N4008525R2563 P325 Amendment 0001.pdf

PDF 210 KB Posted

Attached to
P325 HUMAN PERFORMANCE TRAINING CENTER
Solicitation number
N4008525R2563
Issued by

About this file

This document is an Amendment (0001) to a naval construction solicitation for the P325 Human Performance Training Center located at JEB Little Creek-Fort Story in Virginia Beach, Virginia. The amendment accomplishes three key objectives: 1) incorporates a Site Visit Log as Attachment J, 2) includes responses to a Pre-Proposal Inquiry (PPI) questioning the Lowest Price Technically Acceptable (LPTA) evaluation method, and 3) replaces a specification document for Total Building Commissioning with a revised version. The solicitation is restricted to Multiple Award Construction Contract (MACC) holders under contract N4008521D0079-0086, specifically targeting large general construction projects in the Hampton Roads Area of Responsibility. The amendment is issued by NAVFACYSCOM Mid-Atlantic Contracting Core, with a contract point of contact named Angie Clifton, and is dated 03/21/2025.

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

N40085

N40085-25-R-2563, P325 HUMAN PERFORMANCE TRAINING CENTER, JEB LITTLE CREEK-FORT STORY, VIRGINIA BEACH, VIRGINIA

SEE SF 30 BLOCK 14 CONTINUATION PAGE

Contract POC:Angie Clifton, angela.j.clifton2.civ@us.navy.mil

NAVFACYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK, VA 23511-3095

See Item 6

N4008525R2563

1 2

03/21/2025

03/05/2025

Amendment 0001

The purpose of this amendment is to:

1. Incorporate the Site Visit Log

2. Incorporate PPI responses

3. Incorporate Revised Specifications

1. Incorporate the Site Visit Log

The site visit log is entitled “Attachment J – P325 Site Visit Log” is attached separately

2. Incorporate PPI Responses

PPI

Number

Date Submitted

Reference Question Government

Response Page Section Para

1 3/11/2025 9 RFP General Requirements Eval

The RFP General Requirements states under Evaluation on page 9 of 10, “To make a determination of best value, the LPTA process is selected as appropriate for this acquisition because the best value is expected to result from selection of the technically acceptable proposal with the lowest evaluated price.” This is the first Task Order in this program to be solicited with this evaluation method, and the degree of information required in Factor 1 Technical Solution exceeds that of a typical LPTA solicitation. Please consider revising the requirements of this solicitation’s factors to be more representative of the evaluation method by removing Factor 1 Technical Solution; otherwise, please consider revising the evaluation method of this solicitation to more accurately reflect the level of technical information requested in Factor 1 Technical Solution. Adjusting the technical requirements or the evaluation criteria to alleviate the LPTA criteria will help increase the overall attractiveness of this Task Order which will increase overall competition for the Government.

Bid per RFP

3. Incorporate Revised Specifications

Specification “01 91 00.15_22 Total building Commissioning (5/16)” is replaced with “01 91 00.15_22 Total building Commissioning (8/24)”. See ”Attachment K – Revised Specification”, attached separately.

File details come from the government source that posted it. Updated .