P347 Perimeter Security Improvement, Portsmouth Naval Shipyard, NCTS Cutler, Maine

Cancelled Solicitation Posted

Solicitation number
N4008523R2539
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Navy Naval Facilities Engineering Command (NAVFAC) is seeking a construction contract for perimeter security improvements at Portsmouth Naval Shipyard and NCTS Cutler in Maine. The project involves Anti-Terrorism/Force Protection (AT/FP) upgrades that will enhance physical security in accordance with DoD Minimum Anti-Terrorism Standards for Buildings. Specific project components include constructing an entry control facility with a new entry control point fence, sliding gate, guard and truck inspection office, main entry canopy, and pass and identification office. The solicitation requires contractors to renovate and expand Building #129, a one-story security building, to support security personnel functions. A comprehensive security fence will be constructed around the entire peninsula, with the project aimed at improving overall site security and compliance with federal safety standards. The solicitation was initially posted on April 5, 2023, with a final response deadline of December 1, 2023.

The contract is not designated for any specific set-aside category and will be awarded through a design-bid-build (DBB) procurement method. The project is located in Cutler, Maine, specifically at the Portsmouth Naval Shipyard and NCTS Cutler site. While specific award values are not explicitly detailed in the solicitation, the project involves significant infrastructure modifications across multiple building and site elements. The scope encompasses civil, structural, architectural, mechanical, electrical, and telecommunications work, indicating a complex, multi-disciplinary construction effort. Contractors will need to demonstrate expertise in military facility security improvements, site infrastructure development, and compliance with rigorous Department of Defense construction standards. The project will require careful coordination with naval facility managers and adherence to strict site access and security protocols throughout the construction process.

Notice text

2 versions

Update #2 · Latest ·

This project, P347 DBB Perimeter Security Improvements at Portsmouth Naval Shipyard, NCTS Cutler, Maine, will provide Anti-Terrorism/Force Protection (AT/FP) features and comply with AT/FP regulations, and physical security mitigation in accordance with DoD Minimum Anti-Terrorism Standards for Buildings. This project includes an entry control facility (ECF) that includes an entry control point fence, a guard and truck inspection office, a main entry canopy, a Pass and Identification office and a restricted area security fence. The entry control point fence includes a chain link security fence and a sliding gate. The guard and truck inspection office is constructed of metal stud walls with cementitious siding and an exposed steel canopy structure. The single lane main entry canopy will be used for identification checks, and is comprised of concrete structural elements and an exposed steel canopy structure. The guard and truck inspection office will be attached to the main entry canopy. Building #129, the existing one-story security building, will be renovated and enlarged to provide required components to support security personnel functions and the pass and identification office. The project also constructs a security fence around the restricted area, which comprises the entire peninsula.

Update #1 ·

This project, P347 DBB Perimeter Security Improvements at Portsmouth Naval Shipyard, NCTS Cutler, Maine, will provide Anti-Terrorism/Force Protection (AT/FP) features and comply with AT/FP regulations, and physical security mitigation in accordance with DoD Minimum Anti-Terrorism Standards for Buildings. This project includes an entry control facility (ECF) that includes an entry control point fence, a guard and truck inspection office, a main entry canopy, a Pass and Identification office and a restricted area security fence. The entry control point fence includes a chain link security fence and a sliding gate. The guard and truck inspection office is constructed of metal stud walls with cementitious siding and an exposed steel canopy structure. The single lane main entry canopy will be used for identification checks, and is comprised of concrete structural elements and an exposed steel canopy structure. The guard and truck inspection office will be attached to the main entry canopy. Building #129, the existing one-story security building, will be renovated and enlarged to provide required components to support security personnel functions and the pass and identification office. The project also constructs a security fence around the restricted area, which comprises the entire peninsula.

Files

File Type Posted
Amendment 0012.pdf PDF
P-347 Price Proposal Form AMD 0012.pdf PDF
1614700Amend0011dwg.pdf PDF
P347 AMENDMENT 0011.pdf PDF
1614700Amend0011spc.pdf PDF
P347 AMENDMENT 0010.pdf PDF
Prospect Harbor Canopy Drawings Calcs Data.pdf PDF
P347 J-A Interior Finishes Redacted.pdf PDF
P347 AMENDMENT 0009.pdf PDF
1614700Amend0008spc.pdf PDF
1614700Amend0008dwg.pdf PDF
P347 AMENDMENT 0008.pdf PDF
P347 AMENDMENT 0007.pdf PDF
09 26 00.pdf PDF
Uline IH-1119-SPFR.PDF PDF
Uline IH-2769-SPFR.PDF PDF
08 14 00.pdf PDF
P347 AMENDMENT 0006.pdf PDF
CS507 - FENCING DETAILS.pdf PDF
P347 AMENDMENT 0005.pdf PDF
P347 AMENDMENT 0004.pdf PDF
1614700dwg22of22TELECOM_SECURITY_AUDIO.pdf PDF
1614700dwg12of22CIVIL_EROSION_04.pdf PDF
1614700dwg17of22ARCHITECTURAL_INTERIOR.pdf PDF
1614700dwg16of22STRUCTURAL.pdf PDF
1614700dwg08of22CIVIL_SIGNING_UTILITIES.pdf PDF
1614700dwg20of22MECHANICAL.pdf PDF
1614700dwg06of22CIVIL_GRADING_DRAINAGE_01.pdf PDF
1614700dwg05of22CIVIL_SITE.pdf PDF
1614700dwg13of22WETLAND.pdf PDF
1614700dwg09of22CIVIL_EROSION_01.pdf PDF
1614700spc1of1.pdf PDF
1614700dwg07of22CIVIL_GRADING_DRAINAGE_02.pdf PDF
1614700dwg21of22ELECTRICAL.pdf PDF
1614700dwg18of22FIRE.pdf PDF
1614700dwg19of22PLUMBING.pdf PDF
1614700dwg11of22CIVIL_EROSION_03.pdf PDF
1614700dwg14of22LANDSCAPING.pdf PDF
1614700dwg15of22ENVIRONMENTAL.pdf PDF
1614700dwg10of22CIVIL_EROSION_02.pdf PDF
1614700dwg04of22CIVIL_ALIGNMENT_DEMO.pdf PDF
1614700dwg01of22GENERAL.pdf PDF
1614700dwg03of22EXISTING_CONDITION.pdf PDF
1614700dwg02of22HAZMAT_GEOTECH.pdf PDF
P347 AMENDMENT 0003.pdf PDF
P347 AMENDMENT 0002.pdf PDF
P347 AMENDMENT 0001.pdf PDF
Cutler Site Access Requirements-Contractor Instructions.docx DOCX document
SECNAV_5512_1_dtd_May21.pdf PDF
Cutler Site Access Requirements-NAVFAC Instructions.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

Notice history

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors