Amendment 0008 - Attachment ELINs Roofing IDIQ Revised.xlsx
XLSX spreadsheet 123 KB Posted
- Solicitation number
- N4008526B0006
About this file
This is an Exhibit Line Item Numbers (ELIN) pricing template for an Indefinite Delivery/Indefinite Quantity (IDIQ) maintenance construction contract for roofing services at Department of the Navy installations. The contract covers three locations: Philadelphia Naval Business Center (PNBC), Naval Support Activity Philadelphia (NSA-P), and Naval Support Activity Mechanicsburg (NSA-M). The document provides a comprehensive unit-priced line item structure organized by service category and includes pricing tables for a base option year and four option years.
The pricing template encompasses approximately 270 line items per location (540 total for both Philadelphia and Mechanicsburg sites) organized into major service categories: roof decks, roof insulation, shingled roof systems, built-up roofing systems, EPDM rubber roof systems, thermoplastic alloy (TPA) roofing systems, metal base flashing and coping, metal gutters and downspouts, valley flashing, miscellaneous metal flashing, roof drain sumps, strainers, scupper linings, conductor heads, splash pans, expansion joints, vent flashing, caulking, reglet work, fascia boards, asbestos and lead abatement, cleaning and clearing operations, service calls (limited to $2,500 combined labor and material costs per call), roof surveys/assessments, and labor/materials for non-prepriced work negotiated by the Contracting Officer. All unit prices in the template are currently blank (showing $0 values), indicating this is a pre-award document awaiting contractor pricing submissions. The contract structure allows for flexible task ordering while maintaining fixed unit rates throughout the base year and four one-year option periods.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Option
| Roofing Contract | ||||||
| Attachment J-0200000-05 | ||||||
| Exhibit Line Item Numbers | ||||||
| Base Option | ||||||
| Solicitation/Contract No.: N40085-26-D-XXXX | ||||||
| Philadelphia Roofing Contract | ||||||
| ELIN Number | Supplies/Services | Est. Quantity | Unit | Unit Price | Total | |
| ROOF DECKS | ||||||
| A0001 | Remove existing metal roof decks (ALL OR PARTIAL) and replace with new steel roof decking, shall include all closures and accessories. | 3 | SQ | X | $ - 0 | |
| Remove existing wood roof deck and replace with new wood decking | ||||||
| A0002 | 1" nominal T & G (treated) | 40 | BF | X | $ - 0 | |
| A0003 | 2" nominal T & G (treated) | 40 | BF | X | $ - 0 | |
| A0004 | 3/4" plywood | 40 | SF | X | $ - 0 | |
| A0005 | 1/2" plywood | 25 | SF | X | $ - 0 | |
| ROOF INSULATION | ||||||
| Remove and replace rigid roof insulation in conjunction with roofing systems specified herein. Average 1”x12”x12” | ||||||
| A0006 | Remove and replace polyisocyanurate tapered insulation panels | 10 | BF | X | $ - 0 | |
| A0007 | Remove and replace tapered roof insulation | 10 | BF | X | $ - 0 | |
| A0008 | Remove and replace vapor barrier in conjunction with built up roofing system | 10 | SQ | X | $ - 0 | |
| A0009 | Remove and replace resin sized building paper (5 lb.) | 5 | SQ | X | $ - 0 | |
| A0010 | Remove existing cants and replace with new fiberboard cants 4 x 4 | 30 | LF | X | $ - 0 | |
| A0011 | Remove existing cants and replace with new treated wood cants 4 x 4 | 30 | LF | X | $ - 0 | |
| A0012 | Remove existing Nailers and replace with new treated 2" x 6" wood | 100 | BF | X | $ - 0 | |
| SHINGLED ROOF SYSTEMS | ||||||
| Remove existing composition shingles and replace with new composition shingles, shall include starter | ||||||
| A0013 | Twenty Five Year (3 tab ) | 10 | SQ | X | $ - 0 | |
| A0014 | Thirty Year (architectural) | 6 | SQ | X | $ - 0 | |
| A0015 | Forty Year (architectural) | 6 | SQ | X | $ - 0 | |
| A0016 | Remove and dispose of existing composition shingles (all types)(where new shingles are not going to be installed) | 6 | SQ | X | $ - 0 | |
| A0017 | Remove and dispose of existing slate shingles. | 6 | SQ | X | $ - 0 | |
| A0018 | Remove and re-install existing slate shingles (All or Partial) | 2 | SQ | X | $ - 0 | |
| A0019 | Install new slate shingles (Weathering green, Vermont)(All or Partial) | 3 | SQ | X | $ - 0 | |
| A0020 | Install new slate shingles (Buckingham)(All or Partial) | 3 | SQ | X | $ - 0 | |
| Remove existing preformed metal (All or Partial) roofing and replace with new preformed metal roofing | ||||||
| A0021 | Coated steel | 20 | SQ | X | $ - 0 | |
| A0022 | Coated aluminum | 20 | SQ | X | $ - 0 | |
| A0023 | Left Blank Intentionally | |||||
| Field paint roof mounted equipment | ||||||
| A0024 | Up to 25 SF X in surface area X | 12 | SF | X | $ - 0 | |
| A0025 | Over 25 SF X in surface area X | 12 | SF | X | $ - 0 | |
| BUILT UP ROOF | ||||||
| Remove existing roof system and replace with new aggregate surfaced BU roofing system | ||||||
| A0026 | System GAA (Gravel) | 6 | SQ | X | $ - 0 | |
| Remove existing roof system and replace with new smooth surfaced BU roofing system. | ||||||
| A0027 | System Gas | 6 | SQ | X | $ - 0 | |
| Remove existing roof system and replace with new single ply reinforced modified bitumen sheet roofing system | ||||||
| A0028 | Torch Applied | 6 | SQ | X | $ - 0 | |
| A0029 | Mop Applied | 6 | SQ | X | $ - 0 | |
| A0030 | Remove existing base flashing and replace with new 2 ply glass felt base flashing | 50 | SF | X | $ - 0 | |
| A0031 | Remove existing base flashing and replace with new 3-ply bituminous base flashing | 12 | SF | X | $ - 0 | |
| A0032 | Remove existing base flashing and replace with new single ply reinforced modified, bitumen sheet roofing flashing modified. | 12 | SF | X | $ - 0 | |
| A0033 | Remove and Dispose of Second layer | 10 | SQ | X | $ - 0 | |
| A0034 | (1) Walkway/Asphalt Planks | 100 | SF | X | $ - 0 | |
| ROOF AND PARAPET WALL DAMPROOFING | ||||||
| A0035 | Coat Existing BU Roof or Parapet Wall | 50 | SF | X | $ - 0 | |
| E.P.D.M. (RUBBER ROOF SYSTEM) (Install new E.P.D.M. Roof System over Existing Built-up Roof) | ||||||
| A0036 | Ballasted System | 10 | SQ | X | $ - 0 | |
| A0037 | Mechanically Fastened System | 10 | SQ | X | $ - 0 | |
| A0038 | Full Adhered System | 10 | SQ | X | $ - 0 | |
| Remove existing roof system and replace with new E.P.D.M. roof system | ||||||
| A0039 | Ballasted System | 10 | SQ | X | $ - 0 | |
| A0040 | Mechanically Fastened System | 10 | SQ | X | $ - 0 | |
| A0041 | Full Adhered System | 10 | SQ | X | $ - 0 | |
| A0042 | Install new E.P.D.M. Wall/Curb Flashings | 50 | SF | X | $ - 0 | |
| A0043 | Install Rubber Pipe Vents | 5 | EA | X | $ - 0 | |
| A0044 | Install Termination Bars. Shall include caulking | 12 | LF | X | $ - 0 | |
| A0045 | Install E.P.D.M Walk Pads | 5 | EA | X | $ - 0 | |
| Remove existing roof system and replace with new Thermoplastic alloy roof system (TPA) | ||||||
| A0046 | Mechanically Fastened | 5 | SQ | X | $ - 0 | |
| A0047 | Ballasted | 5 | SQ | X | $ - 0 | |
| A0048 | Install new TPA wall/curb flashing | 25 | SF | X | $ - 0 | |
| A0049 | Install new TPA pipe vent flashing | 5 | EA | X | $ - 0 | |
| Remove existing metal base flashing and replace with new metal base flashing | ||||||
| A0050 | Copper | 25 | SF | X | $ - 0 | |
| A0051 | Aluminum | 25 | SF | X | $ - 0 | |
| A0052 | Aluminum/various colors | 25 | SF | X | $ - 0 | |
| A0053 | Stainless Steel | 25 | SF | X | $ - 0 | |
| Remove existing and install new metal coping. Shall include caulking. | ||||||
| A0054 | Copper | 25 | SF | X | $ - 0 | |
| A0055 | Aluminum | 25 | SF | X | $ - 0 | |
| A0056 | Aluminum/various colors | 25 | SF | X | $ - 0 | |
| A0057 | Stainless Steel | 25 | SF | X | $ - 0 | |
| Remove metal drip edge and replace with new metal drip edge | ||||||
| A0058 | Copper | 6 | LF | X | $ - 0 | |
| A0059 | Aluminum | 6 | LF | X | $ - 0 | |
| A0060 | Aluminum/various colors | 6 | LF | X | $ - 0 | |
| A0061 | Stainless Steel | 6 | LF | X | $ - 0 | |
| METAL GUTTERS AND DOWNSPOUTS | ||||||
| Install Metal Gutters | ||||||
| A0062 | Copper/5" ogee | 100 | LF | X | $ - 0 | |
| A0063 | Copper/6" ogee | 100 | LF | X | $ - 0 | |
| A0064 | Copper/6" half round | 100 | LF | X | $ - 0 | |
| A0065 | Copper/6" box | 100 | LF | X | $ - 0 | |
| A0066 | Copper/8" box | 100 | LF | X | $ - 0 | |
| A0067 | Prefinished Alum/5" ogee | 100 | LF | X | $ - 0 | |
| A0068 | Prefinished Alum/6" ogee | 100 | LF | X | $ - 0 | |
| A0069 | Prefinished Alum/6" Box | 100 | LF | X | $ - 0 | |
| A0070 | Prefinished Alum/8" Box | 100 | LF | X | $ - 0 | |
| A0071 | Stainless steel/6" box | 100 | LF | X | $ - 0 | |
| A0072 | Stainless steel/8" box | 100 | LF | X | $ - 0 | |
| Install Metal Downspouts | ||||||
| A0073 | Copper 2" x 3" | 100 | LF | X | $ - 0 | |
| A0074 | Copper 3" x 4" | 100 | LF | X | $ - 0 | |
| A0075 | Copper/3" round | 100 | LF | X | $ - 0 | |
| A0076 | Copper/4" round | 100 | LF | X | $ - 0 | |
| A0077 | Copper/6" round | 100 | LF | X | $ - 0 | |
| A0078 | Prefinished alum 2" x 3" | 100 | LF | X | $ - 0 | |
| A0079 | Prefinished alum 3" x 4" | 100 | LF | X | $ - 0 | |
| A0080 | Stainless Steel 3" x 4" | 100 | LF | X | $ - 0 | |
| A0081 | Provide and place new concrete splash block | 5 | EA | X | $ - 0 | |
| (standard commercial size) | ||||||
| Gutters, Downspouts and Drains | ||||||
| A0082 | Remove and dispose of existing gutters and/or downspouts | 100 | LF | X | $ - 0 | |
| A0083 | Remove and reinstall existing gutters and/or downspouts. Reseal all joints | 100 | LF | X | $ - 0 | |
| A0084 | Realign and resecure existing gutters and/or downspouts (Replace hangers, fasteners and straps) as needed. Reseal all joints. | 200 | LF | X | $ - 0 | |
| A0085 | Resolder broken gutter joints | 3 | EA | X | $ - 0 | |
| A0086 | Reseal, broken gutter joints | 3 | EA | X | $ - 0 | |
| Remove existing metal open valley flashing and replace with new metal valley flashing | ||||||
| A0087 | Copper | 25 | SF | X | $ - 0 | |
| A0088 | Aluminum | 25 | SF | X | $ - 0 | |
| A0089 | Aluminum/various colors | 25 | SF | X | $ - 0 | |
| A0090 | Stainless Steel | 25 | SF | X | $ - 0 | |
| Remove existing metal flashing/miscellaneous | ||||||
| A0091 | Copper | 25 | SF | X | $ - 0 | |
| A0092 | Aluminum | 25 | SF | X | $ - 0 | |
| A0093 | Aluminum/various colors | 25 | SF | X | $ - 0 | |
| A0094 | Stainless Steel | 25 | SF | X | $ - 0 | |
| A0095 | Compatible w/EPDM & CPE | 25 | SF | X | $ - 0 | |
| Remove existing pitch pocket and 'replace with new | ||||||
| A0096 | Copper | 2 | SF | X | $ - 0 | |
| A0097 | Aluminum | 2 | SF | X | $ - 0 | |
| A0098 | Stainless steel | 2 | SF | X | $ - 0 | |
| Roof Drain Sumps | ||||||
| A0099 | Provide and Install TPA EPDM roof drain Sumps | 1 | EA | X | $ - 0 | |
| A0100 | TPA EPDM roof drain sumps (removal only) | 2 | EA | X | $ - 0 | |
| Strainers | ||||||
| A0101 | Metal Strainers | 10 | EA | X | $ - 0 | |
| A0102 | PVC Strainers | 10 | EA | X | $ - 0 | |
| A0103 | Metal Strainers | 10 | EA | X | $ - 0 | |
| A0104 | PVC Strainers | 10 | EA | X | $ - 0 | |
| Remove existing metal scupper lining and replace with new metal scupper lining | ||||||
| A0105 | Copper | 10 | EA | X | $ - 0 | |
| A0106 | Stainless Steel | 10 | EA | X | $ - 0 | |
| Remove existing metal conductor heads and replace with new metal conductor heads | ||||||
| A0107 | Copper | 10 | EA | X | $ - 0 | |
| A0108 | Stainless Steel | 10 | EA | X | $ - 0 | |
| Install new metal splash pans | ||||||
| A0109 | Copper | 10 | EA | X | $ - 0 | |
| A0110 | Stainless Steel | 10 | EA | X | $ - 0 | |
| Remove existing expansion joints and replace bituminous base flashing, metal counterflashing and metal joint cover | ||||||
| A0111 | Copper | 100 | SF | X | $ - 0 | |
| A0112 | Aluminum | 100 | SF | X | $ - 0 | |
| A0113 | Stainless Steel | 100 | SF | X | $ - 0 | |
| Vent Flashing | ||||||
| A0114 | Remove existing pipe vent flashing and replace with new lead pipe vent flashing | 10 | EA | X | $ - 0 | |
| A0115 | Remove existing metal vent collars and replace with new vent collars and accessories | 10 | EA | X | $ - 0 | |
| Caulking | ||||||
| A0116 | Install caulking | 110 | LF | X | $ - 0 | |
| A0117 | Remove existing caulking and replace with new sealant/caulking | 50 | LF | X | $ - 0 | |
| Reglet | ||||||
| A0118 | Cut new Reglet In masonry | 50 | LF | X | $ - 0 | |
| A0119 | Cut new Reglet In concrete | 50 | LF | X | $ - 0 | |
| Fascia Board | ||||||
| A0120 | Remove existing fascia and replace with new fascia board | 100 | BF | X | $ - 0 | |
| A0121 | Prime and paint fascia board | 100 | SF | X | $ - 0 | |
| A0122 | Cover existing fascia board with aluminum coil stock (various colors) | 100 | SF | X | $ - 0 | |
| A0123 | Reserved for MODs | 0 | X | $ - 0 | ||
| Asbestos Abatement | ||||||
| A0124 | Additional cost incurred for the removal and disposal of asbestos containing substances. Regular roofing only. | 200 | SF | X | $ - 0 | |
| A0125 | Additional cost incurred for the removal and disposal of asbestos containing substance. (Flashings, Pitch pockets, etc.) | 200 | SF | X | $ - 0 | |
| A0126 | Removal of lead based paint. 'Contractor removes loose paint from surface and disposes. | 200 | SF | X | $ - 0 | |
| Cleaning and Clearing | ||||||
| A0127 | Clean and clear gutters and dispose of all debris from site. | 500 | LF | X | $ - 0 | |
| A0128 | Clean and Clear down spouts and remove debris from site. | 250 | LF | X | $ - 0 | |
| A0129 | Clean and clear roof drains | 10 | EA | X | $ - 0 | |
| A0130 | Provide power washing. The Contractor shall Power Wash roof surfaces and clear drain baskets. (Does not include gutter or down spout cleaning.) | 5000 | SF | X | $ - 0 | |
| Additional Labor and Materials not accounted for in ELINs | ||||||
| A0131 | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Material costs shall BE NEGOTIATED BY KO. | 1 | LS | X | $ - 0 | |
| A0132 | Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO. | 2000 | HRS | X | $ - 0 | |
| Service calls | ||||||
| A0133 | Perform Service calls at PNYA and NSA-P . The Contractor shall respond to service calls within 24 hours of service call request. The contractor shall make necessary repairs to roof or roof system. Service calls are limited to a combined labor and material cost not to exceed $2,500.00. (Used for leaks and other emergencies) | 20 | EA | X | $ - 0 | |
| Perform Roof Survey In accordance with Attachment-B | ||||||
| A0134 | Perform Roof Survey / Assessment Per SF | 500,000 | EA | X | $ - 0 | |
| NON-PREPRICED LABOR, MATERIAL and COMMAND INTEREST WORK | ||||||
| A0135 | Bldg. 1 NSAP Spring power washing, minor deficiency repairs, drain cleaning, and analysis report. 100,000 sq ft epoxy coated roofing system. (Ref Attachment E NWSS B1 NSAP.) | 1 | EV | X | $ - 0 | |
| A0136 | Bldg. 1 NSAP Fall drain cleaning, Roof analysis and minor repairs. 100,000 sq ft epoxy coated roofing system. (Ref Attachment E NWSS B1 NSAP.) | 1 | EV | X | $ - 0 | |
| Total Price for PHL BASE OPTION YEAR (IQ) (Sum of Exhibit Line Items A0001- A0136) | $ - 0 | |||||
| Mechanicsburg Roofing Contract | ||||||
| ELIN Number | Supplies/Services | Est. Quantity | Unit | Unit Price | Total | |
| ROOF DECKS | ||||||
| A0137 | Remove existing metal roof decks (ALL OR PARTIAL) and replace with new steel roof decking, shall include all closures and accessories. | 3 | SQ | X | $ - 0 | |
| Remove existing wood roof deck and replace with new wood decking | ||||||
| A0138 | 1" nominal T & G (treated) | 40 | BF | X | $ - 0 | |
| A0139 | 2" nominal T & G (treated) | 40 | BF | X | $ - 0 | |
| A0140 | 3/4" plywood | 40 | SF | X | $ - 0 | |
| A0141 | 1/2" plywood | 25 | SF | X | $ - 0 | |
| ROOF INSULATION | ||||||
| Remove and replace rigid roof insulation in conjunction with roofing systems specified herein. Average 1”x12”x12” | ||||||
| A0142 | Remove and replace polyisocyanurate tapered insulation panels | 10 | BF | X | $ - 0 | |
| A0143 | Remove and replace tapered roof insulation | 10 | BF | X | $ - 0 | |
| A0144 | Remove and replace vapor barrier in conjunction with built up roofing system | 10 | SQ | X | $ - 0 | |
| A0145 | Remove and replace resin sized building paper (5 lb.) | 5 | SQ | X | $ - 0 | |
| A0146 | Remove existing cants and replace with new fiberboard cants 4 x 4 | 30 | LF | X | $ - 0 | |
| A0147 | Remove existing cants and replace with new treated wood cants 4 x 4 | 30 | LF | X | $ - 0 | |
| A0148 | Remove existing Nailers and replace with new treated 2" x 6" wood | 100 | BF | X | $ - 0 | |
| SHINGLED ROOF SYSTEMS | ||||||
| Remove existing composition shingles and replace with new composition shingles, shall include starter | ||||||
| A0149 | Twenty Five Year (3 tab ) | 10 | SQ | X | $ - 0 | |
| A0150 | Thirty Year (architectural) | 6 | SQ | X | $ - 0 | |
| A0151 | Forty Year (architectural) | 6 | SQ | X | $ - 0 | |
| A0152 | Remove and dispose of existing composition shingles (all types)(where new shingles are not going to be installed) | 6 | SQ | X | $ - 0 | |
| A0153 | Remove and dispose of existing slate shingles. | 6 | SQ | X | $ - 0 | |
| A0154 | Remove and re-install existing slate shingles (All or Partial) | 2 | SQ | X | $ - 0 | |
| A0155 | Install new slate shingles (Weathering green, Vermont)(All or Partial) | 3 | SQ | X | $ - 0 | |
| A0156 | Install new slate shingles (Buckingham)(All or Partial) | 3 | SQ | X | $ - 0 | |
| Remove existing preformed metal (All or Partial) roofing and replace with new preformed metal roofing | ||||||
| A0157 | Coated steel | 20 | SQ | X | $ - 0 | |
| A0158 | Coated aluminum | 20 | SQ | X | $ - 0 | |
| A0159 | Left Blank Intentionally | |||||
| Field paint roof mounted equipment | ||||||
| A0160 | Up to 25 SF X in surface area X | 12 | SF | X | $ - 0 | |
| A0161 | Over 25 SF X in surface area X | 12 | SF | X | $ - 0 | |
| BUILT UP ROOF | ||||||
| Remove existing roof system and replace with new aggregate surfaced BU roofing system | ||||||
| A0162 | System GAA (Gravel) | 6 | SQ | X | $ - 0 | |
| Remove existing roof system and replace with new smooth surfaced BU roofing system. | ||||||
| A0163 | System Gas | 6 | SQ | X | $ - 0 | |
| Remove existing roof system and replace with new single ply reinforced modified bitumen sheet roofing system | ||||||
| A0164 | Torch Applied | 6 | SQ | X | $ - 0 | |
| A0165 | Mop Applied | 6 | SQ | X | $ - 0 | |
| A0166 | Remove existing base flashing and replace with new 2 ply glass felt base flashing | 50 | SF | X | $ - 0 | |
| A0167 | Remove existing base flashing and replace with new 3-ply bituminous base flashing | 12 | SF | X | $ - 0 | |
| A0168 | Remove existing base flashing and replace with new single ply reinforced modified, bitumen sheet roofing flashing modified. | 12 | SF | X | $ - 0 | |
| A0169 | Remove and Dispose of Second layer | 10 | SQ | X | $ - 0 | |
| A0170 | (1) Walkway/Asphalt Planks | 100 | SF | X | $ - 0 | |
| ROOF AND PARAPET WALL DAMPROOFING | ||||||
| A0171 | Coat Existing BU Roof or Parapet Wall | 50 | SF | X | $ - 0 | |
| E.P.D.M. (RUBBER ROOF SYSTEM) (Install new E.P.D.M. Roof System over Existing Built-up Roof) | ||||||
| A0172 | Ballasted System | 10 | SQ | X | $ - 0 | |
| A0173 | Mechanically Fastened System | 10 | SQ | X | $ - 0 | |
| A0174 | Full Adhered System | 10 | SQ | X | $ - 0 | |
| Remove existing roof system and replace with new E.P.D.M. roof system | ||||||
| A0175 | Ballasted System | 10 | SQ | X | $ - 0 | |
| A0176 | Mechanically Fastened System | 10 | SQ | X | $ - 0 | |
| A0177 | Full Adhered System | 10 | SQ | X | $ - 0 | |
| A0178 | Install new E.P.D.M. Wall/Curb Flashings | 50 | SF | X | $ - 0 | |
| A0179 | Install Rubber Pipe Vents | 5 | EA | X | $ - 0 | |
| A0180 | Install Termination Bars. Shall include caulking | 12 | LF | X | $ - 0 | |
| A0181 | Install E.P.D.M Walk Pads | 5 | EA | X | $ - 0 | |
| Remove existing roof system and replace with new Thermoplastic alloy roof system (TPA) | ||||||
| A0182 | Mechanically Fastened | 5 | SQ | X | $ - 0 | |
| A0183 | Ballasted | 5 | SQ | X | $ - 0 | |
| A0184 | Install new TPA wall/curb flashing | 25 | SF | X | $ - 0 | |
| A0185 | Install new TPA pipe vent flashing | 5 | EA | X | $ - 0 | |
| Remove existing metal base flashing and replace with new metal base flashing | ||||||
| A0186 | Copper | 25 | SF | X | $ - 0 | |
| A0187 | Aluminum | 25 | SF | X | $ - 0 | |
| A0188 | Aluminum/various colors | 25 | SF | X | $ - 0 | |
| A0189 | Stainless Steel | 25 | SF | X | $ - 0 | |
| Remove existing and install new metal coping. Shall include caulking. | ||||||
| A0190 | Copper | 25 | SF | X | $ - 0 | |
| A0191 | Aluminum | 25 | SF | X | $ - 0 | |
| A0192 | Aluminum/various colors | 25 | SF | X | $ - 0 | |
| A0193 | Stainless Steel | 25 | SF | X | $ - 0 | |
| Remove metal drip edge and replace with new metal drip edge | ||||||
| A0194 | Copper | 6 | LF | X | $ - 0 | |
| A0195 | Aluminum | 6 | LF | X | $ - 0 | |
| A0196 | Aluminum/various colors | 6 | LF | X | $ - 0 | |
| A0197 | Stainless Steel | 6 | LF | X | $ - 0 | |
| METAL GUTTERS AND DOWNSPOUTS | ||||||
| Install Metal Gutters | ||||||
| A0198 | Copper/5" ogee | 100 | LF | X | $ - 0 | |
| A0199 | Copper/6" ogee | 100 | LF | X | $ - 0 | |
| A0200 | Copper/6" half round | 100 | LF | X | $ - 0 | |
| A0201 | Copper/6" box | 100 | LF | X | $ - 0 | |
| A0202 | Copper/8" box | 100 | LF | X | $ - 0 | |
| A0203 | Prefinished Alum/5" ogee | 100 | LF | X | $ - 0 | |
| A0204 | Prefinished Alum/6" ogee | 100 | LF | X | $ - 0 | |
| A0205 | Prefinished Alum/6" Box | 100 | LF | X | $ - 0 | |
| A0206 | Prefinished Alum/8" Box | 100 | LF | X | $ - 0 | |
| A0207 | Stainless steel/6" box | 100 | LF | X | $ - 0 | |
| A0208 | Stainless steel/8" box | 100 | LF | X | $ - 0 | |
| Install Metal Downspouts | ||||||
| A0209 | Copper 2" x 3" | 100 | LF | X | $ - 0 | |
| A0210 | Copper 3" x 4" | 100 | LF | X | $ - 0 | |
| A0211 | Copper/3" round | 100 | LF | X | $ - 0 | |
| A0212 | Copper/4" round | 100 | LF | X | $ - 0 | |
| A0213 | Copper/6" round | 100 | LF | X | $ - 0 | |
| A0214 | Prefinished alum 2" x 3" | 100 | LF | X | $ - 0 | |
| A0215 | Prefinished alum 3" x 4" | 100 | LF | X | $ - 0 | |
| A0216 | Stainless Steel 3" x 4" | 100 | LF | X | $ - 0 | |
| A0217 | Provide and place new concrete splash block | 5 | EA | X | $ - 0 | |
| (standard commercial size) | ||||||
| Gutters, Downspouts and Drains | ||||||
| A0218 | Remove and dispose of existing gutters and/or downspouts | 100 | LF | X | $ - 0 | |
| A0219 | Remove and reinstall existing gutters and/or downspouts. Reseal all joints | 100 | LF | X | $ - 0 | |
| A0220 | Realign and resecure existing gutters and/or downspouts (Replace hangers, fasteners and straps) as needed. Reseal all joints. | 200 | LF | X | $ - 0 | |
| A0221 | Resolder broken gutter joints | 3 | EA | X | $ - 0 | |
| A0222 | Reseal, broken gutter joints | 3 | EA | X | $ - 0 | |
| Remove existing metal open valley flashing and replace with new metal valley flashing | ||||||
| A0223 | Copper | 25 | SF | X | $ - 0 | |
| A0224 | Aluminum | 25 | SF | X | $ - 0 | |
| A0225 | Aluminum/various colors | 25 | SF | X | $ - 0 | |
| A0226 | Stainless Steel | 25 | SF | X | $ - 0 | |
| Remove existing metal flashing/miscellaneous | ||||||
| A0227 | Copper | 25 | SF | X | $ - 0 | |
| A0228 | Aluminum | 25 | SF | X | $ - 0 | |
| A0229 | Aluminum/various colors | 25 | SF | X | $ - 0 | |
| A0230 | Stainless Steel | 25 | SF | X | $ - 0 | |
| A0231 | Compatible w/EPDM & CPE | 25 | SF | X | $ - 0 | |
| Remove existing pitch pocket and 'replace with new | ||||||
| A0232 | Copper | 2 | SF | X | $ - 0 | |
| A0233 | Aluminum | 2 | SF | X | $ - 0 | |
| A0234 | Stainless steel | 2 | SF | X | $ - 0 | |
| Roof Drain Sumps | ||||||
| A235 | Provide and Install TPA EPDM roof drain Sumps | 1 | EA | X | $ - 0 | |
| A0236 | TPA EPDM roof drain sumps (removal only) | 2 | EA | X | $ - 0 | |
| Strainers | ||||||
| A0237 | Metal Strainers | 10 | EA | X | $ - 0 | |
| A0238 | PVC Strainers | 10 | EA | X | $ - 0 | |
| A0239 | Metal Strainers | 10 | EA | X | $ - 0 | |
| A0240 | PVC Strainers | 10 | EA | X | $ - 0 | |
| Remove existing metal scupper lining and replace with new metal scupper lining | ||||||
| A0241 | Copper | 10 | EA | X | $ - 0 | |
| A0242 | Stainless Steel | 10 | EA | X | $ - 0 | |
| Remove existing metal conductor heads and replace with new metal conductor heads | ||||||
| A0243 | Copper | 10 | EA | X | $ - 0 | |
| A0244 | Stainless Steel | 10 | EA | X | $ - 0 | |
| Install new metal splash pans | ||||||
| A0245 | Copper | 10 | EA | X | $ - 0 | |
| A0246 | Stainless Steel | 10 | EA | X | $ - 0 | |
| Remove existing expansion joints and replace bituminous base flashing, metal counterflashing and metal joint cover | ||||||
| A0247 | Copper | 100 | SF | X | $ - 0 | |
| A0248 | Aluminum | 100 | SF | X | $ - 0 | |
| A0249 | Stainless Steel | 100 | SF | X | $ - 0 | |
| Vent Flashing | ||||||
| A0250 | Remove existing pipe vent flashing and replace with new lead pipe vent flashing | 10 | EA | X | $ - 0 | |
| A0251 | Remove existing metal vent collars and replace with new vent collars and accessories | 10 | EA | X | $ - 0 | |
| Caulking | ||||||
| A0252 | Install caulking | 110 | LF | X | $ - 0 | |
| A0253 | Remove existing caulking and replace with new sealant/caulking | 50 | LF | X | $ - 0 | |
| Reglet | ||||||
| A0254 | Cut new Reglet In masonry | 50 | LF | X | $ - 0 | |
| A0255 | Cut new Reglet In concrete | 50 | LF | X | $ - 0 | |
| Fascia Board | ||||||
| A0256 | Remove existing fascia and replace with new fascia board | 100 | BF | X | $ - 0 | |
| A0257 | Prime and paint fascia board | 100 | SF | X | $ - 0 | |
| A0258 | Cover existing fascia board with aluminum coil stock (various colors) | 100 | SF | X | $ - 0 | |
| A0259 | Reserved for MODs | 0 | X | $ - 0 | ||
| Asbestos Abatement | ||||||
| A0260 | Additional cost incurred for the removal and disposal of asbestos containing substances. Regular roofing only. | 200 | SF | X | $ - 0 | |
| A0261 | Additional cost incurred for the removal and disposal of asbestos containing substance. (Flashings, Pitch pockets, etc.) | 200 | SF | X | $ - 0 | |
| A0262 | Removal of lead based paint. 'Contractor removes loose paint from surface and disposes. | 200 | SF | X | $ - 0 | |
| Cleaning and Clearing | ||||||
| A0263 | Clean and clear gutters and dispose of all debris from site. | 500 | LF | X | $ - 0 | |
| A0264 | Clean and Clear down spouts and remove debris from site. | 250 | LF | X | $ - 0 | |
| A0265 | Clean and clear roof drains | 10 | EA | X | $ - 0 | |
| A0266 | Provide power washing. The Contractor shall Power Wash roof surfaces and clear drain baskets. (Does not include gutter or down spout cleaning.) | 5000 | SF | X | $ - 0 | |
| Additional Labor and Materials not accounted for in ELINs | ||||||
| A0267 | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Material costs shall BE NEGOTIATED BY KO. | LS | X | $ - 0 | ||
| A0268 | Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO. | 2000 | HRS | X | $ - 0 | |
| Service calls | ||||||
| A0269 | Perform Service calls at NSA-Mechanicsburg. The Contractor shall respond to service calls within 24 hours of service call request. The contractor shall make necessary repairs to roof or roof system. Service calls are limited to a combined labor and material cost not to exceed $2,500.00. (Used for leaks and other emergencies) | 20 | EA | X | $ - 0 | |
| Perform Roof Survey In accordance with Attachment-B | ||||||
| A0270 | Perform Roof Survey / Assessment Per SF | 500,000 | EA | X | $ - 0 | |
| Total Price for Mech BASE OPTION YEAR (IQ) (Sum of Exhibit Line Items A0137- A0270) | $ - 0 |
Total Combined Price for Mech and PHL BASE OPTION YEAR (IQ) (Sum of Exhibit Line Items A0001- A0270) $ - 0
Option Year 1
| Roofing Contract | ||||||
| Attachment J-0200000-05 | ||||||
| Exhibit Line Item Numbers | ||||||
| Option Year 1 | ||||||
| Solicitation/Contract No.: N40085-26-D-XXXX | ||||||
| Philadelphia Roofing Contract | ||||||
| ELIN Number | Supplies/Services | Est. Quantity | Unit | Unit Price | Total | |
| ROOF DECKS | ||||||
| B0001 | Remove existing metal roof decks (ALL OR PARTIAL) and replace with new steel roof decking, shall include all closures and accessories. | 3 | SQ | X | $ - 0 | $ - 0 |
| Remove existing wood roof deck and replace with new wood decking | ||||||
| B0002 | 1" nominal T & G (treated) | 40 | BF | X | $ - 0 | $ - 0 |
| B0003 | 2" nominal T & G (treated) | 40 | BF | X | $ - 0 | $ - 0 |
| B0004 | 3/4" plywood | 40 | SF | X | $ - 0 | $ - 0 |
| B0005 | 1/2" plywood | 25 | SF | X | $ - 0 | $ - 0 |
| ROOF INSULATION | ||||||
| Remove and replace rigid roof insulation in conjunction with roofing systems specified herein. Average 1”x12”x12” | ||||||
| B0006 | Remove and replace polyisocyanurate tapered insulation panels | 10 | BF | X | $ - 0 | $ - 0 |
| B0007 | Remove and replace tapered roof insulation | 10 | BF | X | $ - 0 | $ - 0 |
| B0008 | Remove and replace vapor barrier in conjunction with built up roofing system | 10 | SQ | X | $ - 0 | $ - 0 |
| B0009 | Remove and replace resin sized building paper (5 lb.) | 5 | SQ | X | $ - 0 | $ - 0 |
| B0010 | Remove existing cants and replace with new fiberboard cants 4 x 4 | 30 | LF | X | $ - 0 | $ - 0 |
| B0011 | Remove existing cants and replace with new treated wood cants 4 x 4 | 30 | LF | X | $ - 0 | $ - 0 |
| B0012 | Remove existing Nailers and replace with new treated 2" x 6" wood | 100 | BF | X | $ - 0 | $ - 0 |
| SHINGLED ROOF SYSTEMS | ||||||
| Remove existing composition shingles and replace with new composition shingles, shall include starter | ||||||
| B0013 | Twenty Five Year (3 tab ) | 10 | SQ | X | $ - 0 | $ - 0 |
| B0014 | Thirty Year (architectural) | 6 | SQ | X | $ - 0 | $ - 0 |
| B0015 | Forty Year (architectural) | 6 | SQ | X | $ - 0 | $ - 0 |
| B0016 | Remove and dispose of existing composition shingles (all types)(where new shingles are not going to be installed) | 6 | SQ | X | $ - 0 | $ - 0 |
| B0017 | Remove and dispose of existing slate shingles. | 6 | SQ | X | $ - 0 | $ - 0 |
| B0018 | Remove and re-install existing slate shingles (All or Partial) | 2 | SQ | X | $ - 0 | $ - 0 |
| B0019 | Install new slate shingles (Weathering green, Vermont)(All or Partial) | 3 | SQ | X | $ - 0 | $ - 0 |
| B0020 | Install new slate shingles (Buckingham)(All or Partial) | 3 | SQ | X | $ - 0 | $ - 0 |
| Remove existing preformed metal (All or Partial) roofing and replace with new preformed metal roofing | ||||||
| B0021 | Coated steel | 20 | SQ | X | $ - 0 | $ - 0 |
| B0022 | Coated aluminum | 20 | SQ | X | $ - 0 | $ - 0 |
| B0023 | Left Blank Intentionally | |||||
| Field paint roof mounted equipment | ||||||
| B0024 | Up to 25 SF X in surface area X | 12 | SF | X | $ - 0 | $ - 0 |
| B0025 | Over 25 SF X in surface area X | 12 | SF | X | $ - 0 | $ - 0 |
| BUILT UP ROOF | ||||||
| Remove existing roof system and replace with new aggregate surfaced BU roofing system | ||||||
| B0026 | System GAA (Gravel) | 6 | SQ | X | $ - 0 | $ - 0 |
| Remove existing roof system and replace with new smooth surfaced BU roofing system. | ||||||
| B0027 | System Gas | 6 | SQ | X | $ - 0 | $ - 0 |
| Remove existing roof system and replace with new single ply reinforced modified bitumen sheet roofing system | ||||||
| B0028 | Torch Applied | 6 | SQ | X | $ - 0 | $ - 0 |
| B0029 | Mop Applied | 6 | SQ | X | $ - 0 | $ - 0 |
| B0030 | Remove existing base flashing and replace with new 2 ply glass felt base flashing | 50 | SF | X | $ - 0 | $ - 0 |
| B0031 | Remove existing base flashing and replace with new 3-ply bituminous base flashing | 12 | SF | X | $ - 0 | $ - 0 |
| B0032 | Remove existing base flashing and replace with new single ply reinforced modified, bitumen sheet roofing flashing modified. | 12 | SF | X | $ - 0 | $ - 0 |
| B0033 | Remove and Dispose of Second layer | 10 | SQ | X | $ - 0 | $ - 0 |
| B0034 | (1) Walkway/Asphalt Planks | 100 | SF | X | $ - 0 | $ - 0 |
| ROOF AND PARAPET WALL DAMPROOFING | $ - 0 | |||||
| B0035 | Coat Existing BU Roof or Parapet Wall | 50 | SF | X | $ - 0 | $ - 0 |
| E.P.D.M. (RUBBER ROOF SYSTEM) (Install new E.P.D.M. Roof System over Existing Built-up Roof) | $ - 0 | |||||
| B0036 | Ballasted System | 10 | SQ | X | $ - 0 | $ - 0 |
| B0037 | Mechanically Fastened System | 10 | SQ | X | $ - 0 | $ - 0 |
| B0038 | Full Adhered System | 10 | SQ | X | $ - 0 | $ - 0 |
| Remove existing roof system and replace with new E.P.D.M. roof system | $ - 0 | |||||
| B0039 | Ballasted System | 10 | SQ | X | $ - 0 | $ - 0 |
| B0040 | Mechanically Fastened System | 10 | SQ | X | $ - 0 | $ - 0 |
| B0041 | Full Adhered System | 10 | SQ | X | $ - 0 | $ - 0 |
| B0042 | Install new E.P.D.M. Wall/Curb Flashings | 50 | SF | X | $ - 0 | $ - 0 |
| B0043 | Install Rubber Pipe Vents | 5 | EA | X | $ - 0 | $ - 0 |
| B0044 | Install Termination Bars. Shall include caulking | 12 | LF | X | $ - 0 | $ - 0 |
| B0045 | Install E.P.D.M Walk Pads | 5 | EA | X | $ - 0 | $ - 0 |
| Remove existing roof system and replace with new Thermoplastic alloy roof system (TPA) | $ - 0 | |||||
| B0046 | Mechanically Fastened | 5 | SQ | X | $ - 0 | $ - 0 |
| B0047 | Ballasted | 5 | SQ | X | $ - 0 | $ - 0 |
| B0048 | Install new TPA wall/curb flashing | 25 | SF | X | $ - 0 | $ - 0 |
| B0049 | Install new TPA pipe vent flashing | 5 | EA | X | $ - 0 | $ - 0 |
| Remove existing metal base flashing and replace with new metal base flashing | $ - 0 | |||||
| B0050 | Copper | 25 | SF | X | $ - 0 | $ - 0 |
| B0051 | Aluminum | 25 | SF | X | $ - 0 | $ - 0 |
| B0052 | Aluminum/various colors | 25 | SF | X | $ - 0 | $ - 0 |
| B0053 | Stainless Steel | 25 | SF | X | $ - 0 | $ - 0 |
| Remove existing and install new metal coping. Shall include caulking. | $ - 0 | |||||
| B0054 | Copper | 25 | SF | X | $ - 0 | $ - 0 |
| B0055 | Aluminum | 25 | SF | X | $ - 0 | $ - 0 |
| B0056 | Aluminum/various colors | 25 | SF | X | $ - 0 | $ - 0 |
| B0057 | Stainless Steel | 25 | SF | X | $ - 0 | $ - 0 |
| Remove metal drip edge and replace with new metal drip edge | $ - 0 | |||||
| B0058 | Copper | 6 | LF | X | $ - 0 | $ - 0 |
| B0059 | Aluminum | 6 | LF | X | $ - 0 | $ - 0 |
| B0060 | Aluminum/various colors | 6 | LF | X | $ - 0 | $ - 0 |
| B0061 | Stainless Steel | 6 | LF | X | $ - 0 | $ - 0 |
| METAL GUTTERS AND DOWNSPOUTS | $ - 0 | |||||
| Install Metal Gutters | $ - 0 | |||||
| B0062 | Copper/5" ogee | 100 | LF | X | $ - 0 | $ - 0 |
| B0063 | Copper/6" ogee | 100 | LF | X | $ - 0 | $ - 0 |
| B0064 | Copper/6" half round | 100 | LF | X | $ - 0 | $ - 0 |
| B0065 | Copper/6" box | 100 | LF | X | $ - 0 | $ - 0 |
| B0066 | Copper/8" box | 100 | LF | X | $ - 0 | $ - 0 |
| B0067 | Prefinished Alum/5" ogee | 100 | LF | X | $ - 0 | $ - 0 |
| B0068 | Prefinished Alum/6" ogee | 100 | LF | X | $ - 0 | $ - 0 |
| B0069 | Prefinished Alum/6" Box | 100 | LF | X | $ - 0 | $ - 0 |
| B0070 | Prefinished Alum/8" Box | 100 | LF | X | $ - 0 | $ - 0 |
| B0071 | Stainless steel/6" box | 100 | LF | X | $ - 0 | $ - 0 |
| B0072 | Stainless steel/8" box | 100 | LF | X | $ - 0 | $ - 0 |
| Install Metal Downspouts | $ - 0 | |||||
| B0073 | Copper 2" x 3" | 100 | LF | X | $ - 0 | $ - 0 |
| B0074 | Copper 3" x 4" | 100 | LF | X | $ - 0 | $ - 0 |
| B0075 | Copper/3" round | 100 | LF | X | $ - 0 | $ - 0 |
| B0076 | Copper/4" round | 100 | LF | X | $ - 0 | $ - 0 |
| B0077 | Copper/6" round | 100 | LF | X | $ - 0 | $ - 0 |
| B0078 | Prefinished alum 2" x 3" | 100 | LF | X | $ - 0 | $ - 0 |
| B0079 | Prefinished alum 3" x 4" | 100 | LF | X | $ - 0 | $ - 0 |
| B0080 | Stainless Steel 3" x 4" | 100 | LF | X | $ - 0 | $ - 0 |
| B0081 | Provide and place new concrete splash block | 5 | EA | X | $ - 0 | $ - 0 |
| (standard commercial size) | $ - 0 | |||||
| Gutters, Downspouts and Drains | $ - 0 | |||||
| B0082 | Remove and dispose of existing gutters and/or downspouts | 100 | LF | X | $ - 0 | $ - 0 |
| B0083 | Remove and reinstall existing gutters and/or downspouts. Reseal all joints | 100 | LF | X | $ - 0 | $ - 0 |
| B0084 | Realign and resecure existing gutters and/or downspouts (Replace hangers, fasteners and straps) as needed. Reseal all joints. | 200 | LF | X | $ - 0 | $ - 0 |
| B0085 | Resolder broken gutter joints | 3 | EA | X | $ - 0 | $ - 0 |
| B0086 | Reseal, broken gutter joints | 3 | EA | X | $ - 0 | $ - 0 |
| Remove existing metal open valley flashing and replace with new metal valley flashing | $ - 0 | |||||
| B0087 | Copper | 25 | SF | X | $ - 0 | $ - 0 |
| B0088 | Aluminum | 25 | SF | X | $ - 0 | $ - 0 |
| B0089 | Aluminum/various colors | 25 | SF | X | $ - 0 | $ - 0 |
| B0090 | Stainless Steel | 25 | SF | X | $ - 0 | $ - 0 |
| Remove existing metal flashing/miscellaneous | $ - 0 | |||||
| B0091 | Copper | 25 | SF | X | $ - 0 | $ - 0 |
| B0092 | Aluminum | 25 | SF | X | $ - 0 | $ - 0 |
| B0093 | Aluminum/various colors | 25 | SF | X | $ - 0 | $ - 0 |
| B0094 | Stainless Steel | 25 | SF | X | $ - 0 | $ - 0 |
| B0095 | Compatible w/EPDM & CPE | 25 | SF | X | $ - 0 | $ - 0 |
| Remove existing pitch pocket and 'replace with new | $ - 0 | |||||
| B0096 | Copper | 2 | SF | X | $ - 0 | $ - 0 |
| B0097 | Aluminum | 2 | SF | X | $ - 0 | $ - 0 |
| B0098 | Stainless steel | 2 | SF | X | $ - 0 | $ - 0 |
| Roof Drain Sumps | $ - 0 | |||||
| B099 | Provide and Install TPA EPDM roof drain Sumps | 1 | EA | X | $ - 0 | $ - 0 |
| B100 | TPA EPDM roof drain sumps (removal only) | 2 | EA | X | $ - 0 | $ - 0 |
| Strainers | $ - 0 | |||||
| B0101 | Metal Strainers | 10 | EA | X | $ - 0 | $ - 0 |
| B0102 | PVC Strainers | 10 | EA | X | $ - 0 | $ - 0 |
| B0103 | Metal Strainers | 10 | EA | X | $ - 0 | $ - 0 |
| B0104 | PVC Strainers | 10 | EA | X | $ - 0 | $ - 0 |
| Remove existing metal scupper lining and replace with new metal scupper lining | $ - 0 | |||||
| B0105 | Copper | 10 | EA | X | $ - 0 | $ - 0 |
| B0106 | Stainless Steel | 10 | EA | X | $ - 0 | $ - 0 |
| Remove existing metal conductor heads and replace with new metal conductor heads | $ - 0 | |||||
| B0107 | Copper | 10 | EA | X | $ - 0 | $ - 0 |
| B0108 | Stainless Steel | 10 | EA | X | $ - 0 | $ - 0 |
| Install new metal splash pans | $ - 0 | |||||
| B0109 | Copper | 10 | EA | X | $ - 0 | $ - 0 |
| B0110 | Stainless Steel | 10 | EA | X | $ - 0 | $ - 0 |
| Remove existing expansion joints and replace bituminous base flashing, metal counterflashing and metal joint cover | $ - 0 | |||||
| B0111 | Copper | 100 | SF | X | $ - 0 | $ - 0 |
| B0112 | Aluminum | 100 | SF | X | $ - 0 | $ - 0 |
| B0113 | Stainless Steel | 100 | SF | X | $ - 0 | $ - 0 |
| Vent Flashing | $ - 0 | |||||
| B0114 | Remove existing pipe vent flashing and replace with new lead pipe vent flashing | 10 | EA | X | $ - 0 | $ - 0 |
| B0115 | Remove existing metal vent collars and replace with new vent collars and accessories | 10 | EA | X | $ - 0 | $ - 0 |
| Caulking | $ - 0 | |||||
| B0116 | Install caulking | 110 | LF | X | $ - 0 | $ - 0 |
| B0117 | Remove existing caulking and replace with new sealant/caulking | 50 | LF | X | $ - 0 | $ - 0 |
| Reglet | $ - 0 | |||||
| B0118 | Cut new Reglet In masonry | 50 | LF | X | $ - 0 | $ - 0 |
| B0119 | Cut new Reglet In concrete | 50 | LF | X | $ - 0 | $ - 0 |
| Fascia Board | $ - 0 | |||||
| B0120 | Remove existing fascia and replace with new fascia board | 100 | BF | X | $ - 0 | $ - 0 |
| B0121 | Prime and paint fascia board | 100 | SF | X | $ - 0 | $ - 0 |
| B0122 | Cover existing fascia board with aluminum coil stock (various colors) | 100 | SF | X | $ - 0 | $ - 0 |
| B0123 | Reserved for MODs | 0 | X | $ - 0 | $ - 0 | |
| Asbestos Abatement | $ - 0 | |||||
| B0124 | Additional cost incurred for the removal and disposal of asbestos containing substances. Regular roofing only. | 200 | SF | X | $ - 0 | $ - 0 |
| B0125 | Additional cost incurred for the removal and disposal of asbestos containing substance. (Flashings, Pitch pockets, etc.) | 200 | SF | X | $ - 0 | $ - 0 |
| B0126 | Removal of lead based paint. 'Contractor removes loose paint from surface and disposes. | 200 | SF | X | $ - 0 | $ - 0 |
| Cleaning and Clearing | $ - 0 | |||||
| B0127 | Clean and clear gutters and dispose of all debris from site. | 500 | LF | X | $ - 0 | $ - 0 |
| B0128 | Clean and Clear down spouts and remove debris from site. | 250 | LF | X | $ - 0 | $ - 0 |
| B0129 | Clean and clear roof drains | 10 | EA | X | $ - 0 | $ - 0 |
| B0130 | Provide power washing. The Contractor shall Power Wash roof surfaces and clear drain baskets. (Does not include gutter or down spout cleaning.) | 5000 | SF | X | $ - 0 | $ - 0 |
| Additional Labor and Materials not accounted for in ELINs | $ - 0 | |||||
| B0131 | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Material costs shall BE NEGOTIATED BY KO. | LS | X | $ - 0 | $ - 0 | |
| B0132 | Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO. | 2000 | HRS | X | $ - 0 | $ - 0 |
| Service calls | $ - 0 | |||||
| B0133 | Perform Service calls at PNYA and NSA-P. The Contractor shall respond to service calls within 24 hours of service call request. The contractor shall make necessary repairs to roof or roof system. Service calls are limited to a combined labor and material cost not to exceed $2,500.00. (Used for leaks and other emergencies) | 20 | EA | X | $ - 0 | $ - 0 |
| Perform Roof Survey In accordance with Attachment-B | $ - 0 | |||||
| B0134 | Perform Roof Survey / Assessment Per SF | 500,000 | EA | X | $ - 0 | $ - 0 |
| NON-PREPRICED LABOR, MATERIAL and COMMAND INTEREST WORK | $ - 0 | |||||
| B0135 | Bldg. 1 NSAP Spring power washing, minor deficiency repairs, drain cleaning, and analysis report. 100,000 sq ft epoxy coated roofing system. (Ref Attachment E NWSS B1 NSAP.) | 1 | EV | X | $ - 0 | $ - 0 |
| B0136 | Bldg. 1 NSAP Fall drain cleaning, Roof analysis and minor repairs. 100,000 sq ft epoxy coated roofing system. (Ref Attachment E NWSS B1 NSAP.) | 1 | EV | X | $ - 0 | $ - 0 |
| Total Price for PHL OPTION YEAR 1 (IQ) (Sum of Exhibit Line Items B0001- B0136) | $ - 0 | |||||
| Mechanicsburg Roofing Contract | ||||||
| ELIN Number | Supplies/Services | Est. Quantity | Unit | Unit Price | Total | |
| ROOF DECKS | ||||||
| B0137 | Remove existing metal roof decks (ALL OR PARTIAL) and replace with new steel roof decking, shall include all closures and accessories. | 3 | SQ | X | $ - 0 | $ - 0 |
| Remove existing wood roof deck and replace with new wood decking | $ - 0 | |||||
| B0138 | 1" nominal T & G (treated) | 40 | BF | X | $ - 0 | $ - 0 |
| B0139 | 2" nominal T & G (treated) | 40 | BF | X | $ - 0 | $ - 0 |
| B0140 | 3/4" plywood | 40 | SF | X | $ - 0 | $ - 0 |
| B0141 | 1/2" plywood | 25 | SF | X | $ - 0 | $ - 0 |
| ROOF INSULATION | $ - 0 | |||||
| Remove and replace rigid roof insulation in conjunction with roofing systems specified herein. Average 1”x12”x12” | $ - 0 | |||||
| B0142 | Remove and replace polyisocyanurate tapered insulation panels | 10 | BF | X | $ - 0 | $ - 0 |
| B0143 | Remove and replace tapered roof insulation | 10 | BF | X | $ - 0 | $ - 0 |
| B0144 | Remove and replace vapor barrier in conjunction with built up roofing system | 10 | SQ | X | $ - 0 | $ - 0 |
| B0145 | Remove and replace resin sized building paper (5 lb.) | 5 | SQ | X | $ - 0 | $ - 0 |
| B0146 | Remove existing cants and replace with new fiberboard cants 4 x 4 | 30 | LF | X | $ - 0 | $ - 0 |
| B0147 | Remove existing cants and replace with new treated wood cants 4 x 4 | 30 | LF | X | $ - 0 | $ - 0 |
| B0148 | Remove existing Nailers and replace with new treated 2" x 6" wood | 100 | BF | X | $ - 0 | $ - 0 |
| SHINGLED ROOF SYSTEMS | $ - 0 | |||||
| Remove existing composition shingles and replace with new composition shingles, shall include starter | $ - 0 | |||||
| B0149 | Twenty Five Year (3 tab ) | 10 | SQ | X | $ - 0 | $ - 0 |
| B0150 | Thirty Year (architectural) | 6 | SQ | X | $ - 0 | $ - 0 |
| B0151 | Forty Year (architectural) | 6 | SQ | X | $ - 0 | $ - 0 |
| B0152 | Remove and dispose of existing composition shingles (all types)(where new shingles are not going to be installed) | 6 | SQ | X | $ - 0 | $ - 0 |
| B0153 | Remove and dispose of existing slate shingles. | 6 | SQ | X | $ - 0 | $ - 0 |
| B0154 | Remove and re-install existing slate shingles (All or Partial) | 2 | SQ | X | $ - 0 | $ - 0 |
| B0155 | Install new slate shingles (Weathering green, Vermont)(All or Partial) | 3 | SQ | X | $ - 0 | $ - 0 |
| B0156 | Install new slate shingles (Buckingham)(All or Partial) | 3 | SQ | X | $ - 0 | $ - 0 |
| Remove existing preformed metal (All or Partial) roofing and replace with new preformed metal roofing | $ - 0 | |||||
| B0157 | Coated steel | 20 | SQ | X | $ - 0 | $ - 0 |
| B0158 | Coated aluminum | 20 | SQ | X | $ - 0 | $ - 0 |
| B0159 | Left Blank Intentionally | |||||
| Field paint roof mounted equipment | $ - 0 | |||||
| B0160 | Up to 25 SF X in surface area X | 12 | SF | X | $ - 0 | $ - 0 |
| B0161 | Over 25 SF X in surface area X | 12 | SF | X | $ - 0 | $ - 0 |
| BUILT UP ROOF | $ - 0 | |||||
| Remove existing roof system and replace with new aggregate surfaced BU roofing system | $ - 0 | |||||
| B0162 | System GAA (Gravel) | 6 | SQ | X | $ - 0 | $ - 0 |
| Remove existing roof system and replace with new smooth surfaced BU roofing system. | $ - 0 | |||||
| B0163 | System Gas | 6 | SQ | X | $ - 0 | $ - 0 |
| Remove existing roof system and replace with new single ply reinforced modified bitumen sheet roofing system | $ - 0 | |||||
| B0164 | Torch Applied | 6 | SQ | X | $ - 0 | $ - 0 |
| B0165 | Mop Applied | 6 | SQ | X | $ - 0 | $ - 0 |
| B0166 | Remove existing base flashing and replace with new 2 ply glass felt base flashing | 50 | SF | X | $ - 0 | $ - 0 |
| B0167 | Remove existing base flashing and replace with new 3-ply bituminous base flashing | 12 | SF | X | $ - 0 | $ - 0 |
| B0168 | Remove existing base flashing and replace with new single ply reinforced modified, bitumen sheet roofing flashing modified. | 12 | SF | X | $ - 0 | $ - 0 |
| B0169 | Remove and Dispose of Second layer | 10 | SQ | X | $ - 0 | $ - 0 |
| B0170 | (1) Walkway/Asphalt Planks | 100 | SF | X | $ - 0 | $ - 0 |
| ROOF AND PARAPET WALL DAMPROOFING | $ - 0 | |||||
| B0171 | Coat Existing BU Roof or Parapet Wall | 50 | SF | X | $ - 0 | $ - 0 |
| E.P.D.M. (RUBBER ROOF SYSTEM) (Install new E.P.D.M. Roof System over Existing Built-up Roof) | $ - 0 | |||||
| B0172 | Ballasted System | 10 | SQ | X | $ - 0 | $ - 0 |
| B0173 | Mechanically Fastened System | 10 | SQ | X | $ - 0 | $ - 0 |
| B0174 | Full Adhered System | 10 | SQ | X | $ - 0 | $ - 0 |
| Remove existing roof system and replace with new E.P.D.M. roof system | $ - 0 | |||||
| B0175 | Ballasted System | 10 | SQ | X | $ - 0 | $ - 0 |
| B0176 | Mechanically Fastened System | 10 | SQ | X | $ - 0 | $ - 0 |
| B0177 | Full Adhered System | 10 | SQ | X | $ - 0 | $ - 0 |
| B0178 | Install new E.P.D.M. Wall/Curb Flashings | 50 | SF | X | $ - 0 | $ - 0 |
| B0179 | Install Rubber Pipe Vents | 5 | EA | X | $ - 0 | $ - 0 |
| B0180 | Install Termination Bars. Shall include caulking | 12 | LF | X | $ - 0 | $ - 0 |
| B0181 | Install E.P.D.M Walk Pads | 5 | EA | X | $ - 0 | $ - 0 |
| Remove existing roof system and replace with new Thermoplastic alloy roof system (TPA) | $ - 0 | |||||
| B0182 | Mechanically Fastened | 5 | SQ | X | $ - 0 | $ - 0 |
| B0183 | Ballasted | 5 | SQ | X | $ - 0 | $ - 0 |
| B0184 | Install new TPA wall/curb flashing | 25 | SF | X | $ - 0 | $ - 0 |
| B0185 | Install new TPA pipe vent flashing | 5 | EA | X | $ - 0 | $ - 0 |
| Remove existing metal base flashing and replace with new metal base flashing | $ - 0 | |||||
| B0186 | Copper | 25 | SF | X | $ - 0 | $ - 0 |
| B0187 | Aluminum | 25 | SF | X | $ - 0 | $ - 0 |
| B0188 | Aluminum/various colors | 25 | SF | X | $ - 0 | $ - 0 |
| B0189 | Stainless Steel | 25 | SF | X | $ - 0 | $ - 0 |
| Remove existing and install new metal coping. Shall include caulking. | $ - 0 | |||||
| B0190 | Copper | 25 | SF | X | $ - 0 | $ - 0 |
| B0191 | Aluminum | 25 | SF | X | $ - 0 | $ - 0 |
| B0192 | Aluminum/various colors | 25 | SF | X | $ - 0 | $ - 0 |
| B0193 | Stainless Steel | 25 | SF | X | $ - 0 | $ - 0 |
| Remove metal drip edge and replace with new metal drip edge | $ - 0 | |||||
| B0194 | Copper | 6 | LF | X | $ - 0 | $ - 0 |
| B0195 | Aluminum | 6 | LF | X | $ - 0 | $ - 0 |
| B0196 | Aluminum/various colors | 6 | LF | X | $ - 0 | $ - 0 |
| B0197 | Stainless Steel | 6 | LF | X | $ - 0 | $ - 0 |
| METAL GUTTERS AND DOWNSPOUTS | $ - 0 | |||||
| Install Metal Gutters | $ - 0 | |||||
| B0198 | Copper/5" ogee | 100 | LF | X | $ - 0 | $ - 0 |
| B0199 | Copper/6" ogee | 100 | LF | X | $ - 0 | $ - 0 |
| B0200 | Copper/6" half round | 100 | LF | X | $ - 0 | $ - 0 |
| B0201 | Copper/6" box | 100 | LF | X | $ - 0 | $ - 0 |
| B0202 | Copper/8" box | 100 | LF | X | $ - 0 | $ - 0 |
| B0203 | Prefinished Alum/5" ogee | 100 | LF | X | $ - 0 | $ - 0 |
| B0204 | Prefinished Alum/6" ogee | 100 | LF | X | $ - 0 | $ - 0 |
| B0205 | Prefinished Alum/6" Box | 100 | LF | X | $ - 0 | $ - 0 |
| B0206 | Prefinished Alum/8" Box | 100 | LF | X | $ - 0 | $ - 0 |
| B0207 | Stainless steel/6" box | 100 | LF | X | $ - 0 | $ - 0 |
| B0208 | Stainless steel/8" box | 100 | LF | X | $ - 0 | $ - 0 |
| Install Metal Downspouts | $ - 0 | |||||
| B0209 | Copper 2" x 3" | 100 | LF | X | $ - 0 | $ - 0 |
| B0210 | Copper 3" x 4" | 100 | LF | X | $ - 0 | $ - 0 |
| B0211 | Copper/3" round | 100 | LF | X | $ - 0 | $ - 0 |
| B0212 | Copper/4" round | 100 | LF | X | $ - 0 | $ - 0 |
| B0213 | Copper/6" round | 100 | LF | X | $ - 0 | $ - 0 |
| B0214 | Prefinished alum 2" x 3" | 100 | LF | X | $ - 0 | $ - 0 |
| B0215 | Prefinished alum 3" x 4" | 100 | LF | X | $ - 0 | $ - 0 |
| B0216 | Stainless Steel 3" x 4" | 100 | LF | X | $ - 0 | $ - 0 |
| B0217 | Provide and place new concrete splash block | 5 | EA | X | $ - 0 | $ - 0 |
| (standard commercial size) | $ - 0 | |||||
| Gutters, Downspouts and Drains | $ - 0 | |||||
| B0218 | Remove and dispose of existing gutters and/or downspouts | 100 | LF | X | $ - 0 | $ - 0 |
| B0219 | Remove and reinstall existing gutters and/or downspouts. Reseal all joints | 100 | LF | X | $ - 0 | $ - 0 |
| B0220 | Realign and resecure existing gutters and/or downspouts (Replace hangers, fasteners and straps) as needed. Reseal all joints. | 200 | LF | X | $ - 0 | $ - 0 |
| B0221 | Resolder broken gutter joints | 3 | EA | X | $ - 0 | $ - 0 |
| B0222 | Reseal, broken gutter joints | 3 | EA | X | $ - 0 | $ - 0 |
| Remove existing metal open valley flashing and replace with new metal valley flashing | $ - 0 | |||||
| B0223 | Copper | 25 | SF | X | $ - 0 | $ - 0 |
| B0224 | Aluminum | 25 | SF | X | $ - 0 | $ - 0 |
| B0225 | Aluminum/various colors | 25 | SF | X | $ - 0 | $ - 0 |
| B0226 | Stainless Steel | 25 | SF | X | $ - 0 | $ - 0 |
| Remove existing metal flashing/miscellaneous | $ - 0 | |||||
| B0227 | Copper | 25 | SF | X | $ - 0 | $ - 0 |
| B0228 | Aluminum | 25 | SF | X | $ - 0 | $ - 0 |
| B0229 | Aluminum/various colors | 25 | SF | X | $ - 0 | $ - 0 |
| B0230 | Stainless Steel | 25 | SF | X | $ - 0 | $ - 0 |
| B0231 | Compatible w/EPDM & CPE | 25 | SF | X | $ - 0 | $ - 0 |
| Remove existing pitch pocket and 'replace with new | $ - 0 | |||||
| B0232 | Copper | 2 | SF | X | $ - 0 | $ - 0 |
| B0233 | Aluminum | 2 | SF | X | $ - 0 | $ - 0 |
| B0234 | Stainless steel | 2 | SF | X | $ - 0 | $ - 0 |
| Roof Drain Sumps | $ - 0 | |||||
| B235 | Provide and Install TPA EPDM roof drain Sumps | 1 | EA | X | $ - 0 | $ - 0 |
| B0236 | TPA EPDM roof drain sumps (removal only) | 2 | EA | X | $ - 0 | $ - 0 |
| Strainers | $ - 0 | |||||
| B0237 | Metal Strainers | 10 | EA | X | $ - 0 | $ - 0 |
| B0238 | PVC Strainers | 10 | EA | X | $ - 0 | $ - 0 |
| B0239 | Metal Strainers | 10 | EA | X | $ - 0 | $ - 0 |
| B0240 | PVC Strainers | 10 | EA | X | $ - 0 | $ - 0 |
| Remove existing metal scupper lining and replace with new metal scupper lining | $ - 0 | |||||
| B0241 | Copper | 10 | EA | X | $ - 0 | $ - 0 |
| B0242 | Stainless Steel | 10 | EA | X | $ - 0 | $ - 0 |
| Remove existing metal conductor heads and replace with new metal conductor heads | $ - 0 | |||||
| B0243 | Copper | 10 | EA | X | $ - 0 | $ - 0 |
| B0244 | Stainless Steel | 10 | EA | X | $ - 0 | $ - 0 |
| Install new metal splash pans | $ - 0 | |||||
| B0245 | Copper | 10 | EA | X | $ - 0 | $ - 0 |
| B0246 | Stainless Steel | 10 | EA | X | $ - 0 | $ - 0 |
| Remove existing expansion joints and replace bituminous base flashing, metal counterflashing and metal joint cover | $ - 0 | |||||
| B0247 | Copper | 100 | SF | X | $ - 0 | $ - 0 |
| B0248 | Aluminum | 100 | SF | X | $ - 0 | $ - 0 |
| B0249 | Stainless Steel | 100 | SF | X | $ - 0 | $ - 0 |
| Vent Flashing | $ - 0 | |||||
| B0250 | Remove existing pipe vent flashing and replace with new lead pipe vent flashing | 10 | EA | X | $ - 0 | $ - 0 |
| B0251 | Remove existing metal vent collars and replace with new vent collars and accessories | 10 | EA | X | $ - 0 | $ - 0 |
| Caulking | $ - 0 | |||||
| B0252 | Install caulking | 110 | LF | X | $ - 0 | $ - 0 |
| B0253 | Remove existing caulking and replace with new sealant/caulking | 50 | LF | X | $ - 0 | $ - 0 |
| Reglet | $ - 0 | |||||
| B0254 | Cut new Reglet In masonry | 50 | LF | X | $ - 0 | $ - 0 |
| B0255 | Cut new Reglet In concrete | 50 | LF | X | $ - 0 | $ - 0 |
| Fascia Board | $ - 0 | |||||
| B0256 | Remove existing fascia and replace with new fascia board | 100 | BF | X | $ - 0 | $ - 0 |
| B0257 | Prime and paint fascia board | 100 | SF | X | $ - 0 | $ - 0 |
| B0258 | Cover existing fascia board with aluminum coil stock (various colors) | 100 | SF | X | $ - 0 | $ - 0 |
| B0259 | Reserved for MODs | 0 | X | $ - 0 | $ - 0 | |
| Asbestos Abatement | $ - 0 | |||||
| B0260 | Additional cost incurred for the removal and disposal of asbestos containing substances. Regular roofing only. | 200 | SF | X | $ - 0 | $ - 0 |
| B0261 | Additional cost incurred for the removal and disposal of asbestos containing substance. (Flashings, Pitch pockets, etc.) | 200 | SF | X | $ - 0 | $ - 0 |
| B0262 | Removal of lead based paint. 'Contractor removes loose paint from surface and disposes. | 200 | SF | X | $ - 0 | $ - 0 |
| Cleaning and Clearing | $ - 0 | |||||
| B0263 | Clean and clear gutters and dispose of all debris from site. | 500 | LF | X | $ - 0 | $ - 0 |
| B0264 | Clean and Clear down spouts and remove debris from site. | 250 | LF | X | $ - 0 | $ - 0 |
| B0265 | Clean and clear roof drains | 10 | EA | X | $ - 0 | $ - 0 |
| B0266 | Provide power washing. The Contractor shall Power Wash roof surfaces and clear drain baskets. (Does not include gutter or down spout cleaning.) | 5000 | SF | X | $ - 0 | $ - 0 |
| Additional Labor and Materials not accounted for in ELINs | $ - 0 | |||||
| B0267 | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Material costs shall BE NEGOTIATED BY KO. | LS | X | $ - 0 | $ - 0 | |
| B0268 | 1x | 2000 | HRS | X | $ - 0 | $ - 0 |
| Service calls | $ - 0 | |||||
| B0269 | Perform Service calls at NSA-Mechanicsburg. The Contractor shall respond to service calls within 24 hours of service call request. The contractor shall make necessary repairs to roof or roof system. Service calls are limited to a combined labor and material cost not to exceed $2,500.00. (Used for leaks and other emergencies) | 20 | EA | X | $ - 0 | $ - 0 |
| Perform Roof Survey In accordance with Attachment-B | $ - 0 | |||||
| B0270 | Perform Roof Survey / Assessment Per SF | 500,000 | EA | X | $ - 0 | $ - 0 |
| Total Price for Mech OPTION YEAR 1 (IQ) (Sum of Exhibit Line Items B0137- B0270) | $ - 0 |
Total Combined Price for Mech and PHL OPTION YEAR 1 (IQ) (Sum of Exhibit Line Items B0001- B0270) $ - 0
Option Year 2
| Roofing Contract | ||||||
| Attachment J-0200000-05 | ||||||
| Exhibit Line Item Numbers | ||||||
| Option Year 2 | ||||||
| Solicitation/Contract No.: N40085-26-D-XXXX | ||||||
| Philadelphia Roofing Contract | ||||||
| ELIN Number | Supplies/Services | Est. Quantity | Unit | Unit Price | Total | |
| ROOF DECKS | ||||||
| C0001 | Remove existing metal roof decks (ALL OR PARTIAL) and replace with new steel roof decking, shall include all closures and accessories. | 3 | SQ | X | $ - 0 | $ - 0 |
| Remove existing wood roof deck and replace with new wood decking | ||||||
| C0002 | 1" nominal T & G (treated) | 40 | BF | X | $ - 0 | $ - 0 |
| C0003 | 2" nominal T & G (treated) | 40 | BF | X | $ - 0 | $ - 0 |
| C0004 | 3/4" plywood | 40 | SF | X | $ - 0 | $ - 0 |
| C0005 | 1/2" plywood | 25 | SF | X | $ - 0 | $ - 0 |
| ROOF INSULATION | $ - 0 | |||||
| Remove and replace rigid roof insulation in conjunction with roofing systems specified herein. Average 1”x12”x12” | $ - 0 | |||||
| C0006 | Remove and replace polyisocyanurate tapered insulation panels | 10 | BF | X | $ - 0 | $ - 0 |
| C0007 | Remove and replace tapered roof insulation | 10 | BF | X | $ - 0 | $ - 0 |
| C0008 | Remove and replace vapor barrier in conjunction with built up roofing system | 10 | SQ | X | $ - 0 | $ - 0 |
| C0009 | Remove and replace resin sized building paper (5 lb.) | 5 | SQ | X | $ - 0 | $ - 0 |
| C0010 | Remove existing cants and replace with new fiberboard cants 4 x 4 | 30 | LF | X | $ - 0 | $ - 0 |
| C0011 | Remove existing cants and replace with new treated wood cants 4 x 4 | 30 | LF | X | $ - 0 | $ - 0 |
| C0012 | Remove existing Nailers and replace with new treated 2" x 6" wood | 100 | BF | X | $ - 0 | $ - 0 |
| SHINGLED ROOF SYSTEMS | $ - 0 | |||||
| Remove existing composition shingles and replace with new composition shingles, shall include starter | $ - 0 | |||||
| C0013 | Twenty Five Year (3 tab ) | 10 | SQ | X | $ - 0 | $ - 0 |
| C0014 | Thirty Year (architectural) | 6 | SQ | X | $ - 0 | $ - 0 |
| C0015 | Forty Year (architectural) | 6 | SQ | X | $ - 0 | $ - 0 |
| C0016 | Remove and dispose of existing composition shingles (all types)(where new shingles are not going to be installed) | 6 | SQ | X | $ - 0 | $ - 0 |
| C0017 | Remove and dispose of existing slate shingles. | 6 | SQ | X | $ - 0 | $ - 0 |
| C0018 | Remove and re-install existing slate shingles (All or Partial) | 2 | SQ | X | $ - 0 | $ - 0 |
| C0019 | Install new slate shingles (Weathering green, Vermont)(All or Partial) | 3 | SQ | X | $ - 0 | $ - 0 |
| C0020 | Install new slate shingles (Buckingham)(All or Partial) | 3 | SQ | X | $ - 0 | $ - 0 |
| Remove existing preformed metal (All or Partial) roofing and replace with new preformed metal roofing | $ - 0 | |||||
| C0021 | Coated steel | 20 | SQ | X | $ - 0 | $ - 0 |
| C0022 | Coated aluminum | 20 | SQ | X | $ - 0 | $ - 0 |
| C0023 | Left Blank Intentionally | |||||
| Field paint roof mounted equipment | $ - 0 | |||||
| C0024 | Up to 25 SF X in surface area X | 12 | SF | X | $ - 0 | $ - 0 |
| C0025 | Over 25 SF X in surface area X | 12 | SF | X | $ - 0 | $ - 0 |
| BUILT UP ROOF | $ - 0 | |||||
| Remove existing roof system and replace with new aggregate surfaced BU roofing system | $ - 0 | |||||
| C0026 | System GAA (Gravel) | 6 | SQ | X | $ - 0 | $ - 0 |
| Remove existing roof system and replace with new smooth surfaced BU roofing system. | $ - 0 | |||||
| C0027 | System Gas | 6 | SQ | X | $ - 0 | $ - 0 |
| Remove existing roof system and replace with new single ply reinforced modified bitumen sheet roofing system | $ - 0 | |||||
| C0028 | Torch Applied | 6 | SQ | X | $ - 0 | $ - 0 |
| C0029 | Mop Applied | 6 | SQ | X | $ - 0 | $ - 0 |
| C0030 | Remove existing base flashing and replace with new 2 ply glass felt base flashing | 50 | SF | X | $ - 0 | $ - 0 |
| C0031 | Remove existing base flashing and replace with new 3-ply bituminous base flashing | 12 | SF | X | $ - 0 | $ - 0 |
| C0032 | Remove existing base flashing and replace with new single ply reinforced modified, bitumen sheet roofing flashing modified. | 12 | SF | X | $ - 0 | $ - 0 |
| C0033 | Remove and Dispose of Second layer | 10 | SQ | X | $ - 0 | $ - 0 |
| C0034 | (1) Walkway/Asphalt Planks | 100 | SF | X | $ - 0 | $ - 0 |
| ROOF AND PARAPET WALL DAMPROOFING | $ - 0 | |||||
| C0035 | Coat Existing BU Roof or Parapet Wall | 50 | SF | X | $ - 0 | $ - 0 |
| E.P.D.M. (RUBBER ROOF SYSTEM) (Install new E.P.D.M. Roof System over Existing Built-up Roof) | $ - 0 | |||||
| C0036 | Ballasted System | 10 | SQ | X | $ - 0 | $ - 0 |
| C0037 | Mechanically Fastened System | 10 | SQ | X | $ - 0 | $ - 0 |
| C0038 | Full Adhered System | 10 | SQ | X | $ - 0 | $ - 0 |
| Remove existing roof system and replace with new E.P.D.M. roof system | $ - 0 | |||||
| C0039 | Ballasted System | 10 | SQ | X | $ - 0 | $ - 0 |
| C0040 | Mechanically Fastened System | 10 | SQ | X | $ - 0 | $ - 0 |
| C0041 | Full Adhered System | 10 | SQ | X | $ - 0 | $ - 0 |
| C0042 | Install new E.P.D.M. Wall/Curb Flashings | 50 | SF | X | $ - 0 | $ - 0 |
| C0043 | Install Rubber Pipe Vents | 5 | EA | X | $ - 0 | $ - 0 |
| C0044 | Install Termination Bars. Shall include caulking | 12 | LF | X | $ - 0 | $ - 0 |
| C0045 | Install E.P.D.M Walk Pads | 5 | EA | X | $ - 0 | $ - 0 |
| Remove existing roof system and replace with new Thermoplastic alloy roof system (TPA) | $ - 0 | |||||
| C0046 | Mechanically Fastened | 5 | SQ | X | $ - 0 | $ - 0 |
| C0047 | Ballasted | 5 | SQ | X | $ - 0 | $ - 0 |
| C0048 | Install new TPA wall/curb flashing | 25 | SF | X | $ - 0 | $ - 0 |
| C0049 | Install new TPA pipe vent flashing | 5 | EA | X | $ - 0 | $ - 0 |
| Remove existing metal base flashing and replace with new metal base flashing | $ - 0 | |||||
| C0050 | Copper | 25 | SF | X | $ - 0 | $ - 0 |
| C0051 | Aluminum | 25 | SF | X | $ - 0 | $ - 0 |
| C0052 | Aluminum/various colors | 25 | SF | X | $ - 0 | $ - 0 |
| C0053 | Stainless Steel | 25 | SF | X | $ - 0 | $ - 0 |
| Remove existing and install new metal coping. Shall include caulking. | $ - 0 | |||||
| C0054 | Copper | 25 | SF | X | $ - 0 | $ - 0 |
| C0055 | Aluminum | 25 | SF | X | $ - 0 | $ - 0 |
| C0056 | Aluminum/various colors | 25 | SF | X | $ - 0 | $ - 0 |
| C0057 | Stainless Steel | 25 | SF | X | $ - 0 | $ - 0 |
| Remove metal drip edge and replace with new metal drip edge | $ - 0 | |||||
| C0058 | Copper | 6 | LF | X | $ - 0 | $ - 0 |
| C0059 | Aluminum | 6 | LF | X | $ - 0 | $ - 0 |
| C0060 | Aluminum/various colors | 6 | LF | X | $ - 0 | $ - 0 |
| C0061 | Stainless Steel | 6 | LF | X | $ - 0 | $ - 0 |
| METAL GUTTERS AND DOWNSPOUTS | $ - 0 | |||||
| Install Metal Gutters | $ - 0 | |||||
| C0062 | Copper/5" ogee | 100 | LF | X | $ - 0 | $ - 0 |
| C0063 | Copper/6" ogee | 100 | LF | X | $ - 0 | $ - 0 |
| C0064 | Copper/6" half round | 100 | LF | X | $ - 0 | $ - 0 |
| C0065 | Copper/6" box | 100 | LF | X | $ - 0 | $ - 0 |
| C0066 | Copper/8" box | 100 | LF | X | $ - 0 | $ - 0 |
| C0067 | Prefinished Alum/5" ogee | 100 | LF | X | $ - 0 | $ - 0 |
| C0068 | Prefinished Alum/6" ogee | 100 | LF | X | $ - 0 | $ - 0 |
| C0069 | Prefinished Alum/6" Box | 100 | LF | X | $ - 0 | $ - 0 |
| C0070 | Prefinished Alum/8" Box | 100 | LF | X | $ - 0 | $ - 0 |
| C0071 | Stainless steel/6" box | 100 | LF | X | $ - 0 | $ - 0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .