Amendment 0007 - Attachment ELINs Roofing IDIQ Revised.xlsx
XLSX spreadsheet 125 KB Posted
- Solicitation number
- N4008526B0006
About this file
This is an Exhibit Line Item Numbers (ELIN) pricing attachment for an Indefinite Delivery/Indefinite Quantity (IDIQ) roofing maintenance and repair contract covering two Navy installations: Philadelphia Naval Business Center/Naval Support Activity Philadelphia and Naval Support Activity Mechanicsburg. The contract structure includes a base option year plus four option years, with separate pricing exhibits for each location.
The scope of work encompasses comprehensive roofing services organized into major categories: roof deck removal and replacement (metal and wood); roof insulation systems (polyisocyanurate, tapered insulation, vapor barriers, cants, and nailers); shingled roof systems (composition and slate in various grades); built-up roofing systems (aggregate and smooth surfaced); EPDM rubber roof systems (ballasted, mechanically fastened, and fully adhered); thermoplastic alloy (TPA) roofing systems; metal flashings and coping in multiple materials (copper, aluminum, stainless steel); metal gutters and downspouts; roof drainage components; caulking and sealant work; fascia board services; asbestos and lead paint abatement; cleaning and clearing operations; emergency service calls (limited to $2,500 per call); and roof surveys. The pricing template includes estimated quantities and unit prices for 270 line items across both locations, with two lump-sum line items for materials and labor to be negotiated by the Contracting Officer. The total contract value across the base year and four option years is currently $0.00, indicating this is a pre-award pricing template awaiting contractor submission of unit prices.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Option
| Roofing Contract | ||||||
| Attachment J-0200000-05 | ||||||
| Exhibit Line Item Numbers | ||||||
| Base Option | ||||||
| Solicitation/Contract No.: N40085-26-D-XXXX | ||||||
| Philadelphia Roofing Contract | ||||||
| ELIN Number | Supplies/Services | Est. Quantity | Unit | Unit Price | Total | |
| ROOF DECKS | ||||||
| A0001 | Remove existing metal roof decks (ALL OR PARTIAL) and replace with new steel roof decking, shall include all closures and accessories. | 3 | SQ | X | $ - 0 | |
| Remove existing wood roof deck and replace with new wood decking | ||||||
| A0002 | 1" nominal T & G (treated) | 40 | BF | X | $ - 0 | |
| A0003 | 2" nominal T & G (treated) | 40 | BF | X | $ - 0 | |
| A0004 | 3/4" plywood | 40 | SF | X | $ - 0 | |
| A0005 | 1/2" plywood | 25 | SF | X | $ - 0 | |
| ROOF INSULATION | ||||||
| Remove and replace rigid roof insulation in conjunction with roofing systems specified herein. | ||||||
| A0006 | Remove and replace polyisocyanurate tapered insulation panels | 10 | SQ | X | $ - 0 | |
| A0007 | Remove and replace tapered roof insulation | 10 | SQ | X | $ - 0 | |
| A0008 | Remove and replace vapor barrier in conjunction with built up roofing system | 10 | SQ | X | $ - 0 | |
| A0009 | Remove and replace resin sized building paper (5 lb.) | 5 | SQ | X | $ - 0 | |
| A0010 | Remove existing cants and replace with new fiberboard cants 4 x 4 | 30 | LF | X | $ - 0 | |
| A0011 | Remove existing cants and replace with new treated wood cants 4 x 4 | 30 | LF | X | $ - 0 | |
| A0012 | Remove existing Nailers and replace with new treated 2" x 6" wood | 100 | BF | X | $ - 0 | |
| SHINGLED ROOF SYSTEMS | ||||||
| Remove existing composition shingles and replace with new composition shingles, shall include starter | ||||||
| A0013 | Twenty Five Year (3 tab ) | 10 | SQ | X | $ - 0 | |
| A0014 | Thirty Year (architectural) | 6 | SQ | X | $ - 0 | |
| A0015 | Forty Year (architectural) | 6 | SQ | X | $ - 0 | |
| A0016 | Remove and dispose of existing composition shingles (all types)(where new shingles are not going to be installed) | 6 | SQ | X | $ - 0 | |
| A0017 | Remove and dispose of existing slate shingles. | 6 | SQ | X | $ - 0 | |
| A0018 | Remove and re-install existing slate shingles (All or Partial) | 2 | SQ | X | $ - 0 | |
| A0019 | Install new slate shingles (Weathering green, Vermont)(All or Partial) | 3 | SQ | X | $ - 0 | |
| A0020 | Install new slate shingles (Buckingham)(All or Partial) | 3 | SQ | X | $ - 0 | |
| Remove existing preformed metal (All or Partial) roofing and replace with new preformed metal roofing | ||||||
| A0021 | Coated steel | 20 | SQ | X | $ - 0 | |
| A0022 | Coated aluminum | 20 | SQ | X | $ - 0 | |
| A0023 | Left Blank Intentionally | |||||
| Field paint roof mounted equipment | ||||||
| A0024 | Up to 25 SF X in surface area X | 12 | SF | X | $ - 0 | |
| A0025 | Over 25 SF X in surface area X | 12 | SF | X | $ - 0 | |
| BUILT UP ROOF | ||||||
| Remove existing roof system and replace with new aggregate surfaced BU roofing system | ||||||
| A0026 | System GAA (Gravel) | 6 | SQ | X | $ - 0 | |
| Remove existing roof system and replace with new smooth surfaced BU roofing system. | ||||||
| A0027 | System Gas | 6 | SQ | X | $ - 0 | |
| Remove existing roof system and replace with new single ply reinforced modified bitumen sheet roofing system | ||||||
| A0028 | Torch Applied | 6 | SQ | X | $ - 0 | |
| A0029 | Mop Applied | 6 | SQ | X | $ - 0 | |
| A0030 | Remove existing base flashing and replace with new 2 ply glass felt base flashing | 50 | SF | X | $ - 0 | |
| A0031 | Remove existing base flashing and replace with new 3-ply bituminous base flashing | 12 | SF | X | $ - 0 | |
| A0032 | Remove existing base flashing and replace with new single ply reinforced modified, bitumen sheet roofing flashing modified. | 12 | SF | X | $ - 0 | |
| A0033 | Remove and Dispose of Second layer | 10 | SQ | X | $ - 0 | |
| A0034 | (1) Walkway/Asphalt Planks | 100 | SF | X | $ - 0 | |
| ROOF AND PARAPET WALL DAMPROOFING | ||||||
| A0035 | Coat Existing BU Roof or Parapet Wall | 50 | SF | X | $ - 0 | |
| E.P.D.M. (RUBBER ROOF SYSTEM) (Install new E.P.D.M. Roof System over Existing Built-up Roof) | ||||||
| A0036 | Ballasted System | 10 | SQ | X | $ - 0 | |
| A0037 | Mechanically Fastened System | 10 | SQ | X | $ - 0 | |
| A0038 | Full Adhered System | 10 | SQ | X | $ - 0 | |
| Remove existing roof system and replace with new E.P.D.M. roof system | ||||||
| A0039 | Ballasted System | 10 | SQ | X | $ - 0 | |
| A0040 | Mechanically Fastened System | 10 | SQ | X | $ - 0 | |
| A0041 | Full Adhered System | 10 | SQ | X | $ - 0 | |
| A0042 | Install new E.P.D.M. Wall/Curb Flashings | 50 | SF | X | $ - 0 | |
| A0043 | Install Rubber Pipe Vents | 5 | EA | X | $ - 0 | |
| A0044 | Install Termination Bars. Shall include caulking | 12 | LF | X | $ - 0 | |
| A0045 | Install E.P.D.M Walk Pads | 5 | EA | X | $ - 0 | |
| Remove existing roof system and replace with new Thermoplastic alloy roof system (TPA) | ||||||
| A0046 | Mechanically Fastened | 5 | SQ | X | $ - 0 | |
| A0047 | Ballasted | 5 | SQ | X | $ - 0 | |
| A0048 | Install new TPA wall/curb flashing | 25 | SF | X | $ - 0 | |
| A0049 | Install new TPA pipe vent flashing | 5 | EA | X | $ - 0 | |
| Remove existing metal base flashing and replace with new metal base flashing | ||||||
| A0050 | Copper | 25 | SF | X | $ - 0 | |
| A0051 | Aluminum | 25 | SF | X | $ - 0 | |
| A0052 | Aluminum/various colors | 25 | SF | X | $ - 0 | |
| A0053 | Stainless Steel | 25 | SF | X | $ - 0 | |
| Remove existing and install new metal coping. Shall include caulking. | ||||||
| A0054 | Copper | 25 | SF | X | $ - 0 | |
| A0055 | Aluminum | 25 | SF | X | $ - 0 | |
| A0056 | Aluminum/various colors | 25 | SF | X | $ - 0 | |
| A0057 | Stainless Steel | 25 | SF | X | $ - 0 | |
| Remove metal drip edge and replace with new metal drip edge | ||||||
| A0058 | Copper | 6 | LF | X | $ - 0 | |
| A0059 | Aluminum | 6 | LF | X | $ - 0 | |
| A0060 | Aluminum/various colors | 6 | LF | X | $ - 0 | |
