REVISION 001.pdf

PDF 471 KB Posted

Attached to
P1395 SOF MARINE RAIDER REGIMENT HQ, MCAS, CAMP LEJEUNE
Solicitation number
N40085-19-R-9148
Issued by

About this file

This document outlines revisions to construction plans and specifications for the P1395 SOF Marine Raider Regiment Headquarters project at Marine Corps Air Station Camp Lejeune. Key details include:

  • The project constructs 2,788 square meters of headquarters facilities including supporting structures, utilities, parking, roadways, sidewalks and site work. Revisions update boring logs, stormwater management details, erosion control plans, construction sequencing and stabilization timeframes.

  • The solicitation is issued by the Naval Facilities Engineering Command on behalf of the Department of the Navy for construction of the project in accordance with anti-terrorism standards and sustainable building requirements. Special construction features include soil surcharge loads and stormwater best management practices. Electrical, mechanical and information systems are also within scope.

  • Revisions to plans and specifications support compliance with regulatory permitting requirements and improve stormwater management through an enlarged level spreader, filter strip and emergency spillway. Construction sequencing clarifies stabilization and landscaping obligations.

View the file

Other files

File Type Posted
C-514.pdf PDF
CG103.pdf PDF
CE106.pdf PDF
C-513.pdf PDF
CG107.pdf PDF
CD04-20201022 GER P1395 Marine Raider Bn HQS R4 -ALZ Sealed.pdf PDF
CG108.pdf PDF
B-104.pdf PDF
C-507.pdf PDF
B-103.pdf PDF
B-102.pdf PDF
CE103.pdf PDF
B-101.pdf PDF
C-515.pdf PDF
CE102.pdf PDF
AMENDMAENT 0004 FOR P1395.pdf PDF
01 30 01.00 22.pdf PDF
P1395 08052020 Arch Revisions.pdf PDF
20_0622_P1395_Marine-Raider_HQ_FInal_Interior_Sheets.pdf PDF
P-1395-E-Revision 1_2020-08-05.pdf PDF
P1395 AMENDMENT 0003.pdf PDF
P1395 MARINE RAIDER FF-E Est Cost Summary_FINAL_20_0810.pdf PDF
09 69 13.pdf PDF
Part 1-P1395 BVD Request for Pricing Bid Form Spreadsheet.pdf PDF
UPDATED P1395 BID SCHEDULE.pdf PDF
P1395 PPI LOG 03.pdf PDF
AMENDMENT 0002 FOR P1395.pdf PDF
PPI LOG 02 Document..pdf PDF
P1395 SOF PPIs LOG 01.pdf PDF
10 51 00.pdf PDF
13 42 75.pdf PDF
AMENDMENT 0001 P1395.pdf PDF
1603164spc01of01.pdf PDF
Attachment E - Past Performance Questionnaire.docx DOCX document
Attachment F - Small Business Subcontracting Plan.docx DOCX document
1603164dwg01of03.pdf PDF
ATTACHMENT G P1395 PRICE PROPOSAL FORM.pdf PDF
1603164dwg03of03.pdf PDF
Attachment B - Construction Experience Project Data Sheet.docx DOCX document
Attachment D - Small Business Participation and Commitment Strategy.docx DOCX document
1603164dwg02of03.pdf PDF
P1395 RFP for N40085-19-R-9148.pdf PDF
Attachment A - Pre-Proposal Inquiries Form.xlsx XLSX spreadsheet
Attachment C - Small Business Subcontracting Record.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOF MARINE RAIDER REGIMENT HEADQUARTERS P-1395 FY20 PKG 2

MARSOC CAMP LEJEUNE, NC SOL. #

REVISION 0001 – Page 1 of 3 P1395

REVISION 001

1. Geotechnical Engineering Report

a. Title page – change to Revision 4 and date October 22, 2020

b. Certification Page – Geotechnical Engineer of Record changed to Aaron L. Zdinak, PE

(NC)

c. Table of Contents – updated to account for added text

d. Table 5.1 – revise elevations for 19P-01, 19P-02 and A, 19P-03, 19P-04, 19P-05, 19SW-

01, and 19SW-02

e. Table 7.1 – revise elevations to reflect surveyed information and calculated elevations based on measured depths

f. Section 7.6 Subsurface Water – revise test associated with subsurface water observations in explorations associated with stormwater facilities, including clarification of interpretation of Seasonal High Water Table (SHWT) and reference to new Figure A-6 (subsurface diagram within the Stormwater Management Facilities)

g. Section 8.8.2 Stormwater Management Facilities – clarification of SHWT observations on which to base pond design

h. Throughout – use consistent terminology (stormwater management facilities) to describe the stormwater management (SWM) elements located south of the planned building area.

i. Appendix A, Figure A-6 – create new Figure A-6 to depict the subsurface diagram and observed/interpreted subsurface water conditions impacting SWM facilities

j. Appendix B, Boring Logs – update boring logs to depict surveyed ground surface elevations and SHWT elevations.

2. Sheets B-101 through B-104

a. Update boring logs to reflect surveyed elevations and appropriately documented SHTW elevations

b. Update note 4 on B-104 to appropriately reflect reference to revised Geotechnical

Engineering Report.

3. Sheet CG103

a. Revised level spreader/filter strip to be larger.

b. Revised emergency spillway to be slightly larger.

c. Revised keynote 3.

4. Sheet CG107

a. Sheet added to set per NCDEQ request for calculation purposes.

5. Sheet CG108

a. Sheet added to set per NCDEQ request detailing the limits of disturbance.

6. Sheet CE102

a. Added the concrete washout area to the Phase 1 Erosion Control Plan (the concrete washout area was already shown in the Phase 2 Erosion Control Plan).

7. Sheet CE103

a. Added a detail reference to the temporary soil stockpile.

8. Sheet CE106

a. Revised level spreader/filter strip to be larger.

9. Sheet C-507

REVISION 0001 – Page 2 of 3

a. Revised detail A2 to show forebay of the sand filter basin to be lined with impervious membrane

b. Revised detail A2 to reference new detail for forebay basin section.

c. Revised detail A4 to make base of outlet structure slightly larger.

d. Revised detail D3 to indicate revised length of cast-in-place concrete level to match larger level spreader.

e. Revised detail D4 to provide specifications of the sand to be used in the sand filter basin.

f. Added detail C2 (Forebay Basin – Section)

g. Revised Detail C1 to make width of emergency spillway slightly larger.

10. Sheet C-513

a. Added detail A4 (Stockpile)

11. Sheet C-514

a. Revised stabilization timeframes to be no more than 7 calendar days from the last land disturbing activity due to being in a sensitive watershed (previously allowed 14 days in some instances).

b. Added fertilizer application rates.

c. Added to the Construction Sequence that all denuded areas not paved shall be sodded

(this is already indicated on the landscape plans).

12. Sheet C-515

a. Revised stabilization timeframes to be no more than 7 calendar days from the last land disturbing activity due to being in a sensitive watershed (previously allowed 14 days in some instances).

---END OF REVISION---