WORK ORDER NO.
At the
PREPARED BY:
Mechanical:
Electrical:
Plumbing:
Interior1Design:
Architectural:
Civil:
Structural:
Hazmat:
Survey:
APPROVED BY:
Specifications:
For Commander, NAVFAC:
Date:
Submitted By: Date:
UNCLASSIFIED/FOR OFFICIAL USE ONLY
H. Nelson Adcock, PE Dan Livingstone, PLS
John Adams, PE, BEMP Marsha Tucker, CID
Help Note All fields can be edited. If you have trouble selecting a field, either use the tab key or click "highlight fields" in Acrobat 7. Fields that are not needed can be selected and deleted. Tool tips with "additional field" can be deleted or changed. The contract number can also be deleted or changed.
yliu Stamp
P347 PERIMETER SECURITY IMPROVEMENT P1614700
CUTLER, MAINE
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 30 01.00 22 DESIGN, PROCUREMENT AND INSTALLATION OF FURNITURE,
FIXTURES AND EQUIPMENT
01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT
MANAGEMENT SYSTEM
01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REQUIREMENTS AND REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 20 QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT
INFORMATION (eOMSI)
01 78 30.00 22 GIS DATA DELIVERABLES
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 82 00 ASBESTOS REMEDIATION
02 83 00 LEAD REMEDIATION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
03 45 00 PRECAST ARCHITECTURAL CONCRETE
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 05 20.00 27 POST-INSTALLED CONCRETE AND MASONRY ANCHORS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
PROJECT TABLE OF CONTENTS Page 1
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 11 13 BITUMINOUS DAMPPROOFING
07 13 53 ELASTOMERIC SHEET WATERPROOFING
07 14 00 FLUID-APPLIED WATERPROOFING
07 21 16 MINERAL FIBER BLANKET INSULATION
07 21 23 LOOSE FILL THERMAL INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 27 36 SPRAY FOAM AIR BARRIERS
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 72 20 GRAVITY-TYPE ROOF VENTILATORS
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 31 00 ACCESS DOORS AND PANELS
08 34 01 FORCED ENTRY RESISTANT COMPONENTS
08 34 02 BULLET-RESISTANT COMPONENTS
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 51 13 ALUMINUM WINDOWS
08 51 23 STEEL WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 87 23.13 SAFETY FILMS
08 91 00 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
DI VI SI ON 10 - SPECI ALTI ES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 14 53 TRAFFIC SIGNAGE
10 26 00 WALL PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
PROJECT TABLE OF CONTENTS Page 2
10 51 13 LOCKERS
DI VI SI ON 12 - FURNI SHI NGS
12 24 13 ROLLER WINDOW SHADES
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 93 00 SITE FURNISHINGS
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 35 11 PREFABRICATED STEEL GUARD BOOTH
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBING, GENERAL PURPOSE
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 05 93.00 22 TESTING, ADJUSTING, AND BALANCING FOR MECHANICAL SYSTEMS
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00.00 22 INSTRUMENTATION AND CONTROL FOR HVAC (PWD-MAINE) (J&A)
23 09 13.00 22 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 22 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS (PWD-MAINE)
23 09 53.00 20 SPACE TEMPERATURE CONTROL SYSTEMS
23 11 20 FACILITY GAS PIPING
23 30 00 HVAC AIR DISTRIBUTION
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 82 00.00 20 TERMINAL HEATING UNITS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
25 08 11.00 20 RISK MANAGEMENT FRAMEWORK FOR FACILITY-RELATED CONTROL
SYSTEMS
25 10 10.00 22 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END AND
INTEGRATION (PWD-MAINE)
DI VI SI ON 26 - ELECTRI CAL
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 27 14.00 20 ELECTRICITY METERING
26 32 15.00 ENGINE-GENERATOR SET STATIONARY 15-2500 KW, WITH
AUXILIARIES
26 36 23 AUTOMATIC TRANSFER SWITCHES
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
PROJECT TABLE OF CONTENTS Page 3
28 31 70 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 05 19.13 GEOTEXTILES FOR EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 23 00.00 20 EXCAVATION AND FILL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 23 AGGREGATE BASE COURSES
32 12 13 BITUMINOUS PRIME COATS
32 12 16.16 ROAD-MIX ASPHALT PAVING
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 13 73.19 COMPRESSION CONCRETE PAVING JOINT SEALANT
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 31 13.53 HIGH-SECURITY FENCES (CHAIN LINK AND ORNAMENTAL) AND GATES
