This document is a Pre-Proposal Inquiry Responses summary addressing contractor questions regarding a federal roofing IDIQ (Indefinite Delivery/Indefinite Quantity) contract solicitation. The incumbent contractor is Ark Construction Management. The solicitation involves roofing services with multiple line items (ELINs) covering various roofing systems and related work.
Key clarifications provided by the government address scope of work and pricing for specific roofing systems. Cover boards are included in base option costs for polyisocyanurate insulation (ELINs A0006-A0007), though A0007 specifically covers material other than polyisocyanurate. For EPDM rubber roof system overlays (ELINs A0036-A0038), cover boards are included and a one-year warranty is assumed. The membrane removal and installation costs do not include separate line items for flashing, coping, pipes, walk pads, or insulation removal; contractors should use multiple line items in conjunction to obtain full pricing. Power washing (ELIN A0104) will be measured in square feet rather than linear feet per Amendment 0007. Disposal costs are to be included in equipment and material pricing. Several ELINs were removed or revised via Amendment 0007, including the aluminum slate shingles coating item (A0023) and clarifications on thermoplastic alloy (TPA) roofing specifications. Three pending responses remain regarding EM385 training hour requirements, tapered insulation thickness assumptions, and whether ELINs A0006 and A0007 are intended for different applications. Labor and material line items (A0131-A0132) are intended for work not covered under specific ELINs. Contractors must reference EM385 standards and state/local building codes for means and methods on multiple items. Past performance requirements will not be evaluated as part of sealed bid evaluation but will inform responsibility determination if the bidder is the apparent low bidder.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. PRE-PROPOSAL INQUIRY RESPONSES:
Question
Reference Question Government Response
Page Section Paragraph
Attachment
B
Base
Option
A006-
A007
Are cover boards- HD iso/ Densdeck included in this cost- or if they are apart of the system an additional SQ amount can be added to the total?
Included in the cost.
Attachment
B
Base
Option A0023
Coat roofing with aluminum pigmented slate shingles (All or
Partial) slate shingles (All or Partial) fibered bitumen roof coating- What does it mean by coating roofing with aluminum slate shingles? Is this a typo and the line item is for coating aluminum slate and slate shingles with fibered coating?
Removed from ELINS. See revised ELINs provided via
Amendment 0007.
Attachment
B
Base
Option
A0046-
Remove existing roof system and replace with new Thermoplastic alloy roof system (TPA) - There are no specs in the IDIQ specifications book for TPA- there is for PVC, can this line item be changed to PVC and if not can a TPA section be added - and basis of design manufacturer?
See UFGS 07 54 23 TPA Spec revision provided with
Amendment 0007.
Attachment
B
Base
Option
A0036-
A0038
E.P.D.M. (RUBBER ROOF
SYSTEM) (Install new E.P.D.M. Roof
System over Existing Built-up Roof)-
Is this for an overlay system? If so does this price include a cover board?
Yes. Included.
Attachment
B
Base
Option
A0036-
A0038
E.P.D.M. (RUBBER ROOF
SYSTEM) (Install new E.P.D.M. Roof
System over Existing Built-up Roof)-
What is the mil to be assumed?
Contractors means and methods should adhere to the
EM385 state and local bldg.
codes
Attachment
B
Base
Option
A0036-
A0038
E.P.D.M. (RUBBER ROOF
SYSTEM) (Install new E.P.D.M. Roof
System over Existing Built-up Roof)-
What is the warranty to be assumed?
1 year
Attachment
B
Base
Option
A0028-
Remove existing roof system and replace with new single ply reinforced modified bitumen sheet roofing system- Can you provide a basis of design for this system?
Contractors means and methods should adhere to the
EM385 state and local bldg.
codes
B
Base
Option
A0028-
Remove existing roof system and replace with new single ply reinforced modified bitumen sheet roofing system- Please let me know if our interpretation is correct- These line items do not include wall flashing, coping, pipes, walk pads, insulation
Confirmed.
removal and install, etc. and is the cost to remove the membrane system and to install the new membrane system-this would be used in conjunction with other line items to get full price?
Att. B -
Roofing
IDIQ
ELINs
ELIN
A0027 System Gas
Please provide additional detail on the scope of work required
Contractors means and methods should adhere to the
EM385 state and local bldg.
codes
Att. B -
Roofing
IDIQ
ELINs
ELIN
A0104
Power washing
The "unit" calls for LF. Should this be measured and priced in SF vs. LF?
Confirmed. Will be measured in SF. See revised ELINs provided via Amendment
0007 as ELIN(s) A0130 and
A0266.
Att. B -
Roofing
IDIQ
ELINs
ELIN
A0131
Unit Priced
Labor
Please provide additional clarification for this CLIN. Is this to only represent the hourly rate for Overhead when labor is paid at a fixed rate (Unit
Priced Labr) and direct materials are negotiated per specific work order?
See revised ELINs provided via Amendment 0007.
Att. B -
Roofing
IDIQ
ELINs
ELIN
A0132
Labor
Category
Please provide additional clarification as to which labor category from the prevailing wage category this CLIN should be quoted. Projects typically have multiple applicable prevailing wages (roofer, equipment operator, general laborer...). Each project has a blended rate depending on the specific work required. In order to fairly assess, a specific prevailing wage category should be used for comparison purpose.
See revised ELINs provided via Amendment 0007.
Att. B -
Roofing
IDIQ
ELINs
ELIN
Perform
Service
Call
Please clarify. Service calls have a material and labor cap of $2,500. Is this CLIN to include the $2,500 cap or only capture the cost to dispatch a crew for a service call.
This ELIN is to have someone come out to assess an emergency.
"B" ELINS
RFP AO132
A0132 states to provide labor cost to perform all unit cost work. Will this per hour cost be assigned to all work that is performed. Then applied to the amount of hours it takes to do the work.
PENDING RESPONSE
Attachment
"B" ELINS
RFP A0006
What should we use for the average thickness of tapered insulation or should this be changed to brdft. Price.
Tapered insulation is priced based off the thickness of the insulation. A brdft foot is define as 1”x12”x12”.
PENDING RESPONSE
"B" ELINS
RFP
Various
ELINS
Should there be a line item for disposal under non-pre-priced labor, material or should that be carried in the unit cost.
Yes, disposal will be included in equipment and material
"B" ELINS
RFP
Various
ELINS
Will there be line items added for
Safety, mobilization, and travel time.
Labor and material ELINS
Please provide the incumbent roofing contractors, company name, POC information (Name, email, Phone).
Ark Construction
Management is the incumbent.
Please provide the incumbent roofing contractors, company name, POC information (Name, email, Phone).
See response to PPI#52.
56 8
Section
00 21 13
Instructio ns to
Bidders
Responsibil ity
Determinat ion
Informatio n
It is requested that prior contracts for similar work of similar magnitude and
POC information for the issuing organizations be provided for reference, how many past performances are required/preferred?
Is there a time period of how recent the contracts should be? Using what criteria will these contracts be evaluated to determine firm's responsibility?
There is no minimum, maximum or time period for prior contracts and there are is no evaluation criteria. As stated under the
Responsibility
Determination Information and on page 8 of the IFB;
“Although required to be submitted with the bid package, this information will not be evaluated as part of the sealed bid evaluation. This information forms the basis of your firm's responsibility determination should your firm be the apparent low bidder."
57 8
Section
00 21 13
Instructio ns to
Bidders
Responsibil ity
Determinat ion
Informatio n
Please clarify how you would like us to provide a schedule for performing required services. Should the schedule assume the utilization of every ELIN service? How will this schedule be evaluated to determine responsibility?
Responsibility Determination revised to remove "including a schedule". See Amendment
0007 for revisions.
60 5 1000
Please confirm the CLIN price includes all other requirements other than the ELIN price. (i.e., overhead, bonding, QC, PM, etc.)
This was revised and no longer included in the ELIN attachment. See revised
ELINS with Amendment
0007.
64 10 01-35-26 1.8.2
If EM 385 Training is required-is the
40, 24 or 16 hour training needed for qualification?
PENDING RESPONSE
65 5 01-35-26 Is Type 2 PPE hard hats required? Reference the EM385.
66 5 01-35-26 What clearances are required for site access? TWIC? FBI? 5512?
See Attachment General
Specification posted with
Amendment 0005.
67 1 Attachm ent B
Please confirm both ELIN Lines
A0006 and A0007 is the same scope of work? If not, please provide the clarification.
A007 is for material other than polyisocyanurate.
68 1
ELIN 0008 Please specify what type of vapor barrier.
The Navy follows the em385 and all city and state regulations and codes.
69 1
ELIN 0023 Please specify clarification on work- coating of slate shingles?
Removed from ELINS. See revised ELINs provided via
Amendment 0007.
70 1
ELIN 0026,27,28,29- Please advise on manufacturing requirements.
The Navy follows the EM385 and all city and state regulations and codes.
71 1
ELIN A0100 Please clarify the details of roof drain cleaning (i.e. only roof level)?
Roof drain cleaning consists of rooftop baskets and main vertical drain. Does not include bldg. drains
There are modified bitumen line items in the ELINs but no specifications in
Attachment A.
Modified bitumen line items are located in the
Specifications.
For line item A0131, what type of work is meant to be addressed? Is this to be priced for evaluation?
This line item is used for materials and equipment not covered under other specific
ELINs. An example would be renting a high reach
For line item A0132, what type of work is expected for the unit labor work? Is this to be priced for evaluation?
This line item is used for
Labor not covered under other specific ELINs. An example would be an equipment operator or additional labor needed for traffic...
Line items A0006 and A0007 are both tapered insulations. Is one of them meant to be for field/flat boards?
PENDING RESPONSE
ATTACHMENTS:
1. Amendment 0007 – UFGS 07 54 23 TPA
2. Amendment 0007 – Attachment E – NWSS B1NSAP
3. Amendment 0007 – Attachment ELINS – ELINS Roofing IDIQ Revised
(End Summary of Changes)
File details come from the government source that posted it. Updated .