About this file

This is a Request for Proposals (RFP) for a Small Business Multiple Award Construction Contract (MACC) issued by NAVFAC Mid-Atlantic for general construction projects primarily at Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point. The total contract value across all awardees is not to exceed $495 million over a one-year base period plus four one-year options. Individual task orders will typically range from $250,000 to $15 million.

The government intends to award approximately five IDIQ contracts under this total small business set-aside (NAICS 236220, size standard $45M). The initial seed project is B-1005 Design Wing Relocation at MCB Camp Lejeune, involving interior renovations including HVAC, electrical, flooring, and other building systems. Proposals are due March 27, 2025 by 2:00 PM local time. Award will be made using best value trade-off methodology, with non-price factors (corporate experience, safety, management approach) and past performance approximately equal to price. Awardees must participate in all task order competitions unless they formally withdraw, which is limited to three times per contract year. A bid guarantee of 20% of the total bid price or $3M (whichever is less) is required. The minimum guaranteed amount per awardee is $5,000.

View the file

Other files

File Type Posted
N4008524R2785 Amendment 0010.pdf PDF
N4008524R2785 Amendment 0009.pdf PDF
N4008524R2785 Amendment 0008.pdf PDF
N4008524R2785 Amendment 0007.pdf PDF
M101_rev 2.pdf PDF
E-103.pdf PDF
E-104.pdf PDF
VMR- uncapped.jpg JPG image
M602.pdf PDF
E-107.pdf PDF
E-105.pdf PDF
M101.pdf PDF
M104.pdf PDF
E-106.pdf PDF
A-202.pdf PDF
E-101.pdf PDF
M601.pdf PDF
M103.pdf PDF
23 73 33_Amendment 2.pdf PDF
N4008524R2785 Amendment 0006.pdf PDF
M802.pdf PDF
VMR- capped.jpg JPG image
M501.pdf PDF
E-102.pdf PDF
A-105.pdf PDF
25 05 11.00.pdf PDF
A-501.pdf PDF
T-1.pdf PDF
N4008524R2785 Amendment 0005.pdf PDF
23 09 23.13 20 Attachment 4.pdf PDF
23 09 23.13 20 Attachment 5.pdf PDF
23 09 00.pdf PDF
N4008524R2785 Amendment 0004.pdf PDF
01 32 16.00 20.pdf PDF
22 00 00.pdf PDF
Attachment Q - Revised Drawings.pdf PDF
23 09 23.13 20 Attachment 2.pdf PDF
23 09 13.pdf PDF
23 09 23.02.pdf PDF
Attachment O - Revised Specs pg3.pdf PDF
Attachment M - Specifications TOC.pdf PDF
Attachment N - Revised Eletrical-Telecomm Sheets.pdf PDF
Attachment P - Site Visit Log.pdf PDF
N4008524R2785 Amendment 0003.pdf PDF
N4008524R2785 Amendment 0002.pdf PDF
Attachment I - Site Visit Information REVISED.pdf PDF
Attachment K - Asbestos Inspection Report.pdf PDF
Attachment L - Electrical Room.pdf PDF
Attachment J - Site Visit Participant Log.xlsx XLSX spreadsheet
Attachment I - Site Visit Information.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Indefinite-Delivery Indefinite-Quantity Small Business Multiple Aw ard Construction Contract for General Construction Projects Primarily aboard Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point in the NAVFAC MIDLANT Marine Corps Installation East Area of Responsibility

This procurement is being solicited as a total small business set-aside.

All correspondence regarding this solicitation shall be directed via email to Jonathan Durham at jonathan.m.durham.civ@us.navy.mil

JONATHAN M. DURHAM 757-341-0216

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

11-Feb-2025

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days after receiving aw ard, notice to proceed. This performance period is mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________27 Mar 2025 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

N4008524R2785 87

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

N4008524R2785

Section 00 10 00 - Solicitation

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 495,000,000 Project Small Business General Construction MACC

FFP

Indefinite-Delivery Indefinite-Quantity Small Business Multiple Award Construction Contract for General Construction Projects Primarily aboard Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point in the NAVFAC MIDLANT Marine Corps Installation East Area of Responsibility FOB: Destination

PSC CD: Y1JZ

MAX

NET AMT

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 N/A N/A N/A N/A

Section 00 21 00 - Instructions

INSTRUCTIONS TO OFFERORS

TABLE OF CONTENTS

1. GENERAL

1.1 NOTICE TO OFFERORS

1.2 GENERAL OVERVIEW OF PROCUREMENT PROCESS

1.3 GENERAL OVERVIEW OF CONTRACT

2. GENERAL OVERVIEW OF THE SEED PROJECT

3. BASIS FOR AWARD

4. EVALUATION FACTORS FOR AWARD

5. PROPOSAL REQUIREMENTS

5.1 SITE VISIT

5.2 PROPOSAL SUBMISSION INSTRUCTIONS

5.3 PRE-PROPOSAL INQUIRIES (PPIs)

5.4 CONTRACT OPPORTUNITIES (SAM.GOV)

5.5 INCORPORATION OF TECHNICAL PROPOSALS

6. ATTACHMENTS

1. GENERAL

1.1 NOTICE TO OFFERORS

1.1.1 THIS SOLICITATION IS BEING ISSUED AS A TOTAL SMALL BUSINESS SET-ASIDE. THE NAICS

CODE FOR THIS PROCUREMENT IS 236220 AND THE SIZE STANDARD IS $45M.

1.2 GENERAL OVERVIEW OF PROCUREMENT PROCESS

1.2.1 This solicitation is formatted as a Request for Proposal (RFP) in accordance with the requirements designated by sections of the FAR 15.203. This method permits evaluation of proposals based on price competition, technical merit and other factors; permits impartial and comprehensive evaluation of offerors' proposals; permits discussions if necessary; and ensures selection of the source(s) whose performance provides the best value to the Government.

This acquisition will be solicited as a competitively negotiated procurement as a total small business set-aside.

1.2.2 The Government reserves the right to reject any or all proposals at any time prior to award; to negotiate with any or all offerors; to award the contracts to other than the offeror submitting the lowest total price; to award to other than the offeror submitting the highest technically rated proposal; and to award to the offeror submitting the proposal determined by the Government to be the most advantageous (best value) to the Government. OFFERORS

ARE ADVISED THAT AWARD MAY BE MADE WITHOUT DISCUSSION OR ANY CONTACT

CONCERNING THE PROPOSALS RECEIVED. Therefore, proposals should be submitted initially on the most favorable price and technical terms. Offerors should not assume that they will be contacted or afforded an opportunity to qualify, discuss, or revise their proposals. However, the Government reserves the right to clarify certain aspects of proposals or conduct discussions providing an opportunity for the offeror to revise its proposal.

1.3 GENERAL OVERVIEW OF CONTRACT

1.3.1 This acquisition will result in the award of a Firm Fixed-Price (FFP), Indefinite Delivery/ Indefinite Quantity (IDIQ), Multiple Award Construction Contract (MACC) for Design-Bid-Build (DBB) General Construction projects primarily in the NAVFAC MIDATLANTIC MCI East AOR. Projects will be primarily aboard Marine Corps Base

(MCB) Camp Lejeune and Marine Corps Air Station (MCAS) Cherry Point. Work may be required at other sites within the area of responsibility of NAVFAC MIDLANT. The Government intends to award approximately five (5) contracts resulting from this solicitation to the responsible Offerors whose proposals represent the best values after evaluation in accordance with the factors and their relative importance, unless more or less than five (5) is determined to be the best value to the government by the Source Selection Authority.

1.3.2 Construction projects to be performed under this MACC will require the ability to manage multiple task orders concurrently aboard MCB Camp Lejeune and MCAS Cherry Point . General construction projects will include, but are not limited to, new construction, demolition, repair, alteration, and renovation of buildings, systems and infrastructure and may include civil, structural, mechanical, electrical, fire protection, and communication systems.

Types of facilities may include, but are not limited to, administrative, industrial, warehouses, maintenance, hangars, communications, personnel support, recreation, lodging, dormitory, roads, etc. Lead or asbestos abatement may be required. Work in explosive facilities may be required. The selected contractor(s) will be responsible for all labor, supervision, engineering, design, materials, equipment, tools, parts, supplies, and transportation to perform all of the services described in the drawings and specifications provided for each individual project.

1.3.3 The completion date for the IDIQ contracts is one (1) year from the date of contract award with four (4) one-year option periods, not to exceed 60 months. The total five-year (base and four 12-month options) estimated construction cost for all contracts is not to exceed $495,000,000 for the life of the contract. Projects for the MACC have an estimated construction cost between $250,000 and $15,000,000; however, smaller and larger dollar value projects may be considered at the discretion of the Contracting Officer. The Government guarantees an award amount of $5,000 to each successful offeror.

1.3.4 After award of the initial contracts and “seed” project, the successful IDIQ contractors will compete for task orders based on best value, using the tradeoff process or lowest price technically acceptable (to include lowest price). Only the successful IDIQ contractors will compete for task orders.

1.3.5 The intent of this contract is that all MACC Contractors participate in pre-proposal conferences and site-visits and submit proposals on each task order. Contract awardees will be expected to submit a proposal for all Task Order Requests for Proposal (RFP) received from the Government. However, in the event a MACC awardee is unable to submit a proposal on a particular RFP, the contractor is required to notify, in writing, the Contracting Officer who issued the RFP and the ACO for the basic contract within five (5) working days from receipt of the RFP. A MACC awardee can only elect to withdraw from submitting a proposal on three (3) task order RFPs during the course of each year of the contract (base plus four options). Additional withdrawal requests, in excess of three

(3) per year, may result in the Government choosing not to exercise remaining option terms.

1.3.6 Each task order will contain project specific evaluation factors that will vary depending on the unique requirements for each task order. Additionally, each task order will cite a specific completion date and associated liquidated damages.

1.3.7 Contractor Performance Information: Contractor’s performance will be evaluated using the respective contractor performance evaluation report entry system located on the website http://www.cpars.gov/. Prior to commencement of work the contractor is required to provide the government with the name, phone number and email address of the “Contractor’s Representative” that will be responsible for receipt and review of draft performance evaluations prepared by the government in the appropriate system. It is the contractor’s responsibility to keep this contact information current.

2. GENERAL OVERVIEW OF THE SEED PROJECT

2.1 The initial project (“seed project”) that will be awarded as the first task order concurrently with the basic contract is B-1005 Design Wing Relocation, MCB Camp Lejeune, North Carolina. The work consists of the removal of all interior HVAC, electrical, flooring, suspended ceilings, walls, doors in the current ROICC office suite as well as removal of a concrete landing and sidewalks outside of the suite. The project also includes the removal of the ceilings in Suite 55 only. The former ROICC office suite will be up-fit with new HVAC, electrical, interior flooring, suspended ceilings, finishes, walls, doors and exterior ramps and sidewalks as per the design documents and all incidental related work.

* Solicitation Section 01 00 00 will include the General Requirements for the seed project.

Pursuant to FAR 52.232-18, Availability of Funds, the Government's obligation under this solicitation, or any task order or contract that might result from the solicitation is entirely subject to, and contingent upon, the availability of appropriated funds. Should the Government be unable to award the seed project, the Government guarantees an award in the amount of $5,000 to each successful offeror upon award of the Multiple Award Construction Contracts.

This minimum guarantee is over the full term of the contract, including option years. No legal liability on the part of the Government shall arise until funds are made available to the Contracting Officer and a task order or contract is awarded by the Contracting Officer. Any offeror proposing on this solicitation does so at its own cost and with the full knowledge that a task order for the seed project, might not result from this solicitation.

3. BASIS FOR AWARD

3.1 The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contracts; to negotiate with offerors in the competitive range; and to award the contracts to the offerors submitting the proposals determined to represent the best value—the proposals most advantageous to the Government, cost/price and other factors considered.

3.2 As stated in the solicitation, the Government intends to evaluate proposals and award contracts without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

3.3 The tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror.

3.4 As stated in the solicitation, the relative order of importance of the non-price evaluation factors is the technical factors (Factors 1, 2, and 3) are of equal importance to each other and, when combined, are equal in importance to the past performance evaluation/performance confidence assessment factor (Factor 4). When the proposal is evaluated as a whole, the technical factors and past performance confidence assessment rating, when combined, (i.e., the non-price evaluation factors) are approximately equal price.

3.5 Any proposal found to have a Deficiency in meeting the stated solicitation requirements or performance objectives will be considered ineligible for award, unless the Deficiency is corrected through discussions, if held. An Unacceptable rating in any of the non-cost/price factors will result in an overall rating of “Unacceptable” for the non-cost/price factors, unless corrected through discussions. Proposals may be found to have either a Significant Weakness or multiple Weaknesses that impact either the individual factor rating or the overall rating for the proposal. The evaluation report must document the evaluation board’s assessment of the identified weakness(s) and the associated risk to successful contract performance resulting from the weakness(s). This assessment must provide the rationale for proceeding to award without discussions.

4. EVALUATION FACTORS FOR AWARD

1. The solicitation requires the evaluation of price and the following non-cost/price factors:

Factor 1 – Corporate Experience Factor 2 – Safety Factor 3 – Management Approach and Schedule

Factor 4 - Past Performance

The distinction between Corporate Experience and Past Performance is Corporate Experience pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity. Past Performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.

2. The relative order of importance of the non-price evaluation factors is the technical factors, Factors 1, 2, 3 are of equal importance to each other and, when combined, are equal in importance to the past performance evaluation/performance confidence assessment factor (Factor 4). When the proposal is evaluated as a whole, the technical factors and past performance/performance confidence assessment factor combined (i.e., the non-price evaluation factors) are approximately equal to price.

The importance of price will increase if the Offerors’ non-cost/price proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of a non-cost/price proposal’s superiority to the Government. Award will be made to the responsible Offeror(s) whose offer conforms to the solicitation and represents the best value to the Government, price and non-price factors considered.

3. Basis of Evaluation and Submittal Requirements for Each Factor.

a. Price Proposal

(1) Solicitation Submittal Requirements:

The offeror shall submit one (1) electronic copy via PIEE of the solicitation submittal requirements identified below.

The Price and Non-price proposals shall be submitted in separate files and submitted in Portable Document Format (PDF). In addition, non- price/technical information included in the price proposal will not be considered. Likewise, price information included in the non-price/technical proposal will not be considered. All required proposal documents shall be submitted in accordance with FAR 15.208.

All submissions shall include the following:

1. Executed SF1442: Offeror shall insert its company name and address in Block #14, telephone number in Block

#15, acknowledge all amendments in Block #19 (if applicable), name and title of person authorized to sign in Block #20A, signature in Block #20B, and offer date in Block #20C of the SF1442. In addition, Offeror shall provide a cover page with solicitation number, solicitation title, Offeror name, address, phone number, fax number, Unique Entity Identifier (UEI), CAGE code, and Federal Tax ID number, Point of Contact (POC), POC phone number, and POC email address, with its proposal.

2. Completed Price Proposal Form for Seed Project: The Offeror is required to submit a completed Price Proposal

Form that includes completion of all contract line items numbers (CLINs). Pricing information is not required to be completed under Section 00 10 00 – Solicitation Contract Form in SF 1442.

3. Bid Bond (SF-24): Offeror shall submit a bid bond (SF-24) in the amount of 20% of total project bid price for the seed project or $3M, whichever amount is less. The bid bond shall be in the name of the Offeror identified on the SF1442.

4. SAM registration: Offeror shall ensure current registration on the SAM Website, www.sam.gov, including

Annual Representations and Certifications are complete and updated for this procurement. If a Representation or Certification required by Section 00 45 00 of the RFP is not provided in SAM, include the representation or certification in your price proposal.

5. FAPIIS Offeror shall ensure Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete, as required by FAR 52.209-7, Information Regarding Responsibility Matters.

6. VETS-4212 registration: Confirmation of filing of Veterans’ Employment and Training (VETS-4212) for the

2023/2024 filing cycle, if the Offeror is required to submit, Offeror shall ensure a current VETS-4212 report has been submitted to the Department of Labor (DOL) website, http://www.dol.gov/vets/vets4212.htm.An email confirmation of submission can be requested and received by the Offeror from the DOL website and submitted in the price proposal. If the Offeror is not required to submit a report to VETS-4212, include a brief statement and justification explaining why the Offeror is not required to submit a report. Visit the VETS-4212 website for details concerning if your company is required to submit a VETS-4212 report and to request an email confirmation of submission.

7. Joint Venture (JV) Agreement (if applicable): If the offeror is a JV, clearly submit the name of each entity that comprises the JV (offeror). For each entity, provide the complete name of the firm, address of the entity, Unique Entity Identifier (UEI), CAGE code, Point of Contact (POC), POC phone number, and POC email address.

Provide a copy of the signed JV agreement.

NOTE 1: A small business joint venture Offeror must submit, with its offer, the representation required in paragraph

(c) of FAR solicitation provision 52.212-3, Offeror Representations and Certifications- Commercial Products and Commercial Services, and paragraph (c) of FAR solicitation provision 52.219-1, Small Business Program Representations, in accordance with 52.204-8(d) and 52.212-3(b) for the following categories:

(A) Small business;

(B) Service-disabled veteran-owned small business;

(C) Women-owned small business (WOSB) under the WOSB Program;

(D) Economically disadvantaged women-owned small business under the WOSB Program; or

(E) Historically underutilized business zone small business.

8. Bank Reference: The offeror shall submit a signed bank reference demonstrating adequate financial resources.

If offeror’s firm has a line of credit – provide information on how many figures offeror can borrow against the line of credit (i.e. medium 6 figures – exact line of credit is not required).

9. Financial Statements: The offeror shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or signed by an authorized officer of the organization. Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements, submit the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies. The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the offeror.

10. Facilities and Equipment: Description of offeror’s facilities and equipment to perform work under this contract.

11. Other Work: Description or listing of the offeror’s other work presently under contract.

(2) Basis of Evaluation:

The Government will evaluate price based on the total price for the seed project. Total price consists of the basic requirements and all option items for the seed project. The Government intends to evaluate all options and has included the provision FAR 52.217-5, Evaluation of Options (JUL 1990) in the solicitation. In accordance with FAR 52.217- 5, evaluation of options will not obligate the Government to exercise the option(s). Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:

• Comparison of proposed prices received in response to the RFP.

• Comparison of proposed prices with the IGCE.

• Comparison of proposed prices with available historical information.

• Comparison of market survey results.

Although required to be submitted with offeror’s price proposal, Items 3 through 11 above will not be evaluated as part of the price proposal. This information will be utilized by the Government in the responsibility determination and for considering responsiveness to the solicitation requirements.

b. Non-cost/price Proposal:

All submissions shall include the following:

The offeror shall submit one (1) electronic copy via PIEE of the solicitation submittal requirements identified below.

The Price and Non-cost/price proposal shall be submitted in separate files and submitted in Portable Document Format (PDF). Price information included in the non-price/technical proposal will not be considered. Likewise, non-price/technical information included in the price proposal will not be considered. All required proposal documents shall be submitted in accordance with FAR 15.208.

Offeror shall provide a cover page with solicitation number, solicitation title, Offeror name, address, phone number, Fax Number, Unique Entity Identifier (UEI), CAGE code, Federal Tax ID number, Point of Contact (POC), POC phone number, and POC email address with its proposal.

Refer to individual factors for page limitations. Pages that exceed indicated page limitations will not be evaluated.

Note: If proposing as a Joint-Venture (JV), please submit the POC, UEI, and CAGE Code for each JV partner.

Factor 1, Corporate Experience

Offerors shall submit a minimum of three (3) up to a maximum of five (5) relevant construction projects that best demonstrates its experience on relevant projects (similar in Size, Scope, and Complexity as defined below). Offeror must have performed as prime contractor on all submitted projects.

For purposes of this evaluation, a relevant project is further defined as follows:

Size: A final construction cost of at least $5,000,000. (At least one project must demonstrate with a final construction cost of at least $10,000,000.)

Scope/Complexity: In addition to meeting the above Size requirement, relevant projects shall demonstrate experience with at least one of the following:

• New Construction: New building construction of a commercial, industrial, or institutional building. (Projects may incorporate one or more of these three types of buildings into a single project, but the submitted project must meet all of the Size and Scope/Complexity requirements, as defined.

• Renovation: Interior/Exterior renovation of or new addition to an existing commercial, industrial, or institutional building. Individual projects shall demonstrate experience with repair/alterations to multiple building systems or infrastructures (e.g. mechanical, electrical, architectural, fire protection).

The submitted projects must cumulatively demonstrate relevant experience with New Construction and Renovation projects.

Notes:

• Experience as the prime contractor is required on all submitted projects. The Government will not consider experience of proposed subcontractors. However, the Government will consider the offeror’s experience as a subcontractor, as long as the narrative clearly demonstrates the offeror’s work on the submitted project meets the Size, Scope/Complexity, and timeline requirements as defined in Factor 1.

• The Offeror must clearly identify the building systems repaired or altered in each Renovation Project within their narrative. The project may be determined Not Relevant if the Government is unable to clearly determine which building systems were repaired/altered. Additionally, work that is strictly ancillary to a main system will not be considered as multiple systems (e.g. electrical work ancillary to mechanical installation).

• Projects submitted that only include horizontal or civil site work will be considered Not Relevant.

• A submitted project may include both New Construction and Renovation. However, if a submitted project contains both new construction and renovation work, the offeror shall clearly delineate the dollar value for the portion of the final construction cost associated with the New Construction work and the Renovation work in the project description. In order for a project to be considered Relevant as a New Construction Project, the value of the New Construction work must independently meet project Size and Scope/Complexity requirements. Likewise, for a project to be considered Relevant as a Renovation Project, the value of the renovation work must independently meet project Size and Scope/Complexity requirements. A project may be determined not to satisfy relevancy requirements for new construction or renovation if the Government is unable to clearly determine whether the project meets the respective requirements.

Projects submitted for the Offeror shall be completed within the past ten (10) years of the date of issuance of this

RFP.

For all submitted projects, the project description must clearly describe whether the project is new construction or renovation, states the final construction cost (delineated for new and renovation, if applicable), and clearly addresses how the project meets the Size, Scope/Complexity, and timeframe requirements. If the Government deems the provided information unclear, if any of this information is missing, this may result in the project being considered Not Relevant, which could result in a rating of UNACCEPTABLE for this Factor.

A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project and will not be considered.

The attached Construction Experience Project Data Sheet (Attachment B) is MANDATORY and SHALL be used to submit project information. Except as specifically requested, the Government will not consider information submitted in addition to this form nor will the Government consider information submitted via any other medium. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages). Information beyond this page limit will not be considered.

If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects may be submitted for the Joint Venture members. Offerors are still limited to a total of five (5) projects combined. Offerors may submit experience where a member of the JV performed as a JV with another entity but must clearly demonstrate how its work on that project met Size and Scope/Complexity as defined above. Likewise, Offerors that are not submitting as a JV may submit a project where it performed as a JV with another entity but must clearly demonstrate how its work on that project met Size and Scope/ Complexity as defined above. Offerors are still limited to a total of five (5) projects combined.

For a JV, the Offeror shall submit a signed JV agreement. For 8(a) Mentor-Protégé Joint Venture, the Offeror shall submit the signed SBA Mentor-Protégé Approval Letter and signed JV agreement.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the Project Data Sheet for the project at issue shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement and clearly describe the role that firm will have in the performance of the contract. If meaningful involvement is not demonstrated, experience of the affiliate/subsidiary/parent firm will not be considered which may result in the project being deemed Not Relevant.

In accordance with 13 CFR 125.2(g), small business Offerors may utilize the prime contractor experience of a small business first-tier subcontractor(s) to demonstrate experience under this evaluation factor if that small business Offeror cannot independently satisfy the experience requirement as defined above. In order to utilize the experience of a small business first-tier subcontractor(s), the offeror must specifically identify the proposed small business first-tier contractor(s) and clearly demonstrate on the applicable Project Data Sheet that the subcontractor will have meaningful involvement in the performance of this MACC. The Offeror must provide a supporting joint venture agreement, partnership agreement, teaming agreement, or letter of commitment from the subcontractor. The explanation of the meaningful involvement shall be included with this Factor. The Offeror or its small business first-tier subcontractor shall have been the prime contractor on all submitted projects. The Government notes that 13 CFR 125.2(g) is specific to only small business Offerors and named small business first-tier subcontractors. As such, the small business Offeror is not permitted to use the experience of a large business subcontractor or large business corporate affiliate in place of its own experience if the small business Offeror cannot independently satisfy the experience requirement as defined above.

The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing relevant construction projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review five projects. Any projects submitted in excess of the five (5) will not be considered. Offerors that do not submit a minimum of three (3) relevant Projects will be rated

UNACCEPTABLE.

If the Offeror is able to demonstrate the ability to perform multiple projects simultaneously through projects that are considered Relevant, the Offeror’s Corporate Experience may be considered more favorably than those who do not have experience performing multiple simultaneous projects.

The Offeror may receive more favorable consideration if it demonstrates four or more Relevant projects.

Factor 2, Safety

The Offeror shall submit the following information: The Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate; and Total Case Rate (TCR) for the specified five (5) Calendar Years (CY), as well as a safety narrative, as described further below. For a partnership or joint venture, the Offeror shall submit separate DART rates and TCR for the specified five (5) CY for each contractor who is part of the partnership/joint venture; however, the offeror shall provide only one safety narrative. Any fatalities experienced within this 5-year timeframe must be explained in detail to include root cause and corrective actions.

NOTE: DART and TCR shall not be submitted for subcontractors

1. DART Rate: Submit five (5) previous complete calendar years’ [CY2020, CY2021, CY2022, CY2023, and CY2024] worth of data (not an overall average). If the Offeror has no DART rate, for any year, the offeror must affirmatively state so and explain why. Should a negative trend occur above Moderate Risk levels, an acceptable/detailed explanation is required that includes any corrective actions taken for improvement.

a. DART cases include injuries or illnesses resulting in death, days away from work, and/or restricted work or transfer to another job days beyond the day of injury/illness.

b. Calculation of DART rate: Multiply the total number of DART cases by 200,000, and then divide by the number of employee labor hours worked.

𝑫𝑨𝑹𝑻 𝑹𝑨𝑻𝑬

Number of DART Incidents x 200,000

Total Number of Employee Labor Hours Worked

2. TCR Rate: Submit five (5) previous complete calendar years’ [CY2020, CY2021, CY2022, CY2023, and CY2024] worth of data (not an overall average). If the Offeror has no TCR rate, for any year, the offeror must affirmatively state so and explain why. Should a negative trend occur above Moderate Risk levels, an acceptable/detailed explanation is required that includes any corrective actions taken for

a. TCR cases include injuries or illnesses resulting in death, days away from work, restricted work or transfer to another job days beyond the day of injury/illness, medical treatment beyond first aid, or loss of consciousness.

b. Calculation of TCR rate: Multiply the total number of TCR incidents by 200,000, and then divide by the number of employee labor hours worked.

𝑻𝑪𝑹 𝑹𝑨𝑻𝑬

Number of TCR Incidents x 200,000

Total Number of Employee Labor Hours Worked

3. Technical Approach to Safety: Submit a narrative that addresses the following:

a. Describe the Offeror’ s approach to implementing and executing a Safety Management System

(SMS) including Management/Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS.

b. Describe the evaluation process used to select potential subcontractors.

c. Describe the processes of how the Offeror will oversee safety compliance of subcontractors at all levels throughout performance of the contract (to include the Offeror’s own in-house workforce).

d. The Technical Approach to Safety narrative shall be limited to two (2) single-sided pages or one (1) double-sided page.

4. The Government reserves the right to review other available sources (public/Government internal) of information. These may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), Electronic Contract Management System (eCMS), etc.

The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The evaluation will collectively consider the DART rate, TCR, Technical Approach to Safety, and other sources of information available to the Government as part of such collective evaluation. The board will evaluate the DART rates and TCR to determine if the Offeror has demonstrated a history of safe work practices taking into account any negative trends and extenuating circumstances that impact the rating.

1. DART Rate: The board will evaluate trends over the last five years considering changes that take it from one risk level (or more) to the next up or down. Negative trends occurring above Moderate Risk levels require the offeror to provide a detailed explanation that includes any corrective actions taken for

a. Missing data without an explanation is considered a Deficiency.

b. Declining trends that push the risk levels from Moderate Risk (MR) or higher to Low Risk (LR) or Very Low Risk (VLR) may indicate a Strength.

c. An increasing DART rate trend could be considered a Weakness (i.e. MR or better to High Risk

(HR) or Extremely High Risk EHR)) if an acceptable explanation is not provided for any trends that rise above Moderate Risk.

d. This chart correlates the DART rate to the level of risk:

Risk DART Rate Very Low Risk Less Than 1.0 Low Risk From 1.0 to 1.99 Moderate Risk From 2.0 to 2.99 High Risk From 3.0 to 4.0 Extremely High Risk Greater than 4.0

2. TCR Rate: The board will evaluate trends over the last five years considering changes that take it from one risk level (or more) to the next up or down. Negative trends occurring above Moderate Risk levels require the offeror to provide a detailed explanation that includes any corrective actions taken for

a. Missing data without an explanation is considered a Deficiency.

b. Declining trends that push the risk levels from Moderate Risk (MR) or higher to Low Risk (LR) or

Very Low Risk (VLR) may indicate a Strength.

c. An increasing TCR rate trend could be considered a Weakness (i.e. MR or better to High Risk (HR) or Extremely High Risk EHR)) if an acceptable explanation is not provided for any trends that rise above Moderate Risk.

d. This chart correlates the TCR rate to the level of risk:

Risk TCR Rate

Very Low Risk Less Than 2.49 Low Risk From 2.5 to 3.49 Moderate Risk From 3.5 to 4.49 High Risk From 4.5 to 5.99 Extremely High Risk Greater than 6.0

3. The Technical Approach to Safety Narrative. To determine the degree to which the Offeror:

a. Describes a viable SMS that addresses implementing and executing a Safety Management System

(SMS) including Management/Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS.

b. Describes a methodical process of evaluating subcontractor’s safety performance in their selection process.

c. Describes a logical management plan to hold themselves and their subcontractors accountable for adhering to the safety requirements of the contract.

d. The Technical Approach to Safety narrative shall be limited to two (2) single-sided pages or one (1) double-sided page. Information on pages beyond this will not be considered.

4. The Government reserves the right to review other available sources (public/Government internal) of information. These may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), Electronic Contract Management System (eCMS), etc.

Factor 3, Management Approach

Offeror shall submit a detailed Management Approach narrative describing how the offeror intends to successfully complete work awarded under this MACC. The narrative plan shall not exceed six (6) singled-sided pages or three

(3) double-sided pages (with the exception of the organizational chart). Information on pages beyond this limit will not be considered. The narrative, at a minimum, must address the following:

• Offeror’s strategy for successful execution of work awarded under resulting contract, managing multiple concurrent projects, and managing the geographic coverage of the contract requirements.

• Offeror’s plan for accomplishing varied Design-Bid-Build projects for general construction.

• The offeror shall describe the roles, responsibilities, and contractual relationships between the various firms that will perform this contract. The narrative shall also include a simple organizational chart that clearly identifies the lines of authority between the entities. (The organizational chart is not part of the page limitation).

• Offeror’s strategy for quality control, compliance with contract documents, cost/budget management, subcontractor management, and schedule requirements.

The narrative will be evaluated to determine whether the offeror’s management approach will contribute to successful performance for this contract. Proposals providing greater detail and demonstrating a greater understanding of the requirements, as outlined above, may be rated higher. Failure to address all elements set out above will render the proposal unacceptable.

Factor 4, Past Performance

If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 1. The offeror shall include all completed CPARS (interim and final) for a project. If there is not a completed CPARS evaluation, the Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 1 for both construction and design experience. AN OFFEROR

SHALL NOT SUBMIT A PPQ WHEN A COMPLETED CPARS IS AVAILABLE.

If a CPARS evaluation is not available, completed PPQs should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). Offerors should ensure correct phone numbers and email addresses are provided for the client point of contact. Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Jonathan Durham via email at jonathan.m.durham.civ@us.navy.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

Offerors are highly encouraged to provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 1 – Corporate Experience. Additionally, Offerors are highly encouraged to address any adverse past performance issues. Explanations shall not exceed two (2) double-sided pages (or four (4) single-sided pages) in total. Information provided beyond this page limit will not be considered.

Sources of Past Performance Information for evaluation that may be used are as follows:

• Past performance information provided by the offeror, as solicited;

• Past performance information obtained from questionnaires tailored to the circumstances of the acquisition;

and

• Past performance information obtained from any other sources available to the Government, to include, but not limited to, Contractor Performance Assessment Reporting System (CPARS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; the Defense Contract Management Agency; and interviews with Program Managers, Contracting Officers, and Fee Determining Officials.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

A copy of the blank Past Performance Questionnaire to be used for requesting client references is included as Attachment C.

The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the Offeror’s references or the references’ unwillingness to provide the information requested may affect the Government’s evaluation of this factor.

This evaluation focuses on how well the Offeror performed on the relevant projects submitted under Factor 1 – Corporate Experience and past performance on other projects currently documented in known sources. The Government will consider the currency and relevance of the information, the source of the information, context of the data, and general trends in Contractor’s performance. In the case of Offerors for which there is no information on past performance, or where past performance information is not available or so sparse that no meaningful assessment can be performed, the Offeror may not be evaluated favorably or unfavorably and will instead receive a “Neutral” rating (See FAR 15.305(a)(2)(iv)). The Government may determine that a “Substantial Confidence” or “Satisfactory Confidence” past performance rating is worth more than a “Neutral Confidence” past performance rating in a best value tradeoff as long as the determination is consistent with stated selection criteria.

The degree to which past performance evaluations and all other past performance information reviewed by the Government (e.g., CPARS, Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), performance recognition documents, and information obtained from any other source) reflect a trend of satisfactory performance considering:

• A pattern of successful completion of tasks;

• A pattern of deliverables that are timely and of good quality;

• A pattern of cooperativeness and teamwork with the Government at all levels (task managers, contracting officers, auditors, etc.); and

• Recency of tasks performed that are identical to, similar to, or related to the task at hand.

5. PROPOSAL REQUIREMENTS

5.1 SITE VISIT

Site Visit Information will be provided via amendment

5.2 PROPOSAL SUBMISSION INSTRUCTIONS

In response to this request for proposal, the complete proposal shall include both the Price Proposal and the Non- Price Factors Proposal, submitted in accordance with the above Basis of Evaluation and Submittal Requirements for Each Factor as follows:

Offerors shall submit electronic proposals (.pdf format) in response to this solicitation. Only the PIEE Solicitation Module is authorized for the submission of electronic proposals in response to this solicitation. Electronic proposal submissions should be no larger than 1.9 GB per file. Offerors shall ensure that the Government has received the electronic proposal prior to the date and time specified. PIEE Solicitation Vendor Access Instructions are provided via Attachment I. Emailed submissions will not be accepted.

Offerors shall allow adequate time to upload files…