About this file

This document is a Civil Dwg (Civil Drawing) file for a Naval Facilities Engineering Command project located at Marine Corps Base Camp Lejeune and Naval Station Norfolk, Virginia. The comprehensive drawing set includes multiple sheets (VF100, CS100, CG100, CU100, etc.) that provide detailed topographic survey information, existing site conditions, and technical specifications for a construction project. The survey was completed by Stantec Consulting Services Inc. on August 9, 2022, and covers a site with various features including asphalt surfaces, woods, chain-link fencing, storm pipes, sanitary sewer manholes, and utility infrastructure.

The drawings include precise geospatial data with coordinate references, elevation measurements, and notations about horizontal and vertical datums (NAD83/2011 NC State Plane and NAVD 88). Maintenance notes are included for erosion control measures like check dams, riprap installations, and silt sock/wattle perimeter protections. The document is part of a larger Naval Facilities Engineering Command project related to the Design-Build/Design-Bid-Build Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract for Marine Corps Installations East Area of Responsibility, with design revision dates ranging from April to November 2025.

View the file

Other files

File Type Posted
N4008525R2507 Amendment 0013.pdf PDF
N4008525R2507 Amendment 0012.pdf PDF
N4008525R2507 Amendment 0011.pdf PDF
N4008525R2507 Amendment 0010.pdf PDF
N4008525R2507 Amendment 0009.pdf PDF
N4008525R2507 Amendment 0008.pdf PDF
Civil revisions narrative.docx DOCX document
N4008525R2507 Amendment 0007.pdf PDF
P-1219PackageSewageLiftStationInfo.pdf PDF
N4008525R2507 Amendment 0006.pdf PDF
N4008525R2507 Amendment 0005.pdf PDF
BLDG P1538-1701821-CG123-REV03.pdf PDF
Amendment 0004 - Revisions Narrative.pdf PDF
N4008525R2507 Amendment 0004.pdf PDF
BLDG P1538-1701821-B-109-REV02.pdf PDF
Amendment 0004 SPC Revisions.pdf PDF
2025 NEW UTILITIES RATES.pdf PDF
BLDG P1538-1701821-C-523-REV02.pdf PDF
Attachment J - Price Proposal Form Rev1.docx DOCX document
Technical Amendment 0003 SPC.pdf PDF
Technical Amendment 0003 - Revisions Narrative.pdf PDF
N4008525R2507 Amendment 0003.pdf PDF
Technical Amendment 0003 DWG.pdf PDF
25R2507 (P1538 Seed Project) Site Visit Log.pdf PDF
N4008525R2507 Amendment 0002.pdf PDF
MARSOC - Site Visit Contractor Access Roster.xlsx XLSX spreadsheet
Technical Amendment 0001.pdf PDF
N4008525R2507 Amendment 0001.pdf PDF
Attachment I - P1538 DWG 2 of 6.pdf PDF
Attachment I - P1538 DWG 1 of 6.pdf PDF
Attachment H - P1538 SPECS.pdf PDF
Attachment E - Historical Small Business Utilization.docx DOCX document
Attachment A - PPI Log Template.xlsx XLSX spreadsheet
Attachment J - Price Proposal Form.docx DOCX document
Attachment I - P1538 DWG 6 of 6.pdf PDF
Attachment I - P1538 DWG 5 of 6.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
N4008525R2507.pdf PDF
Attachment I - P1538 DWG 3 of 6.pdf PDF
Attachment G - Small Business Subcontracting Plan (SBSP) Template.docx DOCX document
Attachment I - P1538 DWG 4 of 6.pdf PDF
Attachment F - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Attachment C - Construction and Design Experience Project Data Sheet.docx DOCX document
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X X

X

X X

X X

X X

X X

X X

X

D

X

X

X

D

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

XX

X

X

X

X X

X X

X X

X X

X X

X

X

X

X X

X

D

SD

SD

SD

SD

LOD

LOD

LOD

LOD

LODLOD

LOD

LO

D

LOD

LO

D

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

D

SD

D

SD

7'CHL-3SBW

WOODS

INV=19.82'-FES

18"RCP

RIP-RAP

ASPHALT

ASPHALT

T

X X

X

X

X

X

X

X

X X

SD

SD

20'

10'

15'

20'

15'

20'

20'

20'

15'

20'

25'

30'

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

NORTH

PLAN

B-109

2025-11-19

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

CONC

EOI

FES

RCP

CHL

3SBW

X X X

T

SD

SAN

FO

T

W W

E E E

G G

J

VF001

2025-05-23

7'CHL-3SBW

7'CHL-3SBW

WOODS

WOODS

WOODS

CABLE BOX

INV=18.91'-FES

INV=19.82'-FES

18"RCP

RIP-RAP

RIP-RAP

ASPHALT

ASPHALT

ASPHALT

T

T

C

X X

X

X X

X X X

X

X

X

X

X

X

N=304,183.420' E=2,470,525.415'

EL=32.216'

SPIKE NAIL

N=304,430.552' E=2,471,155.679'

EL=23.196'

SPIKE NAIL

N=304,083.403' E=2,471,129.877'

EL=19.795'

SPIKE NAIL

N=304,025.617' E=2,471,315.414'

EL=16.725'

SPIKE NAIL

N=304,039.024' E=2,470,991.775'

EL=20.181'

SPIKE NAIL

N=304,008.335' E=2,470,895.183'

EL=19.035'

SPIKE NAIL

N=303,927.280' E=2,470,710.141'

EL=18.566'

SPIKE NAIL

LEGEND

I, BRUCE D. BEAVERS, CERTIFY THAT THIS SURVEY WAS COMPLETED UNDER

MY DIRECT AND RESPONSIBLE CHARGE FROM AN ACTUAL FIELD SURVEY MADE UNDER

MY SUPERVISION; THAT THIS GROUND SURVEY WAS PERFORMED AT THE 95% PERCENT

CONFIDENCE LEVEL TO MEET FEDERAL GEOGRAPHIC DATA COMMITTEE STANDARDS;

THAT THIS SURVEY WAS PERFORMED TO MEET THE REQUIREMENTS FOR A

TOPOGRAPHIC/PLANIMETRIC SURVEY TO THE ACCURACY OF CLASS AA, AND THAT THE

FIELD DATA WAS COMPLETED ON AUGUST 9, 2022; THAT THE SURVEY MAPPING WAS

COMPLETED ON AUGUST 16, 2022; AND ALL COORDINATES ARE BASED ON NC

'NAD 83'/2011 AND ALL ELEVATIONS ARE BASED ON NAVD 88.

BRUCE D. BEAVERS PLS L-3451

NOTES:

1. THE PURPOSE OF THIS MAP IS TO SHOW TOPOGRAPHIC FEATURES AND

INFORMATION ONLY AND IS NOT TO BE USED FOR BOUNDARY OR PROPERTY

OWNERSHIP INFORMATION.

2. THIS DRAWING REPRESENTS THE EXISTING CONDITIONS AS OF AUGUST 9, 2022.

3. SURVEYED BY: STANTEC CONSULTING SERVICES INC.

4. SURVEY DATE: AUGUST 16, 2022

5. HORIZONTAL DATUM: NAD83/2011 NC STATE PLANE US SURVEY FEET.

6. VERTICAL DATUM: NAVD 88, GEOID 12A.

7. THIS MAP DOES NOT VERIFY THE EXISTENCE OF, NOR CERTIFY THE LOCATION

OF ANY JURISDICTIONAL WETLANDS THAT MAY EXIST ON OR NEAR THE PROPERTY.

8. UNDERGROUND UTILITIES ARE NOT A PART OF THIS SURVEY.

CONC

EOI

FES

RCP

CHL

3SBW

LIGHT POLE

POWER POLE

TELEPHONE MANHOLE

SIGN

GUY WIRE

MONUMENT

SURVEY CONTROL

SANITARY SEWER MANHOLE

CONCRETE

END OF INFORMATION

FLARED END SECTION

REINFORCED CONCRETE PIPE

CHAIN LINK

3 STRAND BARBED WIRE

WOODS

FENCE

LIDAR DATA AREA

STORM PIPE

T

SD

E

E

E

E

E

E E

E E

E E

E

W

W

W

W

W

W

W W

W

W W

SAN

SAN

SAN

SAN

SAN

SAN

SAN

S

20'

10'

15'

20'

20'

15'

20'

20'

20'

15'

10'

10'

15'

20'

25'25'

25'

30'

21'

24'

FO

FO

FO

FO

FO

FO

FO

FO

T

T

T

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

T

T

T

T

T

T

T

T

T

G

G

G

G

G

G

G

G

G

T

J

T

J

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

NORTH

PLAN

VF100

EXISTING IMPERVIOUS

DATA

Line # Length Direction Line # Length Direction Line # Length Direction Line # Length Direction Line # Length Direction

WOODS

WOODS

WOODS

INV=18.91'-FES

INV=19.82'-FES

18"RCP

RIP-RAP

RIP-RAP

ASPHALT

ASPHALT

T

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

SD

SD

E

E

E

E

E

EE

E

E

E

E

E

E

E

E E

E

E E

E E

E E

E E

E

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

W W

W

W

W W

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

T

T

T

T

T

T

T

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

26 25

10 9

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

NORTH

PLAN

VF101

ASPHALT

ASPHALT

X

X

X

X

X

X

X X

W

W

W

W

W

W

W

SAN

SAN

SAN

SAN

20'

21'

24'

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

T

T

T

T

T

T

G

G

G

G

G

T

J

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

NORTH

PLAN

NORTH

PLAN

VF102

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

X X X

D

CO

H Y D

W W

F F

S

CONC

EOI

FES

RCP

CHL

3SBW

X X X

T

SD

SAN

FO

T

W W

E E E

G G

J

G

C-001

7'CHL-3SBW

WOODS

WOODS

WOODS

CABLE BOX

INV=18.91'-FES

INV=19.82'-FES

18"RCP

RIP-RAP

RIP-RAP

ASPHALT

ASPHALT

ASPHALT

T

T

C

X X

X

X X

X X X

X

X

X

X

X

X

LEGEND

I, BRUCE D. BEAVERS, CERTIFY THAT THIS SURVEY WAS COMPLETED UNDER

MY DIRECT AND RESPONSIBLE CHARGE FROM AN ACTUAL FIELD SURVEY MADE UNDER

MY SUPERVISION; THAT THIS GROUND SURVEY WAS PERFORMED AT THE 95% PERCENT

CONFIDENCE LEVEL TO MEET FEDERAL GEOGRAPHIC DATA COMMITTEE STANDARDS;

THAT THIS SURVEY WAS PERFORMED TO MEET THE REQUIREMENTS FOR A

TOPOGRAPHIC/PLANIMETRIC SURVEY TO THE ACCURACY OF CLASS AA, AND THAT THE

FIELD DATA WAS COMPLETED ON AUGUST 9, 2022; THAT THE SURVEY MAPPING WAS

COMPLETED ON AUGUST 16, 2022; AND ALL COORDINATES ARE BASED ON NC

'NAD 83'/2011 AND ALL ELEVATIONS ARE BASED ON NAVD 88.

BRUCE D. BEAVERS PLS L-3451

NOTES:

1. THE PURPOSE OF THIS MAP IS TO SHOW TOPOGRAPHIC FEATURES AND

INFORMATION ONLY AND IS NOT TO BE USED FOR BOUNDARY OR PROPERTY

OWNERSHIP INFORMATION.

2. THIS DRAWING REPRESENTS THE EXISTING CONDITIONS AS OF AUGUST 9, 2022.

3. SURVEYED BY: STANTEC CONSULTING SERVICES INC.

4. SURVEY DATE: AUGUST 16, 2022

5. HORIZONTAL DATUM: NAD83/2011 NC STATE PLANE US SURVEY FEET.

6. VERTICAL DATUM: NAVD 88, GEOID 12A.

7. THIS MAP DOES NOT VERIFY THE EXISTENCE OF, NOR CERTIFY THE LOCATION

OF ANY JURISDICTIONAL WETLANDS THAT MAY EXIST ON OR NEAR THE PROPERTY.