32 92 19 SEEDING
32 93 00 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 05 23.13 UTILITY HORIZONTAL DIRECTIONAL DRILLING
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 11 13 POTABLE WATER SUPPLY WELLS
33 11 23 NATURAL GAS AND LIQUID PETROLEUM PIPING
33 16 16 FACTORY-FABRICATED FIRE PROTECTION WATER STORAGE TANKS
33 30 00 SANITARY SEWERAGE
33 31 23.00 10 SANITARY SEWER FORCE MAIN PIPING
33 32 16 PACKAGED UTILITY WASTEWATER PUMPING STATIONS
33 40 00 STORM DRAINAGE UTILITIES
33 46 16 SUBDRAINAGE PIPING
33 47 13 POND AND RESERVOIR LINERS
33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 34 - TRANSPORTATION
34 71 13.16 VEHICLE CRASH BARRIERS
34 71 13.19 CRASH RATED ACTIVE VEHICLE BARRIERS AND CONTROLS
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 31 19 STONE, CHANNEL, SHORELINE/COASTAL PROTECTION FOR STRUCTURES
APPENDICES
APPENDIX A: SUBMITTAL REGISTER
APPENDIX B: FINAL LAND USE CONTROL REMEDIAL DESIGN
APPENDIX C: GEOPYHISICAL ASSESSMENT REPORT
APPENDIX D: HAZARDOUS MATERIAL INSPECTION REPORT
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
DOCUMENT 00 01 15
LIST OF DRAWINGS
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
SHEET
NUMBER
SHEET NAME NAVFAC #s
G-001 COVER SHEET 12880783
G-002 SHEET INDEX 12880784
G-003 SHEET INDEX 12880785
G-004 CIVIL GENERAL NOTES 12880786
GI001 BUILDING CODE/LIFE SAFETY ANALYSIS AND LEGEND - VISITOR
CONTROL CENTER
12880787
GI002 BUILDING CODE/LIFE SAFETY ANALYSIS AND LEGEND - INSPECTION
STATION
12880788
GI003 CODE COMPLIANCE SITE PLAN 12880789
GI101 LIFE SAFETY PLAN - VISITOR CONTROL CENTER 12880790
GI102 LIFE SAFETY PLAN - INSPECTION STATION 12880791
GC001 MAINTENANCE OF TRAFFIC - GENERAL NOTES & SEQUENCE OF
CONSTRUCTION
12880792
GC002 MAINTENANCE OF TRAFFIC AND SIGN LEGEND 12880793
GC100 OVERALL MAINTENANCE OF TRAFFIC PLAN 12880794
GC101 MAINTENANCE OF TRAFFIC - PHASE 1 12880795
GC102 MAINTENANCE OF TRAFFIC - PHASE 1 12880796
GC103 MAINTENANCE OF TRAFFIC - PHASE 1 12880797
GC104 MAINTENANCE OF TRAFFIC - PHASE 2 12880798
GC105 MAINTENANCE OF TRAFFIC - PHASE 2 12880799
GC106 MAINTENANCE OF TRAFFIC - PHASE 2 12880800
GC107 MAINTENANCE OF TRAFFIC - PHASE 3 12880801
GC108 MAINTENANCE OF TRAFFIC - PHASE 3 12880802
GC109 MAINTENANCE OF TRAFFIC - PHASE 3 12880803
GC500 MAINTENANCE OF TRAFFIC DETAILS 12880804
H-101 BLDG 129 - VISITOR CONTROL CENTER - FLOOR PLAN - HAZMAT
REMOVAL
12880805
H-102 BLDG 130 - FLOOR PLAN - HAZMAT REMOVAL 12880806
B-100 BORING LOCATION PLAN 12880807
B-201 OVEREXCAVATION/UNDERCUT PLAN - B129 (VCC) 12880808
B-500 BORING LOGS 12880809
B-501 BORING LOGS 12880810
B-502 BORING LOGS 12880811
B-600 BORING LOG SCHEDULE 12880812
V-001 EXISTING CONDITIONS LEGEND AND NOTES 12880813
VF100 OVERALL EXISTING CONDITIONS PLAN 12880814
DOCUMENT 00 01 15 Page 1
VF101 EXISTING CONDITIONS PLAN 12880815
VF102 EXISTING CONDITIONS PLAN 12880816
VF103 EXISTING CONDITIONS PLAN 12880817
VF104 EXISTING CONDITIONS PLAN 12880818
VF105 EXISTING CONDITIONS PLAN 12880819
VF106 EXISTING CONDITIONS PLAN 12880820
VF107 EXISTING CONDITIONS PLAN 12880821
VF108 EXISTING CONDITIONS PLAN 12880822
VF109 EXISTING CONDITIONS PLAN 12880823
VF110 EXISTING CONDITIONS PLAN 12880824
VF111 EXISTING CONDITIONS PLAN 12880825
VF112 EXISTING CONDITIONS PLAN 12880826
C-001 CIVIL LEGEND AND ABBREVIATIONS 12880827
CA100 ALIGNMENT DATA SHEET KEY PLAN 12880828
CA101 ALIGNMENT DATA SHEET 12880829
CA102 ALIGNMENT DATA SHEET 12880830
CA103 ALIGNMENT DATA SHEET 12880831
CA104 ALIGNMENT DATA SHEET 12880832
CA105 ALIGNMENT DATA SHEET 12880833
CA106 ALIGNMENT DATA SHEET 12880834
CA107 ALIGNMENT DATA SHEET 12880835
CA108 ALIGNMENT DATA SHEET 12880836
CA109 ALIGNMENT DATA SHEET 12880837
CA110 ALIGNMENT DATA SHEET 12880838
CA111 ALIGNMENT DATA SHEET 12880839
CA600 ECF ROADWAY ALIGNMENT DATA SHEET SCHEDULE 12880840
CA601 ECF FENCE ALIGNMENT DATA SHEET SCHEDULE 12880841
CD001 DEMOLITION LEGEND AND NOTES 12880842
CD100 OVERALL DEMOLITION PLAN 12880843
CD101 DEMOLITION PLAN 12880844
CD102 DEMOLITION PLAN 12880845
CD103 DEMOLITION PLAN 12880846
CD104 DEMOLITION PLAN 12880847
CS001 SITE LAYOUT LEGEND AND NOTES 12880848
CS100 OVERALL SITE LAYOUT PLAN 12880849
CS101 SITE LAYOUT PLAN 12880850
CS102 SITE LAYOUT PLAN 12880851
CS103 SITE LAYOUT PLAN 12880852
CS104 SITE LAYOUT PLAN 12880853
CS105 SITE LAYOUT PLAN 12880854
CS106 SITE LAYOUT PLAN 12880855
CS107 SITE LAYOUT PLAN 12880856
CS108 SITE LAYOUT PLAN 12880857
CS109 SITE LAYOUT PLAN 12880858
CS110 SITE LAYOUT PLAN 12880859
CS111 SITE LAYOUT PLAN 12880860
CS201 PROFILE 12880861
CS202 PROFILE 12880862
CS301 TYPICAL SECTIONS 12880863
CS302 TYPICAL SECTIONS 12880864
CS303 TYPICAL SECTIONS 12880865
CS304 TYPICAL SECTIONS 12880866
CS305 TYPICAL SECTIONS 12880867
CS306 TYPICAL SECTIONS 12880868
DOCUMENT 00 01 15 Page 2
CS307 PAVEMENT DETAILS 12880869
CS308 PAVEMENT JOINT DETAILS 12880870
CS400 PASS AND IDENTIFICATION OFFICE AREA ENLARGED SITE PLAN 12880871
CS401 ID CHECK AREA ENLARGED SITE PLAN 12880872
CS402 ID CHECK AREA ENLARGED SITE PLAN 12880873
CS500 SITE LAYOUT DETAILS 12880874
CS501 SITE LAYOUT DETAILS 12880875
CS502 GUARDRAIL DETAILS 12880876
CS503 GUARDRAIL DETAILS 12880877
CS504 GUARDRAIL DETAILS 12880878
CS505 GUARDRAIL DETAILS 12880879
CS506 FENCING DETAILS 12880880
CS507 FENCING DETAILS 12880881
CS508 FENCING DETAILS 12880882
CS509 SWING GATE DETAILS 12880883
CS510 SLIDING GATE DETAILS 12880884
CS511 PASSIVE VEHICLE CABLE BARRIER DETAILS 12880885
CS512 PASSIVE VEHICLE CABLE BARRIER DETAILS 12880886
CS513 PASSIVE VEHICLE CABLE BARRIER DETAILS 12880887
CS514 PASSIVE VEHICLE CABLE BARRIER DETAILS 12880888
CS515 PASSIVE VEHICLE CABLE BARRIER DETAILS 12880889
CS516 BOLLARD DETAILS 12880890
CS517 CRASH BEAM DETAILS 12880891
CS518 CRASH BEAM DETAILS 12880892
CS600 FENCING SCHEDULE 12880893
CG100 OVERALL GRADING PLAN 12880894
CG101 GRADING PLAN 12880895
CG102 GRADING PLAN 12880896
CG103 GRADING PLAN 12880897
CG104 GRADING PLAN 12880898
CG105 OVERALL DRAINAGE PLAN 12880899
CG106 DRAINAGE PLAN 12880900
CG107 DRAINAGE PLAN 12880901
CG108 DRAINAGE PLAN 12880902
CG109 DRAINAGE PLAN 12880903
CG200 DRAINAGE PROFILES 12880904
CG201 DRAINAGE PROFILES 12880905
CG400 DRAINAGE PLAN LARGE SCALE VIEW - VCC FOUNDATION DRAIN 12880906
CG401 DRAINAGE PLAN LARGE SCALE VIEW - ECF FOUNDATION AND CANOPY
UNDERDRAIN
12880907
CG402 GRADING PLAN LARGE SCALE VIEW - PARKING LOT 12880908
CG403 GRADING PLAN LARGE SCALE VIEW - GUARD AND TRUCK INSPECTION
OFFICE
12880909
CG500 DRAINAGE DETAILS 12880910
CG501 DRAINAGE DETAILS 12880911
CG502 DRAINAGE DETAILS 12880912
CG503 DRAINAGE DETAILS 12880913
CG504 STORMWATER MANAGEMENT DETAILS 12880914
CG505 STORMWATER MANAGEMENT DETAILS 12880915
CG600 ROADWAY SCHEDULE 12880916
CG601 DRAINAGE SCHEDULE 12880917
CG602 DRAINAGE SCHEDULE 12880918
CG603 DRAINAGE SCHEDULE 12880919
CG604 DRAINAGE SCHEDULE 12880920
DOCUMENT 00 01 15 Page 3
CM001 SIGN AND PAVEMENT MARKING LEGEND 12880921
CM100 OVERALL SIGNS AND PAVEMENT MARKINGS PLAN 12880922
CM101 SIGNS AND PAVEMENT MARKINGS PLAN 12880923
CM102 SIGNS AND PAVEMENT MARKINGS PLAN 12880924
CM400 SAFETY SCHEME DETAIL PLAN 12880925
CM401 SAFETY SCHEME DETAIL PLAN 12880926
CM500 SIGNS AND PAVEMENT MARKING DETAILS 12880927
CM501 ENTRANCE SIGN DETAIL 12880928
CU100 OVERALL UTILITY PLAN 12880929
CU101 UTILITY SITE PLAN 12880930
CU102 UTILITY PROFILES 12880931
CU501 UTILITY DETAILS 12880932
CU502 UTILITY DETAILS 12880933
CU503 UTILITY DETAILS 12880934
CE001 EROSION AND SEDIMENT CONTROL GENERAL NOTES 12880935
CE002 EROSION AND SEDIMENT CONTROL GENERAL NOTES AND SEQUENCE OF
CONSTRUCTION
12880936
CE100 OVERALL EROSION AND SEDIMENT CONTROL PLAN PHASE 1 12880937
CE101 EROSION AND SEDIMENT CONTROL PLAN PHASE 1 12880938
CE102 EROSION AND SEDIMENT CONTROL PLAN PHASE 1 12880939
CE103 EROSION AND SEDIMENT CONTROL PLAN PHASE 1 12880940
CE104 OVERALL EROSION AND SEDIMENT CONTROL PLAN PHASE 2 12880941
CE105 EROSION AND SEDIMENT CONTROL PLAN PHASE 2 12880942
CE106 EROSION AND SEDIMENT CONTROL PLAN PHASE 2 12880943
CE107 EROSION AND SEDIMENT CONTROL PLAN PHASE 2 12880944
CE108 OVERALL EROSION AND SEDIMENT CONTROL PLAN PHASE 3 12880945
CE109 EROSION AND SEDIMENT CONTROL PLAN PHASE 3 12880946
CE110 EROSION AND SEDIMENT CONTROL PLAN PHASE 3 12880947
CE111 EROSION AND SEDIMENT CONTROL PLAN PHASE 3 12880948
CE112 EROSION AND SEDIMENT CONTROL PLAN PHASE 3 12880949
CE113 EROSION AND SEDIMENT CONTROL PLAN PHASE 3 12880950
CE114 EROSION AND SEDIMENT CONTROL PLAN PHASE 3 12880951
CE115 EROSION AND SEDIMENT CONTROL PLAN PHASE 3 12880952
CE116 EROSION AND SEDIMENT CONTROL PLAN PHASE 3 12880953
CE117 EROSION AND SEDIMENT CONTROL PLAN PHASE 3 12880954
CE118 OVERALL EROSION AND SEDIMENT CONTROL PLAN PHASE 4 12880955
CE119 EROSION AND SEDIMENT CONTROL PLAN PHASE 4 12880956
CE120 EROSION AND SEDIMENT CONTROL PLAN PHASE 4 12880957
CE500 EROSION AND SEDIMENT CONTROL DETAILS 12880958
CX100 WETLAND IMPACT SHEET KEY PLAN 12880959
CX101 WETLAND IMPACT SHEET 12880960
CX102 WETLAND IMPACT SHEET 12880961
CX103 WETLAND IMPACT SHEET 12880962
CX104 WETLAND IMPACT SHEET 12880963
