic 10K

(65')

No equipment list. No maintenance.

Page No.:

RFP 13 Will Bid Date be Extended?

Bid due date has been extended to 10 March 2026

NLT 2:00 PM EDT via

Amendment 0004.

Page No.:

RFP

52.226-

27 Site

Visit

Since access to roof could not be given at the 1st site visit due to snow and weather will there be a 2nd site visit scheduled.

There will not be another site visit held.

"C" NSWC

PNYA

Roofs and

Attachment

"B" ELINS

RFP

"C" &

"B"

Attachment "C" List Thirty Three (33)

Roof that get cleaning and inspections.

These Roofs on Attachment "C" are

NOT Listed on Attachment "B"

ELINS. Will these roofs be added to the ELIN list for PNYA.

This is not part of the scope.

Attachment C revised with

Amendment 0005.

Attachment

"B" ELINS

RFP All Pages

Should Labor be included in each unit cost? The amount of labor required for each unit cost will be significantly different.

Include labor to perform the work described in the ELINs.

Additional labor will be captured in the ELIN 0132.

Attachment

"B" ELINS

RFP AO132

AO132 states to provide labor cost to perform all unit cost work. Will this per hour cost be assigned to all work that is performed. Then applied to the amount of hours it takes to do the work.

PENDING RESPONSE

Attachment

"B" ELINS

RFP A0006

What should we use for the average thickness of tapered insulation or should this be changed to brdft. Price.

Tapered insulation is priced based off the thickness of the insulation. A brdft foot is define as 1”x12”x12”.

PENDING RESPONSE

Attachment

"B" ELINS

RFP

A0006 and

A0007

Looks like A006 and A007 are the exact same price but worded differently is this correct.

A006 and A007 are for different material

Attachment

"B" ELINS

RFP

Various

ELINS

Should there be a line item for disposal under non-pre-priced labor, material or should that be carried in the unit cost.

PENDING RESPONSE

Attachment

"B" ELINS

RFP

Various

ELINS

Will there be line items added for

Safety, mobilization, and travel time.

PENDING RESPONSE

Attachment

"D" PNYA

CNIC Roof

RFP

Various

ELINS

This shows one Roof Area B44 states

Granite Shingles. Should this be

Slate? Also please confirm SF of roof area.

See revised Attachment D with Amendment 0005.

Attachment

"D" PNYA

CNIC Roof

RFP

Various

ELINS

This shows one Roof Area B44 states

Granite Shingles. Should this be

Slate? Also please confirm SF of roof area.

See response to PPI#47.

013000

Page No.:

03 /

014500

Page No.:

09 /

013526

Page No.:

10.

Specificati on Section

No.:

013000

Administra tive

Requireme nts, 014500

Quality

013000

Paragrap h No.:

1.4.1 /

014500

Paragrap h No.:

1.6.2.2 /

013526

Confirm that the field manager can be

(1) one manager Tripple Hat as long as the one individual meets all the qualification requirements. Field

Superintendent 10 years experience, CQC Manager 10 Years experience

QC Certificate and SSHO Level Two per US Army Corps of Engineers EM-

385 Safety and Health Manual based

No, the SSHO has to be separate. Reference the

EM385

Control and

013526

Governmen tal Safety

Requireme nts

Paragrap h No.:

1.8.

on 2024 version with required safety and heath certificates.

013526

Page No.:

13.

Specificati on Section

No.:

013526

Governmen tal Safety

Requireme nts

013526

Paragrap h No.:

1.09

The Governmental Safety & Health

Requirements specification requires the Accident Prevention Plan (APP) be prepared per the EM-385 1-1

(2024). The EM-385 1-1 requires a

Competent Person in Fall Protection

Training which requires 24 HRS of

EM-385 1-1 and ANSI training both hands on and classroom. Please confirm this training is required for this RFP.

Confirmed.

Attachment

"B" ELINS

RFP

Various

ELINS

Please confirm if all the following cost should be included in each ELIN.

Labor, Material, CQC, SSHO, Field

Superintendent, Trailers, Fall

Protection, Equipment, Other General

Conditions, Field Overhead, Office

Overhead, Project Management and

Profit. If any of these should be included in separate ELIN's please confirm which ones.

Confirmed.

Please confirm if a single, duly qualified individual may "triple hat" and serve as the project superintendent, QC Manager, and

SSHO.

No, the SSHO has to be separate. Reference the

EM385

50 Is US Citizen mandatory at Job site? Yes

51 Please share the photos of site visit.

There were no photos taken of the site visit.

Please provide the incumbent roofing contractors, company name, POC information (Name, email, Phone).

PENDING RESPONSE

Please provide the incumbent roofing contractors, company name, POC information (Name, email, Phone).

PENDING RESPONSE

54 8

Section 00

21 13 -

Instructions to Bidders

3.2 Bid

Submissi on

Instructio ns

Is this project a Small Business or

VOSB/SDVOSB set aside? The SF

1442 states it is a Total Small Business

Set-Aside, however the Bid

Submission Instructions require

"Confirmation of filing of Veterans'

Employment and Training (VETS)

VETS-4212 for the 2024/2025 filing cycle."

This is a Total Small Business

Set-Aside. VETS 4212 for

2024/2025 is a requirement.

55 8

Section 00

21 13 -

Instructions to Bidders

Responsi bility

Determin ation

Informati on

The required information for the responsibility determination will not be evaluated as part of the sealed bid evaluation and instead used to form the basis of responsibility. Will this evaluation be conducted on a pass/fail basis for the information provided?

How is this requirement a price only, not a LPTA evaluation if past performances and technical capabilities of the low bidder will be evaluated for acceptability?

"The Responsibility

Determination is performed after the bid opening and required in accordance with

FAR 9.104-1 as stated in the

IFB. The IFB states: Although required to be submitted with the bid package, this information will not be evaluated as part of the sealed bid evaluation. This information forms the basis of your firm's responsibility determination should your firm be the apparent low bidder. This IDIQ is being awarded under FAR Part 14."

56 8

Section 00

21 13 -

Instructions to Bidders

Responsi bility

Determin ation

Informati on

It is requested that prior contracts for similar work of similar magnitude and

POC information for the issuing organizations be provided for reference, how many past performances are required/preferred?

Is there a time period of how recent the contracts should be? Using what criteria will these contracts be evaluated to determine firm's responsibility?

PENDING RESPONSE

57 8

Section 00

21 13 -

Instructions to Bidders

Responsi bility

Determin ation

Informati on

Please clarify how you would like us to provide a schedule for performing required services. Should the schedule assume the utilization of every ELIN service? How will this schedule be evaluated to determine responsibility?

PENDING RESPONSE

58 8 3.2 Please clarify providing a technical schedule with the proposal?

A work schedule will be requested with proposal of each task order. To provide estimated days on site. In addition, when work starts an actual schedule is requested at the pre-con meeting.

59 31 252.204-

Please advise if this contract will require CMMC Level 2 Requirements.

This will be evaluated on a per task order basis.

60 5 1000

Please confirm the CLIN price includes all other requirements other than the ELIN price. (i.e., overhead, bonding, QC, PM, etc.)

PENDING RESPONSE

61 3.2

Does the government expect offeror's to submit pricing based on the average task orders in the previous 5 years?

Submit pricing per current rates.

62 10 01-35-26 1.8.2

Please confirm on dual roles between the supervisor, QC, and SSHO. Is this negotiable (i.e. based on the magnitude of the project)?

No, the SSHO has to be separate. Reference the

EM385

63 10 01-35-26 1.8.2

What are the expectations for the

SSHO in regard to being onsite each day/week during Task order work (i.e.

does this include QC inspections)?

Reference the EM385.

64 10 01-35-26 1.8.2

If EM 385 Training is required-is the

40, 24 or 16 hour training needed for qualification?

PENDING RESPONSE

65 5 01-35-26 Is Type 2 PPE hard hats required? PENDING RESPONSE

66 5 01-35-26 What clearances are required for site access? TWIC? FBI? 5512?

PENDING RESPONSE

67 1

B

Please confirm both ELIN Lines

A0006 and A0007 is the same scope of work? If not, please provide the clarification.

PENDING RESPONSE

68 1

ELIN 0008 Please specify what type of vapor barrier.

PENDING RESPONSE

69 1

ELIN 0023 Please specify clarification on work- coating of slate shingles?

PENDING RESPONSE

70 1

ELIN 0026,27,28,29- Please advise on manufacturing requirements.

PENDING RESPONSE

71 1

ELIN A0100 Please clarify the details of roof drain cleaning (i.e. only roof level)?

PENDING RESPONSE

There are modified bitumen line items in the ELINs but no specifications in

Attachment A.

PENDING RESPONSE

There are TPA line items in the ELINs but no specifications in Attachment A.

See revised ELINs provided via Amendment 0005

Please provide a site map for NSA

Mechanicsburg.

Provided as Attachment with

Amendment 0005.

Please provide a roof history for NSA

Mechanicsburg and NSA Philadelphia similar to Attachment C NSWC PNYA

Roofs.

Documentation to be provided per task order.

The ELINs do not include items for the 6 times per year roof/gutter/drain cleaning as per Attachment C or the biannual work referenced in

Attachment D. Is this work required for this contract?

Revised Attachment provided.

No cleanings are required for this contract. However, this work could be requested through a task order.

What type of wood species is expected for the T&G treated wood decking?

The Navy follows the minimum requirements under the em385 and all city and state regulations and codes unless specified.

This contract includes Davis Bacon wages for two counties that are significantly different. Which should be used for pricing?

See revised ELINs provided via Amendment 0005

Are there any specific criteria or certification requirements for the individual(s) conducting roof surveys?

The Navy follows the minimum requirements under the em385 and all city and state regulations and codes unless specified.

How are weather-related delays handled for the task orders?

An ECD extension request is submitted.

Wind

Uplift

Requireme nts

Provide wind speeds for all roof systems per the specification sections

"Wind Uplift Resistance."

The Navy follows the minimum requirements under the em385 and all city and state regulations and codes unless specified.

82 12 07 53 23 2.1.1 For Type II EPDM reinforced, is a thickness of 75 mils acceptable?

The Navy follows the minimum requirements under the em385 and all city and state regulations and codes unless specified.

83 12 07 53 23 2.1.1 For ballasted EPDM roofs, provide minimum mil thickness.

The Navy follows the minimum requirements under the em385 and all city and state regulations and codes unless specified.

For line item A0131, what type of work is meant to be addressed? Is this to be priced for evaluation?

PENDING RESPONSE

For line item A0132, what type of work is expected for the unit labor work? Is this to be priced for evaluation?

What are the onsite staffing requirements?

See Attachment General

Specifications.

Line items A0006 and A0007 are both tapered insulations. Is one of them meant to be for field/flat boards?

PENDING RESPONSE

Can the insulation be priced by various thicknesses for different R-values that might be required?

The Navy follows the minimum requirements under the em385 and all city and state regulations and codes unless specified.

Can the tapered insulation be priced by board foot rather than by the square?

See revised ELINs provided via Amendment 0005. Prices shall be provided by unit indicated in each Line Item.

Please allow for a time extension on the proposal due date to allow for the responses to the questions to be reflected in the proposals.

See response to PPI# 35.

Is the bid guarantee to be based on

20% of the base year total price?

The bid guarantee shall be

20% of the bid price for the total contract including base plus all four option years, or

$3M, whichever is less.

92 12 07 60 00 2.2.20

According to the Copings paragraph, copings shall be copper unless otherwise indicated. If allowed, what thicknesses are required for aluminum and stainless steel? No thicknesses are provided for aluminum or stainless steel on Table I for copings other than copper.

The Navy follows the em385 and all city and state regulations and codes.

93 ELIN

We will have different pricing based on the wage rates for each county. Can the ELINs be separated to include the actual costs for each site?

See revised ELINs provided via Amendment 0005.

ATTCH

C&D

Please provide clarification on inspections at each location.

No inspections are required under this contract.

Inspection/Surveys may be requested however, this will be done through a task order in which all information will be provided at that time.

Can the bid date be extended by 1 week?

See response to PPI# 35.

Will the costs associated the required for the full time QC manager, SSHO and Superintendent be added to the total cost of each Task Order after the scope of work and the duration of the individual Task Order is established?

Yes, we will provide a Service

Repair Order (SRO) for you to fill in which includes ELINs we used pertaining to the work. For any labor and materials not covered in a specific ELIN you will use

Please provide Wage Rates for

Mechanicsburg location. If they differ from the Phila. wage rates there should be a different pricing schedule for that location.

Wage Rates for

Mechanicsburg are provided by the IFB.

98 8 3.2 2

We are a Joint Venture with a Mentor

Protégé in place. Are we required to submit financials for both parties or will just the mentor's suffice?

Both are required. Refer to page 8 of the IFB and bid per

IFB.

Will the following FAR Clauses be incorporated into this contract?

DFARS Clause 252.204-7021

Contractor Compliance with

Cybersecurity Model Certification

Level Requirements DFARS Provision

252.204-7025 Notice of Cybersecurity

Maturity Model Certification Level

Requirements

Both are already included in the IFB.

100 ELIN's

Philadelphia and Mechanicsburg have significant differences in their wage rates. Also, the travel costs will vary significantly depending on the location of each task order. Two separate ELIN's should be provided for each location for accurate pricing.

Please advise if this is possible.

A revision to the ELINs was made to separate Philadelphia and Mechanicsburg. See

Amendment 0005.

How many contractors do you anticipate will be selected/awarded this contract for advantageous & competitive pricing that best serves the United States government?

One contractor will be selected for this award.

Per the site meeting, could you please advise when photos documenting the general conditions of the roofs will be made available?

Photos will not be provided as the condition of each roof is not necessary as this is an

IDIQ contract. Each task order will have its own individual site visit.

Additionally, can we expect an extension to the proposal due date to allow time for responses to submitted questions?

See response to PPI#35.

104 27 3 52.228-1

The Surety Company is asking what dollar amount are we using, since there is not a seed project. Ie. 20% of

X? ___________. The Specs say 3,000,000. We want to be accurate.

See response to PPI#91.

ATTACHMENTS:

1. Amendment 0005 – Attachment A – General Specification Revisions

2. Amendment 0005 – Attachment B – Roof Survey Check List

3. Amendment 0005 – Attachment C - NSWC PNYA Roofs (Revised)

4. Amendment 0005 – Attachment D - PNYA CNIC Bldg. 44 Roof (Revised)

5. Amendment 0005 – Attachment ELINS – ELINS Roofing IDIQ Revised

6. Amendment 0005 – Attachment P – NSA-M Base Map

(End Summary of Changes)

File details come from the government source that posted it. Updated .