This is an Exhibit Line Item Numbers (ELIN) attachment for an Indefinite Delivery/Indefinite Quantity (IDIQ) maintenance construction contract for roofing services at three Department of the Navy installations: Philadelphia Naval Business Center (PNBC), Naval Support Activity Philadelphia (NSA-P), and Naval Support Activity Mechanicsburg (NSA-M). The contract number is N40085-26-D-XXXX and includes a base option plus four option years with identical pricing structures for each contract period.

The contract encompasses comprehensive roofing services across two primary locations (Philadelphia and Mechanicsburg), with detailed unit-priced line items for removal, replacement, and maintenance of various roofing systems and components. Services include roof deck work (metal and wood), insulation removal and replacement, shingled roof systems (composition and slate), built-up roofing, EPDM rubber roofing systems, thermoplastic alloy (TPA) roofing, metal gutters and downspouts, flashing work, caulking, fascia board work, asbestos abatement, cleaning and clearing operations, service calls (with a $2,500 maximum per call), roof surveys, and additional labor and materials to be negotiated. Materials range from copper and aluminum to stainless steel components, measured in square feet (SF), board feet (BF), linear feet (LF), and equipment units (EA). The contract also includes two non-prepriced evaluation (EV) line items for specific Building 1 NSAP maintenance tasks involving power washing and roof analysis of a 100,000 square foot epoxy-coated roofing system. All pricing columns show $0.00, indicating this is a pricing template requiring contractor submission of unit prices for each ELIN during contract award.

View the file

Other files

File Type Posted
N4008526B0006 Bid Abstract.pdf PDF
Amendment 0010.pdf PDF
Amendment 0009.pdf PDF
AMENDMENT 0008.pdf PDF
Amendment 0008 Pre-Proposal Inquiries.pdf PDF
Amendment 0008 - Attachment ELINs Roofing IDIQ Revised.xlsx XLSX spreadsheet
Amendment 0007 Pre-Proposal Inquiries.pdf PDF
AMENDMENT 0007.pdf PDF
Amendment 0007 - Attachment ELINs Roofing IDIQ Revised.xlsx XLSX spreadsheet
Amendment 0007 - Attachment E NWSS B1 NSAP.pdf PDF
Amendment 0007 UFGS 07 54 23 TPA.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005 - Attachment P NSA-M Base Map.pdf PDF
Amendment 0005 - Attachment C NSWC PNYA Roofs (Revised).xlsx XLSX spreadsheet
Amendment 0005 - Attachment A General Specification.docx DOCX document
AMENDMENT 0005.pdf PDF
Amendment 0005 - Attachment ELINs Roofing IDIQ Revised.xlsx XLSX spreadsheet
Amendment 0005 - Attachment D PNYA CNIC Bldg. 44 Roof (Revised).xlsx XLSX spreadsheet
Amendment 0005 - Attachment B Roof Survey Check List.doc DOC document
N4008526B0006 0005 PPI Responses.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001 - Sign In Sheet Philadelphia.pdf PDF
AMENDMENT 0001.pdf PDF
Amendment 0001 - Sign In Sheet Mechanicsburg.pdf PDF
Attachment O - SECNAV 5512.pdf PDF
Attachment G NSA-P Site Map.pdf PDF
Attachment E Roof Survey Check List.pdf PDF
Attachment A - IDIQ Specifications.pdf PDF
Attachment F Lessons Learn Roof Fire.pptx PPTX presentation
N4008526B0006.pdf PDF
Attachment N - PIEE Vendor Access Instructions.pdf PDF
Attachment J Table 07 60 00 Flashing Sheet Metal.pdf PDF
Attachment H PNYA Site Map.pdf PDF
Attachment M - Pre-Proposal Inquiry (PPI) Form.xlsx XLSX spreadsheet
Attachment L Table 07 62 13 Copper Sheet Metal.pdf PDF
Attachment K Table 07 61 14.00 20 Standing Seam Roof.pdf PDF
Attachment I NSWC Roof Drawings.pdf PDF
Attachment D PNYA CNIC Roofs.xlsx XLSX spreadsheet
Attachment C NSWC PNYA Roofs.xlsx XLSX spreadsheet
Attachment B - Roofing IDIQ ELINs.xlsx XLSX spreadsheet
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Option

Roofing Contract
Attachment J-0200000-05
Exhibit Line Item Numbers
Base Option
Solicitation/Contract No.: N40085-26-D-XXXX
Philadelphia Roofing Contract
ELIN NumberSupplies/ServicesEst. QuantityUnitUnit PriceTotal
ROOF DECKS
A0001Remove existing metal roof decks (ALL OR PARTIAL) and replace with new steel roof decking, shall include all closures and accessories.3SQX$ - 0
Remove existing wood roof deck and replace with new wood decking
A00021" nominal T & G (treated)40BFX$ - 0
A00032" nominal T & G (treated)40BFX$ - 0
A00043/4" plywood40SFX$ - 0
A00051/2" plywood25SFX$ - 0
ROOF INSULATION
Remove and replace rigid roof insulation in conjunction with roofing systems specified herein. Average 1”x12”x12”
A0006Remove and replace polyisocyanurate tapered insulation panels10BFX$ - 0
A0007Remove and replace tapered roof insulation10BFX$ - 0
A0008Remove and replace vapor barrier in conjunction with built up roofing system10SQX$ - 0
A0009Remove and replace resin sized building paper (5 lb.)5SQX$ - 0
A0010Remove existing cants and replace with new fiberboard cants 4 x 430LFX$ - 0
A0011Remove existing cants and replace with new treated wood cants 4 x 430LFX$ - 0
A0012Remove existing Nailers and replace with new treated 2" x 6" wood100BFX$ - 0
SHINGLED ROOF SYSTEMS
Remove existing composition shingles and replace with new composition shingles, shall include starter
A0013Twenty Five Year (3 tab )10SQX$ - 0
A0014Thirty Year (architectural)6SQX$ - 0
A0015Forty Year (architectural)6SQX$ - 0
A0016Remove and dispose of existing composition shingles (all types)(where new shingles are not going to be installed)6SQX$ - 0
A0017Remove and dispose of existing slate shingles.6SQX$ - 0
A0018Remove and re-install existing slate shingles (All or Partial)2SQX$ - 0
A0019Install new slate shingles (Weathering green, Vermont)(All or Partial)3SQX$ - 0
A0020Install new slate shingles (Buckingham)(All or Partial)3SQX$ - 0
Remove existing preformed metal (All or Partial) roofing and replace with new preformed metal roofing
A0021Coated steel20SQX$ - 0
A0022Coated aluminum20SQX$ - 0
A0023Left Blank Intentionally
Field paint roof mounted equipment
A0024Up to 25 SF X in surface area X12SFX$ - 0
A0025Over 25 SF X in surface area X12SFX$ - 0
BUILT UP ROOF
Remove existing roof system and replace with new aggregate surfaced BU roofing system
A0026System GAA (Gravel)6SQX$ - 0
Remove existing roof system and replace with new smooth surfaced BU roofing system.
