Amendment 0008 Pre-Proposal Inquiries.pdf
PDF 114 KB Posted
- Solicitation number
- N4008526B0006
About this file
This document is a summary of pre-proposal inquiry responses addressing clarifications on contract line items and requirements from Attachment "B" (ELINs) and other RFP sections.
Question 39 clarifies that ELIN A0132 is designated for labor costs not captured in other line items, with the per-hour cost applied to actual hours worked. Question 40 addresses the unit of measure for tapered insulation in ELIN A0006, with the government response indicating the unit was updated to board feet (BF) per Amendment 0008, defining a board foot as 1"x12"x12". Question 64 specifies EM 385 training requirements based on personnel classification: 40-hour training for Site Safety and Health Officers (SSHOs), 24-hour training for managers, supervisors, and Collateral Duty Safety Officers (CDSOs), and 16-hour training for general workers and non-supervisory personnel. Question 87 clarifies that ELIN A0007 is for tapered insulation materials other than polyisocyanurate, distinguishing it from ELIN A0006. These responses provide essential guidance for proposal preparation regarding labor pricing, insulation material specifications and units of measure, mandatory safety training qualifications, and material type distinctions for pricing purposes.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. PRE-PROPOSAL INQUIRY RESPONSES:
Question
Reference Question Government Response
Page Section Paragraph
Attachment
"B" ELINS
RFP A0132
A0132 states to provide labor cost to perform all unit cost work. Will this per hour cost be assigned to all work that is performed. Then applied to the amount of hours it takes to do the work.
This Line item is for any labor not captured in the other
ELINs.
Attachment
"B" ELINS
RFP A0006
What should we use for the average thickness of tapered insulation or should this be changed to brdft. Price.
Tapered insulation is priced based off the thickness of the insulation. A brdft foot is define as 1”x12”x12”.
Updated unit of measure to
BF. See revised ELINS with
Amendment 0008.
64 10 01-35-26 1.8.2
If EM 385 Training is required-is the
40, 24 or 16 hour training needed for qualification?
40-hour Site Safety and Health
Officers (SSHOs), 24-hour
Managers, supervisors, and
Collateral Duty Safety
Officers (CDSOs).16-hour
General workers and other non-supervisory personnel.
Line items A0006 and A0007 are both tapered insulations. Is one of them meant to be for field/flat boards?
A007 is for material other than polyisocyanurate.
(End Summary of Changes)