This solicitation is for the construction of headquarters facilities for the Marine Raider Regiment at Marine Corps Air Station Camp Lejeune in North Carolina. The project includes constructing 2,788 square meters of single-story steel frame buildings with brick veneer and metal roofs, as well as miscellaneous supporting structures, utilities, parking, roadways, sidewalks, running trails and site work. Special construction features are required for soil surcharge loads and storm water best management practices. Electrical, mechanical, plumbing and fire protection systems will be installed along with information systems for telephone, data, local area networking and mass notification. Site utilities will include domestic water, fire protection water, sanitary sewer, sewage conveyance, propane gas, perimeter security fencing and gates. Low impact development features and Department of Defense sustainable building requirements are to be included. The project also requires anti-terrorism/force protection features to comply with DoD and Marine Corps standards. Geospatial data surveying and mapping is included.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTESPIPING
PIPING VALVES AND ACCESSORIES
PIPING FITTINGS
ABBREVIATIONS
HOSE VALVE WITH CAP
CHECK VALVE
CALIBRATED BALANCING VALVE
PRESSURE REDUCING VALVE (PRV)
ISOLATION VALVE
CIRCUIT SETTER
BALANCING VALVE
SANITARYSAN
SD
V
P
VENT
PROPANE
ELBOW, 90°
ELBOW, 90° TURN DOWN
ELBOW, 90° TURN UP
TEE
TEE, OUTLET UP
TEE, OUTLET DOWN
TEE, OUTLET UP W/ 90° TURN
TEE, OUTLET DOWN W/ 90° TURN
PIPE BREAK
CAP
REDUCED PRESSURE
BACKFLOW PREVENTER
SAFETY OR PRESSURE RELIEF,
STRAIGHT THROUGH VALVE
SAFETY OR PRESSURE RELIEF,
ANGLE VALVE
POTABLE WATER COLD (PWC)
POTABLE WATER HOT (PWH)
AFF
A/S
ABV
(A) B/G B/S
BTUH
BLW
CI
CW
CFH
CO
DEG
DIA
DFU
DWG
EWC
F
FCO
FD
FFE
FT
FR
GAL
GCO
GPM
GWH
HB
HD
HGT
IN
IE
IMB
KW
L
MAX
MIN
MS
MV
NC
NG
NO
OFCI
P
PSI
PWC
PWH
PWHR
RCP
S
SAN
SH
SIM
TYP
U
UON
V
VTR
WC
WCO
WH "X"
WH
ABOVE FINISHED FLOOR
ABOVE SLAB
ABOVE
EXISTING ITEM TO BE ABANDONED IN PLACE
BELOW GRADE
BELOW SLAB
BRITISH THERMAL UNIT/HOUR
BELOW
CAST IRON
COLD WATER
CUBIC FEET/HOUR
CLEAN OUT
DEGREE
DIAMETER
DRAINAGE FIXTURE UNIT
DRAWING
ELECTRIC WATER COOLER
FAHRENHEIT
FLOOR CLEAN OUT
FLOOR DRAIN
FINISHED FLOOR ELEVATION
FOOT/FEET
FROM
GALLON
GRADE CLEAN OUT
GALLONS PER MINUTE
GAS WATER HEATER
HOSE BIBB
HEAD
HEIGHT
INCH
INVERT ELEVATION
ICE MAKER BOX
KILOWATT
LAVATORY
MAXIMUM
MINIMUM
MOP SINK
MIXING VALVE
NORMALLY CLOSED
NATURAL GAS COMPANY
NORMALLY OPEN
OWNER FURNISHED, CONTRACTOR INSTALLED
PROPANE
POUNDS PER SQUARE INCH
POTABLE WATER COLD
POTABLE WATER HOT
POTABLE WATER HOT RETURN
RECIRCULATING PUMP
SINK
SANITARY
SHOWER
SIMILAR
TYPICAL
URINAL
UNLESS OTHERWISE NOTED
VENT
VENT THROUGH ROOF
WATER CLOSET
WALL CLEAN OUT
WATER HAMMER "SIZE"
WALL HYDRANT
1. PROVIDE AND INSTALL ALL PLUMBING SYSTEMS IN ACCORDANCE WITH THE UNIFIED FACILITIES CRITERIA.
2. NO PLUMBING PIPING SHALL BE INSTALLED PRIOR TO APPROVAL OF CONTRACTOR FURNISHED COORDINATION DRAWINGS (INCLUDING, BUT NOT LIMITED TO: FIRE SUPPRESSION, PLUMBING, HVAC, LIGHTING, ETC.). ANY WORK PERFORMED PRIOR TO THE APPROVAL OF ABOVE LISTED DRAWINGS MAY BE REMOVED, RELOCATED, OR ALTERED AT NO ADDITIONAL COST TO THE OWNER.
3. THE DRAWINGS ARE DIAGRAMMATIC AND MAY NOT SHOW COMPLETE OR ACCURATE DETAILS OF THE PLUMBING SYSTEM. MAKE PROPER PIPING CONNECTIONS TO FIXTURES AND EQUIPMENT EVEN THOUGH BRANCH PIPING, ELBOWS, AND CONNECTIONS ARE
NOT SHOWN.
4. INSTALLATION OF PLUMBING PIPING SHALL BE COORDINATED WITH OTHER TRADES WORK TO AVOID CONFLICTS.
5. IF ANY EQUIPMENT OR FIXTURES ARE SUBMITTED FOR REVIEW DIFFERING FROM THOSE SPECIFIED ON THE DRAWINGS, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE PROPER INSTALLATION AND UTILITY CONNECTIONS AT NO
ADDITIONAL COST TO THE OWNER.
7. UNLESS OTHERWISE NOTED, PIPING SHALL BE CONCEALED ABOVE CEILINGS, IN WALLS, PARTITIONS, AND IN PIPE SPACES OR CHASES. IN SPACES WITHOUT SUSPENDED CEILING, INSTALL PIPING EXPOSED MINIMUM 7'-6" TO BOTTOM OF PIPE ABOVE FINISHED
FLOOR.
8. INSTALL SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING BRANCHES SERVING ONE OR MORE FIXTURES.
9. INSTALL PIPING SO ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING ACCESS ARE
ACCESSIBLE.
10. COORDINATE LOCATION OF ACCESS PANELS TO PROVIDE ACCESS TO VALVES AND OTHER APPURTENANCES REQUIRING ACCESS.
ACCESS PANELS SHALL BE FURNISHED AND INSTALLED UNDER DIVISION 08.
11. CUTTING OF STRUCTURAL SYSTEM IS NOT PERMITTED. COORDINATE WITH STRUCTURAL TO ENSURE ADEQUATE CLEARANCE IS
AVAILABLE FOR INSTALLATION OF FLOOR MOUNTED FIXTURES.
12. INSTALL FLUSHOMETER VALVES FOR ACCESSIBLE WATER CLOSETS WITH HANDLE MOUNTED ON WIDE SIDE OF COMPARTMENT.
INSTALL TANKS FOR ACCESSIBLE TANK-TYPE WATER CLOSETS WITH LEVER HANDLE MOUNTED ON WIDE SIDE OF COMPARTMENT.
13. PROVIDE FLOOR CLEANOUTS WITH COVERS DESIGNED FOR SPECIFIC FLOOR FINISH IN WHICH THEY ARE INSTALLED, UNLESS
OTHERWISE NOTED.
14. EXTERIOR VENTS SHALL BE INSTALLED A MINIMUM OF 10'-0" FROM MECHANICAL OUTDOOR AIR INTAKE HOODS/VENTS AND
OPERABLE WINDOWS AND DOORS.
15. POLISHED CHROMIUM-PLATED PIPE, VALVES, AND FITTINGS SHALL BE PROVIDED IN FINISHED SPACES WHERE EXPOSED TO VIEW.
16. REFER TO ELECTRICAL DRAWINGS FOR PLUMBING EQUIPMENT ELECTRICAL CHARACTERISTICS.
17. PIPE PENETRATIONS THROUGH FIRE OR SMOKE RATED PARTITIONS, WALLS, AND/OR FLOORS SHALL BE MADE FIRE AND SMOKE TIGHT. MAINTAIN FIRE RATING OF FLOOR AND WALL ASSEMBLIES IN ACCORDANCE WITH UL SYSTEMS. INSTALL PIPE PENETRATION ASSEMBLIES IN ACCORDANCE WITH UL LISTED MANUFACTURER'S RECOMMENDATIONS. APPROVED MANUFACTURERS ARE: HILTI, MINNESOTA MINING & MFG. CO., THERMAL CERAMICS, AND PACOR, INC.
18. FIELD VERIFY CONDITIONS PRIOR TO CONSTRUCTION AND NOTIFY THE ARCHITECT/ENGINEER OF DISCREPANCIES WITH THE CONSTRUCTION DOCUMENTS AND/OR POTENTIAL PROBLEMS OBSERVED BEFORE COMMENCING WORK IN THE AFFECTED AREA.
STORM DRAIN
AUTOMATIC FLOW LIMITING VALVE
WATER HAMMER ARRESTOR
POTABLE WATER HOT RETURN (PWHR)
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 17 APRIL 2018
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
C
A M
P L
E J E
U N
E
J A
C K
S O
N V
IL
L E
N
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
I E
D
440 S. CHURCH STREET, SUITE 1000
CHARLOTTE, NC 28202
TEL (704)338-6700
/2
/2
:4
:5
P
M C rv t\
\1
-M -C
E N
T R
A L
P
-1
M
A R
IN
E
H Q m a rk
.d im o ff .r v t
P-001
P
M
A R
IN
E
R A
ID
E
R H
E A
D Q
U A
R T
E R
S
LE
G
E N
D , A
B R
E V
IA
T
IO
N
S A
N D
N O
TE
S
CSW
12794361
MDD BNR
06/19/2020
Approved by Emily Sylvester, Director of Installation Development Division
SGL/RMS
1603164
JA
C
K S
O N
V
IL
LE
, N
O R
T H
C A
R O
LI
N
A M
A R
S O
C
EJA
A L G
ALG
S Y
M D
E S
C R
IP
T
IO
N
D A
TE
A
P P
R
REF REFREFREF
A
/ P L1
A
/ P L1
P-402
C1
MECHANICAL SPACE
SHARED OFFICE
OFFICE 2
OFFICE 3
OFFICE 4
OFFICE 5
OFFICE 6
OFFICE 6
OFFICE 7
OFFICE 8
OFFICE 9
OPEN OFFICE
BLUE OPS AREA
CONFERENCE ROOM
OFFICE 10
OFFICE 11
JTAC
CORRIDOR
SECURITY
MENS RESTROOM
COMM
ELECTRICAL
1 2 3 4 5 6 7 8
B
C
D
E
F
G
A
P-401
A1
P-401
A3
ENTRY VESTIBULE
3/4" PWHR
2" VTR
GCO
S-1S-1
3" SAN
3/4" PWC
3/4" PWH
3/4" PWHR
3/4" PWHR
3/4" PWH
3/4" PWC
3" SAN
3" SAN
3/4" PWC
WH-1
WH-1
3/4" PWC
WCO
FCO
3" SAN
2" PWC
1 1/2" PWH
3/4" PWHR
2" PWC
1 1/2" PWH
3/4" PWHR
1.0 GPM NSF 61-G
FLOW LIMITING DEVICE
3/4" PWHR
1.0 GPM NSF 61-G
FLOW LIMITING
DEVICE (TYP OF 2)
3" SAN
4" SAN3" SAN
3" SAN
P-402
A1
2" PWH
2 1/2" PWC
2 1/2" PWC
2" PWH
3/4" PWHR
2" PWC
2" PWH
2 1/2" PWC
MV-1
IMB-1
IMB-1
IMB-1
IMB-1
WALL RATING LEGEND
NON-RATED WALL
1 HR RATED PARTITION
SMOKE PARTITION
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 17 APRIL 2018
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
C
A M
P L
E J E
U N
E
J A
C K
S O
N V
IL
L E
N
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
I E
D
440 S. CHURCH STREET, SUITE 1000
CHARLOTTE, NC 28202
TEL (704)338-6700
/2
/2
:4
:3
P
M C rv t\
\1
-M -C
E N
T R
A L
P
-1
M
A R
IN
E
H Q m a rk
.d im o ff .r v t
PL101
P
M
A R
IN
E
R A
ID
E
R H
E A
D Q
U A
R T
E R
S
S A
N
IT
A R
Y A
N D
S U
P P
LY
F
LO
O
R P
LA
N
A
R E
A
A
CSW
12794362
MDD BNR
06/19/2020
Approved by Emily Sylvester, Director of Installation Development Division
SGL/RMS
1603164
JA
C
K S
O N
V
IL
LE
, N
O R
T H
C A
R O
LI
N
A M
A R
S O
C
EJA
A L G
ALG
GENERAL NOTES
KEY PLAN
A B
0 4' 8' 16'SCALE: 1/8" = 1'-0" (M-301)
PLAN - SANITARY AND SUPPLY - AREA "A" - ELEV 23.5'
A1
PLAN
NORTH
1. ALL PIPING AND EQUIPMENT SHOWN ON THIS DRAWING IS
DIAGRAMMATIC. LOCATE ALL PIPING AND EQUIPMENT SO AS TO CLEAR
ALL OBSTACLES.
2. ALL WORK TO BE PREFORMED IN ACCORDANCE WITH APPLICABLE
FEDERAL, STATE, AND LOCAL CODES.
3. VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF
INSTALLATION OF ALL MECHANICAL AND PLUMBING EQUIPMENT.
CONSTRUCTION DISCREPANCIES TO BE BROUGHT TO THE IMMEDIATE
ATTENTION OF THE CONTRACTING OFFICER FOR A RESOLUTION.
4. COORDINATE ALL REQUIRED CONDUIT, PIPING AND CHASES FOR
GOVERNMENT FURNISHED GOVERNMENT INSTALLED EQUIPMENT WITH
THE GOVERNMENT.
5. REFER TO THE ARCHITECTURAL REFLECTED CEILING PLAN DRAWINGS
FOR LOCATION OF CEILING COMPONENTS INCLUDING DIFFUSERS,
REGISTERS, LIGHTS, SPRINKLERS, FIRE ALARM DEVICES, ETC.
S Y
M D
E S
C R
IP
T
IO
N
D A
TE
A
P
E
F
R E
F R
E F
R E
F
A
/ P L1
A
/ P L1
TEAM ROOM
OFFICE 6
TRASH/MANT.