A0027System Gas6SQX$ - 0
Remove existing roof system and replace with new single ply reinforced modified bitumen sheet roofing system
A0028Torch Applied6SQX$ - 0
A0029Mop Applied6SQX$ - 0
A0030Remove existing base flashing and replace with new 2 ply glass felt base flashing50SFX$ - 0
A0031Remove existing base flashing and replace with new 3-ply bituminous base flashing12SFX$ - 0
A0032Remove existing base flashing and replace with new single ply reinforced modified, bitumen sheet roofing flashing modified.12SFX$ - 0
A0033Remove and Dispose of Second layer10SQX$ - 0
A0034(1) Walkway/Asphalt Planks100SFX$ - 0
ROOF AND PARAPET WALL DAMPROOFING
A0035Coat Existing BU Roof or Parapet Wall50SFX$ - 0
E.P.D.M. (RUBBER ROOF SYSTEM) (Install new E.P.D.M. Roof System over Existing Built-up Roof)
A0036Ballasted System10SQX$ - 0
A0037Mechanically Fastened System10SQX$ - 0
A0038Full Adhered System10SQX$ - 0
Remove existing roof system and replace with new E.P.D.M. roof system
A0039Ballasted System10SQX$ - 0
A0040Mechanically Fastened System10SQX$ - 0
A0041Full Adhered System10SQX$ - 0
A0042Install new E.P.D.M. Wall/Curb Flashings50SFX$ - 0
A0043Install Rubber Pipe Vents5EAX$ - 0
A0044Install Termination Bars. Shall include caulking12LFX$ - 0
A0045Install E.P.D.M Walk Pads5EAX$ - 0
Remove existing roof system and replace with new Thermoplastic alloy roof system (TPA)
A0046Mechanically Fastened5SQX$ - 0
A0047Ballasted5SQX$ - 0
A0048Install new TPA wall/curb flashing25SFX$ - 0
A0049Install new TPA pipe vent flashing5EAX$ - 0
Remove existing metal base flashing and replace with new metal base flashing
A0050Copper25SFX$ - 0
A0051Aluminum25SFX$ - 0
A0052Aluminum/various colors25SFX$ - 0
A0053Stainless Steel25SFX$ - 0
Remove existing and install new metal coping. Shall include caulking.
A0054Copper25SFX$ - 0
A0055Aluminum25SFX$ - 0
A0056Aluminum/various colors25SFX$ - 0
A0057Stainless Steel25SFX$ - 0
Remove metal drip edge and replace with new metal drip edge
A0058Copper6LFX$ - 0
A0059Aluminum6LFX$ - 0
A0060Aluminum/various colors6LFX$ - 0
A0061Stainless Steel6LFX$ - 0
METAL GUTTERS AND DOWNSPOUTS
Install Metal Gutters
A0062Copper/5" ogee100LFX$ - 0
A0063Copper/6" ogee100LFX$ - 0
A0064Copper/6" half round100LFX$ - 0
A0065Copper/6" box100LFX$ - 0
A0066Copper/8" box100LFX$ - 0
A0067Prefinished Alum/5" ogee100LFX$ - 0
A0068Prefinished Alum/6" ogee100LFX$ - 0
A0069Prefinished Alum/6" Box100LFX$ - 0
A0070Prefinished Alum/8" Box100LFX$ - 0
A0071Stainless steel/6" box100LFX$ - 0
A0072Stainless steel/8" box100LFX$ - 0
Install Metal Downspouts
A0073Copper 2" x 3"100LFX$ - 0
A0074Copper 3" x 4"100LFX$ - 0
A0075Copper/3" round100LFX$ - 0
A0076Copper/4" round100LFX$ - 0
A0077Copper/6" round100LFX$ - 0
A0078Prefinished alum 2" x 3"100LFX$ - 0
A0079Prefinished alum 3" x 4"100LFX$ - 0
A0080Stainless Steel 3" x 4"100LFX$ - 0
A0081Provide and place new concrete splash block5EAX$ - 0
(standard commercial size)
Gutters, Downspouts and Drains
A0082Remove and dispose of existing gutters and/or downspouts100LFX$ - 0
A0083Remove and reinstall existing gutters and/or downspouts. Reseal all joints100LFX$ - 0
A0084Realign and resecure existing gutters and/or downspouts (Replace hangers, fasteners and straps) as needed. Reseal all joints.200LFX$ - 0
A0085Resolder broken gutter joints3EAX$ - 0
A0086Reseal, broken gutter joints3EAX$ - 0
Remove existing metal open valley flashing and replace with new metal valley flashing
A0087Copper25SFX$ - 0
A0088Aluminum25SFX$ - 0
A0089Aluminum/various colors25SFX$ - 0
A0090Stainless Steel25SFX$ - 0
Remove existing metal flashing/miscellaneous
A0091Copper25SFX$ - 0
A0092Aluminum25SFX$ - 0
A0093Aluminum/various colors25SFX$ - 0
A0094Stainless Steel25SFX$ - 0
A0095Compatible w/EPDM & CPE25SFX$ - 0
Remove and replace exsisting pitch pocket new
A0096Copper2SFX$ - 0
A0097Aluminum2SFX$ - 0
A0098Stainless steel2SFX$ - 0
Roof Drain Sumps
A0099Provide and Install TPA EPDM roof drain Sumps1EAX$ - 0
A0100TPA EPDM roof drain sumps (removal only)2EAX$ - 0
Strainers
A0101Metal Strainers10EAX$ - 0
A0102PVC Strainers10EAX$ - 0
A0103Metal Strainers10EAX$ - 0
A0104PVC Strainers10EAX$ - 0
Remove existing metal scupper lining and replace with new metal scupper lining
A0105Copper10EAX$ - 0
A0106Stainless Steel10EAX$ - 0
Remove existing metal conductor heads and replace with new metal conductor heads
A0107Copper10EAX$ - 0
A0108Stainless Steel10EAX$ - 0
Install new metal splash pans
A0109Copper10EAX$ - 0
A0110Stainless Steel10EAX$ - 0
Remove existing expansion joints and replace bituminous base flashing, metal counterflashing and metal joint cover
A0111Copper100SFX$ - 0
A0112Aluminum100SFX$ - 0
A0113Stainless Steel100SFX$ - 0
Vent Flashing
A0114Remove existing pipe vent flashing and replace with new lead pipe vent flashing10EAX$ - 0
A0115Remove existing metal vent collars and replace with new vent collars and accessories10EAX$ - 0
Caulking
A0116Install caulking110LFX$ - 0
A0117Remove existing caulking and replace with new sealant/caulking50LFX$ - 0
Reglet
A0118Cut new Reglet In masonry50LFX$ - 0
A0119Cut new Reglet In concrete50LFX$ - 0
Fascia Board
A0120Remove existing fascia and replace with new fascia board100BFX$ - 0
A0121Prime and paint fascia board100SFX$ - 0
A0122Cover existing fascia board with aluminum coil stock (various colors)100SFX$ - 0
A0123Reserved for MODs0X$ - 0
Asbestos Abatement
A0124Additional cost incurred for the removal and disposal of asbestos containing substances. Regular roofing only.200SFX$ - 0
A0125Additional cost incurred for the removal and disposal of asbestos containing substance. (Flashings, Pitch pockets, etc.)200SFX$ - 0
A0126Removal of lead based paint. 'Contractor removes loose paint from surface and disposes.200SFX$ - 0
Cleaning and Clearing
A0127Clean and clear gutters and dispose of all debris from site.500LFX$ - 0
A0128Clean and Clear down spouts and remove debris from site.250LFX$ - 0
A0129Clean and clear roof drains10EAX$ - 0
A0130Provide power washing. The Contractor shall Power Wash roof surfaces and clear drain baskets. (Does not include gutter or down spout cleaning.)5000SFX$ - 0
Additional Labor and Materials not accounted for in ELINs
A0131Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Material costs shall BE NEGOTIATED BY KO.1LSX$ - 0
A0132Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO.2000HRSX$ - 0
Service calls
