This document is an Amendment (Amendment 0010) to Solicitation N4008525R2563 for the P325 Human Performance Training Center project at JEB Little Creek Fort Story in Virginia Beach, Virginia. The amendment incorporates responses to Potential Performance Issues (PPIs) and revises several technical specifications, including clarifications on building demolition sequencing, mechanical and electrical room design conditions, window and door specifications, and site work requirements. Key changes include specifying that buildings 3855A and 3855D will be demolished after occupants move into the new facility, adding detailed requirements for translucent polycarbonate window panels, and modifying indoor temperature design conditions for various room types. The amendment provides additional guidance for the Design of Record (DOR) on technical details such as HVAC system configuration, parking lot design, and third-party sustainability certification requirements.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
Amendment 0010
The purpose of this amendment is to:
1. Incorporate PPI responses
2. Incorporate Revised Specifications
1. Incorporate PPI Responses
PPI
Reference Question Government Response
Page Section Para
Period of
Performance
Numerous PPIs have been asked and remain unanswered regarding the sequencing of the demolition of Building 3814, 3855A, and 3855B. If these facilities must remain operational until the new P325 Facility is complete and operational, the period of performance will have to be increased by at least 4 months.
See Amendment 0010
262 RFP Part 3
We do not see any requirements in the RFP to sequence or phase construction beyond the construction phase to follow the fast track design phase.
Specifically, there does not appear to be a requirement to complete the new facility prior to demolishing the existing facilities. Please confirm that this is correct and that there are no constraints to demolishing the existing facilities after completion of the new facility. Furthermore, please confirm our schedule does not need to allow time for relocation of any existing equipment into the new facility.
See Amendment 0010
263 RFP
Part 3/Gen
Req
We find no phasing nor sequencing requirements between the existing facilities and the new Human Performance Center. If there is a requirement to complete the new facility prior to demolishing or taking the existing facilities out of operation, then the Period of Performance is not long enough. If such relationship exists, please extend the Period of Performance accordingly.
See Amendment 0010
Please provide specifications for the Translucent Window Panels. These appear to be Translucent Sandwich Panels similar to Kalwall.
See Amendment 0010
265 Part 3 Chapter 3 ESR D20 Plumbing
ESR D202001 Pipes and Fittings allows for the use of PVC piping under the building for below ground pipes but ESR D203001 directs us to provide cast iron hub and spigot pipe and fittings for below ground installation.
Recommend approving PVC pipe and fitting for all below and above ground waste and vent piping in this highly corrosive marine environment.
No. Follow Part 3 Chapter 6 ESR, Paragraph D20 Plumbing, D203001 Waste Pipe & Fittings requirements.
266 481 D30
As the system description requires energy efficiency and UFC 1-200-02 is listed as a requirement, no energy recovery requirements on the airside equipment are mandated. Please confirm that some means of energy recovery such as a total enthalpy wheel is required at the air handling units serving the open gym spaces and the remaining office and peripheral spaces.
The offeror's DOR determines what energy saving features will be needed to meet the UFC requirements and the energy code. More than likely the offeror's DOR will require some type of energy savings, and the DOR must convey the need to the offeror for pricing.
267 373
P3, 5-Room Requirements 114, 115, 116
& 117
C302090
72" x 12" Acoustical ceiling baffles are noted for multiple areas adjacent to equipment area. Is there a quantity or sound performance criteria that needs to be met?
Per Part 3, Chapter 6 ESR, Paragraph C10 Interiors references UFC 3-101-01 Architecture, which references UFC 3-
450-1 UFC 3-450-01
Noise and Vibration Control. The offeror's DOR is responsible for the design.
268 19 Chapter 5 114 - Equipment
Per RFP, the number of occupants will vary in the open gym area. Is it reasonable to assume no more than 50 occupants will be in the area at one time? Please provide occupant count for the space.
The offeror's DOR determines the number of occupants per code requirements based on the area of the room.
Part 3, 5.0 Room
Requirements 106-Storage
C301001
C301001Concrete and CMU Wall Finishes indicates "CMU". C301003 Gypsum Wallboard Finishes is not included in the room requirements for this space. Part 6, Attachment K, sheet AE101 indicates metal studs with gypsum board on both sides (Partition
Type S) and furring with gypsum wallboard (Partition Type F) at the exterior walls. Please confirm that there are no CMU Wall Finishes at this space.