CX105 WETLAND IMPACT SHEET 12880964
CX106 WETLAND IMPACT SHEET 12880965
CX107 WETLAND IMPACT SHEET 12880966
CX108 WETLAND IMPACT SHEET 12880967
CX109 WETLAND IMPACT SHEET 12880968
CX110 WETLAND IMPACT SHEET 12880969
LP100 OVERALL LANDSCAPE PLAN 12880970
LP101 LANDSCAPE PLAN 12880971
LP102 LANDSCAPE PLAN 12880972
LP103 LANDSCAPE PLAN 12880973
DOCUMENT 00 01 15 Page 4
LP104 LANDSCAPE PLAN 12880974
LP105 LANDSCAPE PLAN 12880975
LP106 LANDSCAPE PLAN 12880976
LP107 LANDSCAPE PLAN 12880977
LP108 LANDSCAPE PLAN 12880978
LP109 LANDSCAPE PLAN 12880979
LP110 LANDSCAPE PLAN 12880980
LP111 LANDSCAPE PLAN 12880981
LP112 LANDSCAPE PLAN 12880982
XX100 ENVIRONMENTAL FEATURES SHEET KEY PLAN 12880983
XX101 ENVIRONMENTAL FEATURES SHEET 12880984
XX102 ENVIRONMENTAL FEATURES SHEET 12880985
XX103 ENVIRONMENTAL FEATURES SHEET 12880986
XX104 ENVIRONMENTAL FEATURES SHEET 12880987
XX105 ENVIRONMENTAL FEATURES SHEET 12880988
XX106 ENVIRONMENTAL FEATURES SHEET 12880989
XX107 ENVIRONMENTAL FEATURES SHEET 12880990
XX108 ENVIRONMENTAL FEATURES SHEET 12880991
XX109 ENVIRONMENTAL FEATURES SHEET 12880992
XX110 ENVIRONMENTAL FEATURES SHEET 12880993
S-001 GENERAL NOTES 12880994
S-002 GENERAL NOTES 12880995
S-003 GENERAL NOTES 12880996
S-101 FOUNDATION PLAN - VISITOR CONTROL CENTER 12880997
S-102 FOUNDATION PLAN - INSPECTION STATION, POV AND CVIS CANOPIES 12880998
S-103 ROOF FRAMING PLAN - VISITOR CONTROL CENTER 12880999
S-104 ROOF FRAMING PLAN - INSPECTION STATION 12881000
S-105 CANOPY FRAMING PLAN - POV AND CVIS CANOPIES 12881001
S-301 FOUNDATION SECTIONS - VISITOR CONTROL CENTER 12881002
S-302 FOUNDATION SECTIONS - INSPECTION STATION, POV AND CVIS
CANOPIES
12881003
S-303 FOUNDATION SECTIONS - INSPECTION STATION, POV AND CVIS
CANOPIES
12881004
S-304 FOUNDATION SECTIONS - INSPECTION STATION, POV AND CVIS
CANOPIES
12881005
S-310 FRAMING SECTIONS - VISITOR CONTROL CENTER 12881006
S-311 FRAMING SECTIONS - INSPECTION STATION 12881007
S-312 FRAMING SECTIONS - POV AND CVIS CANOPIES 12881008
S-501 TYPICAL DETAILS 12881009
S-502 TYPICAL DETAILS 12881010
S-503 TYPICAL DETAILS 12881011
S-510 TRUSS DIAGRAMS - VISITOR CONTROL CENTER 12881012
S-511 TRUSS DIAGRAMS - INSPECTION STATION 12881013
S-512 TRUSS DIAGRAMS - POV AND CVIS CANOPIES 12881014
A-001 GENERAL PROJECT NOTES, GOVERNING REGULATIONS, MATERIALS
LEGEND, SYMBOLS AND ABBREVIATIONS
12881015
A-002 INSPECTION STATION - AIR BARRIER 12881016
AD101 VISITOR CONTROL CENTER - DEMOLITION FLOOR PLAN, REFLECTED
CEILING PLAN AND WALL SECTION
12881017
AD102 BUILDING 130 - DEMOLITION PLANS AND ELEVATIONS 12881018
A-101 VISITOR CONTROL CENTER - FLOOR PLAN 12881019
A-102 INSPECTION STATION - OVERALL FLOOR PLAN 12881020
A-103 VISITOR CONTROL CENTER - REFLECTED CEILING PLAN 12881021
DOCUMENT 00 01 15 Page 5
A-104 INSPECTION STATION - REFLECTED CEILING PLAN 12881022
A-105 POV AND CVIS CANOPIES - REFLECTED CEILING PLAN 12881023
A-106 VISITOR CONTROL CENTER - ROOF PLAN 12881024
A-107 INSPECTION STATION - ROOF PLAN 12881025
A-108 POV AND CVIS CANOPIES - ROOF PLAN 12881026
A-201 VISITOR CONTROL CENTER - EXTERIOR ELEVATIONS 12881027
A-202 INSPECTION STATION - BUILDING ELEVATIONS 12881028
A-301 VISITOR CONTROL CENTER - BUILDING SECTIONS 12881029
A-302 INSPECTION STATION - BUILDING SECTIONS 12881030
A-303 POV AND CVIS CANOPY SECTIONS 12881031
A-304 VISITOR CONTROL CENTER - WALL SECTIONS 12881032
A-305 INSPECTION STATION - WALL SECTIONS 12881033
A-306 POV AND CVIS CANOPIES - WALL SECTIONS 12881034
A-401 VISITOR CONTROL CENTER - ENLARGED PLANS, ELEVATIONS, AND
TOILET ACCESSORIES
12881035
A-402 INSPECTION STATION - ENLARGED PLANS, ELEVATIONS, AND DETAILS 12881036
A-403 VISITOR CONTROL CENTER - ENLARGED PLANS AND INTERIOR
ELEVATIONS
12881037
A-404 CASEWORK SECTIONS 12881038
A-501 INSPECTION STATION - EXTERIOR DETAILS 12881039
A-502 INSPECTION STATION - EXTERIOR DETAILS 12881040
A-503 INSPECTION STATION - EXTERIOR DETAILS 12881041
A-504 VISITOR CONTROL CENTER - EXTERIOR DETAILS 12881042
A-601 VISITOR CONTROL CENTER - DOOR AND WINDOW SCHEDULE AND DETAILS 12881043
A-602 INSPECTION STATION DOOR SCHEDULE AND DETAILS 12881044
A-603 INSPECTION STATION WINDOW SCHEDULE AND DETAILS 12881045
A-701 VISITOR CONTROL CENTER - FINISH SCHEDULE AND FINISH LEGEND 12881046
A-702 INSPECTION STATION - FINISH SCHEDULE AND FINISH LEGEND 12881047
A-703 VISITOR CONTROL CENTER - FINISH PLAN 12881048
A-704 INSPECTION STATION - FINISH PLAN 12881049
A-705 VISITOR CONTROL CENTER - SIGNAGE PLAN 12881050
A-706 INSPECTION STATION - SIGNAGE PLAN 12881051
A-707 SIGNAGE TYPICAL DETAILS 12881052