A0133Perform Service calls at PNYA and NSA-P . The Contractor shall respond to service calls within 24 hours of service call request. The contractor shall make necessary repairs to roof or roof system. Service calls are limited to a combined labor and material cost not to exceed $2,500.00. (Used for leaks and other emergencies)20EAX$ - 0
Perform Roof Survey In accordance with Attachment-B
A0134Perform Roof Survey / Assessment Per SF500,000EAX$ - 0
NON-PREPRICED LABOR, MATERIAL and COMMAND INTEREST WORK
A0135Bldg. 1 NSAP Spring power washing, minor deficiency repairs, drain cleaning, and analysis report. 100,000 sq ft epoxy coated roofing system. (Ref Attachment E NWSS B1 NSAP.)1EVX$ - 0
A0136Bldg. 1 NSAP Fall drain cleaning, Roof analysis and minor repairs. 100,000 sq ft epoxy coated roofing system. (Ref Attachment E NWSS B1 NSAP.)1EVX$ - 0
Total Price for PHL BASE OPTION YEAR (IQ) (Sum of Exhibit Line Items A0001- A0136)$ - 0
Mechanicsburg Roofing Contract
ELIN NumberSupplies/ServicesEst. QuantityUnitUnit PriceTotal
ROOF DECKS
A0137Remove existing metal roof decks (ALL OR PARTIAL) and replace with new steel roof decking, shall include all closures and accessories.3SQX$ - 0
Remove existing wood roof deck and replace with new wood decking
A01381" nominal T & G (treated)40BFX$ - 0
A01392" nominal T & G (treated)40BFX$ - 0
A01403/4" plywood40SFX$ - 0
A01411/2" plywood25SFX$ - 0
ROOF INSULATION
Remove and replace rigid roof insulation in conjunction with roofing systems specified herein. Average 1”x12”x12”
A0142Remove and replace polyisocyanurate tapered insulation panels10BFX$ - 0
A0143Remove and replace tapered roof insulation10BFX$ - 0
A0144Remove and replace vapor barrier in conjunction with built up roofing system10SQX$ - 0
A0145Remove and replace resin sized building paper (5 lb.)5SQX$ - 0
A0146Remove existing cants and replace with new fiberboard cants 4 x 430LFX$ - 0
A0147Remove existing cants and replace with new treated wood cants 4 x 430LFX$ - 0
A0148Remove existing Nailers and replace with new treated 2" x 6" wood100BFX$ - 0
SHINGLED ROOF SYSTEMS
Remove existing composition shingles and replace with new composition shingles, shall include starter
A0149Twenty Five Year (3 tab )10SQX$ - 0
A0150Thirty Year (architectural)6SQX$ - 0
A0151Forty Year (architectural)6SQX$ - 0
A0152Remove and dispose of existing composition shingles (all types)(where new shingles are not going to be installed)6SQX$ - 0
A0153Remove and dispose of existing slate shingles.6SQX$ - 0
A0154Remove and re-install existing slate shingles (All or Partial)2SQX$ - 0
A0155Install new slate shingles (Weathering green, Vermont)(All or Partial)3SQX$ - 0
A0156Install new slate shingles (Buckingham)(All or Partial)3SQX$ - 0
Remove existing preformed metal (All or Partial) roofing and replace with new preformed metal roofing
A0157Coated steel20SQX$ - 0
A0158Coated aluminum20SQX$ - 0
A0159Left Blank Intentionally
Field paint roof mounted equipment
A0160Up to 25 SF X in surface area X12SFX$ - 0
A0161Over 25 SF X in surface area X12SFX$ - 0
Built up Roof
Remove existing roof system and replace with new aggregate surfaced BU roofing system
A0162System GAA (Gravel)6SQX$ - 0
Remove existing roof system and replace with new smooth surfaced BU roofing system.
A0163System Gas6SQX$ - 0
Remove existing roof system and replace with new single ply reinforced modified bitumen sheet roofing system
A0164Torch Applied6SQX$ - 0
A0165Mop Applied6SQX$ - 0
A0166Remove existing base flashing and replace with new 2 ply glass felt base flashing50SFX$ - 0
A0167Remove existing base flashing and replace with new 3-ply bituminous base flashing12SFX$ - 0
A0168Remove existing base flashing and replace with new single ply reinforced modified, bitumen sheet roofing flashing modified.12SFX$ - 0
A0169Remove and Dispose of Second layer10SQX$ - 0
A0170(1) Walkway/Asphalt Planks100SFX$ - 0
Roof and Parapet Wall Damproofing
A0171Coat Existing BU Roof or Parapet Wall50SFX$ - 0
E.P.D.M. (RUBBER ROOF SYSTEM) (Install new E.P.D.M. Roof System over Existing Built-up Roof)
A0172Ballasted System10SQX$ - 0
A0173Mechanically Fastened System10SQX$ - 0
A0174Full Adhered System10SQX$ - 0
Remove existing roof system and replace with new E.P.D.M. roof system
A0175Ballasted System10SQX$ - 0
A0176Mechanically Fastened System10SQX$ - 0
A0177Full Adhered System10SQX$ - 0
A0178Install new E.P.D.M. Wall/Curb Flashings50SFX$ - 0
A0179Install Rubber Pipe Vents5EAX$ - 0
A0180Install Termination Bars. Shall include caulking12LFX$ - 0
A0181Install E.P.D.M Walk Pads5EAX$ - 0
Remove existing roof system and replace with new Thermoplastic alloy roof system (TPA)
A0182Mechanically Fastened5SQX$ - 0
A0183Ballasted5SQX$ - 0
A0184Install new TPA wall/curb flashing25SFX$ - 0
A0185Install new TPA pipe vent flashing5EAX$ - 0
Remove existing metal base flashing and replace with new metal base flashing
A0186Copper25SFX$ - 0
A0187Aluminum25SFX$ - 0
A0188Aluminum/various colors25SFX$ - 0
A0189Stainless Steel25SFX$ - 0
Remove existing and install new metal coping. Shall include caulking.
A0190Copper25SFX$ - 0
A0191Aluminum25SFX$ - 0
A0192Aluminum/various colors25SFX$ - 0
A0193Stainless Steel25SFX$ - 0
Remove metal drip edge and replace with new metal drip edge
A0194Copper6LFX$ - 0
A0195Aluminum6LFX$ - 0
A0196Aluminum/various colors6LFX$ - 0
A0197Stainless Steel6LFX$ - 0
METAL GUTTERS AND DOWNSPOUTS
Install Metal Gutters
A0198Copper/5" ogee100LFX$ - 0
A0199Copper/6" ogee100LFX$ - 0
A0200Copper/6" half round100LFX$ - 0
A0201Copper/6" box100LFX$ - 0
A0202Copper/8" box100LFX$ - 0
A0203Prefinished Alum/5" ogee100LFX$ - 0
A0204Prefinished Alum/6" ogee100LFX$ - 0
A0205Prefinished Alum/6" Box100LFX$ - 0
A0206Prefinished Alum/8" Box100LFX$ - 0
A0207Stainless steel/6" box100LFX$ - 0
A0208Stainless steel/8" box100LFX$ - 0
Install Metal Downspouts
A0209Copper 2" x 3"100LFX$ - 0
A0210Copper 3" x 4"100LFX$ - 0
A0211Copper/3" round100LFX$ - 0
A0212Copper/4" round100LFX$ - 0
A0213Copper/6" round100LFX$ - 0
A0214Prefinished alum 2" x 3"100LFX$ - 0
A0215Prefinished alum 3" x 4"100LFX$ - 0
A0216Stainless Steel 3" x 4"100LFX$ - 0
A0217Provide and place new concrete splash block5EAX$ - 0
(standard commercial size)
Gutters, Downspouts and Drains
A0218Remove and dispose of existing gutters and/or downspouts100LFX$ - 0
A0219Remove and reinstall existing gutters and/or downspouts. Reseal all joints100LFX$ - 0
A0220Realign and resecure existing gutters and/or downspouts (Replace hangers, fasteners and straps) as needed. Reseal all joints.200LFX$ - 0