See Amendment 0010
477 of
Part 3 - Chapter 6 D202003
Part 3 Chapter 6 paragraph D202003 states "refer to ESR G30 for water meter requirements"; however, ESR G30 does not include any water meter requirements. Please verify if a new water meter is required for this facility.
See Amendment 0010
271 375
Part 3 Section 5 Room
Requirements
Part 3, Chapter 5 Room Requirements for the open fitness areas (including 114 Equipment, 115 Warm Up, 116 Running Lanes, and 117 Cool Down) do not include requirements for acoustic wall panels at the two-story space. Please confirm that acoustical wall panels are required in these areas to meet the acoustic requirements.
The Offeror's DOR is responsible for designing the spaces to meet the acoustic requirements of applicable current UFC requirements.
272 401
Part 3 Section 5 Room
Requirements
Part 3 Room Requirements for 201 Kitchen, line item D304007, indicates an exhaust hood is only needed over the teaching cooktop. Please confirm exhaust hoods are not required over the four (4) student cooktops.
See Amendment 0009 for revisions of Room Requirements (Room
201) and D304007 Exhaust Systems
Part 3, 5.0 Room
Requirements 124-Comm.
C301090
C301090 Other Wall Finishes indicates "Fire-treated plywood over gypsum wall board 8'-0" high all walls; gypsum wall board above 8'-0". C301001 Concrete and CMU Wall Finishes is not included in the Room Requirements for this space. Part 6, Attachment K, Sheet AE101 does not indicate furring with gypsum wallboard (Partition Type CF) at the plan-east CMU wall (Partition Type C). Please confirm that furring with gypsum wallboard (Partition Type CF) is to be included at the plan-east CMU wall.
Provide gypsum board and furring at plan east wall of 124 Comm which is CMU.
Part 3, 5.0 Room
Requirements 204A-Isopod
C301001
C301001Concrete and CMU Wall Finishes indicates "CMU". C301003 Gypsum Wallboard Finishes is not included in the room requirements for this space. Part 6, Attachment K, sheet AE101 indicates metal studs with gypsum board on both sides (Partition
Type S) and furring with gypsum wallboard (Partition Type F) at the plan-south exterior wall. Please confirm that there are no CMU wall finishes at this space.
See Amendment 0010
Part 3, 5.0 Room
Requirements 212-
Communicati ons
C301003
C301090 Other Wall Finishes indicates "Fire-treated plywood over gypsum wall board 8'-0" high all walls; gypsum wall board above 8'-0". C301001 Concrete and CMU Wall Finishes is not included in the Room Requirements for this space. Part 6, Attachment K, Sheet AE101 does not indicate furring with gypsum wallboard (Partition Type CF) at the plan-west and plan-east CMU walls (Partition Type C). Please confirm that furring with gypsum wallboard (Partition Type CF) is to be included at the plan-east and plan-west CMU walls.
Provide gypsum board and furring at plan east and plan west walls of 212 Comm.
Part 3, 5.0 Room
Requirements C101-
Corridor
B203002 Glazed Doors
C101-Corridor, B203002 Glazed Doors indicates, "Type EM3; vision lite." However, Part 6, Attachment K, AE201 Exterior Elevations, B1 Exterior Elevation - South indicates key note 10 "Aluminum Storefront" at this location. Please confirm that Door Type EA3 is required at C101-Corridor per AE201.
See Amendment 0010
Part 3, 5.0 Room
Requirements S101 &
S201-Stair 1
B203001 Solid Doors
S102-Stair 2 (references S101 & S201- Stair 1) B203001 Solid Doors indicates, "Type EM3." However, Part 6, Attachment K, AE201 Exterior Elevations, B1 Exterior Elevation - South indicates key note 10 "Aluminum Storefront" at this location. Please confirm that Door Type EA3 is required at S102-Stair 2 per AE201.
See Amendment 0010
Part 6, Attachment
K, AE201
The exterior elevations indicate key note 10 "Aluminum Storefront" at all openings, except for those indicated by key note 11 "Aluminum Curtain Wall" or key note 4 "Translucent Window Panel System". However, Part 3, 6.0 ESR includes B202001 Windows, although the intention per the drawings is that all "window" openings are to be built out with storefront rather than window units. Please confirm that all "window" openings are to be built out with storefront per EA201.
See Amendment 0010
Can more information about the isopod be provided?
The offeror's DOR shall determine the isopod manufacturer during the design process.
280 108 Part 2 / 01 33
29.05 20 1.4.4.1
01 33 29.05 20 Section 1.4.4.1 states:
"Register and achieve Third Party Certification (TPC), by meeting all TPC and project requirements for a level of LEED BDC Ref Guide Version 4 certification or GBI Green Globes certification, or Government-approved equivalent TPC sustainability certification or validation."
Is GBI DOD Guiding Principles Compliance (GPC) a Government-approved equivalent TPC sustainability certification?
Follow the requirement notes in Part 2, Section 01 33 29.05 20, paragraph 1.4.4.1. The offeror's DOR can choose any TPC in compliance with the
UFC.
281 4 Part 3 -
Chapter 3 3.2.3
New Site Work notes a new 8’ high ornamental vehicular gate south of building 3806. There are two existing vehicular gates shown near this location however the demolition of or the new gate are not shown on the Attachment K - Drawings. Please provide additional information for the extent of demolition of the existing gate(s) and type of new gate desired (Automatic or manual, sliding or swing, and width) at this location.
See Amendment 0010
555 of
Part 6 G40 G4010
What is the existing 15kV cable size (AWG) feeding between the Pad Mounted SF6 Switches' PS-313 and PS-312? Is there a standard 15kV AWG size that is preferred by UEM when connecting new SF6 switches on the utility loop?
15kV cables shall be #750KCMIL for the base loop.
108 of
01 33 29.05 1.4.4.1
Please clarify the preferred Third Party Certification (TPC) provider. Section 01 33 29.05 20 paragraph 1.4.4.1 TPC Registration Required references “….
LEED BDC Ref Guide Version 4 certification or GBI Green Globes certification, or Government-approved equivalent TPC certification or validation….” In contrast the NAVFAC High Performance and Sustainable Building Checklist – Goals found at the end of the section denotes GBCI “Guiding Principles Compliance” as the TPC.
Follow the requirement notes in Part 2, Section 01 33 29.05 20, paragraph 1.4.4.1.
Offeror's DOR can choose any TPC in compliance with the
UFC.
284 n/a n/a n/a
Based on the proximity to ORF, are there submittals or restrictions related to the imaginary surfaces? What submittals to the FAA are required?
See Amendment 0010, Attachment R, Specification Section 01 35 13 Special Project Procedures.
285 483 Part 3, Ch. 6, D30 1
RFP states, "provide 2 … [RTUs]." Is this intended to be a limit, i.e., no more than two RTUs?
The intent is 1 RTU for the gym area (including warm up, cool down, equipment area and running lanes) and 1 RTU for the rest of the building. However, the DOR can split the RTU for the rest of the building into additional RTUs if desired. Smaller RTUs must meet all performance requirements of the RFP and UFCs.
286 483 Part 3, Ch. 6, D30 1
RFP states, "provide 2 … [RTUs]… The open gym area… must be on its own system." Please confirm this means the open gym area must be served by a separate RTU. Is this intended to be one of two RTUs, or in addition to the two RTUs?
The intent is 1 RTU for the gym area (including warm up, cool down, equipment area and running lanes) and 1 RTU for the rest of the building. However, the DOR can split the RTU for the rest of the building into additional RTUs if desired. Smaller RTUs must meet all performance requirements of the RFP and UFCs.
287 483 Part 3, Ch. 6, D30 1
RFP states, "provide 2 … [RTUs]." Is this intended to be a limit, i.e., no more than two RTUs?
The intent is 1 RTU for the gym area (including warm up, cool down, equipment area and running lanes) and 1 RTU for the rest of the building. However, the DOR can split the RTU for the rest of the building into additional RTUs if desired. Smaller RTUs must meet all performance requirements of the RFP and UFCs.
288 485 Part 3, Ch. 6, D30 2
Please confirm that the indoor design conditions listed for Mechanical/Electrical Rooms is only intended to apply to those spaces with heating and ventilating only, not the electrical rooms with DX systems.
Please confirm that electrical rooms and elevator equipment rooms served by dedicated DX systems shall use the indoor design conditions as stated for telecom rooms.
See Amendment 0010
289 492 Part 3, Ch. 6, D304007 2
RFP states, "provide a … residential type hood (Type 2) over the teaching cooktop." The RFP describes multiple student stations. Are hoods required over the student stations as well, or only over the teaching station?
See Amendment 0009 for revisions of Room Requirements (Room
201) and D304007 Exhaust Systems
290 2 Attachment D 4
Please clarify if there is any parking lot or driveway work to be included in the Base Price, or if this is to be captured entirely in Option Item #4.
See Amendment 0010
75;
105;
01 33 10.05 20;
01 33 29.05 20;
D502002
1.2;
1.1, HPSB;
01 33 10.05 20, para. 1.2 states, "The latest version of the publications at the time of RFP issuance must be used."
However, elsewhere, older versions of specific codes are referenced. E.g., 01 33 29.05 20 references ASHRAE 90.1- 2013, and the HPSB Checklist was compared against ASHRAE 90.1- 2013. Additionally, D502002 requires the LPD to "80% lower than those established by ASHRAE 90.1 2010."
Please confirm that in every case, the latest versions of the codes as of the date of publication of the RFP (i.e., 05 March 2025) apply, including for baseline comparisons.
Follow requirements in Spec Section 01 33 10.05 20 paragraph 1.2.
AE101 &
AE102
There are several rooms that are shown to have exterior windows in Part 6:
Drawings that do not indicate B202001 Windows or B202002 Storefronts in the Room Requirements. The following rooms have exterior windows in Part 6 but indicate C101005 Interior WIndows in the Room Requirements: 103, 104, 107, 116, 201, 203, 204, 206, 208, 208A, S101 & S201, and S102 & S202.
Please clarify which windows will be needed
See Amendment 0010
293 4
Part 3/Chap.6/ES
R G40 G403001
G403001 states to demolish existing PDS between buildings 3606 and 3808.
Please confirm/verify the following:
(1) Is the existing PDS concrete encased? (2) Will the PDS structure be abandoned in place with just the cables removed or is the entire PDS, including cables, being removed?
PDS is concrete encased and shall be removed.
294 4
Part 3/Chap.6/ES R G40 & Part 6/Attachment
K
G403001 & Sheet
CD101
In order to accurately capture the cost, please provide site plan showing existing PDS duct bank routing to be demolished. After reviewing sheet CD101, it is unclear where the existing PDS is located to be able to quantify the demolition work. Sheet CD101 does not seem to show the existing PDS to be demolished between Buildings 3606 and 3808.
The extent of available information on PDA routing is shown on Sheet CD101.
295 4
Part 3/Chap.6/ES R G40 & Part 6/Attachment
K
G403001 & Sheet CI101
Please provide OSP telecommunications block diagram indicating how the architecture is to be configured between all buildings (3853, 3802, 3806, 3808, & P235) in order to "complete the campus fiber loop". Please include any/all existing FO handholes, pedestals, etc that will be part of the loop. Paragraph
G403001 seems to suggest a star topology network with P325 being the central location. If a campus loop (ring) topology is desired, what building is labeled as the main campus cross-connect? Sheet CI101 does not seem to show Buildings 3802 or 3808 or the work described under paragraph G403001.
Follow requirements as provided in paragraph G403001.
296 RFP Gen. Req.
For the existing facilities to be demolished, please confirm that localized outages for the existing steam system will be possible and that demolition will not have to be coordinated after the heating season. If coordination is required, please provide the seasonal timeframes for use in generating our demolition activities in our project schedule.
See Division 2, SECTION 01 14 00
Work Restrictions, paragraph 3.1.3 Utility Cutovers and Interruptions.
Part 3 Ch-6
+ ESR
C303002
C303001
Confirm the intention to have 30% of ceiling be a gyp. soffit around the perimeter of the room with acoustic panel ceiling (tray ceiling style) per ESR C303002, min. height difference of 6" for every room requirement meeting that criteria.
Follow Part 3, Chapter 6 ESR, Interior Finishes, C303001 and C303002 requirements which specify the % and height difference.
298 12 D30 D304008
Other sections speaks to packaged VAV rooftop units; however, this section speaks to weather resistant sloped roof. The sloped roof is not a standard feature for some vendors.
Please confirm that there are a minimum of 3 DX vendors that have a standard sloped roof or is the intent to use a custom style unit?
Intent is not to use custom units
IF101A to
IF102B
Please confrim all Furniture and Equipment listed on these plans are not included in Base Bid and are part of the FFE CLIN 08.
Confirmed
2. Incorporate Revised Specifications
Part 3 – Chapter 5 Room Requirements, Room C101-Corridor
Delete:
“B203002 Glazed Doors Type A3”
Part 3 – Chapter 5 Room Requirements, Room 102 Elevator
Change:
“C301003 Gypsum Wallboard Finishes Gypsum board”
To:
“C301001 Concrete and CMU Wall Finishes CMU”
Part 3 – Chapter 5 Room Requirements, Room 106 and 202 Storage
Change:
“C301001 Concrete and CMU Wall Finishes CMU”
To:
“C301001 Concrete and CMU Wall Finishes CMU
C301003 Gypsum Wallboard Finishes Gypsum board”
Part 3 – Chapter 5 Room Requirements, Room S101 & S201 - Stair 1
Change:
“B203001 Solid Door Type EM3”
To:
“B202002 Storefront See Part 6 - Attachment -Drawings”
Part 3 - Project Description, third paragraph:
Change:
“The project includes all pertinent site preparations and site improvements, mechanical and electrical utilities, telecommunications, landscaping, drainage, parking, and exterior lighting. Site improvements include an artificial turf exercise field, exterior storage facility, entry courtyards at each entrance, pedestrian paths, and a dumpster enclosure. The project demolishes buildings 3812, 3855A, and 3855D.”
To:
“The project includes all pertinent site preparations and site improvements, mechanical and electrical utilities, telecommunications, landscaping, drainage, parking, and exterior lighting. Site improvements include an artificial turf exercise field, exterior storage facility, entry courtyards at each entrance, pedestrian paths, and a dumpster enclosure. The project demolishes buildings 3812, 3855A, and 3855D.
Buildings 3855A and 3855D will be demolished after the building occupants have moved into the P325 facility.”
Part 3 - Chapter 3.0 Site Analysis Paragraph 3.2.1 Demolition
Change:
“Site demolition includes the removal of buildings 3812 (approx. 19,355 sf), 3855A (approx. 4,666 sf), and 3855D (approx. 4,658 sf), including the artificial turf field (approx. 4,822 sf). The turf field will not be demolished if the Bid Option for the new turf field is not selected. These buildings must be removed in their entirety, including structure, foundation, concrete slab and all utility service connections. … “
To:
“Site demolition includes the removal of buildings 3812 (approx. 19,355 sf), 3855A (approx. 4,666 sf), and 3855D (approx. 4,658 sf), including the artificial turf field (approx. 4,822 sf). The turf field will not be demolished if the Bid Option for the new turf field is not selected. Demolition of buildings 3855A and 3855D after the building occupants move into the new facility. Provide advance notice to the Contracting Office 45 days before the occupants must move. These buildings must be removed in their entirety, including structure, foundation, concrete slab and all utility service connections. … “
Part 3, Chapter 6 ESR, Paragraph D30 HVAC, page 5:
Change:
Mechanical/Electrical Rooms
Summer 10 °F dry bulb above ambient
Winter 40 °F
To:
Mechanical Rooms Summer 10 °F dry bulb above ambient Winter 40 °F
Add:
Electrical Rooms Summer 85 °F dry bulb Winter 55 °F
Elevator Machine Rooms
Summer 78 °F dry bulb Winter 50 °F
Part 3, Chapter 6 ESR, Paragraph B20 Exterior Enclosure
Add:
“B202090 OTHER EXTERIOR WINDOWS (TRANSLUCENT WINDOW SYSTEMS)
THERMOPLASTIC POLYCARBONATE PANELS
Manufacture systems from translucent polycarbonate panels designed for architectural applications. Provide panels consisting of a polycarbonate resin with a permanent, co-extruded, ultra-violet protective layer; co-extruded by the manufacturer during the original extrusion of the panel a permanent part of the exterior and interior layers. Pot-applied coatings or films of dissimilar materials are unacceptable. Provide panel width not to exceed 2 feet to ensure the best performance for wind uplift, vibration, oil canning and visual appearance. Meet the following manufacturing requirements:
a. Extruded in one single formable length. Transverse sections are unacceptable. Manufacturing the panels with upstands which are integral to the unit, and with the upstands 90 degrees to the panel face (standing seam dry glazed concept). Welding or gluing upstands or standing seam is unacceptable.
b. Provide dry glazed profiles mullions, using no sealant, welding, adhesives or gaskets; thermally break mullions continuous for panel length.
c. For structural performance, the use of adhesives, plastic or sonic welding or sealant is not allowed.
d. For longevity, the minimum ratio of panel weight to thickness must be 0.91 psf for 2.2, 3, and 4 inch double glazed thick panel.
e. Extruded panel includes integral extruded multi-cells, and truss-like structural core for resistance to buckling. Interconnect the panel's exterior skins and space apart by supporting ribs, perpendicular to the skins, at a spacing not to exceed 0.16 inches (truss-like construction). In addition, divide the space between the two exterior skins into a cross section by multiple parallel intermediate surfaces, at a spacing not to exceed 0.16 inches.
f. Interior flame spread classification is Class I in accordance with ASTM E84.
g. Smoke density no greater than 70 in accordance with ASTM D2843.
h. The exterior and interior faces must be an approved light transmitting panel with a CC1 fire rating classification in accordance with ASTM D635.
i. Self-ignition greater than 1058 degrees F in accordance with ASTM D1929.