| A0061 | Stainless Steel | 6 | LF | X | $ - 0 | |
| METAL GUTTERS AND DOWNSPOUTS | ||||||
| Install Metal Gutters | ||||||
| A0062 | Copper/5" ogee | 100 | LF | X | $ - 0 | |
| A0063 | Copper/6" ogee | 100 | LF | X | $ - 0 | |
| A0064 | Copper/6" half round | 100 | LF | X | $ - 0 | |
| A0065 | Copper/6" box | 100 | LF | X | $ - 0 | |
| A0066 | Copper/8" box | 100 | LF | X | $ - 0 | |
| A0067 | Prefinished Alum/5" ogee | 100 | LF | X | $ - 0 | |
| A0068 | Prefinished Alum/6" ogee | 100 | LF | X | $ - 0 | |
| A0069 | Prefinished Alum/6" Box | 100 | LF | X | $ - 0 | |
| A0070 | Prefinished Alum/8" Box | 100 | LF | X | $ - 0 | |
| A0071 | Stainless steel/6" box | 100 | LF | X | $ - 0 | |
| A0072 | Stainless steel/8" box | 100 | LF | X | $ - 0 | |
| Install Metal Downspouts | ||||||
| A0073 | Copper 2" x 3" | 100 | LF | X | $ - 0 | |
| A0074 | Copper 3" x 4" | 100 | LF | X | $ - 0 | |
| A0075 | Copper/3" round | 100 | LF | X | $ - 0 | |
| A0076 | Copper/4" round | 100 | LF | X | $ - 0 | |
| A0077 | Copper/6" round | 100 | LF | X | $ - 0 | |
| A0078 | Prefinished alum 2" x 3" | 100 | LF | X | $ - 0 | |
| A0079 | Prefinished alum 3" x 4" | 100 | LF | X | $ - 0 | |
| A0080 | Stainless Steel 3" x 4" | 100 | LF | X | $ - 0 | |
| A0081 | Provide and place new concrete splash block | 5 | EA | X | $ - 0 | |
| (standard commercial size) | ||||||
| Gutters, Downspouts and Drains | ||||||
| A0082 | Remove and dispose of existing gutters and/or downspouts | 100 | LF | X | $ - 0 | |
| A0083 | Remove and reinstall existing gutters and/or downspouts. Reseal all joints | 100 | LF | X | $ - 0 | |
| A0084 | Realign and resecure existing gutters and/or downspouts (Replace hangers, fasteners and straps) as needed. Reseal all joints. | 200 | LF | X | $ - 0 | |
| A0085 | Resolder broken gutter joints | 3 | EA | X | $ - 0 | |
| A0086 | Reseal, broken gutter joints | 3 | EA | X | $ - 0 | |
| Remove existing metal open valley flashing and replace with new metal valley flashing | ||||||
| A0087 | Copper | 25 | SF | X | $ - 0 | |
| A0088 | Aluminum | 25 | SF | X | $ - 0 | |
| A0089 | Aluminum/various colors | 25 | SF | X | $ - 0 | |
| A0090 | Stainless Steel | 25 | SF | X | $ - 0 | |
| Remove existing metal flashing/miscellaneous | ||||||
| A0091 | Copper | 25 | SF | X | $ - 0 | |
| A0092 | Aluminum | 25 | SF | X | $ - 0 | |
| A0093 | Aluminum/various colors | 25 | SF | X | $ - 0 | |
| A0094 | Stainless Steel | 25 | SF | X | $ - 0 | |
| A0095 | Compatible w/EPDM & CPE | 25 | SF | X | $ - 0 | |
| Remove existing pitch pocket and 'replace with new | ||||||
| A0096 | Copper | 2 | SF | X | $ - 0 | |
| A0097 | Aluminum | 2 | SF | X | $ - 0 | |
| A0098 | Stainless steel | 2 | SF | X | $ - 0 | |
| Roof Drain Sumps | ||||||
| A0099 | Provide and Install TPA EPDM roof drain Sumps | 1 | EA | X | $ - 0 | |
| A0100 | TPA EPDM roof drain sumps (removal only) | 2 | EA | X | $ - 0 | |
| Strainers | ||||||
| A0101 | Metal Strainers | 10 | EA | X | $ - 0 | |
| A0102 | PVC Strainers | 10 | EA | X | $ - 0 | |
| A0103 | Metal Strainers | 10 | EA | X | $ - 0 | |
| A0104 | PVC Strainers | 10 | EA | X | $ - 0 | |
| Remove existing metal scupper lining and replace with new metal scupper lining | ||||||
| A0105 | Copper | 10 | EA | X | $ - 0 | |
| A0106 | Stainless Steel | 10 | EA | X | $ - 0 | |
| Remove existing metal conductor heads and replace with new metal conductor heads | ||||||
| A0107 | Copper | 10 | EA | X | $ - 0 | |
| A0108 | Stainless Steel | 10 | EA | X | $ - 0 | |
| Install new metal splash pans | ||||||
| A0109 | Copper | 10 | EA | X | $ - 0 | |
| A0110 | Stainless Steel | 10 | EA | X | $ - 0 | |
| Remove existing expansion joints and replace bituminous base flashing, metal counterflashing and metal joint cover | ||||||
| A0111 | Copper | 100 | SF | X | $ - 0 | |
| A0112 | Aluminum | 100 | SF | X | $ - 0 | |
| A0113 | Stainless Steel | 100 | SF | X | $ - 0 | |
| Vent Flashing | ||||||
| A0114 | Remove existing pipe vent flashing and replace with new lead pipe vent flashing | 10 | EA | X | $ - 0 | |
| A0115 | Remove existing metal vent collars and replace with new vent collars and accessories | 10 | EA | X | $ - 0 | |
| Caulking | ||||||
| A0116 | Install caulking | 110 | LF | X | $ - 0 | |
| A0117 | Remove existing caulking and replace with new sealant/caulking | 50 | LF | X | $ - 0 | |
| Reglet | ||||||
| A0118 | Cut new Reglet In masonry | 50 | LF | X | $ - 0 | |
| A0119 | Cut new Reglet In concrete | 50 | LF | X | $ - 0 | |
| Fascia Board | ||||||
| A0120 | Remove existing fascia and replace with new fascia board | 100 | BF | X | $ - 0 | |
| A0121 | Prime and paint fascia board | 100 | SF | X | $ - 0 | |
| A0122 | Cover existing fascia board with aluminum coil stock (various colors) | 100 | SF | X | $ - 0 | |
| A0123 | Reserved for MODs | 0 | X | $ - 0 | ||
| Asbestos Abatement | ||||||
| A0124 | Additional cost incurred for the removal and disposal of asbestos containing substances. Regular roofing only. | 200 | SF | X | $ - 0 | |
| A0125 | Additional cost incurred for the removal and disposal of asbestos containing substance. (Flashings, Pitch pockets, etc.) | 200 | SF | X | $ - 0 | |
| A0126 | Removal of lead based paint. 'Contractor removes loose paint from surface and disposes. | 200 | SF | X | $ - 0 | |
| Cleaning and Clearing | ||||||
| A0127 | Clean and clear gutters and dispose of all debris from site. | 500 | LF | X | $ - 0 | |
| A0128 | Clean and Clear down spouts and remove debris from site. | 250 | LF | X | $ - 0 | |
| A0129 | Clean and clear roof drains | 10 | EA | X | $ - 0 | |
| A0130 | Provide power washing. The Contractor shall Power Wash roof surfaces and clear drain baskets. (Does not include gutter or down spout cleaning.) | 5000 | SF | X | $ - 0 | |
| Additional Labor and Materials not accounted for in ELINs | ||||||
| A0131 | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Material costs shall BE NEGOTIATED BY KO. | 1 | LS | X | $ - 0 | |
| A0132 | Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO. | 2000 | HRS | X | $ - 0 | |
| Service calls | ||||||
| A0133 | Perform Service calls at PNYA and NSA-P . The Contractor shall respond to service calls within 24 hours of service call request. The contractor shall make necessary repairs to roof or roof system. Service calls are limited to a combined labor and material cost not to exceed $2,500.00. (Used for leaks and other emergencies) | 20 | EA | X | $ - 0 | |
| Perform Roof Survey In accordance with Attachment-B | ||||||
| A0134 | Perform Roof Survey / Assessment Per SF | 500,000 | EA | X | $ - 0 | |
| NON-PREPRICED LABOR, MATERIAL and COMMAND INTEREST WORK | ||||||
| A0135 | Bldg. 1 NSAP Spring power washing, minor deficiency repairs, drain cleaning, and analysis report. 100,000 sq ft epoxy coated roofing system. (Ref Attachment E NWSS B1 NSAP.) | 1 | EV | X | $ - 0 | |
| A0136 | Bldg. 1 NSAP Fall drain cleaning, Roof analysis and minor repairs. 100,000 sq ft epoxy coated roofing system. (Ref Attachment E NWSS B1 NSAP.) | 1 | EV | X | $ - 0 | |
| Total Price for PHL BASE OPTION YEAR (IQ) (Sum of Exhibit Line Items A0001- A0136) | $ - 0 | |||||
| Mechanicsburg Roofing Contract | ||||||
| ELIN Number | Supplies/Services | Est. Quantity | Unit | Unit Price | Total | |
| ROOF DECKS | ||||||
| A0137 | Remove existing metal roof decks (ALL OR PARTIAL) and replace with new steel roof decking, shall include all closures and accessories. | 3 | SQ | X | $ - 0 | |
| Remove existing wood roof deck and replace with new wood decking | ||||||
| A0138 | 1" nominal T & G (treated) | 40 | BF | X | $ - 0 | |
| A0139 | 2" nominal T & G (treated) | 40 | BF | X | $ - 0 | |
| A0140 | 3/4" plywood | 40 | SF | X | $ - 0 | |
| A0141 | 1/2" plywood | 25 | SF | X | $ - 0 | |
| ROOF INSULATION | ||||||
| Remove and replace rigid roof insulation in conjunction with roofing systems specified herein. | ||||||
