This is Amendment 0007 to Solicitation N4008525R2638, a design-build contract for the NATO Joint Forces Command Norfolk (JFCN) Phase II Interim Modular Facility at Naval Station Norfolk, Virginia. The amendment, issued on 25 June 2026 by NAVFACSYSCOM Mid-Atlantic, extends the proposal submission deadline from 07 July 2026 to 21 July 2026 at 2:00 P.M. EDT. The amendment also incorporates responses to pre-proposal inquiries (PPIs) related to various technical and design requirements. Key clarifications include confirmation that a secondary power source is required for fire pump per NFPA 20; that classified NATO documents will be provided to the contractor after award; that all housing units will be vacant before turnover to the contractor for demolition; that SHPO consultation with the Virginia Department of Historic Resources has been completed with a finding of "no adverse effect" for the 75-foot building heights; that contractors may propose alternative floor-to-floor heights if all UFC and room requirements are met; and that hazardous materials inspections must be conducted on specified buildings prior to demolition, with assumptions provided for bidding purposes on buildings without existing reports.
Additional PPI responses address design flexibility regarding modular construction constraints, finishing floor elevation requirements, the elimination of a loading dock requirement, confirmation that a dumpster pad is required, restriction of non-U.S. citizens from site access during field work, clarification that CAD drawings may be provided after award, and confirmation that additional base installation guide requirements do not apply beyond those specified in the RFP. Bidders are instructed to bid per the RFP specifications unless otherwise clarified, and all correspondence regarding the solicitation shall be directed via email to Kristy Gerrek at NAVFACSYSCOM Mid-Atlantic. The amendment notes that no additional PPIs will be accepted following the initial cutoff date of 27 June 2026.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Block 14 (Description of Amendment/Modification): SOLICITATION NO: N4008525R2638, DESIGN-BUILD P1678 NATO JFCNF PHASE II
INTERIM MODULAR FACILITY, NSA NORFOLK, VA
SEE SF 30 BLOCK 14 CONTINUATION PAGE.
ALL CORRESPONDENCE REGARDING THIS SOLICITATION SHALL BE DIRECTED VIA EMAIL TO KRISTY GERREK AT KRISTY.L.
GERREK.CIV@US.NAVY.MIL.
This amendment is issued to incorporate the following:
1. Extend the proposal due date from 07 JULY 2026 TO 21 JULY 2026 NLT 2:00 P.M. EDT.
2. Provide PPI Responses (Enclosed)
Section 00 00 00 - Procurement and Contracting Requirements
The following changes have been made:
INFORMATION FROM TO
Response Due Date 07 Jul 2026 21 Jul 2026
Section 00 73 00 - Supplementary Conditions
The following attachments were added:
NATO P1678 Amendment 0007 Continuation Page
N4008525R26380007
SECTION SF30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by full text:
AMENDMENT 0007
This amendment is issued to incorporate the following:
1. Extend the proposal due date from 07 JULY 2026 TO 21 JULY 2026 NLT 2:00 P.M. EDT.
2. Provide PPI Responses (Enclosed)
1. The proposal due date is extended from 07 JULY 2026 TO 21 JULY 2026 NLT 2:00 P.M. EDT.
**PLEASE NOTE THAT NO ADDITIONAL PPI’S WILL BE ACCEPTED FOLLOWING THE
INITAL PPI CUT OFF DATE OF 27 JUNE 2026**
2. Pre-proposal Inquiry Responses (Enclosed)
PPI # Page Section Paragraph Question Response
Part 3 Chapter 6 Section D4020
Has the base power been deemed reliable in accordance with NFPA 20?
Per UEM, the circuit feeding this area is not considered reliable per NFPA 20. A secondary power source will be required for the fire pump. RFP calls for 100% building backup and states a secondary power source is required for the fire pump per NFPA 20.
Please see Part 3, Chapter 6, Sections D509002 & G4010 of the RFP.
Please bid per the RFP.
RFP Attach H Part 3, Chapter 2.3.7
Please provide the document "Bi-SCD 085- 009 - NATO Criteria and Standards for Peace Headquarters Facilities" that is referenced in RFP
Bi-SC 085-009 NATO Criteria and Standards and ACO Directive 070-001 are considered CUI. Both documents
Attach H Part 3, Chapter 2.3.7.
will be given to the contractor after award.
General
During the project site walk it appeared housing scheduled to be demolished is still occupied. Please clarify whether there are any restrictions in regards to vacating the units and beginning demolition.
Please bid per the RFP.
All housing units will be vacant before turned over to contractor.
Attachment H pp 1298 &
Parking Garage Building & Life Safety Analysis Code Analysis Part 3, Chapter 2.8
4. Building Height and Area Paragraph 4
The Building Height and Area chart within the drawings state that the maximum height of the parking garage structure is to be 75'. Part 3, Chapter
2.8 states that the Commanding Officer or appointed designee is directed to initiate the Section 106 process to determine any visual impacts that this project may have on the viewshed of two historic districts.
Please advise if the Section 106 has been completed and if so, advise if there are changes to the 75' parking structure height noted. If the study has not been completed, please confirm that the 75' height should be used for the design of the parking structure.
Please bid per the RFP
A SHPO consultation with the Virginia Department of Historic Resources (VDHR) has been conducted. A finding of "no adverse effect" was received for the Joint Forces Command Norfolk (JFCN) Interim Modular Campus (IMC), which includes the parking garage.
Attachment H, pg 392
Part 3, Chapter 4.0
4.3.2 Building
Height
The narrative notes a floor-to-floor height requirement of 14'-0".
Due to interstate transportation requirements of modular construction, the 14'-0" requirement cannot be met; please consider reducing the floor-to-floor height to 13'-3".
Contractor provided solution must meet UFC and room requirements as outlined in Part 3, Chapter 5. Review sight lines and viewing angles of workstations, audiovisual requirements, and account for all building infrastructure.
Attachment H, pg 392
Part 3, Chapter 4.0
4.3.2 Building
Height
The narrative states that a minimum clearance of 2' must be maintained between the structure and the ceiling. At modular units, please confirm that this 2' clearance is to be maintained within the units, however the structural edge of the modular units holding the joisted structure above may encroach into this 2' space.
Contractor provided solution must meet UFC and room requirements as outlined in Part 3, Chapter 5. Review sight lines and viewing angles of workstations, audiovisual requirements, and account for all building infrastructure.
Attachment H, pp 399 -
Part 5, Room Requirements varies
Several ceilings heights are noted at 9'-0". To ensure that the modular components may be transported to the site with a 13'-3" height and the 2' clear space is maintained above the ceiling, please advise if these ceiling heights may be reduced to 8'-10".
Contractor provided solution must meet UFC and room requirements as outlined in Part 3, Chapter 5. Review sight lines and viewing angles of workstations, audiovisual requirements, and account for all building infrastructure.
Attachment H, pp 2276-
Attachment P, Hazardous Materials Report
The hazardous material report defines the findings in the following buildings:
SC32, SC33, SC34, SC35,
SC36, SC37, and SC142.
This report does not include any findings at SC143 or the buildings introduced in Attachment M:
SC38, SC39, and SC45.
Please advise if a report is available for these additional buildings or if reported information from other buildings may be extrapolated to account for these additional buildings (SC38 is similar to SC37, SC39 is similar to SC36, SC45 is similar to SC32, and SC141 is similar to
SC142)
Buildings SC38, SC39, SC45, and SC141 all need to be inspected for hazardous materials prior to demolition.
Follow all federal, state, local regulations and installation requirements.
For a basis of bidding assume the following:
- All hazardous materials present in SC142 are present in
SC141.
- All hazardous materials present in SC32 and SC33 are present in SC45.
- All hazardous materials present in
SC34, SC 35, SC36,
and SC37 are present in SC39 and SC38.
Assume any hazardous materials present are similar in quantity and condition.
Attachment M, pp 9-13
Please advise what offset requirements are required between the new construction and existing facilities SC44, SC46, and
SC140.
Refer to Part 3, Section 2.3.7, which references UFC 4-010-01 and Bi- SCD 085-009. In addition, refer to the applicable referenced standards.
Attachment M, pg 6
The Total Mission Required Seats/Staff with Bid Option introduce space for an additional 148 persons. Please advise if this additional space is to be integrated with any of the other programmed areas (such as J5/J9, J7 or NCIA) or if the added Bid Option Space is to act as its own section within the building.
Additional personnel will be integrated into the other programmed areas if selected. If Line Item 0010 is accepted, programming updates/validation will be included in the design.
Attachment H, pp 892 & 1447
Part 4, G10 Site Preparations Attachment K, Geotechnical Report
G103001 1l1
3.2 Proposed
Construction
The performance technical specifications reference the finish floor elevation per UFC 1-200-01, which states that the finish floor of the building is to be 6" above perimeter finish grade. The geotechnical report notes that "... a finished ground floor elevation is to be approximately EL 14-ft is expected ..." Please confirm that building and parking garage finished floor are to be EL 14-ft or clarify what the preferred elevation of the buildings shall be.
Finished floor elevation to be in accordance with G103001 1.1.
Please confirm that no loading dock is required for the new NATO JFCN Interim Building.
A loading dock is not required. Access for deliveries is required.
Please advise if a dumpster pad for the new building is required, or if trash will be transported to an adjacent building's dumpster.
A dumpster pad is required.
Please confirm that there are no additional base installation guide requirements that are to be used in the development of the project's design.
See PPI #39 response.
Please bid per the RFP.
Attachment H pp 1299 &
Office Building & Life Safety Analysis Code Analysis Part 3, Chapter 2.8
4. Building Height and Area Paragraph 4
The Building Height and Area chart within the drawings state that the maximum height of the office building is to be 75'.
Part 3, Chapter 2.8 states that the Commanding Officer or appointed designee is directed to initiate the Section 106 process to determine any visual impacts that this project may have on the viewshed of two historic districts. Please advise if the Section 106 has been completed and if so, advise if there are changes to the 75' office building height noted.
If the study has not been completed, please confirm that the 75' height should be used as the maximum height for the design of the office building.
Please bid per the RFP.
A SHPO consultation with the Virginia Department of Historic Resources (VDHR) has been conducted. A finding of "no adverse effect" was received for the Joint Forces Command Norfolk (JFCN) Interim Modular Campus (IMC), which includes the parking garage.
Attachment H, pg. 7 01 14 00 1.4.1.2.1
This specification indicates that construction access is not authorized for non-US citizens. Please clarify if this applies to the design team as well and if non-US citizens are able to work on the design of this project.
Please bid per the RFP.
Non-us citizens are allowed to work on the design team but will not be able to access the site for field work, inspections, etc. Please plan accordingly.
Attachment H, Section 4.3.2
The RFP requires a 14'-0” minimum floor-to-floor height. To maintain modular best practice for over-the-road freight on a double drop deck trailer, may we design to a maximum 13'-6” floor-to-floor, provided we
No. Please bid per the
RFP.
demonstrate that all MEP systems and the required 9'- 0” finished ceilings are fully accommodated?
Can CAD files of all drawings be provided?
Please bid per the RFP.
CAD drawings may be provided after award.
Attachment H - Part 3 - Chapter 2.0
2.3.9
2.3.9 - Secure Areas notes, provide secure areas within the building that complies with the Bi-SC 085-009 NATO Criteria and Standards for Peach Headquarters Facilities.
Please provide a copy of this criteria and standards. See response to PPI #39.
2.8 SHPO
Has NAVFAC or the installation reached out the State Office regarding this project? Per the section identified, this coordination could be required to start early in the project processes prior to expenditure of funds.
Given this, unforeseen comments from the reviewing agency could have adverse effects on cost after award.
Please bid per the RFP.
A SHPO consultation with the Virginia Department of Historic Resources (VDHR) has been conducted. A finding of "no adverse effect" was received for the Joint Forces Command Norfolk (JFCN) Interim Modular Campus (IMC), which includes the parking garage.
| IDCode: J |
| Page: 1 |
| Pages: 2 |
| AmendNo: 0007 |
| EffDate: 25 Jun 2026 |
| ReqNo: See Continuation Sheet |
| ProjNo: 1810892 |
| IssCode: N40085 |
| AdmCode: |
| IssuedBy: NAVFACSYSCOM MID-ATLANTIC |
9324 VIRGINIA AVENUE, NORFOLK VA 23511-0395
NORFOLK, VA 23511-0395
UNITED STATES
Kristy GERREK, Email: kristy.l.gerrek.civ@us.navy.mil Telephone: 757-341-0089 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: N4008525R2638 |
| SolDate: 22 Dec 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: See Section 00 70 00 - Conditions of the Contract |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: KRISTY L. GERREK |
| ContDate: |
| CODate: 25 Jun 2026 |
File details come from the government source that posted it. Updated .