A0221Resolder broken gutter joints3EAX$ - 0
A0222Reseal, broken gutter joints3EAX$ - 0
Remove existing metal open valley flashing and replace with new metal valley flashing
A0223Copper25SFX$ - 0
A0224Aluminum25SFX$ - 0
A0225Aluminum/various colors25SFX$ - 0
A0226Stainless Steel25SFX$ - 0
Remove existing metal flashing/miscellaneous
A0227Copper25SFX$ - 0
A0228Aluminum25SFX$ - 0
A0229Aluminum/various colors25SFX$ - 0
A0230Stainless Steel25SFX$ - 0
A0231Compatible w/EPDM & CPE25SFX$ - 0
Remove existing pitch pocket and replace with new
A0232Copper2SFX$ - 0
A0233Aluminum2SFX$ - 0
A0234Stainless steel2SFX$ - 0
Roof Drain Sumps
A235Provide and Install TPA EPDM roof drain Sumps1EAX$ - 0
A0236TPA EPDM roof drain sumps (removal only)2EAX$ - 0
Strainers
A0237Metal Strainers10EAX$ - 0
A0238PVC Strainers10EAX$ - 0
A0239Metal Strainers10EAX$ - 0
A0240PVC Strainers10EAX$ - 0
Remove existing metal scupper lining and replace with new metal scupper lining
A0241Copper10EAX$ - 0
A0242Stainless Steel10EAX$ - 0
Remove existing metal conductor heads and replace with new metal conductor heads
A0243Copper10EAX$ - 0
A0244Stainless Steel10EAX$ - 0
Install new metal splash pans
A0245Copper10EAX$ - 0
A0246Stainless Steel10EAX$ - 0
Remove existing expansion joints and replace bituminous base flashing, metal counterflashing and metal joint cover
A0247Copper100SFX$ - 0
A0248Aluminum100SFX$ - 0
A0249Stainless Steel100SFX$ - 0
Vent Flashing
A0250Remove existing pipe vent flashing and replace with new lead pipe vent flashing10EAX$ - 0
A0251Remove existing metal vent collars and replace with new vent collars and accessories10EAX$ - 0
Caulking
A0252Install caulking110LFX$ - 0
A0253Remove existing caulking and replace with new sealant/caulking50LFX$ - 0
Reglet
A0254Cut new Reglet In masonry50LFX$ - 0
A0255Cut new Reglet In concrete50LFX$ - 0
Fascia Board
A0256Remove existing fascia and replace with new fascia board100BFX$ - 0
A0257Prime and paint fascia board100SFX$ - 0
A0258Cover existing fascia board with aluminum coil stock (various colors)100SFX$ - 0
A0259Reserved for MODs0X$ - 0
Asbestos Abatement
A0260Additional cost incurred for the removal and disposal of asbestos containing substances. Regular roofing only.200SFX$ - 0
A0261Additional cost incurred for the removal and disposal of asbestos containing substance. (Flashings, Pitch pockets, etc.)200SFX$ - 0
A0262Removal of lead based paint. 'Contractor removes loose paint from surface and disposes.200SFX$ - 0
Cleaning and Clearing
A0263Clean and clear gutters and dispose of all debris from site.500LFX$ - 0
A0264Clean and Clear down spouts and remove debris from site.250LFX$ - 0
A0265Clean and clear roof drains10EAX$ - 0
A0266Provide power washing. The Contractor shall Power Wash roof surfaces and clear drain baskets. (Does not include gutter or down spout cleaning.)5000SFX$ - 0
Additional Labor and Materials not accounted for in ELINs
A0267Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Material costs shall BE NEGOTIATED BY KO.LSX$ - 0
A0268Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO.2000HRSX$ - 0
Service calls
A0269Perform Service calls at NSA-Mechanicsburg. The Contractor shall respond to service calls within 24 hours of service call request. The contractor shall make necessary repairs to roof or roof system. Service calls are limited to a combined labor and material cost not to exceed $2,500.00. (Used for leaks and other emergencies)20EAX$ - 0
Perform Roof Survey In accordance with Attachment-B
A0270Perform Roof Survey / Assessment Per SF500,000EAX$ - 0
Total Price for Mech BASE OPTION YEAR (IQ) (Sum of Exhibit Line Items A0137- A0270)$ - 0

Total Combined Price for Mech and PHL BASE OPTION YEAR (IQ) (Sum of Exhibit Line Items A0001- A0270) $ - 0

Option Year 1

Roofing Contract
Attachment J-0200000-05
Exhibit Line Item Numbers
Option Year 1
Solicitation/Contract No.: N40085-26-D-XXXX
Philadelphia Roofing Contract
ELIN NumberSupplies/ServicesEst. QuantityUnitUnit PriceTotal
ROOF DECKS
B0001Remove existing metal roof decks (ALL OR PARTIAL) and replace with new steel roof decking, shall include all closures and accessories.3SQX$ - 0$ - 0
Remove existing wood roof deck and replace with new wood decking
B00021" nominal T & G (treated)40BFX$ - 0$ - 0
B00032" nominal T & G (treated)40BFX$ - 0$ - 0
B00043/4" plywood40SFX$ - 0$ - 0
B00051/2" plywood25SFX$ - 0$ - 0
ROOF INSULATION
Remove and replace rigid roof insulation in conjunction with roofing systems specified herein. Average 1”x12”x12”
B0006Remove and replace polyisocyanurate tapered insulation panels10BFX$ - 0$ - 0
B0007Remove and replace tapered roof insulation10BFX$ - 0$ - 0
B0008Remove and replace vapor barrier in conjunction with built up roofing system10SQX$ - 0$ - 0
B0009Remove and replace resin sized building paper (5 lb.)5SQX$ - 0$ - 0
B0010Remove existing cants and replace with new fiberboard cants 4 x 430LFX$ - 0$ - 0
B0011Remove existing cants and replace with new treated wood cants 4 x 430LFX$ - 0$ - 0
B0012Remove existing Nailers and replace with new treated 2" x 6" wood100BFX$ - 0$ - 0
SHINGLED ROOF SYSTEMS
Remove existing composition shingles and replace with new composition shingles, shall include starter
B0013Twenty Five Year (3 tab )10SQX$ - 0$ - 0
B0014Thirty Year (architectural)6SQX$ - 0$ - 0
B0015Forty Year (architectural)6SQX$ - 0$ - 0
B0016Remove and dispose of existing composition shingles (all types)(where new shingles are not going to be installed)6SQX$ - 0$ - 0
B0017Remove and dispose of existing slate shingles.6SQX$ - 0$ - 0
B0018Remove and re-install existing slate shingles (All or Partial)2SQX$ - 0$ - 0
B0019Install new slate shingles (Weathering green, Vermont)(All or Partial)3SQX$ - 0$ - 0
B0020Install new slate shingles (Buckingham)(All or Partial)3SQX$ - 0$ - 0
Remove existing preformed metal (All or Partial) roofing and replace with new preformed metal roofing
B0021Coated steel20SQX$ - 0$ - 0
B0022Coated aluminum20SQX$ - 0$ - 0
B0023Left Blank Intentionally
Field paint roof mounted equipment
B0024Up to 25 SF X in surface area X12SFX$ - 0$ - 0
B0025Over 25 SF X in surface area X12SFX$ - 0$ - 0
BUILT UP ROOF
Remove existing roof system and replace with new aggregate surfaced BU roofing system
B0026System GAA (Gravel)6SQX$ - 0$ - 0
Remove existing roof system and replace with new smooth surfaced BU roofing system.