| A0142 | Remove and replace polyisocyanurate tapered insulation panels | 10 | SQ | X | $ - 0 | |
| A0143 | Remove and replace tapered roof insulation | 10 | SQ | X | $ - 0 | |
| A0144 | Remove and replace vapor barrier in conjunction with built up roofing system | 10 | SQ | X | $ - 0 | |
| A0145 | Remove and replace resin sized building paper (5 lb.) | 5 | SQ | X | $ - 0 | |
| A0146 | Remove existing cants and replace with new fiberboard cants 4 x 4 | 30 | LF | X | $ - 0 | |
| A0147 | Remove existing cants and replace with new treated wood cants 4 x 4 | 30 | LF | X | $ - 0 | |
| A0148 | Remove existing Nailers and replace with new treated 2" x 6" wood | 100 | BF | X | $ - 0 | |
| SHINGLED ROOF SYSTEMS | ||||||
| Remove existing composition shingles and replace with new composition shingles, shall include starter | ||||||
| A0149 | Twenty Five Year (3 tab ) | 10 | SQ | X | $ - 0 | |
| A0150 | Thirty Year (architectural) | 6 | SQ | X | $ - 0 | |
| A0151 | Forty Year (architectural) | 6 | SQ | X | $ - 0 | |
| A0152 | Remove and dispose of existing composition shingles (all types)(where new shingles are not going to be installed) | 6 | SQ | X | $ - 0 | |
| A0153 | Remove and dispose of existing slate shingles. | 6 | SQ | X | $ - 0 | |
| A0154 | Remove and re-install existing slate shingles (All or Partial) | 2 | SQ | X | $ - 0 | |
| A0155 | Install new slate shingles (Weathering green, Vermont)(All or Partial) | 3 | SQ | X | $ - 0 | |
| A0156 | Install new slate shingles (Buckingham)(All or Partial) | 3 | SQ | X | $ - 0 | |
| Remove existing preformed metal (All or Partial) roofing and replace with new preformed metal roofing | ||||||
| A0157 | Coated steel | 20 | SQ | X | $ - 0 | |
| A0158 | Coated aluminum | 20 | SQ | X | $ - 0 | |
| A0159 | Left Blank Intentionally | |||||
| Field paint roof mounted equipment | ||||||
| A0160 | Up to 25 SF X in surface area X | 12 | SF | X | $ - 0 | |
| A0161 | Over 25 SF X in surface area X | 12 | SF | X | $ - 0 | |
| BUILT UP ROOF | ||||||
| Remove existing roof system and replace with new aggregate surfaced BU roofing system | ||||||
| A0162 | System GAA (Gravel) | 6 | SQ | X | $ - 0 | |
| Remove existing roof system and replace with new smooth surfaced BU roofing system. | ||||||
| A0163 | System Gas | 6 | SQ | X | $ - 0 | |
| Remove existing roof system and replace with new single ply reinforced modified bitumen sheet roofing system | ||||||
| A0164 | Torch Applied | 6 | SQ | X | $ - 0 | |
| A0165 | Mop Applied | 6 | SQ | X | $ - 0 | |
| A0166 | Remove existing base flashing and replace with new 2 ply glass felt base flashing | 50 | SF | X | $ - 0 | |
| A0167 | Remove existing base flashing and replace with new 3-ply bituminous base flashing | 12 | SF | X | $ - 0 | |
| A0168 | Remove existing base flashing and replace with new single ply reinforced modified, bitumen sheet roofing flashing modified. | 12 | SF | X | $ - 0 | |
| A0169 | Remove and Dispose of Second layer | 10 | SQ | X | $ - 0 | |
| A0170 | (1) Walkway/Asphalt Planks | 100 | SF | X | $ - 0 | |
| ROOF AND PARAPET WALL DAMPROOFING | ||||||
| A0171 | Coat Existing BU Roof or Parapet Wall | 50 | SF | X | $ - 0 | |
| E.P.D.M. (RUBBER ROOF SYSTEM) (Install new E.P.D.M. Roof System over Existing Built-up Roof) | ||||||
| A0172 | Ballasted System | 10 | SQ | X | $ - 0 | |
| A0173 | Mechanically Fastened System | 10 | SQ | X | $ - 0 | |
| A0174 | Full Adhered System | 10 | SQ | X | $ - 0 | |
| Remove existing roof system and replace with new E.P.D.M. roof system | ||||||
| A0175 | Ballasted System | 10 | SQ | X | $ - 0 | |
| A0176 | Mechanically Fastened System | 10 | SQ | X | $ - 0 | |
| A0177 | Full Adhered System | 10 | SQ | X | $ - 0 | |
| A0178 | Install new E.P.D.M. Wall/Curb Flashings | 50 | SF | X | $ - 0 | |
| A0179 | Install Rubber Pipe Vents | 5 | EA | X | $ - 0 | |
| A0180 | Install Termination Bars. Shall include caulking | 12 | LF | X | $ - 0 | |
| A0181 | Install E.P.D.M Walk Pads | 5 | EA | X | $ - 0 | |
| Remove existing roof system and replace with new Thermoplastic alloy roof system (TPA) | ||||||
| A0182 | Mechanically Fastened | 5 | SQ | X | $ - 0 | |
| A0183 | Ballasted | 5 | SQ | X | $ - 0 | |
| A0184 | Install new TPA wall/curb flashing | 25 | SF | X | $ - 0 | |
| A0185 | Install new TPA pipe vent flashing | 5 | EA | X | $ - 0 | |
| Remove existing metal base flashing and replace with new metal base flashing | ||||||
| A0186 | Copper | 25 | SF | X | $ - 0 | |
| A0187 | Aluminum | 25 | SF | X | $ - 0 | |
| A0188 | Aluminum/various colors | 25 | SF | X | $ - 0 | |
| A0189 | Stainless Steel | 25 | SF | X | $ - 0 | |
| Remove existing and install new metal coping. Shall include caulking. | ||||||
| A0190 | Copper | 25 | SF | X | $ - 0 | |
| A0191 | Aluminum | 25 | SF | X | $ - 0 | |
| A0192 | Aluminum/various colors | 25 | SF | X | $ - 0 | |
| A0193 | Stainless Steel | 25 | SF | X | $ - 0 | |
| Remove metal drip edge and replace with new metal drip edge | ||||||
| A0194 | Copper | 6 | LF | X | $ - 0 | |
| A0195 | Aluminum | 6 | LF | X | $ - 0 | |
| A0196 | Aluminum/various colors | 6 | LF | X | $ - 0 | |
| A0197 | Stainless Steel | 6 | LF | X | $ - 0 | |
| METAL GUTTERS AND DOWNSPOUTS | ||||||
| Install Metal Gutters | ||||||
| A0198 | Copper/5" ogee | 100 | LF | X | $ - 0 | |
| A0199 | Copper/6" ogee | 100 | LF | X | $ - 0 | |
| A0200 | Copper/6" half round | 100 | LF | X | $ - 0 | |
| A0201 | Copper/6" box | 100 | LF | X | $ - 0 | |
| A0202 | Copper/8" box | 100 | LF | X | $ - 0 | |
| A0203 | Prefinished Alum/5" ogee | 100 | LF | X | $ - 0 | |
| A0204 | Prefinished Alum/6" ogee | 100 | LF | X | $ - 0 | |
| A0205 | Prefinished Alum/6" Box | 100 | LF | X | $ - 0 | |
| A0206 | Prefinished Alum/8" Box | 100 | LF | X | $ - 0 | |
| A0207 | Stainless steel/6" box | 100 | LF | X | $ - 0 | |
| A0208 | Stainless steel/8" box | 100 | LF | X | $ - 0 | |
| Install Metal Downspouts | ||||||
| A0209 | Copper 2" x 3" | 100 | LF | X | $ - 0 | |
| A0210 | Copper 3" x 4" | 100 | LF | X | $ - 0 | |
| A0211 | Copper/3" round | 100 | LF | X | $ - 0 | |
| A0212 | Copper/4" round | 100 | LF | X | $ - 0 | |
| A0213 | Copper/6" round | 100 | LF | X | $ - 0 | |
| A0214 | Prefinished alum 2" x 3" | 100 | LF | X | $ - 0 | |
| A0215 | Prefinished alum 3" x 4" | 100 | LF | X | $ - 0 | |
| A0216 | Stainless Steel 3" x 4" | 100 | LF | X | $ - 0 | |
| A0217 | Provide and place new concrete splash block | 5 | EA | X | $ - 0 | |
| (standard commercial size) | ||||||
| Gutters, Downspouts and Drains | ||||||
| A0218 | Remove and dispose of existing gutters and/or downspouts | 100 | LF | X | $ - 0 | |
| A0219 | Remove and reinstall existing gutters and/or downspouts. Reseal all joints | 100 | LF | X | $ - 0 | |
| A0220 | Realign and resecure existing gutters and/or downspouts (Replace hangers, fasteners and straps) as needed. Reseal all joints. | 200 | LF | X | $ - 0 | |
| A0221 | Resolder broken gutter joints | 3 | EA | X | $ - 0 | |
| A0222 | Reseal, broken gutter joints | 3 | EA | X | $ - 0 | |
| Remove existing metal open valley flashing and replace with new metal valley flashing | ||||||
| A0223 | Copper | 25 | SF | X | $ - 0 | |
| A0224 | Aluminum | 25 | SF | X | $ - 0 | |
| A0225 | Aluminum/various colors | 25 | SF | X | $ - 0 | |
| A0226 | Stainless Steel | 25 | SF | X | $ - 0 | |
| Remove existing metal flashing/miscellaneous | ||||||
| A0227 | Copper | 25 | SF | X | $ - 0 | |
| A0228 | Aluminum | 25 | SF | X | $ - 0 | |
| A0229 | Aluminum/various colors | 25 | SF | X | $ - 0 | |
| A0230 | Stainless Steel | 25 | SF | X | $ - 0 | |
| A0231 | Compatible w/EPDM & CPE | 25 | SF | X | $ - 0 | |
| Remove existing pitch pocket and 'replace with new | ||||||
| A0232 | Copper | 2 | SF | X | $ - 0 | |
| A0233 | Aluminum | 2 | SF | X | $ - 0 | |
| A0234 | Stainless steel | 2 | SF | X | $ - 0 | |
| Roof Drain Sumps | ||||||