PANEL REQUIREMENTS
Appearance: Provide face sheets uniform in color to prevent splotchy appearance and completely free of ridges and wrinkles which prevent proper surface contact. Clusters of air bubbles/pinholes which collect moisture and dirt are not acceptable.
Panel Fabrication: Panel construction must meet the following requirements:
a. Light transmission .34 percent; color clear matte.
b. Assembled panel thickness 4.25 inches.”
Part 3, Chapter 3, Site Analysis, Paragraph 3.2.3. New Site Work
Change:
“3.2.3 New Site Work
The project will construct …... 8’ high ornamental steel security fence 30’ from the western side of the building, 30’ south of building 3806, and 30’ north of the existing concrete storage yard; an 8’ high ornamental vehicular gate south of building 3806; utility service yard with screen walls; landscaping and signage. …….:
To:
“3.2.3 New Site Work
The project will construct …... 8’ high ornamental steel security fence 30’ from the western side of the building, 30’ south of building 3806, and 30’ north of the existing concrete storage yard; utility service yard with screen walls; landscaping and signage. …….”
Part 3, Chapter 6 ESR Paragraph G2020 Parking Lots
Replace: Paragraph G2020 in its entirety with the following:
“G2020 PARKING LOTS (Bid Option)
Provide parking for 34 vehicles. The design of pavements must include the anticipated daily traffic over the life of the project (25years) as well as the existing soil conditions at the site.
Provide parking lots with bituminous pavement. Aggregate pavement may not be used.
Provide new parking and other pavement sections as required by soil conditions and determined by Designer of Record. Design pavement sections in accordance with UFC 3-201-01 Civil Engineering.
Pavement section is the responsibility of the Designer of Record.
Provide other parking improvements including five (5) bicycle stalls, anchored to concrete markings, signage, and landscaping. See ESR G2050 for parking lot landscape requirements.
Provide handicapped parking in accordance with UFC 1-200-01, DoD Building Code (General Building Requirements).”
If the Parking Lot Bid Option is not awarded, remove the existing pavement. Demolish the existing BMP and construct a BMP outside the P325 building footprint as required. Route existing storm transmission structures to new BMP and remove abandoned portion of storm transmission structures. Provide sod and landscaping utilizing the trees, shrubs, and ground covers. Provide the pedestrian paving at building entry as detailed on Conceptual Landscaping Plan in Part Six, Attachment K. “
| 23R2656 Amendment 0001 |
| 23R2656 Amendment 0004 |
| Pages from 23R2541 Amendment 0003-2 |
Amendment 0001 continuation page
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: 0010 |
| Code[0]: N40085 |
| Code[1]: |
| AccountingData[0]: |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: |
| Description[0]: N40085-25-R-2563, Design-Build (DB), P 325 Human Performance Training Center, JEB Little Creek Fort Story, Virginia Beach, Virginia |
SEE SF 30 BLOCK 14 CONTINUATION PAGE
Contract POC: Angie Clifton, angela.j.clifton2.civ@us.navy.mil
| FacilityCode[0]: |
| Code[2]: |
| IssuedBy[0]: NAVFACYSCOM MID-ATLANTIC |
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK, VA 23511-3095
| NameandAddress[0]: |
| AdministeredBy[0]: See Item 6 |
| ContractIDCode[0]: |
| ReqNumber[0]: |
| AmendmentNo[1]: N4008525R2563 |
| ModificationNo[0]: |
| ProjectNo[0]: |
| Page[0]: 1 |
| Pages[0]: 14 |
| EffectiveDate[0]: 05/13/2025 |
| Dated9B[0]: 03/05/2025 |
| Dated10B[0]: |
| CheckBox9[0]: 1 |
| CheckBox10[0]: Off |
| CheckBox11[0]: 1 |
| CheckBox13A[0]: Off |
| CheckBox13B[0]: Off |
| CheckBox13C[0]: Off |
| CheckBox13D[0]: Off |
| IsNot[0]: Off |
| Is[0]: 1 |
| Extended[0]: Off |
| NotExtended[0]: 1 |
| DateSigned[0]: |
| DateSigned[1]: |
| Copies[0]: 1 |
| CopiesReturned[0]: 1 |
File details come from the government source that posted it. Updated .