B0027System Gas6SQX$ - 0$ - 0
Remove existing roof system and replace with new single ply reinforced modified bitumen sheet roofing system
B0028Torch Applied6SQX$ - 0$ - 0
B0029Mop Applied6SQX$ - 0$ - 0
B0030Remove existing base flashing and replace with new 2 ply glass felt base flashing50SFX$ - 0$ - 0
B0031Remove existing base flashing and replace with new 3-ply bituminous base flashing12SFX$ - 0$ - 0
B0032Remove existing base flashing and replace with new single ply reinforced modified, bitumen sheet roofing flashing modified.12SFX$ - 0$ - 0
B0033Remove and Dispose of Second layer10SQX$ - 0$ - 0
B0034(1) Walkway/Asphalt Planks100SFX$ - 0$ - 0
ROOF AND PARAPET WALL DAMPROOFING$ - 0
B0035Coat Existing BU Roof or Parapet Wall50SFX$ - 0$ - 0
E.P.D.M. (RUBBER ROOF SYSTEM) (Install new E.P.D.M. Roof System over Existing Built-up Roof)$ - 0
B0036Ballasted System10SQX$ - 0$ - 0
B0037Mechanically Fastened System10SQX$ - 0$ - 0
B0038Full Adhered System10SQX$ - 0$ - 0
Remove existing roof system and replace with new E.P.D.M. roof system$ - 0
B0039Ballasted System10SQX$ - 0$ - 0
B0040Mechanically Fastened System10SQX$ - 0$ - 0
B0041Full Adhered System10SQX$ - 0$ - 0
B0042Install new E.P.D.M. Wall/Curb Flashings50SFX$ - 0$ - 0
B0043Install Rubber Pipe Vents5EAX$ - 0$ - 0
B0044Install Termination Bars. Shall include caulking12LFX$ - 0$ - 0
B0045Install E.P.D.M Walk Pads5EAX$ - 0$ - 0
Remove existing roof system and replace with new Thermoplastic alloy roof system (TPA)$ - 0
B0046Mechanically Fastened5SQX$ - 0$ - 0
B0047Ballasted5SQX$ - 0$ - 0
B0048Install new TPA wall/curb flashing25SFX$ - 0$ - 0
B0049Install new TPA pipe vent flashing5EAX$ - 0$ - 0
Remove existing metal base flashing and replace with new metal base flashing$ - 0
B0050Copper25SFX$ - 0$ - 0
B0051Aluminum25SFX$ - 0$ - 0
B0052Aluminum/various colors25SFX$ - 0$ - 0
B0053Stainless Steel25SFX$ - 0$ - 0
Remove existing and install new metal coping. Shall include caulking.$ - 0
B0054Copper25SFX$ - 0$ - 0
B0055Aluminum25SFX$ - 0$ - 0
B0056Aluminum/various colors25SFX$ - 0$ - 0
B0057Stainless Steel25SFX$ - 0$ - 0
Remove metal drip edge and replace with new metal drip edge$ - 0
B0058Copper6LFX$ - 0$ - 0
B0059Aluminum6LFX$ - 0$ - 0
B0060Aluminum/various colors6LFX$ - 0$ - 0
B0061Stainless Steel6LFX$ - 0$ - 0
METAL GUTTERS AND DOWNSPOUTS$ - 0
Install Metal Gutters$ - 0
B0062Copper/5" ogee100LFX$ - 0$ - 0
B0063Copper/6" ogee100LFX$ - 0$ - 0
B0064Copper/6" half round100LFX$ - 0$ - 0
B0065Copper/6" box100LFX$ - 0$ - 0
B0066Copper/8" box100LFX$ - 0$ - 0
B0067Prefinished Alum/5" ogee100LFX$ - 0$ - 0
B0068Prefinished Alum/6" ogee100LFX$ - 0$ - 0
B0069Prefinished Alum/6" Box100LFX$ - 0$ - 0
B0070Prefinished Alum/8" Box100LFX$ - 0$ - 0
B0071Stainless steel/6" box100LFX$ - 0$ - 0
B0072Stainless steel/8" box100LFX$ - 0$ - 0
Install Metal Downspouts$ - 0
B0073Copper 2" x 3"100LFX$ - 0$ - 0
B0074Copper 3" x 4"100LFX$ - 0$ - 0
B0075Copper/3" round100LFX$ - 0$ - 0
B0076Copper/4" round100LFX$ - 0$ - 0
B0077Copper/6" round100LFX$ - 0$ - 0
B0078Prefinished alum 2" x 3"100LFX$ - 0$ - 0
B0079Prefinished alum 3" x 4"100LFX$ - 0$ - 0
B0080Stainless Steel 3" x 4"100LFX$ - 0$ - 0
B0081Provide and place new concrete splash block5EAX$ - 0$ - 0
(standard commercial size)$ - 0
Gutters, Downspouts and Drains$ - 0
B0082Remove and dispose of existing gutters and/or downspouts100LFX$ - 0$ - 0
B0083Remove and reinstall existing gutters and/or downspouts. Reseal all joints100LFX$ - 0$ - 0
B0084Realign and resecure existing gutters and/or downspouts (Replace hangers, fasteners and straps) as needed. Reseal all joints.200LFX$ - 0$ - 0
B0085Resolder broken gutter joints3EAX$ - 0$ - 0
B0086Reseal, broken gutter joints3EAX$ - 0$ - 0
Remove existing metal open valley flashing and replace with new metal valley flashing$ - 0
B0087Copper25SFX$ - 0$ - 0
B0088Aluminum25SFX$ - 0$ - 0
B0089Aluminum/various colors25SFX$ - 0$ - 0
B0090Stainless Steel25SFX$ - 0$ - 0
Remove existing metal flashing/miscellaneous$ - 0
B0091Copper25SFX$ - 0$ - 0
B0092Aluminum25SFX$ - 0$ - 0
B0093Aluminum/various colors25SFX$ - 0$ - 0
B0094Stainless Steel25SFX$ - 0$ - 0
B0095Compatible w/EPDM & CPE25SFX$ - 0$ - 0
Remove existing pitch pocket and 'replace with new$ - 0
B0096Copper2SFX$ - 0$ - 0
B0097Aluminum2SFX$ - 0$ - 0
B0098Stainless steel2SFX$ - 0$ - 0
Roof Drain Sumps$ - 0
B099Provide and Install TPA EPDM roof drain Sumps1EAX$ - 0$ - 0
B100TPA EPDM roof drain sumps (removal only)2EAX$ - 0$ - 0
Strainers$ - 0
B0101Metal Strainers10EAX$ - 0$ - 0
B0102PVC Strainers10EAX$ - 0$ - 0
B0103Metal Strainers10EAX$ - 0$ - 0
B0104PVC Strainers10EAX$ - 0$ - 0
Remove existing metal scupper lining and replace with new metal scupper lining$ - 0
B0105Copper10EAX$ - 0$ - 0
B0106Stainless Steel10EAX$ - 0$ - 0
Remove existing metal conductor heads and replace with new metal conductor heads$ - 0
B0107Copper10EAX$ - 0$ - 0
B0108Stainless Steel10EAX$ - 0$ - 0
Install new metal splash pans$ - 0
B0109Copper10EAX$ - 0$ - 0
B0110Stainless Steel10EAX$ - 0$ - 0
Remove existing expansion joints and replace bituminous base flashing, metal counterflashing and metal joint cover$ - 0
B0111Copper100SFX$ - 0$ - 0
B0112Aluminum100SFX$ - 0$ - 0
B0113Stainless Steel100SFX$ - 0$ - 0
Vent Flashing$ - 0
B0114Remove existing pipe vent flashing and replace with new lead pipe vent flashing10EAX$ - 0$ - 0
B0115Remove existing metal vent collars and replace with new vent collars and accessories10EAX$ - 0$ - 0
Caulking$ - 0
B0116Install caulking110LFX$ - 0$ - 0
B0117Remove existing caulking and replace with new sealant/caulking50LFX$ - 0$ - 0
Reglet$ - 0
B0118Cut new Reglet In masonry50LFX$ - 0$ - 0
B0119Cut new Reglet In concrete50LFX$ - 0$ - 0
Fascia Board$ - 0
B0120Remove existing fascia and replace with new fascia board100BFX$ - 0$ - 0
B0121Prime and paint fascia board100SFX$ - 0$ - 0
B0122Cover existing fascia board with aluminum coil stock (various colors)100SFX$ - 0$ - 0