| A235 | Provide and Install TPA EPDM roof drain Sumps | 1 | EA | X | $ - 0 | |
| A0236 | TPA EPDM roof drain sumps (removal only) | 2 | EA | X | $ - 0 | |
| Strainers | ||||||
| A0237 | Metal Strainers | 10 | EA | X | $ - 0 | |
| A0238 | PVC Strainers | 10 | EA | X | $ - 0 | |
| A0239 | Metal Strainers | 10 | EA | X | $ - 0 | |
| A0240 | PVC Strainers | 10 | EA | X | $ - 0 | |
| Remove existing metal scupper lining and replace with new metal scupper lining | ||||||
| A0241 | Copper | 10 | EA | X | $ - 0 | |
| A0242 | Stainless Steel | 10 | EA | X | $ - 0 | |
| Remove existing metal conductor heads and replace with new metal conductor heads | ||||||
| A0243 | Copper | 10 | EA | X | $ - 0 | |
| A0244 | Stainless Steel | 10 | EA | X | $ - 0 | |
| Install new metal splash pans | ||||||
| A0245 | Copper | 10 | EA | X | $ - 0 | |
| A0246 | Stainless Steel | 10 | EA | X | $ - 0 | |
| Remove existing expansion joints and replace bituminous base flashing, metal counterflashing and metal joint cover | ||||||
| A0247 | Copper | 100 | SF | X | $ - 0 | |
| A0248 | Aluminum | 100 | SF | X | $ - 0 | |
| A0249 | Stainless Steel | 100 | SF | X | $ - 0 | |
| Vent Flashing | ||||||
| A0250 | Remove existing pipe vent flashing and replace with new lead pipe vent flashing | 10 | EA | X | $ - 0 | |
| A0251 | Remove existing metal vent collars and replace with new vent collars and accessories | 10 | EA | X | $ - 0 | |
| Caulking | ||||||
| A0252 | Install caulking | 110 | LF | X | $ - 0 | |
| A0253 | Remove existing caulking and replace with new sealant/caulking | 50 | LF | X | $ - 0 | |
| Reglet | ||||||
| A0254 | Cut new Reglet In masonry | 50 | LF | X | $ - 0 | |
| A0255 | Cut new Reglet In concrete | 50 | LF | X | $ - 0 | |
| Fascia Board | ||||||
| A0256 | Remove existing fascia and replace with new fascia board | 100 | BF | X | $ - 0 | |
| A0257 | Prime and paint fascia board | 100 | SF | X | $ - 0 | |
| A0258 | Cover existing fascia board with aluminum coil stock (various colors) | 100 | SF | X | $ - 0 | |
| A0259 | Reserved for MODs | 0 | X | $ - 0 | ||
| Asbestos Abatement | ||||||
| A0260 | Additional cost incurred for the removal and disposal of asbestos containing substances. Regular roofing only. | 200 | SF | X | $ - 0 | |
| A0261 | Additional cost incurred for the removal and disposal of asbestos containing substance. (Flashings, Pitch pockets, etc.) | 200 | SF | X | $ - 0 | |
| A0262 | Removal of lead based paint. 'Contractor removes loose paint from surface and disposes. | 200 | SF | X | $ - 0 | |
| Cleaning and Clearing | ||||||
| A0263 | Clean and clear gutters and dispose of all debris from site. | 500 | LF | X | $ - 0 | |
| A0264 | Clean and Clear down spouts and remove debris from site. | 250 | LF | X | $ - 0 | |
| A0265 | Clean and clear roof drains | 10 | EA | X | $ - 0 | |
| A0266 | Provide power washing. The Contractor shall Power Wash roof surfaces and clear drain baskets. (Does not include gutter or down spout cleaning.) | 5000 | SF | X | $ - 0 | |
| Additional Labor and Materials not accounted for in ELINs | ||||||
| A0267 | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Material costs shall BE NEGOTIATED BY KO. | LS | X | $ - 0 | ||
| A0268 | Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO. | 2000 | HRS | X | $ - 0 | |
| Service calls | ||||||
| A0269 | Perform Service calls at NSA-Mechanicsburg. The Contractor shall respond to service calls within 24 hours of service call request. The contractor shall make necessary repairs to roof or roof system. Service calls are limited to a combined labor and material cost not to exceed $2,500.00. (Used for leaks and other emergencies) | 20 | EA | X | $ - 0 | |
| Perform Roof Survey In accordance with Attachment-B | ||||||
| A0270 | Perform Roof Survey / Assessment Per SF | 500,000 | EA | X | $ - 0 | |
| Total Price for Mech BASE OPTION YEAR (IQ) (Sum of Exhibit Line Items A0137- A0270) | $ - 0 |
Total Combined Price for Mech and PHL BASE OPTION YEAR (IQ) (Sum of Exhibit Line Items A0001- A0270) $ - 0
Option Year 1
| Roofing Contract | ||||||
| Attachment J-0200000-05 | ||||||
| Exhibit Line Item Numbers | ||||||
| Option Year 1 | ||||||
| Solicitation/Contract No.: N40085-26-D-XXXX | ||||||
| Philadelphia Roofing Contract | ||||||
| ELIN Number | Supplies/Services | Est. Quantity | Unit | Unit Price | Total | |
| ROOF DECKS | ||||||
| B0001 | Remove existing metal roof decks (ALL OR PARTIAL) and replace with new steel roof decking, shall include all closures and accessories. | 3 | SQ | X | $ - 0 | $ - 0 |
| Remove existing wood roof deck and replace with new wood decking | ||||||
| B0002 | 1" nominal T & G (treated) | 40 | BF | X | $ - 0 | $ - 0 |
| B0003 | 2" nominal T & G (treated) | 40 | BF | X | $ - 0 | $ - 0 |
| B0004 | 3/4" plywood | 40 | SF | X | $ - 0 | $ - 0 |
| B0005 | 1/2" plywood | 25 | SF | X | $ - 0 | $ - 0 |
| ROOF INSULATION | ||||||
| Remove and replace rigid roof insulation in conjunction with roofing systems specified herein. | ||||||
| B0006 | Remove and replace polyisocyanurate tapered insulation panels | 10 | SQ | X | $ - 0 | $ - 0 |
| B0007 | Remove and replace tapered roof insulation | 10 | SQ | X | $ - 0 | $ - 0 |
| B0008 | Remove and replace vapor barrier in conjunction with built up roofing system | 10 | SQ | X | $ - 0 | $ - 0 |
| B0009 | Remove and replace resin sized building paper (5 lb.) | 5 | SQ | X | $ - 0 | $ - 0 |
| B0010 | Remove existing cants and replace with new fiberboard cants 4 x 4 | 30 | LF | X | $ - 0 | $ - 0 |
| B0011 | Remove existing cants and replace with new treated wood cants 4 x 4 | 30 | LF | X | $ - 0 | $ - 0 |
| B0012 | Remove existing Nailers and replace with new treated 2" x 6" wood | 100 | BF | X | $ - 0 | $ - 0 |
| SHINGLED ROOF SYSTEMS | ||||||
| Remove existing composition shingles and replace with new composition shingles, shall include starter | ||||||
| B0013 | Twenty Five Year (3 tab ) | 10 | SQ | X | $ - 0 | $ - 0 |
| B0014 | Thirty Year (architectural) | 6 | SQ | X | $ - 0 | $ - 0 |
| B0015 | Forty Year (architectural) | 6 | SQ | X | $ - 0 | $ - 0 |
| B0016 | Remove and dispose of existing composition shingles (all types)(where new shingles are not going to be installed) | 6 | SQ | X | $ - 0 | $ - 0 |
| B0017 | Remove and dispose of existing slate shingles. | 6 | SQ | X | $ - 0 | $ - 0 |
| B0018 | Remove and re-install existing slate shingles (All or Partial) | 2 | SQ | X | $ - 0 | $ - 0 |
| B0019 | Install new slate shingles (Weathering green, Vermont)(All or Partial) | 3 | SQ | X | $ - 0 | $ - 0 |
| B0020 | Install new slate shingles (Buckingham)(All or Partial) | 3 | SQ | X | $ - 0 | $ - 0 |
| Remove existing preformed metal (All or Partial) roofing and replace with new preformed metal roofing | ||||||
| B0021 | Coated steel | 20 | SQ | X | $ - 0 | $ - 0 |
| B0022 | Coated aluminum | 20 | SQ | X | $ - 0 | $ - 0 |
| B0023 | Left Blank Intentionally | |||||
| Field paint roof mounted equipment | ||||||
| B0024 | Up to 25 SF X in surface area X | 12 | SF | X | $ - 0 | $ - 0 |
| B0025 | Over 25 SF X in surface area X | 12 | SF | X | $ - 0 | $ - 0 |
| BUILT UP ROOF | ||||||
| Remove existing roof system and replace with new aggregate surfaced BU roofing system | ||||||
| B0026 | System GAA (Gravel) | 6 | SQ | X | $ - 0 | $ - 0 |
| Remove existing roof system and replace with new smooth surfaced BU roofing system. | ||||||
| B0027 | System Gas | 6 | SQ | X | $ - 0 | $ - 0 |
| Remove existing roof system and replace with new single ply reinforced modified bitumen sheet roofing system | ||||||
| B0028 | Torch Applied | 6 | SQ | X | $ - 0 | $ - 0 |
| B0029 | Mop Applied | 6 | SQ | X | $ - 0 | $ - 0 |
| B0030 | Remove existing base flashing and replace with new 2 ply glass felt base flashing | 50 | SF | X | $ - 0 | $ - 0 |
| B0031 | Remove existing base flashing and replace with new 3-ply bituminous base flashing | 12 | SF | X | $ - 0 | $ - 0 |