I-101 VISITOR CONTROL CENTER - FF&E PLAN 12881053
I-102 INSPECTION STATION - FF&E PLAN 12881054
FA001 FIRE ALARM GENERAL NOTES AND LEGEND 12881055
FD101 FIRE ALARM DEMOLITION PLANS 12881056
FA101 FIRE ALARM PLAN - VISITOR CONTROL CENTER 12881057
FA102 FIRE ALARM PLAN - INSPECTION CENTER 12881058
FA501 FIRE ALARM DETAILS 12881059
FA502 FIRE ALARM DETAILS 12881060
P-001 PLUMBING LEGENDS, NOTES, AND ABBREVIATIONS 12881061
PD101 FLOOR PLAN PLUMBING - VISITOR CONTROL CENTER - DEMOLITION 12881062
P-101 FLOOR PLAN PLUMBING - VISITOR CONTROL CENTER - SANITARY 12881063
P-102 FLOOR PLAN PLUMBING - VISITOR CONTROL CENTER - DOMESTIC WATER 12881064
P-103 FLOOR PLAN PLUMBING - INSPECTION STATION - SANITARY 12881065
P-104 FLOOR PLAN PLUMBING - INSPECTION STATION - DOMESTIC WATER 12881066
P-501 PLUMBING DETAILS 12881067
DOCUMENT 00 01 15 Page 6
P-502 PLUMBING DETAILS 12881068
P-503 PLUMBING DETAILS 12881069
P-601 PLUMBING SCHEDULES 12881070
P-602 PLUMBING SCHEDULES 12881071
P-901 PLUMBING ISOMETRICS 12881072
P-902 PLUMBING ISOMETRICS 12881073
P-903 PLUMBING ISOMETRICS 12881074
M-001 MECHANICAL LEGEND, NOTES, AND ABBREVIATIONS 12881075
M-002 MECHANICAL CRITERIA, CODES AND STANDARDS 12881076
MD101 FLOOR PLAN - VISITOR CONTROL CENTER - DEMOLITION 12881077
MD102 BUILDING 130 - FLOOR PLAN - DEMOLITION 12881078
M-101 VISITOR CONTROL CENTER - FLOOR PLAN AREA A - MECHANICAL HVAC 12881079
M-102 VISITOR CONTROL CENTER - FLOOR PLAN AREA B - MECHANICAL HVAC 12881080
M-103 INSPECTION STATION - FLOOR PLAN - MECHANICAL HVAC 12881081
M-301 VISITOR CONTROL CENTER - MECHANICAL SECTIONS 12881082
M-302 VISITOR CONTROL CENTER - MECHANICAL SECTIONS 12881083
M-303 VISITOR CONTROL CENTER - MECHANICAL SECTIONS 12881084
M-304 INSPECTION STATION - MECHANICAL SECTIONS 12881085
M-401 VISITOR CONTROL CENTER - ENLARGED MECHANICAL PLANS 12881086
M-501 MECHANICAL DETAILS 12881087
M-502 MECHANICAL DETAILS 12881088
M-503 MECHANICAL DETAILS 12881089
M-601 MECHANICAL SCHEDULES 12881090
M-602 MECHANICAL SCHEDULES 12881091
M-801 MECHANICAL CONTROLS 12881092
M-802 MECHANICAL CONTROLS 12881093
M-803 MECHANICAL CONTROLS 12881094
M-901 VISITOR CONTROL CENTER - MECHANICAL ISOMETRIC 12881095
M-902 INSPECTION STATION - MECHANICAL ISOMETRIC 12881096
E-001 LEGEND, NOTES, AND ABBREVIATIONS 12881097
ED101 SITE PLAN - ELECTRICAL DEMOLITION 12881098
ED102 VISITORS CENTER FLOOR PLAN - ELECTRICAL DEMOLITION 12881099
ED103 BUILDING 130 - ELECTRICAL DEMOLITION 12881100
ES101 SITE PLAN - ELECTRICAL LIGHTING 12881101
ES102 SITE PLAN - ELECTRICAL POWER 12881102
EL101 VISITORS CONTROL CENTER FLOOR PLAN - ELECTRICAL LIGHTING 12881103
EL102 INSPECTION STATION, POV, AND CVIS CANOPIES FLOOR PLAN -
ELECTRICAL LIGHTING
12881104
EL501 LIGHTING FIXTURE SCHEDULE AND DETAILS 12881105
EL502 LIGHTING DETAILS 12881106
EL503 LIGHTING DETAILS 12881107
EG101 VISITORS CONTROL CENTER ROOF PLAN - LIGHTNING PROTECTION 12881108
EG102 INSPECTION STATION, POV, AND CVIS ROOF PLAN - LIGHTNING
PROTECTION
12881109
EG501 LIGHTNING PROTECTION DETAILS 12881110
EG701 GROUNDING RISER DIAGRAM 12881111
EP101 VISITORS CONTROL CENTER FLOOR PLAN - ELECTRICAL POWER 12881112
EP102 INSPECTION STATION, POV, AND CVIS FLOOR PLAN - ELECTRICAL
POWER
12881113
EP501 POWER DETAILS 12881114
EP502 POWER DETAILS 12881115
EP601 PANELBOARD SCHEDULES 12881116
DOCUMENT 00 01 15 Page 7
EP602 PANELBOARD SCHEDULES 12881117
EP701 POWER RISER DIAGRAM 12881118
TN001 TELECOMMUNICATIONS LEGEND, NOTES, AND ABBREVIATIONS 12881119
TS101 OVERALL SITE PLAN - TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
AND SECURITY
12881120
TS102 ENTRY CONTROL FACILITY SITE PLAN - TELECOMMUNICATIONS OUTSIDE
PLANT (OSP) AND SECURITY
12881121
TS103 HELIX HOUSES SITE PLANS - TELECOMMUNICATIONS OUTSIDE PLANT
(OSP) AND SECURITY
12881122
TS104 BUILDING 100 SITE PLAN - TELECOMMUNICATIONS OUTSIDE PLANT
(OSP) AND SECURITY
12881123
TS105 BUILDING 103 SITE PLAN - TELECOMMUNICATIONS OUTSIDE PLANT
(OSP) AND SECURITY
12881124
TN101 VISITORS CONTROL CENTER FLOOR PLAN - TELECOMMUNICATIONS 12881125
TN102 INSPECTION STATION, POV, AND CVIS FLOOR PLAN -
TELECOMMUNICATIONS
12881126
TN501 TELECOMMUNICATIONS DETAILS 12881127
TN502 TELECOMMUNICATIONS DETAILS 12881128
TN503 TELECOMMUNICATIONS VOICE AND DATA BACKBONE ELEVATION DETAILS 12881129
TY001 ELECTRONIC SECURITY SYSTEM (ESS) LEGEND, NOTES, AND
ABBREVIATIONS
12881130
TY101 VISITORS CONTROL CENTER FLOOR PLAN - ELECTRONIC SECURITY
SYSTEM (ESS)
12881131
TY102 INSPECTION STATION, POV, AND CVIS FLOOR PLAN - ELECTRONIC
SECURITY SYSTEM (ESS)
12881132
TY501 SECURITY DIAGRAMS 12881133
TY502 SECURITY DIAGRAMS AND DETAILS 12881134
TY503 SECURITY DETAILS 12881135
TY504 SECURITY DETAILS 12881136
TY505 SECURITY DETAILS 12881137
TY506 ACTIVE VEHICLE BARRIER DETAILS 12881138
TY507 SECURITY CCTV RISER DIAGRAMS 12881139
TA101 AUDIOVISUAL - WAITING AND SERVICE AREAS ENLARGED PLANS AND
ELEVATIONS
12881140
1.3 SUPPLEMENTARY DRAWINGS
These supplementary drawings may not be a part of the contract but are included with the drawings for information.
1.3.1 Subsurface Data
Subsurface data, not specified or indicated, have been obtained by the Government at the station. The data are available for examination by prospective bidders.
-- End of Document --
DOCUMENT 00 01 15 Page 8
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
The work includes the construction of a new Entry Control Facility (ECF), a Gatehouse/Truck Inspection Office, a Main Entry POV Canopy and Truck Inspection Canopy, a Pass and Identification Office/Visitor Center, Commercial Vehicle Inspection Station, Restricted Area Perimeter Security Fence and grounding of fence, associated roadway and utilities, site work and site preparation, clearing, site demolition, electrical and mechanical installations, significant earthwork associated with construction of the ECF, and related work indicated within the plans and specifications. This site has significant natural and social environmental features and care during construction is paramount. It is critical that the "mission" must be maintained at all times and that critical infrastructure such as any damage to ground matting is repaired immediately upon the occurrence and contracting/government officer is contacted upon such for each occurrence.
1.1.2 Location
The work is located at the NCTAMS LANT Detachment Cutler, off Ridge Road, in Cutler, Maine, as indicated in the Contract Documents.
1.2 OCCUPANCY OF PREMISES
Building(s) will be occupied during performance of work under this Contract. Occupancy notifications will be posted in a prominent location in the work area.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
1.3 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work to remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.4 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.
SECTION 01 11 00 Page 1
Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.
It is the responsibility of the contractor to locate all existing underground utilities that are within the limits of work, prior to any excavation activities. These include but are not limited to the following buried utilities: water lines, sanitary and storm sewers, steam condensate, fuel lines, gas lines, electrical ducts and direct buried conductors, grounding grid, fiber optic cabling, commercial telephone, Base telephone, commercial cable TV, Base instructional cable TV, EMCS, and fire alarm. The contractor must employ the services of a qualified Utility locating company to locate, identify, and mark all underground utilities. The entire construction limits must be thoroughly scanned and researched to determine existing utility locations. Any existing utilities that are indicated on the project drawings must be considered for reference use by the locating company and must be verified. All underground utilities must be clearly marked with flags, paint or stakes prior to any digging operation except that required to determine exact utility location and depth. CAUTION must be used when trenching or excavating around or near buried utilities. The contractor is responsible for the timely repair and/or replacement of direct and collateral damage on any and all underground utilities that are severed, crushed, broken, displaced or otherwise disturbed by the construction operation. The Government must not incur any additional cost for such repair or replacement. The contractor must notify the FEAD a minimum of three working days prior to utility locating. Do not continue with excavation or installation of new work without resolving elevation discrepancies and conflicts.
1.4.1 Notification Prior to Excavation
Notify the Contracting Officer at least 15 days prior to starting excavation work.
1.5 NAVY AND MARINE CORPS (NMCI) COORDINATION REQUIREMENTS
1.5.1 NMCI Contractor Access
Allow the NMCI Contractor access to the facility towards the end of construction (finishes 90 percent complete, rough-in 100 percent complete, Inside Plant (ISP)/Outside Plant (OSP) infrastructure in place) to provide equipment in the telecommunications rooms and make final connections.
Coordinate efforts with the NMCI Contractor to facilitate joint use of building spaces during the final phases of construction. After the Contracting Officer has facilitated coordination meetings between the two contractors, within one week, incorporate the effort of additional coordination with the NMCI Contractor into the construction schedule to demonstrate a plan for maintaining the contract duration.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 2
SECTION 01 11 00 Page 3
SECTION 01 14 00
WORK RESTRICTIONS
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel
1.2 SPECIAL SCHEDULING REQUIREMENTS
a. The existing Ridge Road will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.
b. Permission to interrupt any Activity roads, railroads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.
c. The work under this contract requires special attention to the scheduling and conduct of the work in connection with existing operations. Identify on the construction schedule each factor which constitutes a potential interruption to operations.
1.3 CONTRACTOR ACCESS AND USE OF PREMISES
1.3.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.
1.3.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.3.1.2 Installation Access
Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy
SECTION 01 14 00 Page 1
Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/om/dbids.html . No fees are associated with obtaining a DBIDS credential.
Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation.
1.3.1.2.1 Registration for DBIDS
Registration for DBIDS is available at https://www.cnic.navy.mil/om/dbids.html . Procedure includes:
a. Present a letter or official award document (i.e. DD Form 1155 or SF 1442) from the Contracting Officer, that provides the purpose for access, to the base Visitor Control Center representative.
b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.
c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/om/dbids.html .
d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, fingerprints, base restriction and several other assessments.
e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.
1.3.1.2.2 DBIDS Eligibility Requirements
Throughout the length of the contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.
An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification.
The Government is the final authority.
1.3.1.2.3 DBIDS Notification Requirements
a. Immediately report instances of lost or stolen badges to the Contracting Officer.
b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:
(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.
(2) There is a reasonable basis to conclude that an employee, or
SECTION 01 14 00 Page 2 former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.
1.3.1.2.4 One-Day Passes
Personnel applying for One-Day passes at the Base Visitor Control Office are subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.
1.3.1.3 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.
1.3.2 Working Hours
Regular working hours will consist of an 8 1/2 hour period , between 7 a.m. and 3:30 p.m., Monday through Friday, excluding Government holidays.
1.3.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.
1.3.4 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, and are considered utility cutovers pursuant to the paragraph
WORK OUTSIDE REGULAR HOURS.
d. Connection to Existing Sanitary Sewer Line: Provide positive verification that the existing line conveys sanitary sewer; verify line is not incorrectly connected to a storm drain. Obtain Installation's Sanitary Sewer Connection Permit 2 weeks prior to connection and in accordance with Section 33 30 00 SANITARY SEWERAGE.
SECTION 01 14 00 Page 3
1.4 SECURITY REQUIREMENTS
1.4.1 Station Regulations
No employee or representative of the contractor will be admitted to the work site without an Identification Badge, or is specifically authorized admittance to the work site by the FEAD, Facilities Engineering & Acquisition Division.
IMPORTANT NOTE: FEAD personnel (Construction Managers, Engineers/Architects, Engineering Technicians, Contract Specialists, or Contract Surveillance Representatives) will not receive, process, re-transmit or otherwise handle IN ANY WAY Personally Identifiable Information (PII) related to the badging process. Do NOT forward any of this information to the FEAD.
1.4.2 Contractor Access to NCTAMS LANT Detachment Cutler and Outlying Areas
1. SECNAV 55-12/1 (May 2021) or latest form for granting access to NCTAMS LANT Detachment for commercial and contract employers and employees.
This document is an aid in meeting ASO 5560.6A requirements and is not a substitute for the order.
2. The Pass & Identification Office at Building 129 will issue credentials to authorized contractors. Sub-Contractors and suppliers must coordinate through the Prime-Contractor
3. Criminal Activity. In accordance with ASO 5560.6A, the below list of criminal activities within an applicant's record are considered not in the best interest of the Navy and will be grounds for automatic denial of access aboard the Installation:
a. Conviction of any felony offense.
b. Conviction of any misdemeanor offense, which was the result of a plea bargain of a felony offense.
c. Conviction of any offense involving a weapon.
d. Conviction of any drug offense involving manufacturing or trafficking.
e. More than one misdemeanor conviction of drug related offenses over the applicant's lifetime or one misdemeanor drug related offense within the last five years.
f. Conviction of any assault charge.
g. Conviction of any offense involving theft or larceny.
h. Conviction of any offense of domestic violence.
i. Conviction of any offense related to the abuse/neglect of a child.
j. Conviction of any sexual in nature related offense or registration as a sex offender.
k. Commission of any grievous criminal offense/misconduct while
SECTION 01 14 00 Page 4 aboard any Federal installation, including blatant disregard for rules and regulations of the Installation, but excluding minor traffic offenses.
l. Other than Honorable, Bad Conduct, and Dishonorable discharges from the U.S. Military.
m. Those identified as undocumented citizens.
n. Those on the National Terrorist Watch List.
o. Any individual who attempts to hide or purposely fails to disclose all past criminal history during the vetting process.
p. Any individual that the CNIC Security Office determines to present a risk to the security and safety of the Installation and whose access is deemed not in the best interest of the Navy.
q. Any individual who has been debarred from the Installation by the Installation Commander or is currently listed as debarred from any other Federal installation.
r. Any individual with an outstanding warrant for their arrest or apprehension.
s. Any individual with a pending criminal court case that, if convicted, would result in access denial in accordance with the criteria listed above.
1.4.3 Staging Area
As indicated on the plans, the Contractor staging area will be coordinated with/by the PM. Amount of material on site must be kept to a minimum and must only be material that is pertinent to the work currently being performed. All stockpiling of equipment and materials must be closely coordinated with the Government and must not disrupt activities at the site.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 14 00 Page 5
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EP 1110-1-8 (2016) Construction Equipment Ownership and Operating Expense Schedule
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Schedule of Prices; G
1.3 SCHEDULE OF PRICES
1.3.1 Data Required
Within 15 calendar days of notice of award, prepare and deliver to the Contracting Officer a Schedule of Prices (construction Contract) as directed by the Contracting Officer. Schedule of Prices must have cost summarized and totals provided for each construction category. Provide a detailed breakdown of the Contract price, giving quantities for each of the various kinds of work, unit prices and extended prices. Contractor overhead and profit including salaries for field office personnel, if applicable, must be proportionately spread over all pay items and not included as individual pay items.
1.3.2 Payment Schedule Instructions
Payments will not be made until the Schedule of Prices has been submitted to and accepted by the Contracting Officer.
Additionally, the Schedule of Prices must be separated as follows:
a. Primary Facilities Cost Breakdown:
Defined as work on the primary facilities out to the 5 foot line.
Work out to the 5 foot line includes construction encompassed within a theoretical line 5 foot from the face of exterior walls and includes attendant construction, such as pad mounted HVAC cooling equipment, cooling towers, and transformers placed beyond the 5 foot line.
SECTION 01 20 00 Page 1
b. Supporting Facilities Cost Breakdown:
Defined as site work, including incidental work, outside the 5 foot line.
1.3.3 Schedule Requirements for HVAC TAB
The field work requirements in Section 23 05 93.00 22 TESTING, ADJUSTING, AND BALANCING FOR MECHANICAL SYSTEMS must be broken down in the Schedule of Prices and in the Construction Progress Documentation by separate line items which reflect measurable deliverables. The value for each pay item listed below will be established on a case by case basis for each Contract. The line items are as follows:
a. Approval of Design Review Report: The TABS Agency is required to conduct a review of the project plans and specifications to identify any feature, or the lack thereof, that would preclude successful testing and balancing of the project HVAC systems. Submit the resulting findings to the Government to allow correction of the design. The progress payment will not be issued until the report is reviewed and approved.
b. Approval of the pre-field engineering report: The TABS Agency submits a report which outlines the scope of field work. The report must contain details of what systems will be tested, procedures to be used, sample report forms for reporting test results and a quality control checklist of work items that must be completed before TABS field work commences.
c. Season I field work: Incremental payments are issued as the TABS field work progresses. The TABS Agency mobilizes to the project site and executes the field work as outlined in the pre-field engineering report. The HVAC water and air systems are balanced and operational data must be collected for one seasonal condition (either summer or winter depending on project timing).
d. Approval of Season I report: On completion of the Season I field work, the data is compiled into a report and submitted to the Government. The report is reviewed, and approved, after ensuring compliance with the pre-field engineering report scope of work.
e. Completion of Season I field QA check: Contract QC and Government representatives meet the TABS Agency at the jobsite to retest portions of the systems reported in the Season I report. The purpose of these tests are to validate the accuracy and completeness of the previously submitted Season I report.
f. Approval of Season II report: The TABS Agency completes all Season II field work, which is normally comprised mainly of taking heat transfer temperature readings, in the season opposite of that under which Season I performance data was compiled. Compile this data into a report and submit to the Government. On completion of submittal review to ensure compliance with the pre-field engineering report scope, progress payment is issued. Progress payment is less than that issued for the Season I report since most of the water and air balancing work effort is completed under Season I.
SECTION 01 20 00 Page 2
1.4 CONTRACT MODIFICATIONS
In conjunction with the Contract Clause DFARS 252.236-7000 Modification Proposals-Price Breakdown, and where actual ownership and operating costs of construction equipment cannot be determined from Contractor accounting records, base equipment use rates upon the applicable provisions of the
EP 1110-1-8 .
1.5 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT
1.5.1 Content of Invoice
Requests for payment will be processed in accordance with the Contract Clause FAR 52.232-27 Prompt Payment for Construction Contracts and FAR 52.232-5 Payments Under Fixed-Price Construction Contracts. Invoices not completed in accordance with contract requirements will be returned to the Contractor for correction of the deficiencies. The requests for payment must include the documents listed below.
a. The Contractor's invoice, on NAVFAC Form 7300/30 furnished by the Government, showing in summary form, the basis for arriving at the amount of the invoice. Form 7300/30 must include certification by Quality Control (QC) Manager as required by the Contract.
b. The Estimate for Voucher/ Contract Performance Statement on NAVFAC Form 4330/54 furnished by the Government. Use NAVFAC Form 4330, unless otherwise directed by the Contracting Officer, on NAVFAC Contracts when a Monthly Estimate for Voucher is required.
c. Contractor's Monthly Estimate for Voucher and Contractors Certification (NAVFAC Form 4330) with Subcontractor and supplier payment certification. Other documents, including but not limited to, that need to be received prior to processing payment include the following submittals as required. These items are still required monthly even when a pay voucher is not submitted.
d. Monthly Work-hour report.
e. Updated Construction Progress Schedule and tabular reports required by the contract.
f. Contractor Safety Self Evaluation Checklist.
g. Updated submittal register.
h. Solid Waste Disposal Report.
i. Certified payrolls.
j. Updated testing logs.
k. Other supporting documents as requested.
1.5.2 Submission of Invoices
If DFARS Clause 252.232-7006 Wide Area WorkFlow Payment Instructions is included in the Contract, provide the documents listed in above paragraph CONTENT OF INVOICE in their entirety as attachments in Wide Area Work Flow (WAWF) for each invoice submitted. The maximum size of each WAWF
SECTION 01 20 00 Page 3 attachment is two megabytes, but there are no limits on the number of attachments. If a document cannot be attached in WAWF due to system or size restriction, provide it as instructed by the Contracting Officer.
Monthly invoices and supporting forms for work performed through the anniversary award date of the Contract must be submitted to the Contracting Officer within 5 calendar days of the date of invoice. For example, if Contract award date is the 7th of the month, the date of each monthly invoice must be the 7th and the invoice must be submitted by the 12th of the month.
1.5.3 Final Invoice
a. A final invoice must be accompanied by the certification required by DFARS 252.247.7023 Transportation of Supplies by Sea, and the Contractor's Final Release. If the Contractor is incorporated, the Final Release must contain the corporate seal. An officer of the corporation must sign and the corporate secretary must certify the Final Release.
b. For final invoices being submitted via WAWF, the original Contractor's Final Release Form and required certification of Transportation of Supplies by Sea must be provided directly to the respective Contracting Officer prior to submission of the final invoice. Once receipt of the original Final Release Form and required certification of Transportation of Supplies by Sea has been confirmed by the Contracting Officer, the Contractor must then submit final invoice and attach a copy of the Final Release Form and required certification of Transportation of Supplies by Sea in WAWF.
c. Final invoices not accompanied by the Contractor's Final Release and…