B0123Reserved for MODs0X$ - 0$ - 0
Asbestos Abatement$ - 0
B0124Additional cost incurred for the removal and disposal of asbestos containing substances. Regular roofing only.200SFX$ - 0$ - 0
B0125Additional cost incurred for the removal and disposal of asbestos containing substance. (Flashings, Pitch pockets, etc.)200SFX$ - 0$ - 0
B0126Removal of lead based paint. 'Contractor removes loose paint from surface and disposes.200SFX$ - 0$ - 0
Cleaning and Clearing$ - 0
B0127Clean and clear gutters and dispose of all debris from site.500LFX$ - 0$ - 0
B0128Clean and Clear down spouts and remove debris from site.250LFX$ - 0$ - 0
B0129Clean and clear roof drains10EAX$ - 0$ - 0
B0130Provide power washing. The Contractor shall Power Wash roof surfaces and clear drain baskets. (Does not include gutter or down spout cleaning.)5000SFX$ - 0$ - 0
Additional Labor and Materials not accounted for in ELINs$ - 0
B0131Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Material costs shall BE NEGOTIATED BY KO.LSX$ - 0$ - 0
B0132Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO.2000HRSX$ - 0$ - 0
Service calls$ - 0
B0133Perform Service calls at PNYA and NSA-P. The Contractor shall respond to service calls within 24 hours of service call request. The contractor shall make necessary repairs to roof or roof system. Service calls are limited to a combined labor and material cost not to exceed $2,500.00. (Used for leaks and other emergencies)20EAX$ - 0$ - 0
Perform Roof Survey In accordance with Attachment-B$ - 0
B0134Perform Roof Survey / Assessment Per SF500,000EAX$ - 0$ - 0
NON-PREPRICED LABOR, MATERIAL and COMMAND INTEREST WORK$ - 0
B0135Bldg. 1 NSAP Spring power washing, minor deficiency repairs, drain cleaning, and analysis report. 100,000 sq ft epoxy coated roofing system. (Ref Attachment E NWSS B1 NSAP.)1EVX$ - 0$ - 0
B0136Bldg. 1 NSAP Fall drain cleaning, Roof analysis and minor repairs. 100,000 sq ft epoxy coated roofing system. (Ref Attachment E NWSS B1 NSAP.)1EVX$ - 0$ - 0
Total Price for PHL OPTION YEAR 1 (IQ) (Sum of Exhibit Line Items B0001- B0136)$ - 0
Mechanicsburg Roofing Contract
ELIN NumberSupplies/ServicesEst. QuantityUnitUnit PriceTotal
ROOF DECKS
B0137Remove existing metal roof decks (ALL OR PARTIAL) and replace with new steel roof decking, shall include all closures and accessories.3SQX$ - 0$ - 0
Remove existing wood roof deck and replace with new wood decking$ - 0
B01381" nominal T & G (treated)40BFX$ - 0$ - 0
B01392" nominal T & G (treated)40BFX$ - 0$ - 0
B01403/4" plywood40SFX$ - 0$ - 0
B01411/2" plywood25SFX$ - 0$ - 0
ROOF INSULATION$ - 0
Remove and replace rigid roof insulation in conjunction with roofing systems specified herein. Average 1”x12”x12”$ - 0
B0142Remove and replace polyisocyanurate tapered insulation panels10BFX$ - 0$ - 0
B0143Remove and replace tapered roof insulation10BFX$ - 0$ - 0
B0144Remove and replace vapor barrier in conjunction with built up roofing system10SQX$ - 0$ - 0
B0145Remove and replace resin sized building paper (5 lb.)5SQX$ - 0$ - 0
B0146Remove existing cants and replace with new fiberboard cants 4 x 430LFX$ - 0$ - 0
B0147Remove existing cants and replace with new treated wood cants 4 x 430LFX$ - 0$ - 0
B0148Remove existing Nailers and replace with new treated 2" x 6" wood100BFX$ - 0$ - 0
SHINGLED ROOF SYSTEMS$ - 0
Remove existing composition shingles and replace with new composition shingles, shall include starter$ - 0
B0149Twenty Five Year (3 tab )10SQX$ - 0$ - 0
B0150Thirty Year (architectural)6SQX$ - 0$ - 0
B0151Forty Year (architectural)6SQX$ - 0$ - 0
B0152Remove and dispose of existing composition shingles (all types)(where new shingles are not going to be installed)6SQX$ - 0$ - 0
B0153Remove and dispose of existing slate shingles.6SQX$ - 0$ - 0
B0154Remove and re-install existing slate shingles (All or Partial)2SQX$ - 0$ - 0
B0155Install new slate shingles (Weathering green, Vermont)(All or Partial)3SQX$ - 0$ - 0
B0156Install new slate shingles (Buckingham)(All or Partial)3SQX$ - 0$ - 0
Remove existing preformed metal (All or Partial) roofing and replace with new preformed metal roofing$ - 0
B0157Coated steel20SQX$ - 0$ - 0
B0158Coated aluminum20SQX$ - 0$ - 0
B0159Left Blank Intentionally
Field paint roof mounted equipment$ - 0
B0160Up to 25 SF X in surface area X12SFX$ - 0$ - 0
B0161Over 25 SF X in surface area X12SFX$ - 0$ - 0
BUILT UP ROOF$ - 0
Remove existing roof system and replace with new aggregate surfaced BU roofing system$ - 0
B0162System GAA (Gravel)6SQX$ - 0$ - 0
Remove existing roof system and replace with new smooth surfaced BU roofing system.$ - 0
B0163System Gas6SQX$ - 0$ - 0
Remove existing roof system and replace with new single ply reinforced modified bitumen sheet roofing system$ - 0
B0164Torch Applied6SQX$ - 0$ - 0
B0165Mop Applied6SQX$ - 0$ - 0
B0166Remove existing base flashing and replace with new 2 ply glass felt base flashing50SFX$ - 0$ - 0
B0167Remove existing base flashing and replace with new 3-ply bituminous base flashing12SFX$ - 0$ - 0
B0168Remove existing base flashing and replace with new single ply reinforced modified, bitumen sheet roofing flashing modified.12SFX$ - 0$ - 0
B0169Remove and Dispose of Second layer10SQX$ - 0$ - 0
B0170(1) Walkway/Asphalt Planks100SFX$ - 0$ - 0
ROOF AND PARAPET WALL DAMPROOFING$ - 0
B0171Coat Existing BU Roof or Parapet Wall50SFX$ - 0$ - 0
E.P.D.M. (RUBBER ROOF SYSTEM) (Install new E.P.D.M. Roof System over Existing Built-up Roof)$ - 0
B0172Ballasted System10SQX$ - 0$ - 0
B0173Mechanically Fastened System10SQX$ - 0$ - 0
B0174Full Adhered System10SQX$ - 0$ - 0
Remove existing roof system and replace with new E.P.D.M. roof system$ - 0
B0175Ballasted System10SQX$ - 0$ - 0
B0176Mechanically Fastened System10SQX$ - 0$ - 0
B0177Full Adhered System10SQX$ - 0$ - 0
B0178Install new E.P.D.M. Wall/Curb Flashings50SFX$ - 0$ - 0
B0179Install Rubber Pipe Vents5EAX$ - 0$ - 0
B0180Install Termination Bars. Shall include caulking12LFX$ - 0$ - 0
B0181Install E.P.D.M Walk Pads5EAX$ - 0$ - 0
Remove existing roof system and replace with new Thermoplastic alloy roof system (TPA)$ - 0
B0182Mechanically Fastened5SQX$ - 0$ - 0
B0183Ballasted5SQX$ - 0$ - 0
B0184Install new TPA wall/curb flashing25SFX$ - 0$ - 0
B0185Install new TPA pipe vent flashing5EAX$ - 0$ - 0
Remove existing metal base flashing and replace with new metal base flashing$ - 0
B0186Copper25SFX$ - 0$ - 0
B0187Aluminum25SFX$ - 0$ - 0
B0188Aluminum/various colors25SFX$ - 0$ - 0
B0189Stainless Steel25SFX$ - 0$ - 0
Remove existing and install new metal coping. Shall include caulking.$ - 0
B0190Copper25SFX$ - 0$ - 0
B0191Aluminum25SFX$ - 0$ - 0
B0192Aluminum/various colors25SFX$ - 0$ - 0
B0193Stainless Steel25SFX$ - 0$ - 0
Remove metal drip edge and replace with new metal drip edge$ - 0
B0194Copper6LFX$ - 0$ - 0
B0195Aluminum6LFX$ - 0$ - 0
B0196Aluminum/various colors6LFX$ - 0$ - 0
B0197Stainless Steel6LFX$ - 0$ - 0
METAL GUTTERS AND DOWNSPOUTS$ - 0
Install Metal Gutters$ - 0
B0198Copper/5" ogee100LFX$ - 0$ - 0
B0199Copper/6" ogee100LFX$ - 0$ - 0
B0200Copper/6" half round100LFX$ - 0$ - 0
B0201Copper/6" box100LFX$ - 0$ - 0
B0202Copper/8" box100LFX$ - 0$ - 0
B0203Prefinished Alum/5" ogee100LFX$ - 0$ - 0
B0204Prefinished Alum/6" ogee100LFX$ - 0$ - 0
B0205Prefinished Alum/6" Box100LFX$ - 0$ - 0
B0206Prefinished Alum/8" Box100LFX$ - 0$ - 0
B0207Stainless steel/6" box100LFX$ - 0$ - 0
B0208Stainless steel/8" box100LFX$ - 0$ - 0
Install Metal Downspouts$ - 0
B0209Copper 2" x 3"100LFX$ - 0$ - 0
B0210Copper 3" x 4"100LFX$ - 0$ - 0
B0211Copper/3" round100LFX$ - 0$ - 0
B0212Copper/4" round100LFX$ - 0$ - 0
B0213Copper/6" round100LFX$ - 0$ - 0
B0214Prefinished alum 2" x 3"100LFX$ - 0$ - 0
B0215Prefinished alum 3" x 4"100LFX$ - 0$ - 0
B0216Stainless Steel 3" x 4"100LFX$ - 0$ - 0
B0217Provide and place new concrete splash block5EAX$ - 0$ - 0
(standard commercial size)$ - 0
Gutters, Downspouts and Drains$ - 0
B0218Remove and dispose of existing gutters and/or downspouts100LFX$ - 0$ - 0
B0219Remove and reinstall existing gutters and/or downspouts. Reseal all joints100LFX$ - 0$ - 0
B0220Realign and resecure existing gutters and/or downspouts (Replace hangers, fasteners and straps) as needed. Reseal all joints.200LFX$ - 0$ - 0
B0221Resolder broken gutter joints3EAX$ - 0$ - 0
B0222Reseal, broken gutter joints3EAX$ - 0$ - 0
Remove existing metal open valley flashing and replace with new metal valley flashing$ - 0
B0223Copper25SFX$ - 0$ - 0
B0224Aluminum25SFX$ - 0$ - 0
B0225Aluminum/various colors25SFX$ - 0$ - 0
B0226Stainless Steel25SFX$ - 0$ - 0
Remove existing metal flashing/miscellaneous$ - 0
B0227Copper25SFX$ - 0$ - 0
B0228Aluminum25SFX$ - 0$ - 0
B0229Aluminum/various colors25SFX$ - 0$ - 0
B0230Stainless Steel25SFX$ - 0$ - 0
B0231Compatible w/EPDM & CPE25SFX$ - 0$ - 0
Remove existing pitch pocket and 'replace with new$ - 0
B0232Copper2SFX$ - 0$ - 0
B0233Aluminum2SFX$ - 0$ - 0
B0234Stainless steel2SFX$ - 0$ - 0
Roof Drain Sumps$ - 0
B235Provide and Install TPA EPDM roof drain Sumps1EAX$ - 0$ - 0
B0236TPA EPDM roof drain sumps (removal only)2EAX$ - 0$ - 0
Strainers$ - 0
B0237Metal Strainers10EAX$ - 0$ - 0
B0238PVC Strainers10EAX$ - 0$ - 0
B0239Metal Strainers10EAX$ - 0$ - 0
B0240PVC Strainers10EAX$ - 0$ - 0
Remove existing metal scupper lining and replace with new metal scupper lining$ - 0
B0241Copper10EAX$ - 0$ - 0
B0242Stainless Steel10EAX$ - 0$ - 0
Remove existing metal conductor heads and replace with new metal conductor heads$ - 0
B0243Copper10EAX$ - 0$ - 0
B0244Stainless Steel10EAX$ - 0$ - 0
Install new metal splash pans$ - 0
B0245Copper10EAX$ - 0$ - 0
B0246Stainless Steel10EAX$ - 0$ - 0
Remove existing expansion joints and replace bituminous base flashing, metal counterflashing and metal joint cover$ - 0
B0247Copper100SFX$ - 0$ - 0
B0248Aluminum100SFX$ - 0$ - 0
B0249Stainless Steel100SFX$ - 0$ - 0
Vent Flashing$ - 0
B0250Remove existing pipe vent flashing and replace with new lead pipe vent flashing10EAX$ - 0$ - 0
B0251Remove existing metal vent collars and replace with new vent collars and accessories10EAX$ - 0$ - 0
Caulking$ - 0
B0252Install caulking110LFX$ - 0$ - 0
B0253Remove existing caulking and replace with new sealant/caulking50LFX$ - 0$ - 0
Reglet$ - 0
B0254Cut new Reglet In masonry50LFX$ - 0$ - 0
B0255Cut new Reglet In concrete50LFX$ - 0$ - 0
Fascia Board$ - 0
B0256Remove existing fascia and replace with new fascia board100BFX$ - 0$ - 0
B0257Prime and paint fascia board100SFX$ - 0$ - 0
B0258Cover existing fascia board with aluminum coil stock (various colors)100SFX$ - 0$ - 0
B0259Reserved for MODs0X$ - 0$ - 0
Asbestos Abatement$ - 0
B0260Additional cost incurred for the removal and disposal of asbestos containing substances. Regular roofing only.200SFX$ - 0$ - 0
B0261Additional cost incurred for the removal and disposal of asbestos containing substance. (Flashings, Pitch pockets, etc.)200SFX$ - 0$ - 0
B0262Removal of lead based paint. 'Contractor removes loose paint from surface and disposes.200SFX$ - 0$ - 0
Cleaning and Clearing$ - 0
B0263Clean and clear gutters and dispose of all debris from site.500LFX$ - 0$ - 0
B0264Clean and Clear down spouts and remove debris from site.250LFX$ - 0$ - 0
B0265Clean and clear roof drains10EAX$ - 0$ - 0
B0266Provide power washing. The Contractor shall Power Wash roof surfaces and clear drain baskets. (Does not include gutter or down spout cleaning.)5000SFX$ - 0$ - 0
Additional Labor and Materials not accounted for in ELINs$ - 0
B0267Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Material costs shall BE NEGOTIATED BY KO.LSX$ - 0$ - 0
B02681x2000HRSX$ - 0$ - 0
Service calls$ - 0
B0269Perform Service calls at NSA-Mechanicsburg. The Contractor shall respond to service calls within 24 hours of service call request. The contractor shall make necessary repairs to roof or roof system. Service calls are limited to a combined labor and material cost not to exceed $2,500.00. (Used for leaks and other emergencies)20EAX$ - 0$ - 0