| B0032 | Remove existing base flashing and replace with new single ply reinforced modified, bitumen sheet roofing flashing modified. | 12 | SF | X | $ - 0 | $ - 0 |
| B0033 | Remove and Dispose of Second layer | 10 | SQ | X | $ - 0 | $ - 0 |
| B0034 | (1) Walkway/Asphalt Planks | 100 | SF | X | $ - 0 | $ - 0 |
| ROOF AND PARAPET WALL DAMPROOFING | $ - 0 | |||||
| B0035 | Coat Existing BU Roof or Parapet Wall | 50 | SF | X | $ - 0 | $ - 0 |
| E.P.D.M. (RUBBER ROOF SYSTEM) (Install new E.P.D.M. Roof System over Existing Built-up Roof) | $ - 0 | |||||
| B0036 | Ballasted System | 10 | SQ | X | $ - 0 | $ - 0 |
| B0037 | Mechanically Fastened System | 10 | SQ | X | $ - 0 | $ - 0 |
| B0038 | Full Adhered System | 10 | SQ | X | $ - 0 | $ - 0 |
| Remove existing roof system and replace with new E.P.D.M. roof system | $ - 0 | |||||
| B0039 | Ballasted System | 10 | SQ | X | $ - 0 | $ - 0 |
| B0040 | Mechanically Fastened System | 10 | SQ | X | $ - 0 | $ - 0 |
| B0041 | Full Adhered System | 10 | SQ | X | $ - 0 | $ - 0 |
| B0042 | Install new E.P.D.M. Wall/Curb Flashings | 50 | SF | X | $ - 0 | $ - 0 |
| B0043 | Install Rubber Pipe Vents | 5 | EA | X | $ - 0 | $ - 0 |
| B0044 | Install Termination Bars. Shall include caulking | 12 | LF | X | $ - 0 | $ - 0 |
| B0045 | Install E.P.D.M Walk Pads | 5 | EA | X | $ - 0 | $ - 0 |
| Remove existing roof system and replace with new Thermoplastic alloy roof system (TPA) | $ - 0 | |||||
| B0046 | Mechanically Fastened | 5 | SQ | X | $ - 0 | $ - 0 |
| B0047 | Ballasted | 5 | SQ | X | $ - 0 | $ - 0 |
| B0048 | Install new TPA wall/curb flashing | 25 | SF | X | $ - 0 | $ - 0 |
| B0049 | Install new TPA pipe vent flashing | 5 | EA | X | $ - 0 | $ - 0 |
| Remove existing metal base flashing and replace with new metal base flashing | $ - 0 | |||||
| B0050 | Copper | 25 | SF | X | $ - 0 | $ - 0 |
| B0051 | Aluminum | 25 | SF | X | $ - 0 | $ - 0 |
| B0052 | Aluminum/various colors | 25 | SF | X | $ - 0 | $ - 0 |
| B0053 | Stainless Steel | 25 | SF | X | $ - 0 | $ - 0 |
| Remove existing and install new metal coping. Shall include caulking. | $ - 0 | |||||
| B0054 | Copper | 25 | SF | X | $ - 0 | $ - 0 |
| B0055 | Aluminum | 25 | SF | X | $ - 0 | $ - 0 |
| B0056 | Aluminum/various colors | 25 | SF | X | $ - 0 | $ - 0 |
| B0057 | Stainless Steel | 25 | SF | X | $ - 0 | $ - 0 |
| Remove metal drip edge and replace with new metal drip edge | $ - 0 | |||||
| B0058 | Copper | 6 | LF | X | $ - 0 | $ - 0 |
| B0059 | Aluminum | 6 | LF | X | $ - 0 | $ - 0 |
| B0060 | Aluminum/various colors | 6 | LF | X | $ - 0 | $ - 0 |
| B0061 | Stainless Steel | 6 | LF | X | $ - 0 | $ - 0 |
| METAL GUTTERS AND DOWNSPOUTS | $ - 0 | |||||
| Install Metal Gutters | $ - 0 | |||||
| B0062 | Copper/5" ogee | 100 | LF | X | $ - 0 | $ - 0 |
| B0063 | Copper/6" ogee | 100 | LF | X | $ - 0 | $ - 0 |
| B0064 | Copper/6" half round | 100 | LF | X | $ - 0 | $ - 0 |
| B0065 | Copper/6" box | 100 | LF | X | $ - 0 | $ - 0 |
| B0066 | Copper/8" box | 100 | LF | X | $ - 0 | $ - 0 |
| B0067 | Prefinished Alum/5" ogee | 100 | LF | X | $ - 0 | $ - 0 |
| B0068 | Prefinished Alum/6" ogee | 100 | LF | X | $ - 0 | $ - 0 |
| B0069 | Prefinished Alum/6" Box | 100 | LF | X | $ - 0 | $ - 0 |
| B0070 | Prefinished Alum/8" Box | 100 | LF | X | $ - 0 | $ - 0 |
| B0071 | Stainless steel/6" box | 100 | LF | X | $ - 0 | $ - 0 |
| B0072 | Stainless steel/8" box | 100 | LF | X | $ - 0 | $ - 0 |
| Install Metal Downspouts | $ - 0 | |||||
| B0073 | Copper 2" x 3" | 100 | LF | X | $ - 0 | $ - 0 |
| B0074 | Copper 3" x 4" | 100 | LF | X | $ - 0 | $ - 0 |
| B0075 | Copper/3" round | 100 | LF | X | $ - 0 | $ - 0 |
| B0076 | Copper/4" round | 100 | LF | X | $ - 0 | $ - 0 |
| B0077 | Copper/6" round | 100 | LF | X | $ - 0 | $ - 0 |
| B0078 | Prefinished alum 2" x 3" | 100 | LF | X | $ - 0 | $ - 0 |
| B0079 | Prefinished alum 3" x 4" | 100 | LF | X | $ - 0 | $ - 0 |
| B0080 | Stainless Steel 3" x 4" | 100 | LF | X | $ - 0 | $ - 0 |
| B0081 | Provide and place new concrete splash block | 5 | EA | X | $ - 0 | $ - 0 |
| (standard commercial size) | $ - 0 | |||||
| Gutters, Downspouts and Drains | $ - 0 | |||||
| B0082 | Remove and dispose of existing gutters and/or downspouts | 100 | LF | X | $ - 0 | $ - 0 |
| B0083 | Remove and reinstall existing gutters and/or downspouts. Reseal all joints | 100 | LF | X | $ - 0 | $ - 0 |
| B0084 | Realign and resecure existing gutters and/or downspouts (Replace hangers, fasteners and straps) as needed. Reseal all joints. | 200 | LF | X | $ - 0 | $ - 0 |
| B0085 | Resolder broken gutter joints | 3 | EA | X | $ - 0 | $ - 0 |
| B0086 | Reseal, broken gutter joints | 3 | EA | X | $ - 0 | $ - 0 |
| Remove existing metal open valley flashing and replace with new metal valley flashing | $ - 0 | |||||
| B0087 | Copper | 25 | SF | X | $ - 0 | $ - 0 |
| B0088 | Aluminum | 25 | SF | X | $ - 0 | $ - 0 |
| B0089 | Aluminum/various colors | 25 | SF | X | $ - 0 | $ - 0 |
| B0090 | Stainless Steel | 25 | SF | X | $ - 0 | $ - 0 |
| Remove existing metal flashing/miscellaneous | $ - 0 | |||||
| B0091 | Copper | 25 | SF | X | $ - 0 | $ - 0 |
| B0092 | Aluminum | 25 | SF | X | $ - 0 | $ - 0 |
| B0093 | Aluminum/various colors | 25 | SF | X | $ - 0 | $ - 0 |
| B0094 | Stainless Steel | 25 | SF | X | $ - 0 | $ - 0 |
| B0095 | Compatible w/EPDM & CPE | 25 | SF | X | $ - 0 | $ - 0 |
| Remove existing pitch pocket and 'replace with new | $ - 0 | |||||
| B0096 | Copper | 2 | SF | X | $ - 0 | $ - 0 |
| B0097 | Aluminum | 2 | SF | X | $ - 0 | $ - 0 |
| B0098 | Stainless steel | 2 | SF | X | $ - 0 | $ - 0 |
| Roof Drain Sumps | $ - 0 | |||||
| B099 | Provide and Install TPA EPDM roof drain Sumps | 1 | EA | X | $ - 0 | $ - 0 |
| B100 | TPA EPDM roof drain sumps (removal only) | 2 | EA | X | $ - 0 | $ - 0 |
| Strainers | $ - 0 | |||||
| B0101 | Metal Strainers | 10 | EA | X | $ - 0 | $ - 0 |
| B0102 | PVC Strainers | 10 | EA | X | $ - 0 | $ - 0 |
| B0103 | Metal Strainers | 10 | EA | X | $ - 0 | $ - 0 |
| B0104 | PVC Strainers | 10 | EA | X | $ - 0 | $ - 0 |
| Remove existing metal scupper lining and replace with new metal scupper lining | $ - 0 | |||||
| B0105 | Copper | 10 | EA | X | $ - 0 | $ - 0 |
| B0106 | Stainless Steel | 10 | EA | X | $ - 0 | $ - 0 |
| Remove existing metal conductor heads and replace with new metal conductor heads | $ - 0 | |||||
| B0107 | Copper | 10 | EA | X | $ - 0 | $ - 0 |
| B0108 | Stainless Steel | 10 | EA | X | $ - 0 | $ - 0 |
| Install new metal splash pans | $ - 0 | |||||
| B0109 | Copper | 10 | EA | X | $ - 0 | $ - 0 |
| B0110 | Stainless Steel | 10 | EA | X | $ - 0 | $ - 0 |
| Remove existing expansion joints and replace bituminous base flashing, metal counterflashing and metal joint cover | $ - 0 | |||||
| B0111 | Copper | 100 | SF | X | $ - 0 | $ - 0 |
| B0112 | Aluminum | 100 | SF | X | $ - 0 | $ - 0 |
| B0113 | Stainless Steel | 100 | SF | X | $ - 0 | $ - 0 |
| Vent Flashing | $ - 0 | |||||
| B0114 | Remove existing pipe vent flashing and replace with new lead pipe vent flashing | 10 | EA | X | $ - 0 | $ - 0 |
| B0115 | Remove existing metal vent collars and replace with new vent collars and accessories | 10 | EA | X | $ - 0 | $ - 0 |
| Caulking | $ - 0 | |||||
| B0116 | Install caulking | 110 | LF | X | $ - 0 | $ - 0 |
| B0117 | Remove existing caulking and replace with new sealant/caulking | 50 | LF | X | $ - 0 | $ - 0 |
| Reglet | $ - 0 | |||||
| B0118 | Cut new Reglet In masonry | 50 | LF | X | $ - 0 | $ - 0 |
| B0119 | Cut new Reglet In concrete | 50 | LF | X | $ - 0 | $ - 0 |
| Fascia Board | $ - 0 | |||||
| B0120 | Remove existing fascia and replace with new fascia board | 100 | BF | X | $ - 0 | $ - 0 |
| B0121 | Prime and paint fascia board | 100 | SF | X | $ - 0 | $ - 0 |
| B0122 | Cover existing fascia board with aluminum coil stock (various colors) | 100 | SF | X | $ - 0 | $ - 0 |
| B0123 | Reserved for MODs | 0 | X | $ - 0 | $ - 0 | |
| Asbestos Abatement | $ - 0 | |||||
| B0124 | Additional cost incurred for the removal and disposal of asbestos containing substances. Regular roofing only. | 200 | SF | X | $ - 0 | $ - 0 |
| B0125 | Additional cost incurred for the removal and disposal of asbestos containing substance. (Flashings, Pitch pockets, etc.) | 200 | SF | X | $ - 0 | $ - 0 |
| B0126 | Removal of lead based paint. 'Contractor removes loose paint from surface and disposes. | 200 | SF | X | $ - 0 | $ - 0 |
| Cleaning and Clearing | $ - 0 | |||||
| B0127 | Clean and clear gutters and dispose of all debris from site. | 500 | LF | X | $ - 0 | $ - 0 |
| B0128 | Clean and Clear down spouts and remove debris from site. | 250 | LF | X | $ - 0 | $ - 0 |
| B0129 | Clean and clear roof drains | 10 | EA | X | $ - 0 | $ - 0 |
| B0130 | Provide power washing. The Contractor shall Power Wash roof surfaces and clear drain baskets. (Does not include gutter or down spout cleaning.) | 5000 | SF | X | $ - 0 | $ - 0 |
| Additional Labor and Materials not accounted for in ELINs | $ - 0 | |||||
| B0131 | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Material costs shall BE NEGOTIATED BY KO. | LS | X | $ - 0 | $ - 0 | |
| B0132 | Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO. | 2000 | HRS | X | $ - 0 | $ - 0 |
| Service calls | $ - 0 | |||||
| B0133 | Perform Service calls at PNYA and NSA-P. The Contractor shall respond to service calls within 24 hours of service call request. The contractor shall make necessary repairs to roof or roof system. Service calls are limited to a combined labor and material cost not to exceed $2,500.00. (Used for leaks and other emergencies) | 20 | EA | X | $ - 0 | $ - 0 |
| Perform Roof Survey In accordance with Attachment-B | $ - 0 | |||||
| B0134 | Perform Roof Survey / Assessment Per SF | 500,000 | EA | X | $ - 0 | $ - 0 |
| NON-PREPRICED LABOR, MATERIAL and COMMAND INTEREST WORK | $ - 0 | |||||
| B0135 | Bldg. 1 NSAP Spring power washing, minor deficiency repairs, drain cleaning, and analysis report. 100,000 sq ft epoxy coated roofing system. (Ref Attachment E NWSS B1 NSAP.) | 1 | EV | X | $ - 0 | $ - 0 |
| B0136 | Bldg. 1 NSAP Fall drain cleaning, Roof analysis and minor repairs. 100,000 sq ft epoxy coated roofing system. (Ref Attachment E NWSS B1 NSAP.) | 1 | EV | X | $ - 0 | $ - 0 |
| Total Price for PHL OPTION YEAR 1 (IQ) (Sum of Exhibit Line Items B0001- B0136) | $ - 0 | |||||
| Mechanicsburg Roofing Contract | ||||||
| ELIN Number | Supplies/Services | Est. Quantity | Unit | Unit Price | Total | |
| ROOF DECKS | ||||||
| B0137 | Remove existing metal roof decks (ALL OR PARTIAL) and replace with new steel roof decking, shall include all closures and accessories. | 3 | SQ | X | $ - 0 | $ - 0 |
| Remove existing wood roof deck and replace with new wood decking | $ - 0 | |||||
| B0138 | 1" nominal T & G (treated) | 40 | BF | X | $ - 0 | $ - 0 |
| B0139 | 2" nominal T & G (treated) | 40 | BF | X | $ - 0 | $ - 0 |
| B0140 | 3/4" plywood | 40 | SF | X | $ - 0 | $ - 0 |
| B0141 | 1/2" plywood | 25 | SF | X | $ - 0 | $ - 0 |
| ROOF INSULATION | $ - 0 | |||||
| Remove and replace rigid roof insulation in conjunction with roofing systems specified herein. | $ - 0 | |||||
| B0142 | Remove and replace polyisocyanurate tapered insulation panels | 10 | SQ | X | $ - 0 | $ - 0 |
| B0143 | Remove and replace tapered roof insulation | 10 | SQ | X | $ - 0 | $ - 0 |
| B0144 | Remove and replace vapor barrier in conjunction with built up roofing system | 10 | SQ | X | $ - 0 | $ - 0 |
| B0145 | Remove and replace resin sized building paper (5 lb.) | 5 | SQ | X | $ - 0 | $ - 0 |
| B0146 | Remove existing cants and replace with new fiberboard cants 4 x 4 | 30 | LF | X | $ - 0 | $ - 0 |
| B0147 | Remove existing cants and replace with new treated wood cants 4 x 4 | 30 | LF | X | $ - 0 | $ - 0 |
| B0148 | Remove existing Nailers and replace with new treated 2" x 6" wood | 100 | BF | X | $ - 0 | $ - 0 |
| SHINGLED ROOF SYSTEMS | $ - 0 | |||||
| Remove existing composition shingles and replace with new composition shingles, shall include starter | $ - 0 | |||||
| B0149 | Twenty Five Year (3 tab ) | 10 | SQ | X | $ - 0 | $ - 0 |
| B0150 | Thirty Year (architectural) | 6 | SQ | X | $ - 0 | $ - 0 |
| B0151 | Forty Year (architectural) | 6 | SQ | X | $ - 0 | $ - 0 |
| B0152 | Remove and dispose of existing composition shingles (all types)(where new shingles are not going to be installed) | 6 | SQ | X | $ - 0 | $ - 0 |
| B0153 | Remove and dispose of existing slate shingles. | 6 | SQ | X | $ - 0 | $ - 0 |
| B0154 | Remove and re-install existing slate shingles (All or Partial) | 2 | SQ | X | $ - 0 | $ - 0 |
| B0155 | Install new slate shingles (Weathering green, Vermont)(All or Partial) | 3 | SQ | X | $ - 0 | $ - 0 |
| B0156 | Install new slate shingles (Buckingham)(All or Partial) | 3 | SQ | X | $ - 0 | $ - 0 |
| Remove existing preformed metal (All or Partial) roofing and replace with new preformed metal roofing | $ - 0 | |||||
| B0157 | Coated steel | 20 | SQ | X | $ - 0 | $ - 0 |
| B0158 | Coated aluminum | 20 | SQ | X | $ - 0 | $ - 0 |
| B0159 | Left Blank Intentionally | |||||
| Field paint roof mounted equipment | $ - 0 | |||||
| B0160 | Up to 25 SF X in surface area X | 12 | SF | X | $ - 0 | $ - 0 |
| B0161 | Over 25 SF X in surface area X | 12 | SF | X | $ - 0 | $ - 0 |
| BUILT UP ROOF | $ - 0 | |||||
| Remove existing roof system and replace with new aggregate surfaced BU roofing system | $ - 0 | |||||
| B0162 | System GAA (Gravel) | 6 | SQ | X | $ - 0 | $ - 0 |
| Remove existing roof system and replace with new smooth surfaced BU roofing system. | $ - 0 | |||||
| B0163 | System Gas | 6 | SQ | X | $ - 0 | $ - 0 |
| Remove existing roof system and replace with new single ply reinforced modified bitumen sheet roofing system | $ - 0 | |||||
| B0164 | Torch Applied | 6 | SQ | X | $ - 0 | $ - 0 |
| B0165 | Mop Applied | 6 | SQ | X | $ - 0 | $ - 0 |
| B0166 | Remove existing base flashing and replace with new 2 ply glass felt base flashing | 50 | SF | X | $ - 0 | $ - 0 |
| B0167 | Remove existing base flashing and replace with new 3-ply bituminous base flashing | 12 | SF | X | $ - 0 | $ - 0 |
| B0168 | Remove existing base flashing and replace with new single ply reinforced modified, bitumen sheet roofing flashing modified. | 12 | SF | X | $ - 0 | $ - 0 |
| B0169 | Remove and Dispose of Second layer | 10 | SQ | X | $ - 0 | $ - 0 |
| B0170 | (1) Walkway/Asphalt Planks | 100 | SF | X | $ - 0 | $ - 0 |
| ROOF AND PARAPET WALL DAMPROOFING | $ - 0 | |||||
| B0171 | Coat Existing BU Roof or Parapet Wall | 50 | SF | X | $ - 0 | $ - 0 |
| E.P.D.M. (RUBBER ROOF SYSTEM) (Install new E.P.D.M. Roof System over Existing Built-up Roof) | $ - 0 | |||||
| B0172 | Ballasted System | 10 | SQ | X | $ - 0 | $ - 0 |
| B0173 | Mechanically Fastened System | 10 | SQ | X | $ - 0 | $ - 0 |
| B0174 | Full Adhered System | 10 | SQ | X | $ - 0 | $ - 0 |
| Remove existing roof system and replace with new E.P.D.M. roof system | $ - 0 | |||||
| B0175 | Ballasted System | 10 | SQ | X | $ - 0 | $ - 0 |
| B0176 | Mechanically Fastened System | 10 | SQ | X | $ - 0 | $ - 0 |
| B0177 | Full Adhered System | 10 | SQ | X | $ - 0 | $ - 0 |
| B0178 | Install new E.P.D.M. Wall/Curb Flashings | 50 | SF | X | $ - 0 | $ - 0 |
| B0179 | Install Rubber Pipe Vents | 5 | EA | X | $ - 0 | $ - 0 |
| B0180 | Install Termination Bars. Shall include caulking | 12 | LF | X | $ - 0 | $ - 0 |
| B0181 | Install E.P.D.M Walk Pads | 5 | EA | X | $ - 0 | $ - 0 |
| Remove existing roof system and replace with new Thermoplastic alloy roof system (TPA) | $ - 0 | |||||
| B0182 | Mechanically Fastened | 5 | SQ | X | $ - 0 | $ - 0 |
| B0183 | Ballasted | 5 | SQ | X | $ - 0 | $ - 0 |
| B0184 | Install new TPA wall/curb flashing | 25 | SF | X | $ - 0 | $ - 0 |
| B0185 | Install new TPA pipe vent flashing | 5 | EA | X | $ - 0 | $ - 0 |
| Remove existing metal base flashing and replace with new metal base flashing | $ - 0 | |||||
| B0186 | Copper | 25 | SF | X | $ - 0 | $ - 0 |
| B0187 | Aluminum | 25 | SF | X | $ - 0 | $ - 0 |
| B0188 | Aluminum/various colors | 25 | SF | X | $ - 0 | $ - 0 |
| B0189 | Stainless Steel | 25 | SF | X | $ - 0 | $ - 0 |
| Remove existing and install new metal coping. Shall include caulking. | $ - 0 | |||||
| B0190 | Copper | 25 | SF | X | $ - 0 | $ - 0 |
| B0191 | Aluminum | 25 | SF | X | $ - 0 | $ - 0 |
| B0192 | Aluminum/various colors | 25 | SF | X | $ - 0 | $ - 0 |
| B0193 | Stainless Steel | 25 | SF | X | $ - 0 | $ - 0 |
| Remove metal drip edge and replace with new metal drip edge | $ - 0 | |||||
| B0194 | Copper | 6 | LF | X | $ - 0 | $ - 0 |
| B0195 | Aluminum | 6 | LF | X | $ - 0 | $ - 0 |
| B0196 | Aluminum/various colors | 6 | LF | X | $ - 0 | $ - 0 |
| B0197 | Stainless Steel | 6 | LF | X | $ - 0 | $ - 0 |
| METAL GUTTERS AND DOWNSPOUTS | $ - 0 | |||||
| Install Metal Gutters | $ - 0 | |||||
| B0198 | Copper/5" ogee | 100 | LF | X | $ - 0 | $ - 0 |
| B0199 | Copper/6" ogee | 100 | LF | X | $ - 0 | $ - 0 |
| B0200 | Copper/6" half round | 100 | LF | X | $ - 0 | $ - 0 |
| B0201 | Copper/6" box | 100 | LF | X | $ - 0 | $ - 0 |
| B0202 | Copper/8" box | 100 | LF | X | $ - 0 | $ - 0 |
| B0203 | Prefinished Alum/5" ogee | 100 | LF | X | $ - 0 | $ - 0 |
| B0204 | Prefinished Alum/6" ogee | 100 | LF | X | $ - 0 | $ - 0 |
| B0205 | Prefinished Alum/6" Box | 100 | LF | X | $ - 0 | $ - 0 |
| B0206 | Prefinished Alum/8" Box | 100 | LF | X | $ - 0 | $ - 0 |
| B0207 | Stainless steel/6" box | 100 | LF | X | $ - 0 | $ - 0 |
| B0208 | Stainless steel/8" box | 100 | LF | X | $ - 0 | $ - 0 |
| Install Metal Downspouts | $ - 0 | |||||
| B0209 | Copper 2" x 3" | 100 | LF | X | $ - 0 | $ - 0 |
| B0210 | Copper 3" x 4" | 100 | LF | X | $ - 0 | $ - 0 |
| B0211 | Copper/3" round | 100 | LF | X | $ - 0 | $ - 0 |
| B0212 | Copper/4" round | 100 | LF | X | $ - 0 | $ - 0 |
| B0213 | Copper/6" round | 100 | LF | X | $ - 0 | $ - 0 |
| B0214 | Prefinished alum 2" x 3" | 100 | LF | X | $ - 0 | $ - 0 |
| B0215 | Prefinished alum 3" x 4" | 100 | LF | X | $ - 0 | $ - 0 |
| B0216 | Stainless Steel 3" x 4" | 100 | LF | X | $ - 0 | $ - 0 |
| B0217 | Provide and place new concrete splash block | 5 | EA | X | $ - 0 | $ - 0 |
| (standard commercial size) | $ - 0 | |||||
| Gutters, Downspouts and Drains | $ - 0 | |||||
| B0218 | Remove and dispose of existing gutters and/or downspouts | 100 | LF | X | $ - 0 | $ - 0 |
| B0219 | Remove and reinstall existing gutters and/or downspouts. Reseal all joints | 100 | LF | X | $ - 0 | $ - 0 |
| B0220 | Realign and resecure existing gutters and/or downspouts (Replace hangers, fasteners and straps) as needed. Reseal all joints. | 200 | LF | X | $ - 0 | $ - 0 |
| B0221 | Resolder broken gutter joints | 3 | EA | X | $ - 0 | $ - 0 |
| B0222 | Reseal, broken gutter joints | 3 | EA | X | $ - 0 | $ - 0 |
| Remove existing metal open valley flashing and replace with new metal valley flashing | $ - 0 | |||||
| B0223 | Copper | 25 | SF | X | $ - 0 | $ - 0 |
| B0224 | Aluminum | 25 | SF | X | $ - 0 | $ - 0 |
| B0225 | Aluminum/various colors | 25 | SF | X | $ - 0 | $ - 0 |
| B0226 | Stainless Steel | 25 | SF | X | $ - 0 | $ - 0 |
| Remove existing metal flashing/miscellaneous | $ - 0 | |||||
| B0227 | Copper | 25 | SF | X | $ - 0 | $ - 0 |
| B0228 | Aluminum | 25 | SF | X | $ - 0 | $ - 0 |
| B0229 | Aluminum/various colors | 25 | SF | X | $ - 0 | $ - 0 |
| B0230 | Stainless Steel | 25 | SF | X | $ - 0 | $ - 0 |
| B0231 | Compatible w/EPDM & CPE | 25 | SF | X | $ - 0 | $ - 0 |
| Remove existing pitch pocket and 'replace with new | $ - 0 | |||||
| B0232 | Copper | 2 | SF | X | $ - 0 | $ - 0 |
| B0233 | Aluminum | 2 | SF | X | $ - 0 | $ - 0 |
| B0234 | Stainless steel | 2 | SF | X | $ - 0 | $ - 0 |
| Roof Drain Sumps | $ - 0 | |||||
| B235 | Provide and Install TPA EPDM roof drain Sumps | 1 | EA | X | $ - 0 | $ - 0 |
| B0236 | TPA EPDM roof drain sumps (removal only) | 2 | EA | X | $ - 0 | $ - 0 |
| Strainers | $ - 0 | |||||
| B0237 | Metal Strainers | 10 | EA | X | $ - 0 | $ - 0 |
| B0238 | PVC Strainers | 10 | EA | X | $ - 0 | $ - 0 |
| B0239 | Metal Strainers | 10 | EA | X | $ - 0 | $ - 0 |
| B0240 | PVC Strainers | 10 | EA | X | $ - 0 | $ - 0 |
| Remove existing metal scupper lining and replace with new metal scupper lining | $ - 0 | |||||
| B0241 | Copper | 10 | EA | X | $ - 0 | $ - 0 |
| B0242 | Stainless Steel | 10 | EA | X | $ - 0 | $ - 0 |
| Remove existing metal conductor heads and replace with new metal conductor heads | $ - 0 | |||||
| B0243 | Copper | 10 | EA | X | $ - 0 | $ - 0 |
| B0244 | Stainless Steel | 10 | EA | X | $ - 0 | $ - 0 |
| Install new metal splash pans | $ - 0 | |||||
| B0245 | Copper | 10 | EA | X | $ - 0 | $ - 0 |
| B0246 | Stainless Steel | 10 | EA | X | $ - 0 | $ - 0 |
| Remove existing expansion joints and replace bituminous base flashing, metal counterflashing and metal joint cover | $ - 0 | |||||
| B0247 | Copper | 100 | SF | X | $ - 0 | $ - 0 |
| B0248 | Aluminum | 100 | SF | X | $ - 0 | $ - 0 |
| B0249 | Stainless Steel | 100 | SF | X | $ - 0 | $ - 0 |
| Vent Flashing | $ - 0 | |||||
| B0250 | Remove existing pipe vent flashing and replace with new lead pipe vent flashing | 10 | EA | X | $ - 0 | $ - 0 |
| B0251 | Remove existing metal vent collars and replace with new vent collars and accessories | 10 | EA | X | $ - 0 | $ - 0 |
| Caulking | $ - 0 | |||||
| B0252 | Install caulking | 110 | LF | X | $ - 0 | $ - 0 |
| B0253 | Remove existing caulking and replace with new sealant/caulking | 50 | LF | X | $ - 0 | $ - 0 |
| Reglet | $ - 0 | |||||
| B0254 | Cut new Reglet In masonry | 50 | LF | X | $ - 0 | $ - 0 |
| B0255 | Cut new Reglet In concrete | 50 | LF | X | $ - 0 | $ - 0 |
| Fascia Board | $ - 0 | |||||
| B0256 | Remove existing fascia and replace with new fascia board | 100 | BF | X | $ - 0 | $ - 0 |
| B0257 | Prime and paint fascia board | 100 | SF | X | $ - 0 | $ - 0 |
| B0258 | Cover existing fascia board with aluminum coil stock (various colors) | 100 | SF | X | $ - 0 | $ - 0 |
| B0259 | Reserved for MODs | 0 | X | $ - 0 | $ - 0 | |
| Asbestos Abatement | $ - 0 | |||||
| B0260 | Additional cost incurred for the removal and disposal of asbestos containing substances. Regular roofing only. | 200 | SF | X | $ - 0 | $ - 0 |
| B0261 | Additional cost incurred for the removal and disposal of asbestos containing substance. (Flashings, Pitch pockets, etc.) | 200 | SF | X | $ - 0 | $ - 0 |
| B0262 | Removal of lead based paint. 'Contractor removes loose paint from surface and disposes. | 200 | SF | X | $ - 0 | $ - 0 |
| Cleaning and Clearing | $ - 0 | |||||
| B0263 | Clean and clear gutters and dispose of all debris from site. | 500 | LF | X | $ - 0 | $ - 0 |
| B0264 | Clean and Clear down spouts and remove debris from site. | 250 | LF | X | $ - 0 | $ - 0 |
| B0265 | Clean and clear roof drains | 10 | EA | X | $ - 0 | $ - 0 |
| B0266 | Provide power washing. The Contractor shall Power Wash roof surfaces and clear drain baskets. (Does not include gutter or down spout cleaning.) | 5000 | SF | X | $ - 0 | $ - 0 |
| Additional Labor and Materials not accounted for in ELINs | $ - 0 | |||||
| B0267 | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Material costs shall BE NEGOTIATED BY KO. | LS | X | $ - 0 | $ - 0 | |
| B0268 | 1x | 2000 | HRS | X | $ - 0 | $ - 0 |
| Service calls | $ - 0 | |||||
| B0269 | Perform Service calls at NSA-Mechanicsburg. The Contractor shall respond to service calls within 24 hours of service call request. The contractor shall make necessary repairs to roof or roof system. Service calls are limited to a combined labor and material cost not to exceed $2,500.00. (Used for leaks and other emergencies) | 20 | EA | X | $ - 0 | $ - 0 |
