Attachment C NSWC PNYA Roofs.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- N4008526B0006
About this file
This Excel file is a detailed roof and gutter cleaning specification document for multiple buildings across naval facilities in Pennsylvania. The document outlines comprehensive cleaning and inspection requirements for various roof types across different building locations, including corrugated aluminum, asphalt built-up, standing seam painted aluminum, and modified bitumen roofs. Cleaning is mandated six times annually during specific months (February, April, June, September, October, November), with monthly inspections required regardless of cleaning schedule, and provisions for two additional as-needed cleanings.
The specification provides extensive technical details for each roof, including approximate square footage, roof pitch, construction date, manufacturer warranty information, and specific roof access methods. Each roof entry includes unique characteristics such as roof type, access method (external ladder, high reach, internal stairs), and warranty details. Cleaning requirements are precise, mandating removal of all debris from roof drains, surfaces, gutters, and downspouts, with contractors required to submit inspection reports within 7 calendar days and provide written repair estimates when needed. This document appears to be part of a larger Naval Facilities Engineering Command maintenance contract for roof management at Philadelphia Naval Business Center and other naval support facilities.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Roofs
Table 1. Roof / Gutter / Drain cleaning shall be conducted six times a year (cleanings to be done during the months of February, April, June, September, October, November, with the option to do 2 additional cleanings on an as-needed basis) with inspections conducted every month whether cleaning occurred or not. A report must be submitted following cleaning and or inspection each month.
| Building | Roof-type | Approx. SF | Pitch | Parapet | Date of Roof Construction | Warranty - Manufacturer | Roof Access (See Note 2) | Notes |
| 29 (Roof A) | Corrugated Alum. | 18,602 | 7/12 | Approx. 1980 | Coating - MuleHide (Kalimex 2007) | High reach / ladder | ||
| 29 (Roof B-E) | Asphalt Built-up | 8,686 | Flat | Yes | 2006 - MidAtlantic | Ext. stairway | ||
| 29 (Roof F-H) | Asphalt Built-up | 1,726 | Flat | Yes | 2006 - MidAtlantic | Ext. stairway | ||
| 4 (Roofs A-I, K) | Standing seam painted alum. | 33,816 | 2/12 - 5/12 | Approx. 1985 | High reach / ladder | |||
| 4 (J & L) | Standing seam painted alum. | 14,562 | 5/12 | 2009 | American Alliance/Merchant & Evans | High reach / ladder | ||
| 4 (Roofs M,O,Q) | Mod. bit., 3-ply Built-up, w/ cap | 1,600 | Flat | No | 2004 - Eagle Roofing | Tremco 20-year warranty (2004) | Int. Stairs / elevator | |
| 4 (Roofs N,R,P) | 4 ply modified with cap | 14,000 | Flat | No | 2007 - R.L. Campbell | Tremco 5-year TPW (2004) | Int. Stairs / elevator | |
| 633 (Roof A & B) | Modified Bitumen | 12,900 | Flat | Yes | 2011 Brown and Guarino | GAF 20 Year (2031) | Penthouse/Ext Ladder | |
| 633 (Roof C) | Asphalt Built-up w/insul. | 35,784 | Flat | Yes | 1997 | Tremco 5-year warranty (2001) | Int. Stairs / Ladder | |
| 633 (Roof D1 & D2) | Smooth-surface Asphalt Built-up | 13,040 | Flat | Partial | 1997 | Tremco 5-year warranty (2001) | Int. Stairs / Ladder | |
| 633 (Roof E) | Smooth-surface Asphalt Built-up | 17,990 | Flat | Yes | Approx. 1985 | Int. Stairs / Ladder | ||
| 633 (Roof F) | 4-ply Asphalt BUR w/ syn cap sheet | 34,536 | Flat | Yes | 2007 | Kalimex | Int. Stairs / Ladder | |
| 670 | TPO 60 mil | 8,400 | Flat | Partial | 2011 Johnson/Pro Com | Johnson Roofing | Ext Ladder | |
| 745 (Roofs A-C) | 4-ply Asphalt Built-up - smooth | 4,177 | Approx. 2000 | Ext. ladder | ||||
| 756 (Roofs A-C) | 4-ply Asphalt BUR & corrugated | 11,231 | 2007 - Benaka | Ext. Ladder | ||||
| 77H (Roofs A&E) | Mod. bit., 3-ply Built-up, w/ cap | 70,000 | Flat | Partial | 2004 - Eagle Roofing | Tremco 20-year warranty (2004) | Int. / Ext. Ladders | |
| 77H (Roofs B,C,D) | Standing seam painted alum. | 72,930 | 7/12 | No | 2009 | Kalimex/Merchant & Evans | Int. / Ext. Ladders | |
| 77H (Roof F) | 0.060 EPDM - fully adhered | 2,880 | Flat | No | 1987 | Int. / Ext. Ladders | ||
| 77H East Locker Room | TPO 60 mil | 2,000 | Flat | Partial | 2011 Johnson/Pro Com | Johnson Roofing | Ladder/High Reach | |
| 77L (High roofs) | EPDM - 0.090 mil (over SPUF) | 94,000 | Flat | Yes | 2005 MidAtlantic | 2001 Company Inc. 20-year | Ext. Ladder | |
| 77L (Low roofs) | Mod. bit., 3-ply Built-up, w/ cap | 48,000 | Flat | No | 2003 Boro Const. | Johns Manville 20-year | Ext. Ladder | Interior Roofs are bounded by walls |
| 87 (Roofs A-I) | Standing seam painted alum. Mod Bit Valleys | 106,150 | Yes | 2007 Benaka | Ext. Ladder | |||
| 87 (Roof J) | 0.060 EDPM - fully adhered | 6,900 | Flat | Approx. 2001 | Ext. Ladder | |||
| 666 | Asphalt Built-up w/insul. | 2,000 | Flat | Yes | ||||
| 770 | Flat | Yes | ||||||
| 771 | TPO 60 mil | 3,400 | Flat | No | 2011 Johnson/Pro Com | Johnson Roofing | Ext. ladder | |
| 776 | 0.060 EPDM | 2,268 | Flat | Approx. 1998 | Ext. ladder | |||
| 779 | ||||||||
| 1000 (Roof H&J) | Smooth-surface Asphalt Built-up | 484 | Flat | No | 2012 Persaud/Belcher | Johns-Manville | Int. Stairs / elevator | |
| 1000 (Roof I) | 4-ply Asphalt Built-up w/insul. | 3,800 | Flat | No | 2012 Persaud/Belcher | Johns-Manville | Int. Stairs / elevator | |
| 1000 (Roofs A-G) | 4-ply Asphalt Built-up w/insul. | 100,126 | Flat | No | 2012 Persaud/Belcher | Johns-Manville | Int. Stairs / elevator | |
| 519/520 (Roofs A) | 0.060 EPDM | 17,635 | Flat | No | Approx. 2002 | Ext. ladder | ||
| 519/520( B-H; L-O) | Asphalt Built-up w/insul. | UNK | Flat | No | Approx. 2002 | Ext. ladder | ||
| 542 (Roofs A-C) | 4-ply Asphalt Built-up w/insul. | 107,730 | Flat | No | Approx. 2000 | Tremco 20-year warranty (2004) | Ext. ladder |
| Notes: |
| 1. Deleted |
| 2. If "Ladder" or "High reach / ladder" is noted, then contractor must provide a means of access during cleaning & inspection. |
| 3. Inspection shall consist of visual examination of roof and drainage system for damage or excessive wear. Inspection report shall be submitted to |
| the Government within 7 calendar days of completion of each inspection. Contractor shall submit a written estimate for any repairs needed. |
4. Cleaning shall include removal of all debris (leaves, silt, litter and other foreign matter) from roof drains, roof surface, gutters and downspouts. Contractor shall ensure that all downspouts are clear of debris and can drain properly.
Attachment 1 PNBC Gutter and Drain Cleaning
Page &P of &N
File details come from the government source that posted it. Updated .