About this file

The document is a lessons learned presentation detailing a roof fire incident at Rickover Hall, highlighting critical safety failures and recommended actions for future roofing projects. The incident involved a contractor improperly using a torch on a cold patch roofing product, which led to a fire that was initially extinguished but reignited later, causing significant water damage when the Fire Department responded. Key lessons learned include the importance of using qualified, trained personnel, following product instructions, reporting all fires, and conducting proper fire watch procedures.

The presentation recommends several actions to prevent similar incidents, including requiring proof of roofing system training, mandating Certified Roofing Torch Applicator (CERTA) certification, conducting thorough pre-work surveys, and using heat detection devices during fire watch. The recommendations are specifically tied to a related Naval Facilities Engineering Command (NAVFAC) Indefinite Delivery/Indefinite Quantity (IDIQ) maintenance and construction contract for roofing at three Department of the Navy sites in Pennsylvania: Philadelphia Naval Business Center, Naval Support Activity Philadelphia, and Naval Support Activity Mechanicsburg.

View the file

Other files

File Type Posted
N4008526B0006 Bid Abstract.pdf PDF
Amendment 0010 - Attachment ELINs Roofing IDIQ Revised.xlsx XLSX spreadsheet
Amendment 0010.pdf PDF
Amendment 0009.pdf PDF
AMENDMENT 0008.pdf PDF
Amendment 0008 - Attachment ELINs Roofing IDIQ Revised.xlsx XLSX spreadsheet
Amendment 0008 Pre-Proposal Inquiries.pdf PDF
Amendment 0007 - Attachment ELINs Roofing IDIQ Revised.xlsx XLSX spreadsheet
Amendment 0007 - Attachment E NWSS B1 NSAP.pdf PDF
Amendment 0007 UFGS 07 54 23 TPA.pdf PDF
Amendment 0007 Pre-Proposal Inquiries.pdf PDF
AMENDMENT 0007.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005 - Attachment P NSA-M Base Map.pdf PDF
Amendment 0005 - Attachment C NSWC PNYA Roofs (Revised).xlsx XLSX spreadsheet
Amendment 0005 - Attachment A General Specification.docx DOCX document
AMENDMENT 0005.pdf PDF
Amendment 0005 - Attachment D PNYA CNIC Bldg. 44 Roof (Revised).xlsx XLSX spreadsheet
Amendment 0005 - Attachment B Roof Survey Check List.doc DOC document
N4008526B0006 0005 PPI Responses.pdf PDF
Amendment 0005 - Attachment ELINs Roofing IDIQ Revised.xlsx XLSX spreadsheet
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001 - Sign In Sheet Mechanicsburg.pdf PDF
Amendment 0001 - Sign In Sheet Philadelphia.pdf PDF
AMENDMENT 0001.pdf PDF
Attachment O - SECNAV 5512.pdf PDF
Attachment G NSA-P Site Map.pdf PDF
Attachment E Roof Survey Check List.pdf PDF
Attachment A - IDIQ Specifications.pdf PDF
Attachment N - PIEE Vendor Access Instructions.pdf PDF
Attachment J Table 07 60 00 Flashing Sheet Metal.pdf PDF
Attachment H PNYA Site Map.pdf PDF
Attachment M - Pre-Proposal Inquiry (PPI) Form.xlsx XLSX spreadsheet
Attachment L Table 07 62 13 Copper Sheet Metal.pdf PDF
Attachment K Table 07 61 14.00 20 Standing Seam Roof.pdf PDF
Attachment I NSWC Roof Drawings.pdf PDF
Attachment D PNYA CNIC Roofs.xlsx XLSX spreadsheet
Attachment C NSWC PNYA Roofs.xlsx XLSX spreadsheet
Attachment B - Roofing IDIQ ELINs.xlsx XLSX spreadsheet
N4008526B0006.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LESSONS LEARNED – RICKOVER HALL ROOF FIRE

Incident: The contractor was installing temporary roof patches after a welder installed handrails on the roof prior to an upcoming roof replacement. The Contractor’s carpenter was torching down a temporary patch and caught the existing roof insulation on fire. The initial fire was extinguished with fire extinguishers and water and the Contractor posted a fire watch for at least 2 hours. Around 4pm, contractor was convinced the fire had been entirely extinguished and left the site. Around 9pm, the utilities rover noticed smoke coming from the roof and called the Fire Department. Fire Department found an active fire on the roof and extinguished it with water. The Fire Department also connected to an FDC that was out of service due to ongoing renovations. The heat of the fire caused activation of a sprinkler head below the roof , all of which caused significant inundation of water throughout the building.

Causes and Lessons Learned:

Carpenter performed “torch-down” patching using a cold patch product whose label instructs not to apply heat to the product. This mistake may have triggered or accelerated the ignition of fire in the insulation. Workers must be familiar with the products and follow instructions.

Contractor’s carpenter performed the patching because the roofer wasn’t on site that day. Workers must be experienced and trained in the type of work they are performing.

LESSONS LEARNED – RICKOVER HALL ROOF FIRE

Causes and Lessons Learned (continued):

Contractor did not notify the Fire Department of the initial fire. The Fire Department would use a heat sensing tool and other methods to determine that the fire had not been 100% extinguished or continued to check the roof for fire throughout the evening. Govt Safety Requirements and Roofing Specification Sections in addition to Hot Work Permits all require contractor to “report any fire, no matter how small, to the responsible fire division immediately.”

4. The Fire Department unknowingly connected to an FDC that was not in service and exasperated water damage. LOTO shall be performed of all FDC’s removed from service. LOTO shall be reviewed with Fire Marshall during issuance of burn permits.

Similarities to Recent Fires on NAVFAC Roofing Projects (NAS JAX B110, 124 and Camp Lejeune HS) Unqualified personnel, either non-roofers or roofers without CERTA certification and/or not certified on the roofing system being applied, involved in roofing work that resulted in fire.

A fire watch was present and on site for the required 60 minutes following hot work.

Smoldering material (insulation, wood nailing strips) ignited at some time after the fire watch was lifted.

Differences From Recent Fires on NAVFAC Roofing Projects

The roofing insulation ignited during hot work. The fire was extinguished by the work crew but not reported to the Station Fire Department as required.

The roofing patches used at Rickover Hall were a “cold patch” system that did not require heat for application. Use of a torch for installation was unnecessary and inappropriate.

The Way Ahead: Recommended Actions Only trained/qualified personnel should perform roof installation work. Contract specifications should require proof (i.e. certificate) that all personnel working on roof installation are trained on the roofing system being installed. Certification to be provided as part of the Activity Hazard Analysis (AHA) for roof installation.

Only trained/qualified personnel should perform hot work during roofing installation/repair as required (i.e. using torch to activate adhesives). Contract specifications should require Certified Roofing Torch Applicator (CERTA) certification for all personnel performing hot work during a roof installation/repair project. Certification to be provided as part of the AHA for roof installation.

EM 385-1-1 Section 9 Fire Protection, paragraph 09.A.04.b states, “Areas shall be surveyed prior to performing any hot work to ensure they are free of fire hazards and to determine if a fire watch is required.” Contract specifications should require the contractor to submit a survey report as part of the AHA to ensure a survey has taken place, identify potential fire hazards such as nailing strips, and plan preventative measures.

EM 385-1-1 paragraph 09.K Fire Watch does not require monitoring with heat detection device (i.e. infrared camera or laser thermometer). However, in all four cases cited, doing so may have discovered the smoldering fire and prevented it from becoming a full blaze. Contract specifications should require that contractors performing hot work on a roofing installation/repair use an appropriate heat detection device to survey the work area prior to demobilizing the Fire Watch to ensure there are no potential fires present.

Communicate these recommendations via an Engineering and Construction Bulletin.

The Way Ahead: Recommended Actions (continued) The NDW Fire Chief offered several recommendations following the Rickover Hall fire. Several were directed at establishing a stronger relationship between the FEAD and the local Fire Department. One specific recommendation stood out:

1. Hot work for roof operations should be covered under a separate hot work process and not included in a work site permit. This will ensure that the post inspection and fire watch process is adhered to by the fire department and the contractor (please note that this will be difficult at places that do not have organic fire department assets).

To make this happen, NAVFAC CI5 will work with NAVFAC Safety and/or CNIC Fire Safety to develop a hot work permit specifically tailored for roof work that can then be implemented in the field.