| Perform Roof Survey In accordance with Attachment-B | $ - 0 | |||||
| B0270 | Perform Roof Survey / Assessment Per SF | 500,000 | EA | X | $ - 0 | $ - 0 |
| Total Price for Mech OPTION YEAR 1 (IQ) (Sum of Exhibit Line Items B0137- B0270) | $ - 0 |
Total Combined Price for Mech and PHL OPTION YEAR 1 (IQ) (Sum of Exhibit Line Items B0001- B0270) $ - 0
Option Year 2
| Roofing Contract | ||||||
| Attachment J-0200000-05 | ||||||
| Exhibit Line Item Numbers | ||||||
| Option Year 2 | ||||||
| Solicitation/Contract No.: N40085-26-D-XXXX | ||||||
| Philadelphia Roofing Contract | ||||||
| ELIN Number | Supplies/Services | Est. Quantity | Unit | Unit Price | Total | |
| ROOF DECKS | ||||||
| C0001 | Remove existing metal roof decks (ALL OR PARTIAL) and replace with new steel roof decking, shall include all closures and accessories. | 3 | SQ | X | $ - 0 | $ - 0 |
| Remove existing wood roof deck and replace with new wood decking | ||||||
| C0002 | 1" nominal T & G (treated) | 40 | BF | X | $ - 0 | $ - 0 |
| C0003 | 2" nominal T & G (treated) | 40 | BF | X | $ - 0 | $ - 0 |
| C0004 | 3/4" plywood | 40 | SF | X | $ - 0 | $ - 0 |
| C0005 | 1/2" plywood | 25 | SF | X | $ - 0 | $ - 0 |
| ROOF INSULATION | $ - 0 | |||||
| Remove and replace rigid roof insulation in conjunction with roofing systems specified herein. | $ - 0 | |||||
| C0006 | Remove and replace polyisocyanurate tapered insulation panels | 10 | SQ | X | $ - 0 | $ - 0 |
| C0007 | Remove and replace tapered roof insulation | 10 | SQ | X | $ - 0 | $ - 0 |
| C0008 | Remove and replace vapor barrier in conjunction with built up roofing system | 10 | SQ | X | $ - 0 | $ - 0 |
| C0009 | Remove and replace resin sized building paper (5 lb.) | 5 | SQ | X | $ - 0 | $ - 0 |
| C0010 | Remove existing cants and replace with new fiberboard cants 4 x 4 | 30 | LF | X | $ - 0 | $ - 0 |
| C0011 | Remove existing cants and replace with new treated wood cants 4 x 4 | 30 | LF | X | $ - 0 | $ - 0 |
| C0012 | Remove existing Nailers and replace with new treated 2" x 6" wood | 100 | BF | X | $ - 0 | $ - 0 |
| SHINGLED ROOF SYSTEMS | $ - 0 | |||||
| Remove existing composition shingles and replace with new composition shingles, shall include starter | $ - 0 | |||||
| C0013 | Twenty Five Year (3 tab ) | 10 | SQ | X | $ - 0 | $ - 0 |
| C0014 | Thirty Year (architectural) | 6 | SQ | X | $ - 0 | $ - 0 |
| C0015 | Forty Year (architectural) | 6 | SQ | X | $ - 0 | $ - 0 |
| C0016 | Remove and dispose of existing composition shingles (all types)(where new shingles are not going to be installed) | 6 | SQ | X | $ - 0 | $ - 0 |
| C0017 | Remove and dispose of existing slate shingles. | 6 | SQ | X | $ - 0 | $ - 0 |
| C0018 | Remove and re-install existing slate shingles (All or Partial) | 2 | SQ | X | $ - 0 | $ - 0 |
| C0019 | Install new slate shingles (Weathering green, Vermont)(All or Partial) | 3 | SQ | X | $ - 0 | $ - 0 |
| C0020 | Install new slate shingles (Buckingham)(All or Partial) | 3 | SQ | X | $ - 0 | $ - 0 |
| Remove existing preformed metal (All or Partial) roofing and replace with new preformed metal roofing | $ - 0 | |||||
| C0021 | Coated steel | 20 | SQ | X | $ - 0 | $ - 0 |
| C0022 | Coated aluminum | 20 | SQ | X | $ - 0 | $ - 0 |
| C0023 | Left Blank Intentionally | |||||
| Field paint roof mounted equipment | $ - 0 | |||||
| C0024 | Up to 25 SF X in surface area X | 12 | SF | X | $ - 0 | $ - 0 |
| C0025 | Over 25 SF X in surface area X | 12 | SF | X | $ - 0 | $ - 0 |
| BUILT UP ROOF | $ - 0 | |||||
| Remove existing roof system and replace with new aggregate surfaced BU roofing system | $ - 0 | |||||
| C0026 | System GAA (Gravel) | 6 | SQ | X | $ - 0 | $ - 0 |
| Remove existing roof system and replace with new smooth surfaced BU roofing system. | $ - 0 | |||||
| C0027 | System Gas | 6 | SQ | X | $ - 0 | $ - 0 |
| Remove existing roof system and replace with new single ply reinforced modified bitumen sheet roofing system | $ - 0 | |||||
| C0028 | Torch Applied | 6 | SQ | X | $ - 0 | $ - 0 |
| C0029 | Mop Applied | 6 | SQ | X | $ - 0 | $ - 0 |
| C0030 | Remove existing base flashing and replace with new 2 ply glass felt base flashing | 50 | SF | X | $ - 0 | $ - 0 |
| C0031 | Remove existing base flashing and replace with new 3-ply bituminous base flashing | 12 | SF | X | $ - 0 | $ - 0 |
| C0032 | Remove existing base flashing and replace with new single ply reinforced modified, bitumen sheet roofing flashing modified. | 12 | SF | X | $ - 0 | $ - 0 |
| C0033 | Remove and Dispose of Second layer | 10 | SQ | X | $ - 0 | $ - 0 |
| C0034 | (1) Walkway/Asphalt Planks | 100 | SF | X | $ - 0 | $ - 0 |
| ROOF AND PARAPET WALL DAMPROOFING | $ - 0 | |||||
| C0035 | Coat Existing BU Roof or Parapet Wall | 50 | SF | X | $ - 0 | $ - 0 |
| E.P.D.M. (RUBBER ROOF SYSTEM) (Install new E.P.D.M. Roof System over Existing Built-up Roof) | $ - 0 | |||||
| C0036 | Ballasted System | 10 | SQ | X | $ - 0 | $ - 0 |
| C0037 | Mechanically Fastened System | 10 | SQ | X | $ - 0 | $ - 0 |
| C0038 | Full Adhered System | 10 | SQ | X | $ - 0 | $ - 0 |
| Remove existing roof system and replace with new E.P.D.M. roof system | $ - 0 | |||||
| C0039 | Ballasted System | 10 | SQ | X | $ - 0 | $ - 0 |
| C0040 | Mechanically Fastened System | 10 | SQ | X | $ - 0 | $ - 0 |
| C0041 | Full Adhered System | 10 | SQ | X | $ - 0 | $ - 0 |
| C0042 | Install new E.P.D.M. Wall/Curb Flashings | 50 | SF | X | $ - 0 | $ - 0 |
| C0043 | Install Rubber Pipe Vents | 5 | EA | X | $ - 0 | $ - 0 |
| C0044 | Install Termination Bars. Shall include caulking | 12 | LF | X | $ - 0 | $ - 0 |
| C0045 | Install E.P.D.M Walk Pads | 5 | EA | X | $ - 0 | $ - 0 |
| Remove existing roof system and replace with new Thermoplastic alloy roof system (TPA) | $ - 0 | |||||
| C0046 | Mechanically Fastened | 5 | SQ | X | $ - 0 | $ - 0 |
| C0047 | Ballasted | 5 | SQ | X | $ - 0 | $ - 0 |
| C0048 | Install new TPA wall/curb flashing | 25 | SF | X | $ - 0 | $ - 0 |
| C0049 | Install new TPA pipe vent flashing | 5 | EA | X | $ - 0 | $ - 0 |
| Remove existing metal base flashing and replace with new metal base flashing | $ - 0 | |||||
| C0050 | Copper | 25 | SF | X | $ - 0 | $ - 0 |
| C0051 | Aluminum | 25 | SF | X | $ - 0 | $ - 0 |
| C0052 | Aluminum/various colors | 25 | SF | X | $ - 0 | $ - 0 |
| C0053 | Stainless Steel | 25 | SF | X | $ - 0 | $ - 0 |
| Remove existing and install new metal coping. Shall include caulking. | $ - 0 | |||||
| C0054 | Copper | 25 | SF | X | $ - 0 | $ - 0 |
| C0055 | Aluminum | 25 | SF | X | $ - 0 | $ - 0 |
| C0056 | Aluminum/various colors | 25 | SF | X | $ - 0 | $ - 0 |
| C0057 | Stainless Steel | 25 | SF | X | $ - 0 | $ - 0 |
| Remove metal drip edge and replace with new metal drip edge | $ - 0 | |||||
| C0058 | Copper | 6 | LF | X | $ - 0 | $ - 0 |
| C0059 | Aluminum | 6 | LF | X | $ - 0 | $ - 0 |
| C0060 | Aluminum/various colors | 6 | LF | X | $ - 0 | $ - 0 |
| C0061 | Stainless Steel | 6 | LF | X | $ - 0 | $ - 0 |
| METAL GUTTERS AND DOWNSPOUTS | $ - 0 | |||||
| Install Metal Gutters | $ - 0 | |||||
| C0062 | Copper/5" ogee | 100 | LF | X | $ - 0 | $ - 0 |
| C0063 | Copper/6" ogee | 100 | LF | X | $ - 0 | $ - 0 |
| C0064 | Copper/6" half round | 100 | LF | X | $ - 0 | $ - 0 |
| C0065 | Copper/6" box | 100 | LF | X | $ - 0 | $ - 0 |
| C0066 | Copper/8" box | 100 | LF | X | $ - 0 | $ - 0 |
| C0067 | Prefinished Alum/5" ogee | 100 | LF | X | $ - 0 | $ - 0 |
| C0068 | Prefinished Alum/6" ogee | 100 | LF | X | $ - 0 | $ - 0 |
| C0069 | Prefinished Alum/6" Box | 100 | LF | X | $ - 0 | $ - 0 |
| C0070 | Prefinished Alum/8" Box | 100 | LF | X | $ - 0 | $ - 0 |
| C0071 | Stainless steel/6" box | 100 | LF | X | $ - 0 | $ - 0 |
| C0072 | Stainless steel/8" box | 100 | LF | X | $ - 0 | $ - 0 |
| Install Metal Downspouts | $ - 0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .