Amendment 0009 NATO DB RFP Civil Sheets.pdf

PDF 2 MB Posted

Attached to
DESIGN-BUILD P1678 NATO JFCNF PHASE II INTERIM MODULAR FACILITY, NSA NORFOLK, VA
Solicitation number
N4008525R2638
Issued by

About this file

These are architectural and engineering design documents for the JFC Norfolk Interim Modular Campus project at Naval Support Activity Hampton Roads in Norfolk, Virginia. The drawings are preliminary reference documents prepared by NAVFAC (Naval Facilities Engineering Systems Command) for a Design-Build (D/B) Request for Proposals and show the desired functional arrangement and adjacency for each department, with explicit notation that the D/B team may alter designs for structural and modular accommodations.

The document set includes four primary site plans: a Site Demolition Plan (CD101) identifying 17 demolition and utility removal tasks including removal of existing buildings, pavements, sidewalks, structures, and utility lines (water, gas, sanitary sewer, electrical); a Site Plan (CS101) showing the NATO JFCN Interim Building footprint, temporary four-tier parking garage, concrete sidewalks and walkways, stormwater management areas, fire access roads, and various setback requirements including a 328-foot NATO perimeter fence setback and 50-foot general perimeter setback; a Site Utility Plan (CU101) depicting sanitary sewer connections, water main distribution with isolation gate valves and post-indicator valves, natural gas service, telecommunications ductbank, fire hydrants, electrical connections to a 35kV ductbank with pad-mounted transformer, and generator provisions; and a Utility Connection Details Plan (CU101) providing specific utility line routing, connections to existing infrastructure, and service specifications. The project includes provisions for groundwater dewatering, hazardous materials handling per attached reports, and coordination with existing site conditions, with construction anticipated to occur post-June 2026 per the revision date.

View the file

Other files

File Type Posted
Updated Attachment I - P1678 NATO Price Proposal Form REV2.docx DOCX document
Amendment 0010 P1678 NATO.pdf PDF
Updated Attachment I - P1678 NATO Price Proposal Form REV1.docx DOCX document
Amendment 0009 P1678 NATO.pdf PDF
Amendment 0009 NATO Room Data Sheets.pdf PDF
DB RFP Attachment L - Regional Environmental Checklist.pdf PDF
Amendment 0008 P1678 NATO.pdf PDF
Amendment 0007 P1678 NATO.pdf PDF
Attachment N - P1678 Site Visit Log.pdf PDF
Amendment 0006 P1678 NATO.pdf PDF
Amendment 0005 P1678 NATO.pdf PDF
Attachment G - Small Business Subcontracting Plan (SBSP).docx DOCX document
Attachment L - ODP_ML.xlsx XLSX spreadsheet
Attachment M - JFCN IMF DB RFP - Amended.pdf PDF
Attachment E- Historical Small Business Utilization.docx DOCX document
Attachment F - Small Business Participation Commitment Document.docx DOCX document
Attachment J - SECNAV 5512.pdf PDF
Attachment I - P1678 NATO Price Proposal Form.docx DOCX document
Attachment K - NSA HR Main Site Base Map.pdf PDF
CJA ML-23-80 - Redacted.pdf PDF
Amendment 0004 P1678 NATO.pdf PDF
Amendment 0003 P1678 NATO.pdf PDF
Amendment 0002 P1678 NATO.pdf PDF
Amendment 0002 Pre-Proposal Inquiries.pdf PDF
Updated Attachment C - Experience Project Data Sheet.pdf PDF
Amendment 0001 Pre-Proposal Inquiries.pdf PDF
Amendment 0001 P1678 NATO.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF
Solicitation - N4008525R2638.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment C - Experience Project Data Sheet.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SC49

SC49A

SC41

SC48

SC139

NH31J

SC51

SC140ASC43

SC142

SC39

SC34

SC44

SC47

SC37

SC35

SC33

SC45

SC32

SC52

SC42

SC139A

SC140

SC46

SC40

SC141

SC36

SC38

BLA

NDY ROAD

FO

RR

ES

TA

L D

RI

VE

BLA

NDY ROAD

FORRESTAL DRIVE

LEYTE AVENUE

CO

RR

EG

ID

OR

A

VE

NU

E

FECHTELER ROAD

FECHTELER ROAD

9 8

W

W W

W

W

W

W W

W W

W W

W W

W W

W W

W

W

W W

W W

W W

W

W

W

W

W

W

W

W

W

W

W

W W

W

W W

W

W

W W

W W

W W

W

W

W

W

W

WW

W

W

W

W

W W

W

W W

W W

W W

W W

W W

W W

W W

W W

W

W

W W

W

W W

W W

W W

W

W W

W W

W

W

W

W W

W

W W

W

W

W W

W

W

W

W W

W W

W W

W

W W W W

W

W W

W

W

W

W

W

W

W

W W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

S

S

S

S

S

S

S

S

S

S S

S

S

S

S

S

S

S

S

S

SA

N

SA

N

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

G

G

G

G

G

G

G G

G

G

G

G

G

G G

G G

G

G

G G

G

G

G

G G

G G

G G

G

G

G

G G

G

G

G

G

G

G

G

G G

G G

G G

G G

E

E

E

E

E

E

E

E

E

E E

E E

E E

E

E

E

E

E

E

E

E

E

E

E E

E E

E E

E E

E E

E

E E

E E

E

E E E E E

E E

E E

E

E

E

E

E

E E

E E

E E

E E

E E

E

E

E

E

E E E E E E E E E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E

E E

E E

E E

E E

E

E

E E

E E

EEEE

E E E E E E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E

E E

E E

E E

E

E

E

E

E

E

E

E

E

CB

CB

CB

CB

CB

SD

SD

D

D

D D

D

CB

CB

SD

CB

CB

CB

CB

SD

SD

SD

SD

SDCB

CB

SD

SD

SD

FI

LE

N

AM

E:

C

:\U se rs \c am pe ri\

DC

\A

CC

Do cs

\A

EC

O M

\B P-

AM

ER

(U S)

-6

0-

JF

C No rfo lk

M od ul ar

C am pu s

DB

R

FP

(N

AT

O

)\P ro je ct

F ile s\

De sig n

Co lla bo ra tio n\

-C

\N

AT

O _C

D1

_C O

A2 .d wg L

AY

O

UT

N

AM

E:

C D1

P

LO

TT

ED

: W ed ne sd ay

, J un e

, 2

- 4

:0 9p m U

SE

R:

C am pe rI

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

N O

T

FO

R C

O N

S

TR

U C

TI

O

N

P R

E L

IM

IN

A

R Y

THIS DRAWING IS FOR REFERENCE ONLY, AND SHOWS THE DESIRED

FUNCTIONAL ARRANGEMENT AND ADJACEMCY FOR EACH DEPARTMENT. ITS

INCLUSION DOES NOT PRECLUDE THE D/B TEAM FROM ALTERING FOR

STRUCTURAL AND/OR MODULAR ACCOMODATIONS

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

LA

NT

N

AV

AL

S U

PP

O

R T

AC

TI

VI

TY

H

AM

PT

O

N R

O

AD

S

FY

S

PE

CI

AL

P

RO

JE

CT

J

FC

N

IN

TE

RI

M M

O

DU

LA

R

CA

M

PU

S

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

UP

PO

RT

A

CT

IV

IT

Y

HA

MP

TO

N

RO

AD

S M

ID

LA

N T

D C

C O

R E

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

SEAL

A/E INFO

DRAWFORM REVISION: 04 MAY 2023

SI

TE

D

EM

O

LI

TI

O

N

PL

AN

IPC IPC ACF

AS NOTED

CD101

GENERAL SHEET NOTES

GRAPHIC SCALE(S)

KEYNOTES

A. THE ACTUAL FIELD CONDITIONS AT THE TIME OF CONSTRUCTION MAY

VARY FROM THAT PRESENTED ON THESE PLANS. CONFIRM THE

LOCATION OF ALL ITEMS PRIOR TO START OF CONSTRUCTION.

B. DEMOLITION OF PAVEMENTS INCLUDES AGGREGATE BASE COURSES.

C. PROVIDE SAW CUTS FOR ASPHALT AND CONCRETE DEMOLITION WORK

THAT IS ADJACENT TO EXISTING ASPHALT OR CONCRETE

PAVEMENT/WALKWAYS TO REMAIN.

D. GROUNDWATER MAY BE ENCOUNTERED FOR ALL EXCAVATIONS.

PROVIDE DEWATERING AS REQUIRED.

E. REFER TO HAZMAT REPORT ATTACHED TO THE DB-RFP FOR THE

PRESENCE, LOCATION, AND QUANTITY OF BUILDING HAZMAT REQUIRING

SPECIALIZED HANDLING AND DISPOSAL.

12 4

12 8

1 REMOVE EXISTING CROSSWALK PAVEMENT MARKINGS.

2 DEMOLISH EXISTING CONCRETE WALK.

3 DEMOLISH EXISTING SITE STRUCTURE (GAZEBO).

4 DEMOLISH EXISTING BUILDING AND FOUNDATION.

5 DEMOLISH EXISTING ASPHALT PAVEMENT.

6 REMOVE EXISTING PAVEMENT MARKINGS.

7 DEMOLISH EXISTING GRAVEL PARKING AREA.

8 DEMOLISH EXISTING CONCRETE APRON.

9 DEMOLISH EXISTING WATER LINE.

10 DEMOLISH EXISTING GAS LINE.

11 DEMOLISH EXISTING SANITARY SEWER.

12 CAP OR PLUG EXISTING PIPE.

13 DEMOLISH ALL UTILITY SERVICES ASSOCIATED WITH EXISTING

STRUCTURES.

14 PROTECT EXISTING WATER LINE TO REMAIN DURING

CONSTRUCTION.

15 DEMOLISH EXISTING UNDERGROUND ELECTRICAL.

16 DEMOLISH EXISTING LIGHT.

17 CAP AND ABANDON EXISTING PIPING BELOW

ROADWAY.

NORTH

1"=40' 40' 20' 0 40' 80'

AM

EN

DM

EN

T

5/8 /20

CM

C

SC49

SC49A

SC41

SC48

SC139

NH31J

SC51

SC140ASC43

SC44

SC47

SC52

SC42

SC139A

SC140

SC46

SC40

BLA

NDY ROAD

FO

RR

ES

TA

L D

RI

VE

BLA

NDY ROAD

FORRESTAL DRIVE

LEYTE AVENUE

CO

RR

EG

ID

OR

A

VE

NU

E

FECHTELER ROAD

FECHTELER ROAD

9 8

X

X X

X

X

X

X

X X

X X

X

X

X X

X

X

X

X X

X X

X

TEMPORARY PARKING GARAGE

(4 TIERS)

NATO JFCN INTERIM BUILDING

25'

20'

20'

R30'

R

R

'R20'R

R26'

R30'

R10'

20'

20'

10'

14'

98'

20'

R26'

R2 6'

60'

20'

FI

LE

N

AM

E:

C

:\U se rs \c am pe ri\

DC

\A

CC

Do cs

\A

EC

O M

\B P-

AM

ER

(U S)

-6

0-

JF

C No rfo lk

M od ul ar

C am pu s

DB

R

FP

(N

AT

O

)\P ro je ct

F ile s\

De sig n

Co lla bo ra tio n\

-C

\N

AT

O _C

S1

_C O

A2 .d wg L

AY

O

UT

N

AM

E:

C S1

P

LO

TT

ED

: W ed ne sd ay

, J un e

, 2

- 4

:0 4p m U

SE

R:

C am pe rI

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

N O

T

FO

R C

O N

S

TR

U C

TI

O

N

P R

E L

IM

IN

A

R Y

THIS DRAWING IS FOR REFERENCE ONLY, AND SHOWS THE DESIRED

FUNCTIONAL ARRANGEMENT AND ADJACEMCY FOR EACH DEPARTMENT. ITS

INCLUSION DOES NOT PRECLUDE THE D/B TEAM FROM ALTERING FOR

STRUCTURAL AND/OR MODULAR ACCOMODATIONS

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

LA

NT

N

AV

AL

S U

PP

O

R T

AC

TI

VI

TY

H

AM

PT

O

N R

O

AD

S

FY

S

PE

CI

AL

P

RO

JE

CT

J

FC

N

IN

TE

RI

M M

O

DU

LA

R

CA

M

PU

S

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

UP

PO

RT

A

CT

IV

IT

Y

HA

MP

TO

N

RO

AD

S M

ID

LA

N T

D C

C O

R E

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

SEAL

A/E INFO

DRAWFORM REVISION: 04 MAY 2023

SI

TE

P

LA

N

IPC IPC ACF

AS NOTED

CS101

GENERAL SHEET NOTES

GRAPHIC SCALE(S)

KEYNOTES

A. GROUNDWATER MAY BE ENCOUNTERED FOR ALL EXCAVATIONS. PROVIDE

DEWATERING AS REQUIRED.

6 6

6 16

LEGEND

BUILDING FOOTPRINT

ASPHALT PAVEMENT

CONCRETE SIDEWALK

STORMWATER MANAGEMENT AREA

HEAVY DUTY CONCRETE

PAVEMENT

1 33-FT UNOBSTRUCTED SPACE SETBACK.

2 10-FT BUILDING SETBACK.

3 30-FT EXISTING BUILDING SETBACK.

4 100m (328-FT) NATO SETBACK FROM PERIMETER FENCE.

5 50-FT SETBACK FROM PERIMETER FENCE.

6 CONCRETE WALK. 8-FT MINIMUM WIDTH AT ENTRANCES AND

EXITS. 6-FT MINIMUM WIDTH ALL OTHERS. MATCH EXISTING

WALK WIDTH WHERE NEW CONCRETE IS PARALLEL WITH

EXISTING.

7 20-FT WIDE FIRE ACCESS ROAD (HEAVY DUTY CONCRETE

PAVEMENT).

8 ASPHALT PAVEMENT.

9 BUS PARKING.

10 AREA RESERVED FOR STORMWATER MANAGEMENT.

11 CHAINLINK FENCE.

12 DOUBLE LEAF SWING GATE WITH FIRE DEPARTMENT ACCESS

BOX.

13 PEDESTRIAN TURNSTILE WITH CAC CARD READER.

14 CROSSWALK PAVEMENT MARKING.

15 NO PARKING PAVEMENT MARKING FOR FIRE LANE.

16 ACCESSIBLE PARKING PAVEMENT MARKING AND SIGNAGE.

17 ENTRANCE CANOPY

18 CONCRETE DUMPSTER PAD

NORTH

1"=40' 40' 20' 0 40' 80'

AM

EN

DM

EN

T

5/8 /20

CM

C

CM

C

X

X

X

X

X

X

X X

X X

X

X X

X

X

X

X X

X X

TEMPORARY PARKING GARAGE

(4 TIERS)

NATO JFCN INTERIM BUILDING

SC49

SC49A

SC138

SC41

SC48

SC139

SC138A

NH31J

SC50

SC51

SC140ASC43

SC53

NH31

SC44

SC47

SC52

SC42

SC139A

SC23

SC11

SC10

SC140

SC46

SC40

SC137

SC31

SC136 BLA

NDY ROAD

FO

RR

ES

TA

L D

RI

VE

BLA

NDY ROAD

FORRESTAL DRIVE

LEYTE AVENUE

CO

RR

EG

ID

OR

A

VE

NU

E

FECHTELER ROAD

FECHTELER ROAD

9 8

10 9

W

W

W

W

W

W

W W

W W

W W

W W

W W

W W

W

W

W

W

W

W

W W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W

W

W

W W

W

W

W

W W W W

W W

W W

W W

W W

W W

W W

W

W

W

W W

W W

W

W W

W

W

W W

W

W W

W W

W

W

W W

W W

W W

W W

W W

W W

W

W W

W

W

W

W W W W W

W W

W

W

W

W

W

W

W W

W

W

W

W

W

W

W

W

W W

W

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

S

S

S

S

S

S

S

S

S

S

S

S S

S

S

S

S

S

SA

N

SA

N

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SA

N

SAN

SAN

SAN

SAN

SAN

SAN

SAN

G

G

G

G

G

G

G

G

G

G G

G G

G

G

G

G

G

G

G

G G

G

G

G

G

G

G

G

G

G G

G

E

E

E

E

E

E

E E

E E

E E

E

E E

E E

E

E

E E

E E

E E

E E

E E E E

E E

E E

E E

E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E

E

E

E E E E E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E E

E E

E E

E E

E E

E

EE

E E

E E

E

E E

E E

E

E E

E

E

E

E E

E

E E

E E

E E

E E

E

E E

E E

E E

E

E

E E

E E

EEEE

E E

E E

E E E E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E

E

E

E

E

E

E

E E

E E

E

E

E

EE

E E

E

E

E

E

E

E

CB

CB

CB

CB

CBCB

SD

D

D

D D

D

CB

CB

SD

CB

CB

CB

CB

SD

SD

SD

SD

SDSD

SDCB

CB

SD

SD

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

W

W

W

PIV

PIV

C

C

C

UGC

C

U G

C

W

W W W

W W

C

W

GAS GAS GAS GAS

E

E

E

E E

E E

E E

E

E

E

E E

E E

E

E

E

E

EEEE

E

E

E

FI

LE

N

AM

E:

C

:\U se rs \c am pe ri\

DC

\A

CC

Do cs

\A

EC

O M

\B P-

AM

ER

(U S)

-6

0-

JF

C No rfo lk

M od ul ar

C am pu s

DB

R

FP

(N

AT

O

)\P ro je ct

F ile s\

De sig n

Co lla bo ra tio n\

-C

\N

AT

O _C

U1

_C O

A2 .d wg L

AY

O

UT

N

AM

E:

C U1

P

LO

TT

ED

: W ed ne sd ay

, J un e

, 2

- 4

:0 6p m U

SE

R:

C am pe rI

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

N O

T

FO

R C

O N

S

TR

U C

TI

O

N

P R

E L

IM

IN

A

R Y

THIS DRAWING IS FOR REFERENCE ONLY, AND SHOWS THE DESIRED

FUNCTIONAL ARRANGEMENT AND ADJACEMCY FOR EACH DEPARTMENT. ITS

INCLUSION DOES NOT PRECLUDE THE D/B TEAM FROM ALTERING FOR

STRUCTURAL AND/OR MODULAR ACCOMODATIONS

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

LA

NT

N

AV

AL

S U

PP

O

R T

AC

TI

VI

TY

H

AM

PT

O

N R

O

AD

S

FY

S

PE

CI

AL

P

RO

JE

CT

J

FC

N

IN

TE

RI

M M

O

DU

LA

R

CA

M

PU

S

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

UP

PO

RT

A

CT

IV

IT

Y

HA

MP

TO

N

RO

AD

S M

ID

LA

N T

D C

C O

R E

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

SEAL

A/E INFO

DRAWFORM REVISION: 04 MAY 2023

NORTH

SI

TE

U

TI

LI

TY

P

LA

N

IPC IPC ACF

AS NOTED

CU101

GENERAL SHEET NOTES

GRAPHIC SCALE(S)

KEYNOTES

A. PROVIDE POST-INDICATOR VALVES FOR FIRE SERVICE CONNECTIONS.

B. PROVIDE ISOLATION GATE VALVES ON ALL BRANCH CONNECTIONS TO

NEW AND EXISTING WATER LINES.

C. PROVIDE SITE LIGHTING FOR NEW FACILITIES IN ACCORDANCE WITH THE

RFP DOCUMENTS.

D. FIELD VERIFY LOCATION OF EXISTING UTILITIES AND RELOCATE AS

NECESSARY WHERE IN CONFLICT WITH PROPOSED WORK.

E. GROUNDWATER MAY BE ENCOUNTERED FOR ALL EXCAVATIONS. PROVIDE

DEWATERING AS REQUIRED.

50' 25' 0 50' 100' 1"=50'

LEGEND

SANITARY SEWER

SANITARY SEWER MANHOLE

WATER MAIN

ISOLATION GATE VALVE

POST-INDICATOR VALVEPIV

TELECOMMUNICATION DUCTBANKUGC

C TELECOMMUNICATION MANHOLE

1 APPROXIMATE LOCATION OF EXISTING COMMUNICATION

MANHOLE.

2 3-WAY TELECOMM DUCTBANK.

3 6" FIRE WATER SERVICE.

4 POST-INDICATOR VALVE.

5 8" WATER MAIN.

6 2" DOMESTIC WATER SERVICE.

7 CONNECT TO EXISTING 8" WATER MAIN.

8 4" SANITARY SEWER LATERAL.

9 6" SANITARY SEWER.

10 CONNECT TO EXISTING SANITARY SEWER MANHOLE.

11 8" FIRE WATER SERVICE.

12 1.5" NATURAL GAS SERVICE.

13 CONNECT TO EXISTING NATURAL GAS.

14 PROVIDE GENERATOR.

15 PROVIDE MODULAR PAD-MOUNTED TRANSFORMER.

16 PROVIDE 35kV ELECTRICAL DUCTBANK.

17 CONNECT TO EXISTING 35kV ELECTRICAL DUCTBANK.

18 EXISTING 4-WAY SWITCH ELECTRICAL POINT OF CONNECTION

FOR BOTH FACILITIES.

SAN

W

FIRE HYDRANT

ELECTRICAL MANHOLE

E

NATURAL GASGAS

AM

EN

DM

EN

T

5/8 /20

CM

C

CM

C

File details come from the government source that posted it. Updated .