8. UNDERGROUND UTILITIES ARE NOT A PART OF THIS SURVEY.

CONC

EOI

FES

RCP

CHL

3SBW

LIGHT POLE

POWER POLE

TELEPHONE MANHOLE

SIGN

GUY WIRE

MONUMENT

SURVEY CONTROL

SANITARY SEWER MANHOLE

CONCRETE

END OF INFORMATION

FLARED END SECTION

REINFORCED CONCRETE PIPE

CHAIN LINK

3 STRAND BARBED WIRE

WOODS

FENCE

LIDAR DATA AREA

STORM PIPE

T

SD

E

E

E

E

E

E E

E E

E E

E

W

W

W

W

W

W

W W

W

W W

SAN

SAN

SAN

SAN

SAN

SAN

SAN

S

20'

10'

15'

20'

20'

15'

20'

20'

20'

15'

10'

10'

15'

20'

25'25'

25'

30'

21'

24'

FO

FO

FO

FO

FO

FO

FO

FO

T

T

T

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

T

T

T

T

T

T

T

T

T

G

G

G

G

G

G

G

G

G

X X X X X X X X X X X X X X X

X X

X X

X X

XXX

XX

X

X X

X X X

X

T

J

LODLODLODLODLODLOD

LOD

LOD

LOD

LOD

LOD

LODLOD

LO

D

LOD

LOD

LOD

LODLOD

LOD

LOD

LO

DLOD

LOD

LOD

LO

D

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LOD LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD LOD LOD LOD LOD LOD LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

NORTH

PLAN

CD100

2025-09-19

X X X X X X X X X X X X X X

X X

X X

X X

XXX

XX

X

XX

X X X

X

LOD

LOD

LOD

LOD

LODLOD

LOD

LO

D

LOD

LO

D

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LO

D

LOD

LOD

LOD

LO

D

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

7'CHL-3SBW

7'CHL-3SBW

WOODS

WOODS

WOODS

INV=18.91'-FES

INV=19.82'-FES

18"RCP

RIP-RAP

RIP-RAP

ASPHALT

ASPHALT

T

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

SD

SD

E

E

E

E

E

EE

E

E

E

E

E

E

E

E E

E

E E

E E

E E

E E

E

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

W W

W

W

W W

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

T

T

T

T

T

T

T

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

NORTH

PLAN

CD101

X X X

LODLODLODLODLODLODLODLODLODLODLOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LODLOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD

T

7'CHL-3SBW

ASPHALT

ASPHALT

X

X

X

X

X

X

X X

W

W

W

W

W

W

W

SAN

SAN

SAN

SANFO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

T

T

T

T

T

T

G

G

G

G

G

T

J

LODLODLODLODLODLODLOD

LOD LOD LOD LOD LOD LOD LOD LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LODLOD

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

NORTH

PLAN

NORTH

PLAN

CD102

X

X X

X X

X

X X

X

X X

X X

X

H

Y D

H Y D

H Y

D

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X

X X

X X

X

X

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

LODLODLODLODLODLOD

LOD

LOD

LOD

LOD

LOD

LODLOD

LO

D

LOD

LOD

LOD

LODLOD

LOD

LOD

LO

DLOD

LOD

LOD

LO

D

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LOD LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD LOD LOD LOD LOD LOD LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

CABLE BOXC

X X

X

X

X

X

N=304,183.420' E=2,470,525.415'

EL=32.216'

SPIKE NAIL

N=304,430.552' E=2,471,155.679'

EL=23.196'

SPIKE NAIL

N=304,083.403' E=2,471,129.877'

EL=19.795'

SPIKE NAIL

N=304,025.617' E=2,471,315.414'

EL=16.725'

SPIKE NAIL

N=304,039.024' E=2,470,991.775'

EL=20.181'

SPIKE NAIL

N=304,008.335' E=2,470,895.183'

EL=19.035'

SPIKE NAIL

N=303,927.280' E=2,470,710.141'

EL=18.566'

SPIKE NAIL

LEGEND

CONC

EOI

FES

RCP

CHL

3SBW

LIGHT POLE

POWER POLE

TELEPHONE MANHOLE

SIGN

GUY WIRE

MONUMENT

SURVEY CONTROL

SANITARY SEWER MANHOLE

CONCRETE

END OF INFORMATION

FLARED END SECTION

REINFORCED CONCRETE PIPE

CHAIN LINK

3 STRAND BARBED WIRE

WOODS

FENCE

LIDAR DATA AREA

STORM PIPE

S

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

NORTH

PLAN

CS100

WOODS

RIP-RAP

ASPHALT

ASPHALT

X X

X X

X X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X X

X

X X

X X

X X

X X

X X

XH

Y D

H Y D

H Y

D

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

XX

X

X

X

X X

X X

X X

X X

X X

X

X

X

X X

X

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

LOD

LOD

LOD

LOD

LODLOD

LOD

LO

D

LOD

LO

D

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LO

D

LOD

LOD

LOD

LO

D

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

T

J

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

NORTH

PLAN

CS101

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LODLOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD

T

ASPHALT

ASPHALT

X

X

X

X

X

X

X X

LODLODLODLODLODLODLOD

LOD LOD LOD LOD LOD LOD LOD LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LODLOD

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

NORTH

PLAN

NORTH

PLAN

CS102

X X X X

TCJ

TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ

TCJ

CJ CJ CJ CJ

CJ CJ CJ CJ

CJ CJ CJ CJ

CJ CJ CJ CJ

CJ CJ CJ CJ

CJ CJ CJ CJ

CJ CJ CJ CJ

CJ CJ CJ CJ

CJ CJ CJ CJ

CJ CJ CJ CJ

CJ CJ CJ CJ

CJ CJ CJ CJ

CJ CJ CJ CJ

CJ CJ CJ CJ

CJ CJ CJ CJ

DJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

DJ CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

DC

J

DC

J

DC

J

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DC

J

DC

J

DC

J

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DC

J

DC

J

DC

J

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DC

J

DC

J

DC

J

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DC

J

DC

J

DC

J

DJ DJ DJ

DCJ DCJ DCJ

DJ DJ DJ

DJ DJ DJ

DJ DJ DJ

DJ DJ DJ

DJ DJ DJ

DJ DJ DJ

DCJ DCJ DCJ

DJ DJ DJ

DJ DJ DJ

DJ DJ DJ

DJ DJ DJ

DJ DJ DJ

CJ CJ CJ

CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ

CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ

TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ

CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ

TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ

DJ DJ

DJ

DJ

EJ EJ EJ

EJ

EJ

EJ

EJ

EJ

EJ

EJ

EJ

EJ

EJ

EJ

EJ

EJ

EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ

EJ

EJ

EJ

EJ

EJ

EJ

EJ

EJ

EJ

EJ

EJ

EJ

EJ

EJ

EJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJ

EJ

EJEJ

EJ

EJ

EJ

CJ

CJ

CJ

CJ

DJ

CJ

CJ

DJ

DJ

CJ

CJ

DJ

DC

J

DC

J

DC

J

DC

J

DJ

CJ

CJ

DJ

DJ

CJ

CJ

DJ

DJ

CJ

CJ

DJ

DJ

CJ

CJ

DJ

DJ

CJ

CJ

DJ

DJ

CJ

CJ

DJ

DC

J

DC

J

DC

J

DC

J

DJ

CJ

CJ

DJ

DJ

CJ

CJ

DJ

DJ

CJ

CJ

DJ

DJ

CJ

CJ

DJ

DJ

CJ

CJ

DJ

DC

J

DC

J

DC

J

DC

J

DJ

CJ

CJ

DJ

DJ

CJ

CJ

DJ

CJ

CJ

CJ

CJ

DJ

CJ

CJ

DJ

DJ

CJ

CJ

DJ

DC

J

DC

J

DC

J

DC

J

DC

J

DC

J

DC

J

DC

J

EJ

DJ

DJ R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R R R

R

DJ

DJDJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

R

R

R

R

R

R

R

R

R

R

R

R

DJ

DJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

DC

J

DC

J

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

DC

J

DC

J

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

DJ

DJ

TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ

TE TE

TE TE

TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ TCJ

TCJ

EJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJ

TE TE TE TE TE TE TE TE TE TE TE TE TE TE TE TE TE TE TE TE

TETETETETETETETETETETETETETETETETETETETE

R

RR

R

R

R R

R

TE

TE

TE

EJ

TE

TE

TE

TE

EJ

EJ

DJ

DJ DJ

DJ

DC

J

DC

J

DC

J

DC

J

DJ

DJ

DJ

DJ

DC

J

DC

J

DC

J

DC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TC

J

TETETETE

TE

TE

TE

R

RR R R

R

R

R

CJ

CJ CJ

CJ

CJ

CJ CJ

CJ CJ

CJ CJ

CJ CJ

CJ CJ

CJ CJ

CJ CJ

CJ CJ

CJ CJ

CJ CJ

CJ CJ

CJ CJ

CJ CJ

CJ CJ

CJ CJ

CJ CJ

CJ CJ

CJ CJ

CJ CJ

CJ CJ

CJ CJ

CJ

CJ

CJCJ

CJCJCJCJCJCJCJCJCJCJCJCJCJCJCJCJCJCJCJCJCJCJCJ

CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ

DJDJ

DJDJ DJDJ

CJCJ

CJ CJ

DCJDCJ

CJ CJ

CJ CJ

DJDJ DJDJ

DJ CJ

CJCJ

DCJDCJ

CJ CJ

CJCJ

DJ DJ

RR

R R R R

DCJ DCJ DCJ DCJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

CJ

TE

DJ DJ

DJDJ

DJ

DCJ DCJ DCJ DCJ

DCJ DCJ DCJ DCJDCJ DCJ DCJ

CJ

CJ

CJ CJ

CJCJ

DJ DJ

DJDJ

DJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

DJ

DJ

CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ

CJ

DJ DJ

CJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

DJ

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

NORTH

PLAN

CS103

WOODS

CABLE BOX

INV=19.82'-FES

18"RCP

RIP-RAP

ASPHALT

ASPHALT

ASPHALT

T

T

C

X X

X

X

X

X

LEGEND

I, BRUCE D. BEAVERS, CERTIFY THAT THIS SURVEY WAS COMPLETED UNDER

MY DIRECT AND RESPONSIBLE CHARGE FROM AN ACTUAL FIELD SURVEY MADE UNDER

MY SUPERVISION; THAT THIS GROUND SURVEY WAS PERFORMED AT THE 95% PERCENT

CONFIDENCE LEVEL TO MEET FEDERAL GEOGRAPHIC DATA COMMITTEE STANDARDS;

THAT THIS SURVEY WAS PERFORMED TO MEET THE REQUIREMENTS FOR A

TOPOGRAPHIC/PLANIMETRIC SURVEY TO THE ACCURACY OF CLASS AA, AND THAT THE

FIELD DATA WAS COMPLETED ON AUGUST 9, 2022; THAT THE SURVEY MAPPING WAS

COMPLETED ON AUGUST 16, 2022; AND ALL COORDINATES ARE BASED ON NC

'NAD 83'/2011 AND ALL ELEVATIONS ARE BASED ON NAVD 88.

BRUCE D. BEAVERS PLS L-3451

NOTES:

1. THE PURPOSE OF THIS MAP IS TO SHOW TOPOGRAPHIC FEATURES AND

INFORMATION ONLY AND IS NOT TO BE USED FOR BOUNDARY OR PROPERTY

OWNERSHIP INFORMATION.

2. THIS DRAWING REPRESENTS THE EXISTING CONDITIONS AS OF AUGUST 9, 2022.

3. SURVEYED BY: STANTEC CONSULTING SERVICES INC.

4. SURVEY DATE: AUGUST 16, 2022

5. HORIZONTAL DATUM: NAD83/2011 NC STATE PLANE US SURVEY FEET.

6. VERTICAL DATUM: NAVD 88, GEOID 12A.

7. THIS MAP DOES NOT VERIFY THE EXISTENCE OF, NOR CERTIFY THE LOCATION

OF ANY JURISDICTIONAL WETLANDS THAT MAY EXIST ON OR NEAR THE PROPERTY.

8. UNDERGROUND UTILITIES ARE NOT A PART OF THIS SURVEY.

CONC

EOI

FES

RCP

CHL

3SBW

LIGHT POLE

POWER POLE

TELEPHONE MANHOLE

SIGN

GUY WIRE

MONUMENT

SURVEY CONTROL

SANITARY SEWER MANHOLE

CONCRETE

END OF INFORMATION

FLARED END SECTION

REINFORCED CONCRETE PIPE

CHAIN LINK

3 STRAND BARBED WIRE

WOODS

FENCE

LIDAR DATA AREA

STORM PIPE

T

SD

S

20'

10'

15'

20'

20'

15'

20'

20'

20'

15'

10'

10'

15'

20'

25'25'

25'

30'

X X

X

X X

X X

X

X X

X

X X

X X

X

D

D

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X

X X

X X

X

X D

SD

T

J

LODLODLODLODLODLOD

LOD

LOD

LOD

LOD

LOD

LODLOD

LO

D

LOD

LOD

LOD

LODLOD

LOD

LOD

LO

DLOD

LOD

LOD

LO

D

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LOD LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD LOD LOD LOD LOD LOD LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

DD

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

NORTH

PLAN

CG100

2025-07-17

WOODS

INV=19.82'-FES

18"RCP

RIP-RAP

ASPHALT

ASPHALT

T

X X

X X

X X

X

X

X

X

X

X

X X

SD

SD

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X X

X

X X

X X

X X

X X

X X

X

D

X

X

X

D

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

XX

X

X

X

X X

X X

X X

X X

X X

X

X

X

X X

X

D

SD

SD

SD

SD

LOD

LOD

LOD

LOD

LODLOD

LOD

LO

D

LOD

LO

D

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LO

D

LOD

LOD

LOD

LO

D

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

D

SD

D

SD

26.10

25.94

25.26

26.28

26.57

27.10

25.90

26.

25.

54 24.00

24.19

23.30 22.90

23.35 23.35

23.52 23.3324.00

23.38

24.14

24.28

24.31

24.38 23.53

23.52

24.37

23.39

23.28 22.39

22.89 22.71

22.59

22.68

22.54 22.32

22.42

23.22

24.00 24.00

24.00

23.84

23.84

23.88

23.88

23.50

24.00 24.00

23.88 23.88

23.50

23.50 23.19

24.00 24.00

24.00

24.00

24.0024.0024.00

23.80

23.80

22.32

22.62

22.59 22.58

22.62

22.62

22.69

22.72

A1.1

A1

A4

A4.1

A3.1 A3

A5 A5.1

A5.2

23.88

24.19

23.59

4.1

3.9%

-0.5%

-2.3%

-1.4%

-4.0%

-2.8%

-2.5%

-0.2%

-0.0%

-0.2%

0.0%

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

NORTH

PLAN

CG101

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LODLOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD

T

ASPHALT

ASPHALT

X

X

X

X

X

X

X X

20'

T

J

LODLODLODLODLODLODLOD

LOD LOD LOD LOD LOD LOD LOD LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LODLOD

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

NORTH

PLAN

NORTH

PLAN

CG102

T

J

7'CHL-3SBW

T

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

E

E

E

E

E

EE

E

E

E

E

E

E

E

E E

E

E E

E E

E E

E E

E

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

W W

W

W

W W

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

T

T

T

T

T

T

T

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

SF

SF

SF

SF

SF

SF

SF

TP

TP

TP

TP

TP

TP

TP

TP

TP

TP

TP/SF

TP/SF

TP/SF

TP/SF

TP/SF

TP/SF

TP/SF

TP

/S

F

TP

/S

F

TP

/S

F

TP

/S

F

TP

/S F

TP

/S

F

TP/SF

TP/SF

TP/SF

TP/SF

TP

/S

F

TP

/S

F

TP/SF

TP/SF TP/SF

TP/SF

TP/SF

TP/SF

TP/SF

TP/SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

X X

X X

X

X X

X X

X

X X

X X

X

X

X

X X

X

X

X

X X

X

X

X

X

X

X X

SF

SF

SF

SF

CS

CS

24 24

15 14

20 21

23 19

15 14

LOD

LOD

LOD

LOD

LODLOD

LOD

LO

D

LOD

LO

D

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LO

D

LOD

LOD

LOD

LO

D

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

NORTH

PLAN

6 14

13 12

CG121

X

X

X

X

X X

20'

21'

24'

G

G

G

G

G

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF 17

LODLODLODLODLODLODLODLODLODLODLOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LODLOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD

T

T

J

SF

SFSFSF

SF

SF

SF

SF

SF

SF

T

J

LODLODLODLODLODLODLOD

LOD LOD LOD LOD LOD LOD LOD LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LODLOD

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

NORTH

PLAN

NORTH

PLAN

CG122

G

J

7'CHL-3SBW

T

X X

X X

X X

X

X

X

X

X

X

X X

SD

SD

E

E

E

E

E

EE

E

E

E

E

E

E

E

E E

E

E E

E E

E E

E E

E

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

W W

W

W

W W

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

SF

SF

SF

SF

SF

SF

SF

TP

TP

TP

TP

TP

TP

TP

TP

TP

TP

TP/SF

TP/SF

TP/SF

TP/SF

TP/SF

TP/SF

TP/SF

TP

/S

F

TP

/S

F

TP

/S

F

TP

/S

F

TP

/S F

TP

/S

F

TP/SF

TP/SF

TP/SF

TP/SF

TP

/S

F

TP

/S

F

TP/SF

TP/SF TP/SF

TP/SF

TP/SF

TP/SF

TP/SF

TP/SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

24 24

15 14

20 21

23 19

16 15

15 14

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X X

X

X X

X X

X X

X X

X X

X

D

X

X

X

D

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

XX

X

X

X

X X

X X

X X

X X

X X

X

X

X

X X

X

D

SD

SD

SD

SD

LOD

LOD

LOD

LOD

LODLOD

LOD

LO

D

LOD

LO

D

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LO

D

LOD

LOD

LOD

LO

D

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

D

SD

D

SD

17.5

17.5

17.5 18 19

19 18

19 18

18 19

21 23

20 20

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

NORTH

PLAN

CG123

2025-10-07

X

X

X

X

X X

20'

21'

24'

G

G

G

G

G

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF 17

LODLODLODLODLODLODLODLODLODLODLOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LODLOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD

T

G

T

J

SF

SFSFSF

SF

SF

SF

SF

SF

SF

S

T

J

LODLODLODLODLODLODLOD

LOD LOD LOD LOD LOD LOD LOD LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LODLOD

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

NORTH

PLAN

NORTH

PLAN

CG124

CABLE BOX

T

T

C

X X

X

X

X

X

N=304,183.420' E=2,470,525.415'

EL=32.216'

SPIKE NAIL

N=304,430.552' E=2,471,155.679'

EL=23.196'

SPIKE NAIL

N=304,083.403' E=2,471,129.877'

EL=19.795'

SPIKE NAIL

N=304,025.617' E=2,471,315.414'

EL=16.725'

SPIKE NAIL

N=304,039.024' E=2,470,991.775'

EL=20.181'

SPIKE NAIL

N=304,008.335' E=2,470,895.183'

EL=19.035'

SPIKE NAIL

N=303,927.280' E=2,470,710.141'

EL=18.566'

SPIKE NAIL

LEGEND

CONC

EOI

FES

RCP

CHL

3SBW

LIGHT POLE

POWER POLE

TELEPHONE MANHOLE

SIGN

GUY WIRE

MONUMENT

SURVEY CONTROL

SANITARY SEWER MANHOLE

CONCRETE

END OF INFORMATION

FLARED END SECTION

REINFORCED CONCRETE PIPE

CHAIN LINK

3 STRAND BARBED WIRE

WOODS

FENCE

LIDAR DATA AREA

STORM PIPE

T

E

E

E

E

E

E E

E E

E E

E

W

W

W

W

W

W

W W

W

W W

SAN

SAN

SAN

SAN

SAN

SAN

SAN

S

FO

FO

FO

FO

FO

FO

FO

FO

T

T

T

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

T

T

T

T

T

T

T

T

T

G

G

G

G

G

G

G

G

G

G

GGGGGG

G

G

G

G

J

W

W

W

W W W W W W W W W W W

W

U G

E

T

X X

X

X X

X X

X

X X

X

X X

X X

X

H

Y D

H Y D

W

W

W

W

CO

CO

CO

CO

S

H Y

D

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X

X X

X X

X

X

CO

CO

UG

C

UGC

T

J

LODLODLODLODLODLOD

LOD

LOD

LOD

LOD

LOD

LODLOD

LO

D

LOD

LOD

LOD

LODLOD

LOD

LOD

LO

DLOD

LOD

LOD

LO

D

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LOD LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD LOD LOD LOD LOD LOD LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

G

G

T UGE

UG

E

OHE

OHE

OHE

OHE

OHE

O H

E

T

H

Y D

H Y D

H Y D

T

J

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

NORTH

PLAN

CU100

2025-04-22

T

X X

X X

X X

X

X

X

X

X

X

X

X X

E

E

E

E

E

EE

E

E

E

E

E

E

E

E E

E

E E

E E

E E

E E

E E

E

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

W W

W

W

W

WW

W

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

T

T

T

T

T

T

T

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X X

X

X X

X X

X X

X X

X X

X

F

H

Y D

H Y D

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

W

W

W

W

W

W

W

W

W

W

W

W

CO

CO

F

CO

CO

H Y

D

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

XX

X

X

X

X X

X X

X X

X X

X X

X

X

X

X X

X

F

F

F

F

F

F

CO

CO

UG

C

UG

C

UGC

UGC

UG

C

U G

C

LOD

LOD

LOD

LOD

LODLOD

LOD

LO

D

LOD

LO

D

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LO

D

LOD

LOD

LOD

LO

D

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

G

G

G

G

G

G

G

UG

C

T UGE

UG

E

UG

E

UG

E

UG

E

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

O H

E O

H E

O H

E

T

T

J

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

NORTH

PLAN

CU101

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LODLOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD

T

GGGGGGGG

G

G

G

G

G

G

G

G

G

G

G

W

W

W

W

W

W

W

W

W

W W

W W

W W W W W W W W W W W W W

ASPHALT

ASPHALT

X

X

X

X

X

X

X X

W

W

W

W

W

W

W

SAN

SAN

SAN

SAN

20'

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

T

T

T

T

T

T

G

G

G

G

G

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

T

J

T

T

S

T

J

LODLODLODLODLODLODLOD

LOD LOD LOD LOD LOD LOD LOD LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LODLOD

S

G

G

G G

GGGGGGG

J

W W W W W W W W W W W W W

W W

W

W

U G

E

U G

E

U G

E

T

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

NORTH

PLAN

NORTH

PLAN

CU102

2025-11-11

X

X

X

X X

N=304,183.420' E=2,470,525.415'

EL=32.216'

SPIKE NAIL

N=304,430.552' E=2,471,155.679'

EL=23.196'

SPIKE NAIL

N=304,083.403' E=2,471,129.877'

EL=19.795'

SPIKE NAIL

N=304,025.617' E=2,471,315.414'

EL=16.725'

SPIKE NAIL

N=304,039.024' E=2,470,991.775'

EL=20.181'

SPIKE NAIL

N=304,008.335' E=2,470,895.183'

EL=19.035'

SPIKE NAIL

N=303,927.280' E=2,470,710.141'

EL=18.566'

SPIKE NAIL

LEGEND

CONC

EOI

FES

RCP

CHL

3SBW

LIGHT POLE

POWER POLE

TELEPHONE MANHOLE

SIGN

GUY WIRE

MONUMENT

SURVEY CONTROL

SANITARY SEWER MANHOLE

CONCRETE

END OF INFORMATION

FLARED END SECTION

REINFORCED CONCRETE PIPE

CHAIN LINK

3 STRAND BARBED WIRE

WOODS

FENCE

LIDAR DATA AREA

STORM PIPE

T

E

E

E E

E

E

E

E E

E

E E

W

W

W

W

W

W

W

W

W W

W W

W

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

S

21'

24'

FO

FO

FO

FO

FO

FO

FO

FO

FO

T

T

T

T

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

T

T

T

T

T

T

T

T

T

T

T

G

G

G

G

G

G

G

G

G

G

G

G

GGGGGGGG

G

G

G

G

G

J

W

W

W

W

W W

W W W W W W W W W W W W W

W

U G

E

T

X

X X

X X

X X X

X X

X X

X

X X

X X

XX

X

X X

X X

D

H

Y D

H

Y DW

W

W

W

W

CO

CO

CO

CO

S

H Y

D

D

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

XX

X

X X

X X

X X

X

X

D

CO

SD

CO

UG

C

UGC

UG

C

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

T

J

LODLODLODLODLODLODLODLODLOD

LOD

LOD

LOD

LOD

LOD

LOD

LODLOD

LO

D

LO

D

LO

D

LOD

LOD

LOD

LO

DLOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LOD

LOD

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD LOD LOD LOD LOD LOD LOD LOD

LOD

LOD

LOD

LO

D

LOD

LO

D

LOD

LOD

DD

G

G

G

T

UG

E

UG

E

OHE

OHE

OHE

OHE

OHE

OHE

O H

E

T

H

Y D

H Y D

H Y D

T

J

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

NORTH

PLAN

CU200

10.0

15.0

20.0

25.0

30.0

35.0

10.0

15.0

20.0

25.0

30.0

35.0

1.

' 2.

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

CU201

20.0

25.0

30.0

2.

M

IN

C

LE

AR

AN

C E

3' M

IN

C O

VE

R

10.0

15.0

20.0

25.0

30.0

M

IN

C

LE

AR

AN

C E

3' M

IN

. C

O

VE

R

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

CU202

20.0

25.0

30.0

10.0

15.0

20.0

25.0

30.0

2.

'1.

0.

4.

2.

5'

M

IN

10.0

15.0

20.0

25.0

30.0

10.0

15.0

20.0

25.0

30.0

1.

2.

1.

2.50'

COVER

15.0

20.0

25.0

15.0

20.0

25.0

2.

15.0

20.0

25.0

15.0

20.0

25.0

2.

5'

M

IN

15.0

20.0

25.0

30.0

15.0

20.0

25.0

30.0

3.

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

CU203

20.0

25.0

30.0

1.

1.

0.

3.

2.

5'

M

IN

10.0

15.0

20.0

25.0

30.0

1.

2.

2.

' 2.

1.

2.

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

CU204

20.0

25.0

30.0

10.0

15.0

20.0

25.0

30.0

1.

1.

1.

10.0

15.0

20.0

25.0

30.0

10.0

15.0

20.0

25.0

30.0

1.

1.

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

CU205

20.0

25.0

30.0

2.

2.

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

CU206

T

X X

X X

X X

X

E

E

E

E

E

E

E

E

E E

E

E E

E E

E E

E E

E E

W

W

W

W

W W

W W

W W

W W

W

W

W

WW

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

30'

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO T

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

T

T

T

T

T

T

T

T

T

T

T

T

T

G

G

G

G

G

G

G

G

G

G

G

X X

X X

X X

X X

X

X X

F

F

F

F

F

F

F

F

F

W

W

W

W

W

W

W

W

CO

CO

CO

H Y

D

X

X

X

X X

X

DF

F

F

F

SD

CO

UG

C

UG

C

UGC

UGC

UG

C

UG

C

FL

FL

FL

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LO

D

LOD

LOD

LOD

LO

D

LOD

LOD

LO

D

LO

D

LO

D

LO

D

G

G

G

G

G

UG

C

T UGE

UG

E

UG

E

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

INV=19.82'-FES

18"RCP

RIP-RAP

ASPHALT

ASPHALT

T

X

X

X

X

X

X

SD

SD

E

E

E

E

E

E

EE

E

E

E

E

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

20'

25'25'

21'

24'

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

T

T

T

T

T

T

T

T

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

T

T

T

T

T

T

T

T

T

T

T

T

T

T

G

G

G

G

G

G

G

G

G

G

G

G

X X

X X

X X

X

D

H Y D

F

F

F

F

F

F

F

F

F

D

X

X

X

X

X

X

X

X

CO

SD

SD

SD

UGC

LOD

LOD

LOD

LODLOD

LOD

LO

D

LOD

LO

D

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

OHE

OHE

OHE

OHE

OHE

OHE

OHE

O H

E O

H E

O H

E

T

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

CU207

S

J

LODLODLODLOD

LOD LOD LOD LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LODLOD

S

T

J

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

CU208

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

C-501

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

C-502

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

MAINTENANCE NOTES:

1. INSPECT CHECK PROTECTION WEEKLY AND AFTER 12" OR

GREATER RAINFALL EVENT AND REPAIR IMMEDIATELY.

REMOVE SEDIMENT STRAW, LIMBS, OR OTHER DEBRIS THAT

COULD CLOG THE CHANNEL WHEN NEEDED.

2. IMMEDIATELY CORRECT ANY DAMAGE CAUSED BY

SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM

AND FROM HIGH FLOWS AROUND THE EDGES.

3. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS

NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION,

ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE

CHECK DAM, AND PREVENT LARGE FLOWS FROM CARRYING

SEDIMENT OVER THE DAM. ADD STONES TO DAMS AS

NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION.

KEY RIPRAP

18" INTO

SLOPE

NOTES:

1. HEIGHT AND WIDTH DETERMINED BY EXISTING

TOPOGRAPHY AND SEDIMENT STORAGE REQUIRED.

2. KEY RIP RAP INTO SLOPES FOR STABILITY.

18" 36"

TOP ELEV. OF STORMWATER WEIR ELEV:

12"- #57 WASHED STONE

VARIES CLASS 1

RIPRAP

VA

R

IE

S

" M

AX

9"

SIDE VIEW

SLOPE

SLOPE

STEP SEQUENCE

#57 WASHED STONE

FRONT VIEW

EXISTING SLOPE

VARIES

1/2' -1'

VA

R

IE

S

CHECK DAM

SCALE: NOT TO SCALEA3

C-503

SILT SOCK / WATTLE FOR PERIMETER AND INLET PROTECTION

NOTE:

1. Other materials providing equivalent protection against erosive velocities may be substituted for compost use in silt socks or wattles.

2. Fill silt sock/wattle netting uniformly with compost to the desired length such that logs do not deform.

3. Silt sock/Wattle(s) should be installed parallel to and a minimum of 10 feet beyond the toe of a graded slope. Silt Sock/Wattle(s) located below flat areas should be located at the edge of the land disturbance. The ends of the silt sock/wattle(s) should be turned slightly upslope to prevent runoff from going around the end of the silt sock/wattle(s).

4. Oak or other durable hardwood stakes with a 2 inch x 2 inch cross section should be driven vertically plumb, through the center of the silt sock/wattle. Stakes should be placed at a maximum interval of 4 feet or a maximum interval of 8 feet if the silt sock/wattle is placed in a 4 inch trench.

5. In the event staking is not possible (ie. when socks/wattles are used on pavement) heavy concrete blocks shall be used behind the silt sock/wattle to hold it in place during runoff events.

COMPOST SOCK INITIAL FLOW RATES

Compost Sock Design Diameter

8 Inch (200 nm)

12 Inch (300 nm)

18 Inch (450 nm)

24 Inch (600 nm)

32 Inch (750 nm)

Maximum Slope Length (<2%)

600 Feet (183 m)

750 Feet (229 m)

1,000 Feet (305 m)

1,300 Feet (396 m)

1,650 Feet (500 m)

Hydraulic Flow Through Rate

7.5 gpm/ft (94 l/m/m)

11.3 gpm/ft (141 l/m/m)

15.0 gpm/ft (188 l/m/m)

22.5 gpm/ft (281 l/m/m)

30.0 gpm/ft (374 l/m/m)

MAINTENANCE:

1. Inspect all measures at least weekly and after each rainfall of 1.0 inch or greater.

2. Remove accumulated sediment and any debris as needed to allow for adequate flow.

3. Silt sock/Wattle must be replaced if clogged or torn.

4. If ponding becomes excessive, the silt sock/wattle may need to be replaced with a larger diameter or a different measure.

5. Reinstall if damaged or dislodged.

6. Silt socks/wattles shall be inspected until land disturbance is compete and the area above the measure has been permanently stabilized.

WOOD MULCH OR COMPOST

TO 1/2 HEIGHT OF LOG

4' MAX.

2" x 2"

STAKES

SILT SOCK/ WATTLE

AREA TO BE

PROTECTED

3"

12" MIN.

FLOW

FLOW

SECTION

UNTRENCHED INSTALLATION

TRENCH INTO

GROUND 4" MIN.

8' MAX.

2" x 2"

STAKES

SILT SOCK/ WATTLE

AREA TO BE

PROTECTED

3"

12" MIN.

FLOW

FLOW

SECTION

ENTRENCHED INSTALLATION*

*THIS APPLICATION MAY NOT BE USED WITH COMPOST

SOCKS SMALLER THAN 12".

WORK AREA

AREA TO BE

PROTECTED

SILT SOCK/

WATTLE

MULCH OR COMPOST

FOR UNTRENCHED

SOCKS

ISOMETRIC VIEW

SHEET FLOW

DATE: PAGE:

NORTH CAROLINA

Department of Environmental Quality

Effective Date: 9/1/2023 In accordance with the 2013 Design Manual Updates

C4 SOIL STOCKPILE

SCALE: NOT TO SCALE

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T

M

AR

IN

E

CO

RP

S

NA

VA

L

ST

AT

IO

N

- N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

OF

1701821

P-

S

O F

AR

M

O R

Y

FINAL SUBMITTAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

SPILLWAY DETAIL

CROSS SECTION

8" DEEP TRENCH, BACKFILLED

AND COMPACTED

SECTION AT OPENING

C-504

NCG01 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19

GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH

THE NCG01 CONSTRUCTION GENERAL PERMIT

Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction.

GROUND STABILIZATION SPECIFICATION

Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below:

POLYACRYLAMIDES (PAMS) AND FLOCCULANTS

1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants.

2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures.

3. Apply flocculants at the concentrations specified in the NC DWR List of Approved

PAMS/Flocculants and in accordance with the manufacturer's instructions.

4. Provide ponding area for containment of treated Stormwater before discharging offsite.

5. Store flocculants in leak-proof containers that are kept under storm-resistant cover or surrounded by secondary containment structures.

HAZARDOUS AND TOXIC WASTE

1. Create designated hazardous waste collection areas on-site.

2. Place hazardous waste containers under cover or in secondary containment.

3. Do not store hazardous chemicals, drums or bagged materials directly on the ground.

EQUIPMENT AND VEHICLE MAINTENANCE

1. Maintain vehicles and equipment to prevent discharge of fluids.

2. Provide drip pans under any stored equipment.

3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project.

4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible).

5. Remove leaking vehicles and construction equipment from service until the problem has been corrected.

6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials.

LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE

1. Never bury or burn waste. Place litter and debris in approved waste containers.

2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes.

3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available.

4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland.

5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers.

6. Anchor all lightweight items in waste containers during times of high winds.

7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow.

8. Dispose waste off-site at an approved disposal facility.

9. On business days, clean up and dispose of waste in designated waste containers.

PAINT AND OTHER LIQUID WASTE

1. Do not dump paint and other liquid waste into storm drains, streams or wetlands.

2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available.

3. Contain liquid wastes in a controlled area.

4. Containment must be labeled, sized and placed appropriately for the needs of site.

5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites.

PORTABLE TOILETS

1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags.

2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas.

3. Monitor portable toilets for leaking and properly dispose of any leaked material.

Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit.

HERBICIDES, PESTICIDES AND RODENTICIDES

1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions.

2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning.

3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately.

4. Do not stockpile these materials onsite.

CONCRETE WASHOUTS

1. Do not discharge concrete or cement slurry from the site.

2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility.

3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence.

4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail.

5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .