P347 Perimeter Security Improvement, Portsmouth Naval Shipyard, NCTS Cutler, Maine
Cancelled Solicitation Posted
- Solicitation number
- N4008523R2539
- Agency
-
Naval Facilities Engineering Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Navy Naval Facilities Engineering Command (NAVFAC) is seeking a construction contract for perimeter security improvements at Portsmouth Naval Shipyard and NCTS Cutler in Maine. The project involves Anti-Terrorism/Force Protection (AT/FP) upgrades that will enhance physical security in accordance with DoD Minimum Anti-Terrorism Standards for Buildings. Specific project components include constructing an entry control facility with a new entry control point fence, sliding gate, guard and truck inspection office, main entry canopy, and pass and identification office. The solicitation requires contractors to renovate and expand Building #129, a one-story security building, to support security personnel functions. A comprehensive security fence will be constructed around the entire peninsula, with the project aimed at improving overall site security and compliance with federal safety standards. The solicitation was initially posted on April 5, 2023, with a final response deadline of December 1, 2023.
The contract is not designated for any specific set-aside category and will be awarded through a design-bid-build (DBB) procurement method. The project is located in Cutler, Maine, specifically at the Portsmouth Naval Shipyard and NCTS Cutler site. While specific award values are not explicitly detailed in the solicitation, the project involves significant infrastructure modifications across multiple building and site elements. The scope encompasses civil, structural, architectural, mechanical, electrical, and telecommunications work, indicating a complex, multi-disciplinary construction effort. Contractors will need to demonstrate expertise in military facility security improvements, site infrastructure development, and compliance with rigorous Department of Defense construction standards. The project will require careful coordination with naval facility managers and adherence to strict site access and security protocols throughout the construction process.
Notice text
2 versions
Update #2 · Latest ·
This project, P347 DBB Perimeter Security Improvements at Portsmouth Naval Shipyard, NCTS Cutler, Maine, will provide Anti-Terrorism/Force Protection (AT/FP) features and comply with AT/FP regulations, and physical security mitigation in accordance with DoD Minimum Anti-Terrorism Standards for Buildings. This project includes an entry control facility (ECF) that includes an entry control point fence, a guard and truck inspection office, a main entry canopy, a Pass and Identification office and a restricted area security fence. The entry control point fence includes a chain link security fence and a sliding gate. The guard and truck inspection office is constructed of metal stud walls with cementitious siding and an exposed steel canopy structure. The single lane main entry canopy will be used for identification checks, and is comprised of concrete structural elements and an exposed steel canopy structure. The guard and truck inspection office will be attached to the main entry canopy. Building #129, the existing one-story security building, will be renovated and enlarged to provide required components to support security personnel functions and the pass and identification office. The project also constructs a security fence around the restricted area, which comprises the entire peninsula.
Update #1 ·
This project, P347 DBB Perimeter Security Improvements at Portsmouth Naval Shipyard, NCTS Cutler, Maine, will provide Anti-Terrorism/Force Protection (AT/FP) features and comply with AT/FP regulations, and physical security mitigation in accordance with DoD Minimum Anti-Terrorism Standards for Buildings. This project includes an entry control facility (ECF) that includes an entry control point fence, a guard and truck inspection office, a main entry canopy, a Pass and Identification office and a restricted area security fence. The entry control point fence includes a chain link security fence and a sliding gate. The guard and truck inspection office is constructed of metal stud walls with cementitious siding and an exposed steel canopy structure. The single lane main entry canopy will be used for identification checks, and is comprised of concrete structural elements and an exposed steel canopy structure. The guard and truck inspection office will be attached to the main entry canopy. Building #129, the existing one-story security building, will be renovated and enlarged to provide required components to support security personnel functions and the pass and identification office. The project also constructs a security fence around the restricted area, which comprises the entire peninsula.
Files
Show 40 more
50 files listed here. See the rest on GovTribe.
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Design-Bid-Build (DBB) Perimeter Security Improvements, Portsmouth Naval Shipyard, NCTS Cutler, Maine | Special Notice | |
| Design-Bid-Build (DBB) Perimeter Security Improvements, Portsmouth Naval Shipyard, NCTS Cutler, Maine | Pre-Solicitation | |
| Design-Bid-Build (DBB) Perimeter Security Improvements, Portsmouth Naval Shipyard, NCTS Cutler, Maine | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity