Cutler Site Access Requirements-Contractor Instructions.docx

DOCX document 114 KB Posted

Attached to
P347 Perimeter Security Improvement, Portsmouth Naval Shipyard, NCTS Cutler, Maine
Solicitation number
N4008523R2539
Issued by

View the file

Other files

File Type Posted
Amendment 0012.pdf PDF
P-347 Price Proposal Form AMD 0012.pdf PDF
1614700Amend0011dwg.pdf PDF
P347 AMENDMENT 0011.pdf PDF
1614700Amend0011spc.pdf PDF
Prospect Harbor Canopy Drawings Calcs Data.pdf PDF
P347 AMENDMENT 0010.pdf PDF
P347 AMENDMENT 0009.pdf PDF
P347 J-A Interior Finishes Redacted.pdf PDF
1614700Amend0008spc.pdf PDF
P347 AMENDMENT 0008.pdf PDF
1614700Amend0008dwg.pdf PDF
P347 AMENDMENT 0007.pdf PDF
P347 AMENDMENT 0006.pdf PDF
09 26 00.pdf PDF
Uline IH-2769-SPFR.PDF PDF
08 14 00.pdf PDF
Uline IH-1119-SPFR.PDF PDF
P347 AMENDMENT 0005.pdf PDF
CS507 - FENCING DETAILS.pdf PDF
P347 AMENDMENT 0004.pdf PDF
1614700dwg08of22CIVIL_SIGNING_UTILITIES.pdf PDF
1614700dwg18of22FIRE.pdf PDF
1614700dwg04of22CIVIL_ALIGNMENT_DEMO.pdf PDF
1614700dwg14of22LANDSCAPING.pdf PDF
1614700dwg21of22ELECTRICAL.pdf PDF
1614700dwg15of22ENVIRONMENTAL.pdf PDF
1614700dwg01of22GENERAL.pdf PDF
1614700dwg10of22CIVIL_EROSION_02.pdf PDF
1614700dwg13of22WETLAND.pdf PDF
1614700dwg12of22CIVIL_EROSION_04.pdf PDF
1614700dwg11of22CIVIL_EROSION_03.pdf PDF
1614700spc1of1.pdf PDF
1614700dwg17of22ARCHITECTURAL_INTERIOR.pdf PDF
1614700dwg05of22CIVIL_SITE.pdf PDF
1614700dwg20of22MECHANICAL.pdf PDF
1614700dwg03of22EXISTING_CONDITION.pdf PDF
1614700dwg02of22HAZMAT_GEOTECH.pdf PDF
1614700dwg19of22PLUMBING.pdf PDF
1614700dwg09of22CIVIL_EROSION_01.pdf PDF
1614700dwg22of22TELECOM_SECURITY_AUDIO.pdf PDF
1614700dwg07of22CIVIL_GRADING_DRAINAGE_02.pdf PDF
1614700dwg06of22CIVIL_GRADING_DRAINAGE_01.pdf PDF
1614700dwg16of22STRUCTURAL.pdf PDF
P347 AMENDMENT 0003.pdf PDF
P347 AMENDMENT 0002.pdf PDF
P347 AMENDMENT 0001.pdf PDF
Cutler Site Access Requirements-NAVFAC Instructions.docx DOCX document
N4008523R2539 P347 AMENDMENT 01.pdf PDF
SECNAV_5512_1_dtd_May21.pdf PDF
Show 40 more

Latest 50 of 105 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUTLER ACCESS REQUIREMENTS – P347

CONTRACTOR INSTRUCTIONS:

1. The PRIMARY POINT OF CONTACT for this process is Mr. Carter, information below.

2. Complete this list and send via electronic mail to:

Andy Bui, Contract Specialist: andy.h.bui.civ@us.navy.mil Lisa Ferrell, Design Manager: lisa.a.ferrell3.civ@us.navy.mil

3. Each person on this list is to complete form SECNAV 5512. NOTE: This form contains Personally Identifiable Information (PII) and should be treated accordingly; DO NOT send this form to anyone other than a person qualified to handle PII. Additionally, any missing or incomplete information will negatively impact the time required to review the form. No base access will be granted to persons without an approved 5512. In Block 25, the NAVFAC Sponsor for this project is:

Raymond Carter, Facilities Management Specialist NAVFAC MIDLANT PWD-ME:

raymond.l.carter.civ@us.navy.mil

(207) 703-3058

4. Each person included in the list should individually and securely email a copy of their document ONLY to Cutler Base Security, who is able to properly manage PII:

Corporal Michael Fullmer: michael.r.fullmer.civ@us.navy.mil

5. The vetting process will take approximately 12 days. Incomplete/Missing Information will delay the process. In the event there is Missing or Incomplete information CPL Fullmer will contact any individual directly in the event there is missing or incomplete information. If an individual is denied access, a denial package will be sent to the NAVFAC sponsor and that individual will not be allowed to access the site.

Name
Employer
Contractor (if different than employer)
Phone Number

image1.png

File details come from the government source that posted it. Updated .