Perform Roof Survey In accordance with Attachment-B$ - 0
B0270Perform Roof Survey / Assessment Per SF500,000EAX$ - 0$ - 0
Total Price for Mech OPTION YEAR 1 (IQ) (Sum of Exhibit Line Items B0137- B0270)$ - 0

Total Combined Price for Mech and PHL OPTION YEAR 1 (IQ) (Sum of Exhibit Line Items B0001- B0270) $ - 0

Option Year 2

Roofing Contract
Attachment J-0200000-05
Exhibit Line Item Numbers
Option Year 2
Solicitation/Contract No.: N40085-26-D-XXXX
Philadelphia Roofing Contract
ELIN NumberSupplies/ServicesEst. QuantityUnitUnit PriceTotal
ROOF DECKS
C0001Remove existing metal roof decks (ALL OR PARTIAL) and replace with new steel roof decking, shall include all closures and accessories.3SQX$ - 0$ - 0
Remove existing wood roof deck and replace with new wood decking
C00021" nominal T & G (treated)40BFX$ - 0$ - 0
C00032" nominal T & G (treated)40BFX$ - 0$ - 0
C00043/4" plywood40SFX$ - 0$ - 0
C00051/2" plywood25SFX$ - 0$ - 0
ROOF INSULATION$ - 0
Remove and replace rigid roof insulation in conjunction with roofing systems specified herein. Average 1”x12”x12”$ - 0
C0006Remove and replace polyisocyanurate tapered insulation panels10BFX$ - 0$ - 0
C0007Remove and replace tapered roof insulation10BFX$ - 0$ - 0
C0008Remove and replace vapor barrier in conjunction with built up roofing system10SQX$ - 0$ - 0
C0009Remove and replace resin sized building paper (5 lb.)5SQX$ - 0$ - 0
C0010Remove existing cants and replace with new fiberboard cants 4 x 430LFX$ - 0$ - 0
C0011Remove existing cants and replace with new treated wood cants 4 x 430LFX$ - 0$ - 0
C0012Remove existing Nailers and replace with new treated 2" x 6" wood100BFX$ - 0$ - 0
SHINGLED ROOF SYSTEMS$ - 0
Remove existing composition shingles and replace with new composition shingles, shall include starter$ - 0
C0013Twenty Five Year (3 tab )10SQX$ - 0$ - 0
C0014Thirty Year (architectural)6SQX$ - 0$ - 0
C0015Forty Year (architectural)6SQX$ - 0$ - 0
C0016Remove and dispose of existing composition shingles (all types)(where new shingles are not going to be installed)6SQX$ - 0$ - 0
C0017Remove and dispose of existing slate shingles.6SQX$ - 0$ - 0
C0018Remove and re-install existing slate shingles (All or Partial)2SQX$ - 0$ - 0
C0019Install new slate shingles (Weathering green, Vermont)(All or Partial)3SQX$ - 0$ - 0
C0020Install new slate shingles (Buckingham)(All or Partial)3SQX$ - 0$ - 0
Remove existing preformed metal (All or Partial) roofing and replace with new preformed metal roofing$ - 0
C0021Coated steel20SQX$ - 0$ - 0
C0022Coated aluminum20SQX$ - 0$ - 0
C0023Left Blank Intentionally
Field paint roof mounted equipment$ - 0
C0024Up to 25 SF X in surface area X12SFX$ - 0$ - 0
C0025Over 25 SF X in surface area X12SFX$ - 0$ - 0
BUILT UP ROOF$ - 0
Remove existing roof system and replace with new aggregate surfaced BU roofing system$ - 0
C0026System GAA (Gravel)6SQX$ - 0$ - 0
Remove existing roof system and replace with new smooth surfaced BU roofing system.$ - 0
C0027System Gas6SQX$ - 0$ - 0
Remove existing roof system and replace with new single ply reinforced modified bitumen sheet roofing system$ - 0
C0028Torch Applied6SQX$ - 0$ - 0
C0029Mop Applied6SQX$ - 0$ - 0
C0030Remove existing base flashing and replace with new 2 ply glass felt base flashing50SFX$ - 0$ - 0
C0031Remove existing base flashing and replace with new 3-ply bituminous base flashing12SFX$ - 0$ - 0
C0032Remove existing base flashing and replace with new single ply reinforced modified, bitumen sheet roofing flashing modified.12SFX$ - 0$ - 0
C0033Remove and Dispose of Second layer10SQX$ - 0$ - 0
C0034(1) Walkway/Asphalt Planks100SFX$ - 0$ - 0
ROOF AND PARAPET WALL DAMPROOFING$ - 0
C0035Coat Existing BU Roof or Parapet Wall50SFX$ - 0$ - 0
E.P.D.M. (RUBBER ROOF SYSTEM) (Install new E.P.D.M. Roof System over Existing Built-up Roof)$ - 0
C0036Ballasted System10SQX$ - 0$ - 0
C0037Mechanically Fastened System10SQX$ - 0$ - 0
C0038Full Adhered System10SQX$ - 0$ - 0
Remove existing roof system and replace with new E.P.D.M. roof system$ - 0
C0039Ballasted System10SQX$ - 0$ - 0
C0040Mechanically Fastened System10SQX$ - 0$ - 0
C0041Full Adhered System10SQX$ - 0$ - 0
C0042Install new E.P.D.M. Wall/Curb Flashings50SFX$ - 0$ - 0
C0043Install Rubber Pipe Vents5EAX$ - 0$ - 0
C0044Install Termination Bars. Shall include caulking12LFX$ - 0$ - 0
C0045Install E.P.D.M Walk Pads5EAX$ - 0$ - 0
Remove existing roof system and replace with new Thermoplastic alloy roof system (TPA)$ - 0
C0046Mechanically Fastened5SQX$ - 0$ - 0
C0047Ballasted5SQX$ - 0$ - 0
C0048Install new TPA wall/curb flashing25SFX$ - 0$ - 0
C0049Install new TPA pipe vent flashing5EAX$ - 0$ - 0
Remove existing metal base flashing and replace with new metal base flashing$ - 0
C0050Copper25SFX$ - 0$ - 0
C0051Aluminum25SFX$ - 0$ - 0
C0052Aluminum/various colors25SFX$ - 0$ - 0
C0053Stainless Steel25SFX$ - 0$ - 0
Remove existing and install new metal coping. Shall include caulking.$ - 0
C0054Copper25SFX$ - 0$ - 0
C0055Aluminum25SFX$ - 0$ - 0
C0056Aluminum/various colors25SFX$ - 0$ - 0
C0057Stainless Steel25SFX$ - 0$ - 0
Remove metal drip edge and replace with new metal drip edge$ - 0
C0058Copper6LFX$ - 0$ - 0
C0059Aluminum6LFX$ - 0$ - 0
C0060Aluminum/various colors6LFX$ - 0$ - 0
C0061Stainless Steel6LFX$ - 0$ - 0
METAL GUTTERS AND DOWNSPOUTS$ - 0
Install Metal Gutters$ - 0
C0062Copper/5" ogee100LFX$ - 0$ - 0
C0063Copper/6" ogee100LFX$ - 0$ - 0
C0064Copper/6" half round100LFX$ - 0$ - 0
C0065Copper/6" box100LFX$ - 0$ - 0
C0066Copper/8" box100LFX$ - 0$ - 0
C0067Prefinished Alum/5" ogee100LFX$ - 0$ - 0
C0068Prefinished Alum/6" ogee100LFX$ - 0$ - 0
C0069Prefinished Alum/6" Box100LFX$ - 0$ - 0
C0070Prefinished Alum/8" Box100LFX$ - 0$ - 0
C0071Stainless steel/6" box100LFX$ - 0$ - 0