Updated Attachment C - Experience Project Data Sheet.pdf
PDF 252 KB Posted
- Solicitation number
- N4008525R2638
About this file
This is a Construction & Design Experience Project Data Sheet template (Attachment C) for the Design-Build, P1678 NATO JFCNF Phase II contract (N40085-25-R-2638) with the National Security Agency in Hampton Roads, Virginia. The form serves as an appendix for documenting offeror qualifications and experience on relevant projects.
The template requests comprehensive project information across five potential construction projects, five modifications, and five design projects. For each project submission, offerors must provide firm identification details (name, address, UEI number, CAGE code, point of contact), work role specification (prime contractor, subcontractor, or joint venture), contract/delivery order numbers, award and completion dates, and work type classifications (new construction, renovation, repair, alteration). Section 6 requires identification of contract type (firm-fixed price, cost/time and material, or other arrangements). Sections 7 and 8 differentiate between construction and design projects, with construction projects requiring award amount, final price, and delivery method (design-build, design-bid-build, or IDIQ task orders), while design projects require A/E design fees, total construction value, and service type (design-build RFP development, full plans and specifications, engineering services, or designer of record). Sections 9 and 10 require detailed narrative descriptions of project scope, relevance to RFP requirements, unique features, square footage, construction methods, and specific work self-performed by the firm. This template is used to evaluate contractor experience and capability for the stated federal contract opportunity.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Design-Build, P1678 NATO JFCNF Phase II N40085-25-R-2638 NSA, Hampton Roads, Virginia
ATTACHMENT C
CONSTRUCTION & DESIGN EXPERIENCE PROJECT DATA SHEET
Project No. (check one) : CON #1 CON #2 CON #3 CON #4 CON #5
MOD #1 MOD #2 MOD #3 MOD #4 MOD #5
DESIGN #1 DESIGN #2 DESIGN #3 DESIGN #4 DESIGN #5
1. Experience for: Offeror Joint-Venture Other (Explain)
Firm Name:
Address:
Phone Number:
UEI Number:
Cage Code:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:
If subcontractor, who was prime (Name/Phone #):
3. Contract Number: Delivery/Task Order Number:
Title:
Location:
4. Award Date (mm/dd/yy): Construction Completion Date (mm/dd/yy):
Design Completion Date (mm/dd/yy):
Note: If the final date is not achieved, provide % complete under design or construction completion date.
5. Type of work:
New Construction Renovation Repair Alteration Other (explain):
6. Type of Contract/Task Order: (Check ALL that apply)
Firm-Fixed Price Cost/Time and Material Other (explain):
Complete Block 7 for General Construction AND Modular Projects. Complete Block 8 for Design Projects.
7. Construction Project:
Award Amount: Final Price:
Type of Contract/Task Order: (Check ALL that apply)
Design-Build Design-Bid-Build Delivery/Task Order (IDIQ) Other (explain):
If Design-Build, identify the Lead Design Firm:______________________________________________
Design-Build, P1678 NATO JFCNF Phase II N40085-25-R-2638 NSA, Hampton Roads, Virginia
8. Design Project:
A/E Design Fee: Total Construction Value:
Type of Contract/Task Order: (Check ALL that apply)
Design-Build RFP Development Full Plans & Specs Engineering Services Designer of Record Other (explain):
9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods). If design-build, include a description of the design effort.
10. Provide a detailed description of what work your firm self-performed on this project:
11. Other Information:
File details come from the government source that posted it. Updated .