Attachment P - CJA ML-23-80-ML-AMI_Redacted.pdf
PDF 1 MB Posted
- Attached to
- P325 HUMAN PERFORMANCE TRAINING CENTER
- Solicitation number
- N4008525R2563
About this file
This document is a Class Justification and Approval (CJ&A) for the use of specific manufacturers and product lines for Advanced Metering Infrastructure (AMI) electric meters, front-end interfaces, and software at Naval Facilities Engineering Systems Command (NAVFAC) Mid-Atlantic installations. The document authorizes the use of Schneider Electric's PowerLogic Ion Meters and SCADAPack Smart RTUs, and EIG's Shark 270 and Shark 250 meters for NAVFAC MIDLANT facilities from August 31, 2023 to August 30, 2026.
The justification is based on a business case analysis demonstrating the need for standardization and interoperability of existing advanced energy metering systems. The AMI network will provide centralized monitoring of facility energy consumption, with meters connected through various network methods. The document emphasizes reducing cyber vulnerabilities, minimizing costs associated with multiple equipment solutions, and ensuring compatibility with the Navy Utility Monitoring and Control System (NUMCS). The total estimated dollar value of the brand name equipment is redacted, but the justification covers both MILCON and Special Projects funding types across fiscal years 2023-2026.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .