This document is a PPI (Preliminary Project Information) Revision Narratives document for the P-1538 SOF Armory project at MCB Camp Lejeune, NC. The document details extensive revisions to multiple drawing sheets and specifications across various disciplines including architectural, plumbing, mechanical, electrical, telecommunications, and civil engineering. Key modifications include adding compressed air drops, updating security bar requirements, adjusting gate and turnstile locations, adding AV backboxes and infrastructure details, and making numerous specification changes such as removing PVC shower pans, updating earthwork sections, and adding options for virtual meetings. The revisions appear to be part of a comprehensive design update for a military facility, with changes spanning from technical details like beam grades and concrete jointing to infrastructure elements like vehicle gates and fence grounding.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P‐1538 SOF Armory MCB Camp Lejeune, NC MBFA No: 2202
PPI Revision Narratives Date: September 19, 2025
Drawings
Sheet CD100: Added additional demolition note #11
Sheet CD101: Updated keynote #8 to demolish the existing power pole and guy wires
Sheet CS101: Moved the turnstile and concrete sidewalk far enough from the sliding gate plan west of them so that there is sufficient clearance for the gate to open
Sheet CS103: Add jointing plan
Sheet CG101: Updated the 24’ contour and sidewalk spot elevations
Sheet CG123: Added keynote #15 and layer controlled to show the gravel filter strip
Sheet CU101: Corrected keynotes #1 and #2; Deleted keynotes #19 and #26 and associated blocks in the model file
Sheet CU207: Corrected profiles A1 and A4
Sheet CU208: Corrected profile A2
Sheet C‐511: Deleted detail C2, Asphalt Pavement Patch
Sheet C‐512: Added Card Reader and Card Reader Pedestal details
Sheet C‐513: Added NCDEQ Permanent Seeding detail
Sheet C‐516: Added concrete jointing details
Sheet S‐003: Wide flange beam grade updated to A992 & deck primer requirement removed
Sheet A‐105: Tagged Bulkhead keynotes and tagged vault head ceilings
Sheet A‐304: Deleted insulation at entry roof and corrected slope tag
Sheet A‐403: Added locker tags
Sheet A‐503: Added bulkhead at stair
Sheet A‐505: Added “T” seam detail
Sheet I‐101: CFCI schedule updated to show dimensions
Sheet I‐102: CFCI schedule updated to show dimensions
Sheet I‐103: CFCI schedule updated to show dimensions
Sheet I‐601: Room finish schedule corrected; painted ceilings updated to PNT‐5
Sheet I‐602: Sealed Concrete MFG and info added
Sheet I‐602: WS‐2 Blackout Roller shade added
Sheet P‐107: A3/P‐107 – FLOOR PLAN – AREA B – WATER & COMPRESSED AIR: Added plan note #1 to include the additional ¾” Compressed air drops to hose reels
Sheet P‐501: C4/P‐501 – PLUMBING DETAILS: Removed the seismic bracing detail because it is not applicable for this project
Sheet MH401: Revised note #4 from ‘PROVIDE SECURITY BARS IN DUCT PENETRATION OF MECHANICAL
ROOM. PROVIDE ACCESS DOOR ON SECURE SIDE OF WALL.’ To ‘PROVIDE SECURITY BARS IN ANY DUCT
PENETRATION OF VAULT ASSEMBLY THAT EXCEEDS 96 SQUARE INCHES. PROVIDE ACCESS DOOR ON
SECURE SIDE OF WALL.’
Sheet M‐507: Added detail C1/M‐507 ‘BURIED PREINSULATED CHILLED WATER PIPING DETAIL’
Sheet ES101: Added vehicle gate infrastructure and adjusted turnstile location.
Sheet ES503: Added vehicle gate and turnstile details.
Sheet ES504: Added gate and fence grounding details.
Sheet E‐101: Added receptacles for AV backboxes and racks in Floor Plan Area ‘A’ ‐ Power.
Sheet E‐102: Added duplex receptacles for AV backboxes in Floor Plan Area ‘B’ ‐ Power.
Sheet E‐602: Updated panel schedule for panel ‘P1B’.
Sheet T‐001: Added AV symbols and descriptions to legend.
Sheet T‐101: Added AV backboxes, wall inputs, and ceiling speakers in Floor Plan Area ‘A’ ‐
Telecommunications.
Sheet T‐102: Added AV backboxes and wall inputs in Floor Plan Area ‘B’ ‐ Telecommunications.
Specifications
Tabel of Contents: Revised
Submittal Register: Revised
03 30 00, 3.10.2: Slab FF/FL requirements for industrial construction removed
03 30 00, 3.5.8: Note revised to allow field bending of reinforcing bars up to #5
10 11 00: added to the project
10 51 13: Revised Section to eliminate single tier lockers and add locker benches
12 00 01.00 20: 3.1.2.8 – Added the option for a virtual OTS meeting
22 00 00: Deleted PVC shower pans.
31 00 00: Sections 3.3.3, 3.4.3, 3.4.5, 3.6.2, 3.6.6.1, and 3.6.6.2 have been updated
32 01 16.71: has been removed
32 12 13: has been removed
32 12 16.16: has been removed
32 16 19: Spec has been edited to remove all items related to curb and gutter
33 05 07.13: Spec has been removed.
33 05 23: has been added
33 40 00: Section 2.4.1 and 3.8.1 have been removed