BREAKROOM
CONFERENCE ROOM
CORRIDOR
OFFICE 5
OFFICE 4
OFFICE 3
OFFICE 2
OFFICE 1
CO OFFICE
GREEN OPS AREA
PURPLE OPS AREA
FIRE ALARM ROOM
RECEPTION
CONFERENCE ROOM
BREAKROOM
CONFERENCE ROOM
CO OFFICE
PRINTER
OFFICE 8
TEAM ROOM
OFFICE 7
OFFICE 6
OFFICE 5
OFFICE 3
OFFICE 2
OFFICE 1
8 9
B
C
D
E
F
A
10 11 12 13 14
OFFICE 4
IMB-1S-1
S-1
MS-1
3/4" PWC
3/4" PWH
3/4" PWHR
3/4" PWHR
2" VTR
IMB-1
IMB-1
IMB-1
WH-1
1/2" PWC
1/2" PWC SEE CIVIL DRAWINGS
FOR CONTINUATION
GCO
2" PWC
3/4" PWC
3/4" PWH
3/4" PWHR
3" SAN3" SAN
4" SAN
3" SAN
4" SAN
MV-1
DUPLEX SEWAGE EJECTOR
PUMPS SP-1 & SP-2
3" FORCE
MAIN
2" PWH
2 1/2" PWC
3/4" PWC
3/4" PWH
3/4" PWHR
2 1/2" PWC
2" PWH
3/4" PWHR
2" PWC
2" PWH
2 1/2" PWC
3/4" PWHR
IE 20.62
1.0 GPM NSF 61-G
FLOW LIMITING DEVICE
IE 19.18
WALL RATING LEGEND
NON-RATED WALL
1 HR RATED PARTITION
SMOKE PARTITION
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 17 APRIL 2018
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
C
A M
P L
E J E
U N
E
J A
C K
S O
N V
IL
L E
N
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
I E
D
440 S. CHURCH STREET, SUITE 1000
CHARLOTTE, NC 28202
TEL (704)338-6700
/2
/2
:5
:0
P
M C rv t\
\1
-M -C
E N
T R
A L
P
-1
M
A R
IN
E
H Q m a rk
.d im o ff .r v t
PL102
P
M
A R
IN
E
R A
ID
E
R H
E A
D Q
U A
R T
E R
S
S A
N
IT
A R
Y A
N D
S U
P P
LY
F
LO
O
R P
LA
N
A
R E
A
B
CSW
12794363
MDD BNR
06/19/2020
Approved by Emily Sylvester, Director of Installation Development Division
SGL/RMS
1603164
JA
C
K S
O N
V
IL
LE
, N
O R
T H
C A
R O
LI
N
A M
A R
S O
C
EJA
A L G
ALG
GENERAL NOTES
KEY PLAN
A B
0 4' 8' 16'SCALE: 1/8" = 1'-0" (M-301)
PLAN - SANITARY AND SUPPLY - AREA "B" - ELEV 23.5'
A1
PLAN
NORTH
1. ALL PIPING AND EQUIPMENT SHOWN ON THIS DRAWING IS
DIAGRAMMATIC. LOCATE ALL PIPING AND EQUIPMENT SO AS TO CLEAR
ALL OBSTACLES.
2. ALL WORK TO BE PREFORMED IN ACCORDANCE WITH APPLICABLE
FEDERAL, STATE, AND LOCAL CODES.
3. VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF
INSTALLATION OF ALL MECHANICAL AND PLUMBING EQUIPMENT.
CONSTRUCTION DISCREPANCIES TO BE BROUGHT TO THE IMMEDIATE
ATTENTION OF THE CONTRACTING OFFICER FOR A RESOLUTION.
4. COORDINATE ALL REQUIRED CONDUIT, PIPING AND CHASES FOR
GOVERNMENT FURNISHED GOVERNMENT INSTALLED EQUIPMENT WITH
THE GOVERNMENT.
5. REFER TO THE ARCHITECTURAL REFLECTED CEILING PLAN DRAWINGS
FOR LOCATION OF CEILING COMPONENTS INCLUDING DIFFUSERS,
REGISTERS, LIGHTS, SPRINKLERS, FIRE ALARM DEVICES, ETC.
S Y
M D
E S
C R
IP
T
IO
N
D A
TE
A
P
GWH-1
B
A
REDUCE PRESSURE ZONE
BACKFLOW PREVENTER, PIPE
RELIEF VALVE DISCHARGE
FULL SIZE TO FLOOR DRAIN.
2 1/2" PWC
2" PWH
FD-1
FD-1
FD-1
FD-1
3/4" PWHR
RCP-1
FCO
FD-1
2" VTR
3" SAN
3" SAN
HB-1
3/4" PWC
3" SAN
3" SAN
2" PWC
1" PWC
3" SAN
3" SAN
3" SAN
3/4" PWHR
2 1/2" PWC
3/4" PWC
3/4" PWHR
2" PWH
MECHANICAL SPACE
SEE CIVIL DRAWINGS FOR CONTINUATION
2" PWH
2 1/2" PWC
TOP OF PIPE ELEVATION MINIMUM 20.5'
REDUCE PRESSURE ZONE
BACKFLOW PREVENTER, PIPE
RELIEF VALVE DISCHARGE FULL
SIZE TO FLOOR DRAIN.
3/4" MAKE-UP WATER
TO CHILLED WATER AIR
SEPARATOR
1" MAKE-UP
WATER
3/4" MAKE-UP WATER
TO HEATING WATER AIR
SEPARATOR
7 8
B
A
GWH-1
1 1/2" P
PROPANE METER AND
REGULATOR SET AT 2 PSIG
SEE CIVIL DRAWINGS FOR CONTINUATION
(SEE MECHANICAL)(SEE MECHANICAL)
B-1 B-2
1 1/2" P
1 1/4" P 1 1/4" P
3/4" P
1 1/2" P
MECHANICAL SPACE
4 INCH EQUIPMENT BASE, EXTEND
MINIMUM 6 INCHES BEYOND EQUIPMENT
FOOTPRINT. SEE STRUCTURAL
DRAWINGS FOR EQUIPMENT BASE DETAIL
TOP OF PIPE ELEVATION MINIMUM 20.5'
WALL RATING LEGEND
NON-RATED WALL
1 HR RATED PARTITION
SMOKE PARTITION
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 17 APRIL 2018
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
C
A M
P L
E J E
U N
E
J A
C K
S O
N V
IL
L E
N
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
I E
D
440 S. CHURCH STREET, SUITE 1000
CHARLOTTE, NC 28202
TEL (704)338-6700
/2
/2
:4
:0
P
M C rv t\
\1
-M -C
E N
T R
A L
P
-1
M
A R
IN
E
H Q m a rk
.d im o ff .r v t
P-401
P
M
A R
IN
E
R A
ID
E
R H
E A
D Q
U A
R T
E R
S
E N
LA
R
G E
D P
LU
M
B
IN
G P
LA
N
S
CSW
12794364
MDD BNR
06/19/2020
Approved by Emily Sylvester, Director of Installation Development Division
SGL/RMS
1603164
JA
C
K S
O N
V
IL
LE
, N
O R
T H
C A
R O
LI
N
A M
A R
S O
C
EJA
A L G
ALG
0 1' 2' 4'SCALE: 1/4" = 1'-0" (PL101)
ENLARGED MECHANICAL ROOM -
SANITARY AND DOMESTIC WATER - ELEV 23.5'
A1 0 1' 2' 4'SCALE: 1/4" = 1'-0" (PL101)
ENLARGED MECHANICAL ROOM -
PROPANE - ELEV 23.5'
A3
A B
GENERAL NOTES
KEY PLAN
PLAN
NORTH
1. ALL PIPING AND EQUIPMENT SHOWN ON THIS DRAWING IS
DIAGRAMMATIC. LOCATE ALL PIPING AND EQUIPMENT SO AS TO CLEAR
ALL OBSTACLES.
2. ALL WORK TO BE PREFORMED IN ACCORDANCE WITH APPLICABLE
FEDERAL, STATE, AND LOCAL CODES.
3. VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF
INSTALLATION OF ALL MECHANICAL AND PLUMBING EQUIPMENT.
CONSTRUCTION DISCREPANCIES TO BE BROUGHT TO THE IMMEDIATE
ATTENTION OF THE CONTRACTING OFFICER FOR A RESOLUTION.
4. COORDINATE ALL REQUIRED CONDUIT, PIPING AND CHASES FOR
GOVERNMENT FURNISHED GOVERNMENT INSTALLED EQUIPMENT WITH
THE GOVERNMENT.
5. REFER TO THE ARCHITECTURAL REFLECTED CEILING PLAN DRAWINGS
FOR LOCATION OF CEILING COMPONENTS INCLUDING DIFFUSERS,
REGISTERS, LIGHTS, SPRINKLERS, FIRE ALARM DEVICES, ETC.
S Y
M D
E S
C R
IP
T
IO
N
D A
TE
A
P
6 7 8 9
F
G
U-1
U-1
WC-1
WC-1
WC-1
L-1
L-1
L-1
L-1
WC-1
WC-1
WC-1
WC-1
SH-1
L-1
L-1
L-1
WC-2SH-1
SH-1
SH-1
WC-2
SH-1
EWC-1
1/2" PWC
1" PWC
1" PWH
3/4" PWHR
2" PWC
1 1/2" PWC
2" PWC
1" PWC
3/4" PWHR
3/4" PWC
3/4" PWC
SH-1
3/4" PWH
3/4" PWH
2" PWC
1 1/2" PWH
3/4" PWHR
2" PWC
3/4" PWHR
1 1/2" PWH
2" PWC
1 1/2" PWC
1 1/2" PWH
WH-1
WH-1
1" PWC
1" PWH
U-1
U-1
WC-1
WC-1
WC-1
L-1
L-1
L-1
L-1
WC-1
WC-1
WC-1
WC-1 SH-1
FD-1
FD-1
FD-1
FD-1
6 7 8 9
F
G
L-1
L-1
L-1
SH-1
SH-1
SH-1
WC-2 WC-2
WCO
WCOWCO
WCO
3" SAN
4" SAN
4" SAN FD-1
FD-1
SH-1
2" VTR
2" V 1 1/2" V
2" V
1 1/2" V
2" VTR
EWC-1
2" SAN
1 1/2" V
AUXILIARY
DRAIN BOX
3" SAN
3" SAN
4" SAN
2" SAN
3" SAN
3" SAN
4" SAN
4" SAN
4" SAN
3" SAN
3" SAN
3" SAN FCO
3" SAN3" SAN
FD-1
FD-1
FD-1
3" SAN
3" SAN
3" SAN
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 17 APRIL 2018
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
C
A M
P L
E J E
U N
E
J A
C K
S O
N V
IL
L E
N
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
I E
D
440 S. CHURCH STREET, SUITE 1000
CHARLOTTE, NC 28202
TEL (704)338-6700
/2
/2
:4
:0
P
M C rv t\
\1
-M -C
E N
T R
A L
P
-1
M
A R
IN
E
H Q m a rk
.d im o ff .r v t
P-402
P
M
A R
IN
E
R A
ID
E
R H
E A
D Q
U A
R T
E R
S
E N
LA
R
G E
D P
LU
M
B
IN
G P
LA
N
S
CSW
12794365
MDD BNR
06/19/2020
Approved by Emily Sylvester, Director of Installation Development Division
SGL/RMS
1603164
JA
C
K S
O N
V
IL
LE
, N
O R
T H
C A
R O
LI
N
A M
A R
S O
C
EJA
A L G
ALG
0 4' 8' 16'SCALE: 1/4" = 1'-0" (PL101)
ENLARGED DOMESTIC WATER PLAN - ELEV 23.5'
C1
0 4' 8' 16'SCALE: 1/4" = 1'-0" (PL101)
ENLARGED SANITARY PLAN - ELEV 23.5'
A1
GENERAL NOTES
KEY PLAN
A B
PLAN
NORTH
1. ALL PIPING AND EQUIPMENT SHOWN ON THIS DRAWING IS
DIAGRAMMATIC. LOCATE ALL PIPING AND EQUIPMENT SO AS TO CLEAR
ALL OBSTACLES.
2. ALL WORK TO BE PREFORMED IN ACCORDANCE WITH APPLICABLE
FEDERAL, STATE, AND LOCAL CODES.
3. VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF
INSTALLATION OF ALL MECHANICAL AND PLUMBING EQUIPMENT.
CONSTRUCTION DISCREPANCIES TO BE BROUGHT TO THE IMMEDIATE
ATTENTION OF THE CONTRACTING OFFICER FOR A RESOLUTION.
4. COORDINATE ALL REQUIRED CONDUIT, PIPING AND CHASES FOR
GOVERNMENT FURNISHED GOVERNMENT INSTALLED EQUIPMENT WITH
THE GOVERNMENT.
5. REFER TO THE ARCHITECTURAL REFLECTED CEILING PLAN DRAWINGS
FOR LOCATION OF CEILING COMPONENTS INCLUDING DIFFUSERS,
REGISTERS, LIGHTS, SPRINKLERS, FIRE ALARM DEVICES, ETC.
S Y
M D
E S
C R
IP
T
IO
N
D A
TE
A
P
REMOVABLE KEY
WALL HYDRANT WITH
EXPOSED HOSE CONNECTION
GRADE
BLOCK WALL
STREET ELBOW
DOMESTIC COLD
WATER PIPE
FINISH FLOOR
A F
G
RECESS BOX
LOUVERED
FACEPLATE
DRAIN SIZE AS
INDICATED ON
DRAWINGS
STUD MOUNTING FLANGE
SECURE MOUNTING FLANGE TO
STUD OR PROVIDE STABILIZER
BAR TO SPAN BETWEEN STUDS
CONDENSATE DRAIN SIZE AS
INDICATED ON DRAWINGS. DISCHARGE
INTO AUXILIARY DRAIN WITH AIR BREAK
FUNNEL. 12" MIN TO AIR
GAP/RELIEF VALVE OUTLET.
EXTEND DRAIN PIPING FULL
SIZE TO NEARBY FLOOR DRAIN
REDUCED PRESSURE ZONE
BACKFLOW PREVENTER ASSEMBLY
WITH QUARTER TURN BALL VALVES
4' -0
M
IN
FINISHED GRADE
THRUST BLOCK
CAST IRON SLEEVE
WITH WATERTIGHT SEAL
FINISHED FLOOR
PROVIDE PRESSURE REDUCING
VALVE IF INCOMING PRESSURE
IS GREATER THAN 80 PSI
HOSE END
DRAIN VALVE
1. REFER TO BUILDING FLOOR PLANS FOR SIZE OF DOMESTIC WATER SERVICE
ENTERING EACH BUILDING.
2. SUPPORT SERVICE ASSEMBLY WITH PIPE STANDS BOLTED TO FLOOR, OR ANGLE
BRACKETS BOLTED TO WALL. MINIMUM OF THREE (3) REQUIRED.
NOTE:
PRESSURE GAUGE (TYPICAL)
BRACKET TO WALL WITH BOLTS OR
LAGSCREWS (SURROUND INSULATION)
4'-0" MIN.
TO SYSTEM
WALL
REMOTE READING WATER METER,
PULSE TECHNOLOGY COMPATIBLE WITH
BASE READER. CONNECT WATER
METER TO DDC SYSTEM
STRAINER
BALL VALVE
(TYPICAL)
PROVIDE ENCASE
SEAL AROUND PIPE
BELOW FOOTING
FOOTING OR BOTTOM
GRADE BEAM
NEOPRENE SEAL
BRONZE CLEANOUT PLUG
SET SCREW
ADJUSTABLE HOUSING
SET LEVEL
WITH
FINISHED
FLOOR
NICKEL BRONZE COVER
CONCRETE
FLOOR SLAB
FINISHED FLOOR
WALL CAVITY
SANITARY PIPING
INTERIOR WALL
BRONZE
THREADED
CLEANOUT PLUG
WALL
COVER
PLATE
SLEEVE THRU WALL
CONCRETE FLOOR
FINISHED FLOOR
ADJUSTABLE HOUSING
REMOVABLE STRAINER
COLLAR
GRATE AND RIM. SET
LEVEL AND FLUSH WITH
FINISHED FLOOR
ASSE 1072 TRAP
SEAL DEVICE
DUPLEX PUMP CONTROL PANEL
MOUNTED TO EXTERIOR WALL
2" VENT
GASKETED COVER BY
BASIN MANUFACTURER
FIBERGLASS
BASIN
HIGH WATER
ALARM
PUMP START
PUMP OFF
4" INLET
SP-1 SP-2
GOOSENECK VENT
ABOVE GRADE,
TERMINATE WITH
CARBON FILTER
ALARM SIGNAL
PUMP POWER SUPPLY
ALARM INDICATOR
LIGHT
GRADE
BACKFILL AS REQUIRED
BY MANUFACTURER
3" PUMP DISCHARGE
TO VALVE BOX (TYP)
VALVE BOX PLAN VIEW
2" OF WASHED STONE WITH
FILTER FABRIC WRAPPED UNDER
AND TAPED TO VALVE BOX.
BRICKS OR CONCRETE BLOCKS
SHALL BE PLACED AT CORNERS
TO PREVENT SETTLING.
VALVE BOX SECTION4'-0" x 4'-0" x 0-6" BALLAST
SLAB WITH MAT #5@12
OC EW AT MID-THICKNESS
PLASTIC VALVE BOX WITH
EXTENSIONS AS REQUIRED
GRADE
3" PUMP DISCHARGE
FROM SUMP BASIN (TYP)
CHECK VALVE (TYP)
BALL VALVE (TYP)
PLASTIC VALVE BOX
WITH ACCESS LID
UNION (TYP)
WATER HAMMER ARRESTOR SCHEDULE
1-11 12-32 33-60 61-113 114-154 155-330
F
SUPPLY RISER
PDI SYMBOL
PDI "A"
1. PREFERRED INSTALL WATER HAMMER ARRESTORS AT THE END OF
BRANCH LINE BETWEEN THE LAST TWO FIXTURES SERVED.
2. ONE WATER HAMMER ARRESTOR PER 20' LINE, AND ANOTHER FOR
BRANCHES OVER 20' IN LENGTH.
3. THE SUM OF FIXTURE UNIT RATING OF UNITS OVER 20' IN LENGTH
SHALL BE EQUAL TO OR GREATER THAN THE DEMAND OF THE
BRANCHES.
4. INSTALL WATER HAMMER ARRESTOR BEHIND ACCESS PANEL.
COORDINATE ACCESS PANEL LOCATION WITH ARCHITECTURAL PLANS.
FIXTURE
UNIT RATING
PDI SYMBOL
WATER HAMMER
ARRESTOR
TYPICAL BRANCH
LINE
EDCBA
NOTES:
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 17 APRIL 2018
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
C
A M
P L
E J E
U N
E
J A
C K
S O
N V
IL
L E
N
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
I E
D
440 S. CHURCH STREET, SUITE 1000
CHARLOTTE, NC 28202
TEL (704)338-6700
/2
/2
:4
:1
P
M C rv t\
\1
-M -C
E N
T R
A L
P
-1
M
A R
IN
E
H Q m a rk
.d im o ff .r v t
P-501
P
M
A R
IN
E
R A
ID
E
R H
E A
D Q
U A
R T
E R
S
P
LU
M B
IN
G
D E
TA
IL
S
CSW
12794366
MDD BNR
06/19/2020
Approved by Emily Sylvester, Director of Installation Development Division
SGL/RMS
1603164
JA
C
K S
O N
V
IL
LE
, N
O R
T H
C A
R O
LI
N
A M
A R
S O
C
EJA
A L G
ALG
NTS
B4
WALL HYDRANT
NTS
B1
AUXILIARY DRAIN DETAIL
NTS
A3
RPZ DETAIL WITH METER
NTS
A1
FLOOR AND WALL CLEANOUT DETAIL
NTS
A5
FLOOR DRAIN DETAIL
NTS
B3
DUPLEX SUMP PUMP DETAIL
NTS
C1
WATER HAMMER ARRESTOR INSTALLATION DETAIL
S Y
M D
E S
C R
IP
T
IO
N
D A
TE
A
P
RCP-1
PWHR
STRAINER WITH
BLOWDOWNPWC
PWH
FLUE
SHUT-OFF VALVE (TYP)
THERMOMETER
UNION (TYP)
ASME RATED TEMP. &
PRESSURE RELIEF
VALVE
PIPE TO FLOOR DRAIN
4 INCH EQUIPMENT BASE, EXTEND MINIMUM 6
INCHES BEYOND EQUIPMENT FOOTPRINT. SEE
STRUCTURAL DRAWINGS FOR EQUIPMENT
BASE DETAIL
FINISHED FLOOR
COMBUSTION AIR
INTAKE
NOTE:
1. COMBUSTION AIR INTAKE AND FLUE UP THROUGH ROOF. TERMINATE PER
MANUFACTURER REQUIREMENTS.
GAS CONNECTION, SEE
GAS CONNECTION DETAIL
HEAT TRAP
VACUUM
BREAKER
NOTE 1
NOTE 1
WALL OR FLOOR
PACKING
SEALANT WITH
JOINT BACKING
ALUMINUM
JACKET
INSULATION
(WHERE REQUIRED)
PIPE
NOTE B
(TYP)
SLEEVE
ESCUTCHEON
(WHERE
EXPOSED)
/1
/1
NOTES:
A. THIS DETAIL IS FOR NONFIRE-RATED CONSTRUCTION. PIPE PENETRATIONS IN
FIRE-RATED CONSTRUCTION SHALL BE FIRESTOPPED WITH A UL-CLASSIFIED
SYSTEM.
B. AT INSULATED WALLS PROVIDE PACKING AND SEALANT AT ANNULAR SPACE.
HOSE
BRACKET
3"ø P-TRAP
30" LONG
HOSE
SPOUT WITH HOSE END
AND PAILHOOK
SERVICE FAUCET WITH
VACUUM BREAKER
SPOUT BRACE
INTERIOR BASEMENT OR FIRST FLOOR UNEXCAVATED/OUTSIDE
STANDARD LINK SEAL TYPE
WALL PENETRATION SEAL
S.S. ESCUTCHEON
EXTERIOR WALLWATER STOP AND
ANCHOR COLLAR
ESCUTCHEON
WALL SLEEVE
PRESSURE
REGULATING
VALVE
MINIMUM 5 PIPE DIAMETERS
BEFORE CHANGING DIRECTION
GAS COCK
PLUG
TO APPLIANCE
VENT
LIMITER
UNION
DIRT LEG
FROM GAS MAIN
GAS METER
4 INCH EQUIPMENT BASE, EXTEND
MINIMUM 6 INCHES BEYOND EQUIPMENT
FOOTPRINT. SEE STRUCTURAL
DRAWINGS FOR EQUIPMENT BASE DETAIL
TO BUILDING
SUPPLY
GAS PIPING
PLUG VALVE
PLUGGED TEE WITH BUSHING
AND 3/8" PLUG BY GAS COMPANY
INSULATING UNION
GAS PRESSURE
REGULATOR
TEE WITH BUSHING
AND 3/8" PLUG
PLUG VALVE
FINISHED GRADE
PWH
PWC
MIXING VALVE
PWH
HEAT TRAP
PWH(TEMPERED)
CHECK VALVE (TYP)
BALANCING VALVE WITH
MEMORY STOP (TYP)
THERMOMETER (TYP)
PWHR
NOTE:
1. INSTALL MIXING VALVE PER
MANUFACTURER REQUIREMENTS.
PIPE SLEEVE WITH MINIMUM 1 INCH
CLEARANCE AROUND PIPE (TYP)
PLACE CONCRETE FILL AROUND SLEEVE PRIOR TO
POURING FOUNDATION. CONCRETE FILL TO BE FULL
WIDTH OF FOOTING AND FULL WIDTH OF PIPE
TRENCH OR MINIMUM 2'-0" AND MINIMUM 6 INCHES
ON EACH SIDE, WHICHEVER IS GREATER.
FOUNDATION
FOUNDATION WALL
M
IN
I N
C H
E S
M
IN
I N
C H
E S
M
IN
I N
C H
E S
PIPE THROUGH FOUNDATION WALL
PIPE UNDER FOUNDATION
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 17 APRIL 2018
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
C
A M
P L
E J E
U N
E
J A
C K
S O
N V
IL
L E
N
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
I E
D
440 S. CHURCH STREET, SUITE 1000
CHARLOTTE, NC 28202
TEL (704)338-6700
/2
/2
:4
:1
P
M C rv t\
\1
-M -C
E N
T R
A L
P
-1
M
A R
IN
E
H Q m a rk
.d im o ff .r v t
P-502
P
M
A R
IN
E
R A
ID
E
R H
E A
D Q
U A
R T
E R
S
P
LU
M B
IN
G
D E
TA
IL
S
CSW
12794367
MDD BNR
06/19/2020
Approved by Emily Sylvester, Director of Installation Development Division
SGL/RMS
1603164
JA
C
K S
O N
V
IL
LE
, N
O R
T H
C A
R O
LI
N
A M
A R
S O
C
EJA
A L G
ALG
NTS
A1
GAS WATER HEATER DETAIL NTS
A3
TYPICAL PIPE PENETRATION THROUGH
WALLS AND FLOORS
NTS
C4
TYPICAL MOP SINK DETAIL
NTS
B3
WALL PENETRATION
NTS
B4
GAS CONNECTION DETAIL
NTS
A4
GAS SERVICE DETAIL
NTS
C3
MIXING VALVE DETAIL
NTS
B1
PIPE SLEEVE AT BUILDING FOUNDATION
S Y
M D
E S
C R
IP
T
IO
N
D A
TE
A
P
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 17 APRIL 2018
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
C
A M
P L
E J E
U N
E
J A
C K
S O
N V
IL
L E
N
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
I E
D
440 S. CHURCH STREET, SUITE 1000
CHARLOTTE, NC 28202
TEL (704)338-6700
/2
/2
:4
:1
P
M C rv t\
\1
-M -C
E N
T R
A L
P
-1
M
A R
IN
E
H Q m a rk
.d im o ff .r v t
P-601
P
M
A R
IN
E
R A
ID
E
R H
E A
D Q
U A
R T
E R
S
P
LU
M B
IN
G
S C
H E
D U
LE
S
CSW
12794368
MDD BNR
06/19/2020
Approved by Emily Sylvester, Director of Installation Development Division
SGL/RMS
1603164
JA
C
K S
O N
V
IL
LE
, N
O R
T H
C A
R O
LI
N
A M
A R
S O
C
EJA
A L G
ALG
INST: REFER TO MANUFACTURER'S INSTALLATION INSTRUCTIONS
SPECS: SEE INDICATED SPECIFICATION SECTION FOR INFORMATION
PLANS: SEE PLANS FOR INFORMATION
6. PROVIDE ASSE 1016 BALANCED PRESSURE VALVE WITH LIMIT STOP. SET LIMIT STOP TO DELIVER MAXIMUM 115F WATER.
5. MIXING VALVE BELOW LAVATORY TO LIMIT TEMPERATURE TO 105F.
4. MEASURE MOUNTING HEIGHT ON OUTLET SIDE OF HYDRANT/HOSE BIBB.
3. PROVIDE FLOW LIMITING AERATOR.
2. PROVIDE ASSE 1072 TRAP SEAL DEVICE.
1. WHEN FLOOR MOUNTED, TOP SHALL BE FLUSH WITH THE FLOOR. WHEN MOUNTED VERTICALLY, MOUNT AT 30 INCHES AFF.
NOTES:
WH-1 WALL HYDRANT 3/4 - - - - 36 - 4
HB-1 HOSE BIBB 3/4 - - - - 36 - 4
FD DRAIN, FLOOR 1/2 - PLANS PLANS - -1/2 - 2
GCO GRADE CLEANOUT - - PLANS - - FLUSH -
FCO/WCO FLOOR CLEANOUT / WALL CLEANOUT - - PLANS - - FLUSH/30 - 1
CO CLEANOUT - - PLANS - - - -
S-1 KITCHEN/BREAKROOM SINK 1/2 1/2 1-1/4 1-1/4 1.5 GPM INST YES 3
IMB-1 ICE MAKER BOX 1/2 INST
MS-1 SINK, MOP 3/4 3/4 3 1-1/2 5 GPM INST -
SH-2 SHOWER 1/2 1/2 2 1-1/2 2.5 GPM INST YES 6
SH-1 SHOWER 1/2 1/2 2 1-1/2 2.5 GPM INST - 6
EWC-1 WATER COOLER 1/2 - 1-1/4 1-1/4 - INST YES
U-1 URINAL - - 2 - 0.125 INST -
L-2 LAVATORY 1/2 1/2 1-1/4 1-1/4 0.5 INST YES 3,5
WC-2 WATER CLOSET 1 - 4 2 1.28 INST YES -
WC-1 WATER CLOSET 1 - 4 2 1.28 INST - -
PWC PWH WASTE VENT
MARK FIXTURE DESCRIPTION
CONNECTION SIZE (IN)
GAL/CYCLE
(GPC)
MOUNTING
HEIGHT
IN
ADA
COMPLIANT
NOTES
PLUMBING FIXTURE CONNECTION SCHEDULE
3. LEAD-FREE BRONZE OR STAINLESS STEEL DESIGN RATED FOR POTABLE WATER.
2. NEMA 3R DISCONNECT.
1. ECM MOTOR
NOTES:
RCP-1 MECHANICAL ROOM INLINE / CIRCULATING 4 20 60 115/1 1,2,3
WATTS VOLTS/PH
MARK LOCATION TYPE
FLOW
(GPM)
HEAD
(FT WG)
MOTOR DATA
NOTES
PUMP SCHEDULE
3. INTEGRAL DISCONNECT
2. CONDENSATE NEUTRALIZATION TANK
1. DIRECT VENT
NOTES:
GWH-1 MECH. SPACE 100 140 235 100 120/1 15 199,000 96% 3 3 1,2,3
VOLT/PH MOCP
INPUT
(BTU/HR)
EFF
AIR INTAKE
(IN)
FLUE
(IN)
MARK LOCATION
DEG F
RISE
LWT
DEG F
RECOVERY
(GPH)
GALLONS
ELECTRICAL PROPANE
NOTES
CONDENSING WATER HEATER SCHEDULE
2. DAIL THERMOMETER
1. INTEGRAL STRAINER
NOTES:
MV-1 POTABLE WATER HOT 48 10.0 120 1,2
MARK SERVES
FLOW RATE
(GPM)
PRESSURE
DIFFERENTIAL
(PSI)
SETPOINT
(DEG F)
NOTES
MIXING VALVE
4. RAIL GUIDES WITH STAINLESS STEEL LIFTING CHAIN OR CABLE
3. GAS-TIGHT FIBERGLASS BASIN - 36 INCH DIAMETER BY 72 INCH DEEP
2. NEMA 4X DUPLEX CONTROLLER FOR ALTERING PUMP CONTROL WITH HIGH LEVEL ALARM.
1. NEMA 4X DISCONNECT SWITCH
NOTES:
SP-2
SP-1
DUPLEX 53 24 1 480/3 1,2,3,4
FLOW (GPM) HEAD (FT WG) HP VOLT/PH
MARK TYPE
CAPACITY PER PUMP ELECTRICAL DATA PER PUMP
NOTES
SEWAGE EJECTOR SUMP PUMP SCHEDULE
S Y
M D
E S
C R
IP
T
IO
N
D A
TE
A
P
2" PWC
REDUCE PRESSURE ZONE
BACKFLOW PREVENTER, PIPE
RELIEF VALVE DISCHARGE FULL
SIZE TO FLOOR DRAIN (TYP).
3/4" PWC
3/4" PWH
3/4" PWHR
3/4" PWHR
3/4" PWHR
3/4" PWH
3/4" PWC
2" PWC
1 1/2" PWC
2" PWC
3/4" PWHR
1 1/2" PWH
2" PWC
3/4" PWC
2" PWC
2" PWC
1 1/2" PWC
3/4" PWHR
SEE CIVIL DRAWINGS
FOR CONTINUATION
2 1/2" PWC
GWH-1
SH-1
L-1
WC-1
WC-2
U-1
WC-2
WC-1
L-1
SH-1
S-1
IMB-1
MS-1
EWC-1
WH-1
HB-1
3/4" PWC
3/4" PWC
L-1 L-1
WC-1
WC-1L-1
L-1 L-1 U-1
(TYP OF 4)
3/4" PWC
3/4" PWH
3/4" PWC
3/4" PWH
3/4" PWC
3/4" PWH
3/4" PWHR
WH "A"
(TYP OF 2)
WH "C"
WH "C"
WH "A"
(TYP OF 2)
(TYP OF 4)
SH-1
3/4" PWH
1/2" PWC
1/2" PWH
1/2" PWC
1/2" PWH
RCP-1
2" PWH
3/4" PWHR
MV-1
2 1/2" PWC
2" PWH
2 1/2" PWC
2" PWH
2 1/2" PWC
2" PWH
2" PWH
2 1/2" PWC
2" PWH
2" PWH
3/4" PWC
3/4" PWH
2" PWC
2" PWC
1 1/2" PWH
3/4" PWHR
1" PWC1 1/2" PWH
1" PWH
3/4" PWHR
WH-1
WH-1
3/4" PWC
3/4" MAKE-UP WATER
TO CHILLED WATER
AIR SEPARATOR
3/4" MAKE-UP WATER
TO HEATING WATER
AIR SEPARATOR
3/4" PWC
3/4" PWH
3/4" PWHR IMB-1
S-1
S-1
IMB-1
WH-1
3/4" PWC IMB-1
3/4" PWC
1/2" PWC
IMB-1
IMB-1
S-1
1/2" PWC
IMB-1
3/4" PWC
3/4" PWC
3/4" PWC
3/4" PWH
3/4" PWHR
WH-1
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 17 APRIL 2018
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
C
A M
P L
E J E
U N
E
J A
C K
S O
N V
IL
L E
N
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
I E
D
440 S. CHURCH STREET, SUITE 1000
CHARLOTTE, NC 28202
TEL (704)338-6700
/2
/2
:4
:2
P
M C rv t\
\1
-M -C
E N
T R
A L
P
-1
M
A R
IN
E
H Q m a rk
.d im o ff .r v t
P-901
P
M
A R
IN
E
R A
ID
E
R H
E A
D Q
U A
R T
E R
S
D O
M E
S
TI
C W
A
TE
R R
IS
E
R
CSW
12794369
MDD BNR
06/19/2020
Approved by Emily Sylvester, Director of Installation Development Division
SGL/RMS
1603164
JA
C
K S
O N
V
IL
LE
, N
O R
T H
C A
R O
LI
N
A M
A R
S O
C
EJA
A L G
ALG
NTS
A1
DOMESTIC WATER RISER
GENERAL NOTES
1. SEE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO
INDIVIDUAL FIXTURES
S Y
M D
E S
C R
IP
T
IO
N
D A
TE
A
P
FD-1
FD-1
FD-1
FD-1
2" VTR
3" SAN
3" SAN
3" SAN
3" SAN
3" SAN
3" SAN
2" V
2" VTR
3" SAN
3" SAN
1 1/2" V
1 1/2" VTR
1 1/2" SAN
1 1/2" SAN
3" SAN
3" SAN
2" VTR
1 1/2" V 2" V
3" SAN
1 1/2" SAN
1 1/2" SAN
3" SAN
WC-1
WC-2
WCO
U-1
WCO
WC-2
2" V
WCO
2" VTR
L-1
1 1/2" V
SH-1
(TYP OF 2)
3" SAN
(TYP OF 2)
3" SAN
(TYP OF 4)
L-1
2" VTR
1 1/2" V
S-1
S-1
S-1
SH-1
EWC-1
GCO
FD-1
3" SAN
FD-1
FD-1
FCO
MS-1
SEE CIVIL DRAWINGS
FOR CONTINUATION
AUXILIARY DRAIN BOX
2" SAN
3" SAN
4" SAN
4" SAN
4" SAN
FCO
WCO
FCO
3" SAN
3" SAN
3" SAN
(TYP OF 4)
(TYP OF 4)
3" SAN
4" SAN
1 1/2" V
2" V
(TYP OF 3)
WC-1
(TYP OF 3)
4" SAN
2" V
1 1/2" V
S-1
2" V
3" SAN
3" SAN
3" SAN
DUPLEX SEWAGE
EJECTOR PUMP
3" FORCE MAIN
FD-1
FD-1
3" SAN
3" SAN
3" SAN
FD-1
FD-1
(TYP OF 2)
4" SAN
3" SAN
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 17 APRIL 2018
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
C
A M
P L
E J E
U N
E
J A
C K
S O
N V
IL
L E
N
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
I E
D
440 S. CHURCH STREET, SUITE 1000
CHARLOTTE, NC 28202
TEL (704)338-6700
/2
/2
:4
:2
P
M C rv t\
\1
-M -C
E N
T R
A L
P
-1
M
A R
IN
E
H Q m a rk
.d im o ff .r v t
P-902
P
M
A R
IN
E
R A
ID
E
R H
E A
D Q
U A
R T
E R
S
S A
N
IT
A R
Y R
IS
E
R
CSW
12794370
MDD BNR
06/19/2020
Approved by Emily Sylvester, Director of Installation Development Division
SGL/RMS
1603164
JA
C
K S
O N
V
IL
LE
, N
O R
T H
C A
R O
LI
N
A M
A R
S O
C
EJA
A L G
ALG
NTS
A1
SANITARY RISER
GENERAL NOTES
1. SEE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO
INDIVIDUAL FIXTURES
S Y
M D
E S
C R
IP
T
IO
N
D A
TE
A
P
1 1/4" P
1 1/4" P
1 1/2" P
1 1/2" P
3/4" P
PROPANE METER AND
REGULATOR SET AT 2 PSIG
GWH-1
B-1
B-2
SEE CIVIL DRAWINGS
FOR CONTINUATION
(750 MBH)
(750 MBH)
(200 MBH)
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 17 APRIL 2018
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
C
A M
P L
E J E
U N
E
J A
C K
S O
N V
IL
L E
N
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
I E
D
440 S. CHURCH STREET, SUITE 1000
CHARLOTTE, NC 28202
TEL (704)338-6700
/2
/2
:4
:2
P
M C rv t\
\1
-M -C
E N
T R
A L
P
-1
M
A R
IN
E
H Q m a rk
.d im o ff .r v t
P-903
P
M
A R
IN
E
R A
ID
E
R H
E A
D Q
U A
R T
E R
S
P R
O P
A N
E G
A S
R
IS
E R
CSW
12794371
MDD BNR
06/19/2020
Approved by Emily Sylvester, Director of Installation Development Division
SGL/RMS
1603164
JA
C
K S
O N
V
IL
LE
, N
O R
T H
C A
R O
LI
N
A M
A R
S O
C
EJA
A L G
ALG
NTS
A2
NATURAL GAS RISER
GENERAL NOTES
1. GAS REGULATOR SERVING BUILDING SET AT 2 PSI.
2. PIPING SHALL BE SCHEDULE 40 BLACK STEEL
3. SIZING BASED ON TOTAL GAS LOAD OF 1,700 MBH WITH A TOTAL EQUIVALENT
LENGTH OF 100 FEET OF PIPE TO FARTHEST APPLIANCE WITH ALLOWABLE
PRESSURE DROP OF 0.5 PSIG.
4. PROVIDE CONNECTIONS AT EACH GAS APPLIANCE FOR PRIMARY BURNERS
AND PILOTS INCLUDING ALL ISOLATION VALVES, STRAINERS, AND APPLIANCE
REGULATOR TO PROVIDE PRESSURE REQUIRED BY MANUFACTURER'S
INSTALLATION INSTRUCTIONS.
S Y
M D
E S
C R
IP
T
IO
N
D A
TE
A
P
DIFFUSER, GRILLE OR
REGISTER DESIGNATION TAG
AIR FLOW SCHEMATIC AND
TEMPERATURE CONTROL
DIAGRAM SYMBOLOGY
HVAC SYMBOLOGY
GENERAL NOTES
PIPING
PIPING VALVES
PIPING FITTINGS
ABBREVIATIONS
SA12ø-250
SA-250
12ø
HOSE VALVE WITH CAP
CHECK VALVE
UNION
CALIBRATED BALANCING VALVE
PRESSURE REDUCING VALVE (PRV)
ISOLATION VALVE
BALANCING VALVE
CHILLED WATER SUPPLYCWS
CHILLED WATER RETURNCWR
REFRIGERANT LIQUIDRL
REFRIGERANT SUCTIONRS
CONDENSATE DRAINCD
ELBOW, 90°
ELBOW, 90° TURN DOWN
ELBOW, 90° TURN UP
TEE
TEE, OUTLET UP
TEE, OUTLET DOWN
PIPE BREAK
CAP
BLIND FLANGE
FLOW ARROW
SAFETY OR PRESSURE RELIEF,
STRAIGHT THROUGH VALVE
SAFETY OR PRESSURE RELIEF,
ANGLE VALVE
DIRECT
EVAPORATIVE
COOLER
DIRECT
EXPANSION
COOLING COIL
CONSTANT AIR
VOLUME BOX
VARIABLE AIR
VOLUME BOX
HOT WATER
HEATING COIL
CHILLED WATER
COOLING COIL
ELECTRIC
HEATING COIL
VFD (VARIABLE
FREQUENCY DRIVE)
GAS-FIRED
DUCT FURNACE
FREEZE STAT
FILTER SENSOR
GRAVITY DAMPER
CO2 SENSOR
GAS
ELECTRIC
ANALOG INPUT
ANALOG OUTPUT
DIGITAL INPUT
DIGITAL OUTPUT
COMMUNICATION
VARIABLE FREQUENCY DRIVE
MOTOR STARTER
DIRECT EXPANSION
MOTOR
THERMOSTAT
HUMIDISTAT
SMOKE DETECTOR
CARBON DIOXIDE SENSOR
CURRENT TRANSMITTER
FACE &
BYPASS COIL
DIRECT EXPANSION HEAT
PUMP
EXHAUST FAN
MOTORIZED
OPPOSED
BLADE DAMPER
AIRFLOW
MEASUREMENT
STATION
TEMPERATURE
SENSOR
R
TRANSITION - ONE SIDED
TRANSITION - DOUBLE SIDED
VD, BDD
90° ELBOW TURNED UP,
RECTANGULAR
TRANSITION -
RECTANGULAR TO ROUND DUCT
RECTANGULAR DUCT INCLINE -
RISE OR DROP IN RESPECT TO
THE AIR FLOW
ROUND DUCT INCLINE -
RISE OR DROP IN RESPECT
TO THE AIR FLOW
PRESSURE/TEMPERATURE TEST
PLUG (PETE PLUG OR EQUAL)
VD
BDD
= VOLUME DAMPER
= BACKDRAFT DAMPER
RADIUS ELBOW
ELBOW - W/TURNING VANE
(RECTANGULAR)
FIRE DAMPER
SMOKE DAMPER
SMOKE AND FIRE DAMPER
MOTOR OPERATED DAMPER
M
SA SOUND ATTENUATOR
DUCT ELEVATION
TAG ABOVE FINISH
FLOOR
18x10
T 9'-10" B 9'-0"
FLEXIBLE CONNECTION
FLEXIBLE DUCT
SUPPLY AIR REGISTER OR
GRILLE - W/DUCT-MOUNTED
EXTRACTOR
EXHAUST OR RETURN AIR
REGISTER OR GRILLE
ACOUSTICAL LINING -
DUCT DIMENSIONS FOR NET
FREE AREA
RETURN AIR GRILLE
90° ELBOW TURNED DOWN,
RECTANGULAR
90° ELBOW TURNED UP,
ROUND
90° ELBOW TURNED DOWN,
ROUND
RETURN DUCT SECTION,
RECTANGULAR
SUPPLY DUCT SECTION,
RECTANGULAR
EXHAUST DUCT SECTION,
RECTANGULAR
ROUND DUCT
12x12
RECTANGULAR DUCT12x12
24x12
24x12
24x12
R
HIDDEN DUCT24x18
SUPPLY FAN
EXHAUST AIR GRILLE
SUPPLY DIFFUSER
(NO ARROWS INDICATE 4-WAY)
SUPPLY DIFFUSER
(ROUND)
TAG OR FLOW RATE
SIZE
12x12
12ø
12ø
LOUVERACC AIR COOLED CHILLER
AD ACCESS DOOR
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AFMS AIRFLOW MEASUREMENT STATION
AI ANALOG INPUT
ALT ALTERNATIVE
AMB AMBIENT
AO ANALOG OUTPUT
APD AIR PRESSURE DROP
AS AIR SEPARATOR
AV ANALOG VALUE
AVG AVERAGE
BAS BUILDING AUTOMATION SYSTEM
BHP BRAKE HORSE POWER
BDD BACK DRAFT DAMPER
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BTUH BRITISH THERMAL UNITS PER HOUR
CAV CONSTANT AIR VOLUME
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CO CLEAN OUT
CONN CONNECTION
CONT CONTINUOUS
CU CONDENSING UNIT
CWS CHILLED WATER SUPPLY
CWR CHILLED WATER RETURN
CV CONTROL VALVE
DB DRY BULB
dB DECIBEL(S)
DDC DIRECT DIGITAL CONTROL
DEG F DEGREES FAHRENHEIT
DI DIGITAL INPUT
DIA DIAMETER
DN DOWN
DO DIGITAL OUTPUT
DOAU DEDICATED OUTDOOR AIR UNIT
DS DIRT SEPARATOR
DV DIGITAL VALUE
DX DIRECT EXPANSION
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EFF EFFICIENCY
ERU ENERGY RECOVERY UNIT
ESP EXTERNAL STATIC PRESSURE
ESS EMERGENCY SHUTOFF SWITCH
ET EXPANSION TANK
EWT ENTERING WATER TEMPERATURE
F FAHRENHEIT
FA FREE AREA
FCP FAN CONTROL PANEL
FCU FAN COIL UNIT
FLA FULL LOAD AMPS
FPM FEET PER MINUTE
FS FLOW SWITCH
GAL GALLONS
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HP HORSE POWER
HR HOUR
HTG HEATING
HVAC HEATING, VENTILATION, & AIR CONDITIONING
HWS HEATING WATER SUPPLY
HWR HEATING WATER RETURN
HZ HERTZ
ID INSIDE DIAMETER
IE INVERT ELEVATION
IN INCHES
I/O INPUT/OUTPUT
KW KILOWATT
LAT LEAVING AIR TEMPERATURE
LB POUNDS
L LOUVER
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH THOUSAND BTUH
MCA MINIMUM CURRENT AMPACITY
MISC MISCELLANEOUS
MIN MINIMUM, MINUTES
MFG MANUFACTURING
MOCP MAXIMUM OVERCURRENT DEVICE
MOD MOTOR OPERATED DAMPER
NC NORMALLY CLOSED, NOISE CRITERIA
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
OD OUTSIDE DIAMETER
PD PRESSURE DROP
PH PHASE
PLBG PLUMBING
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAUGE
QTY QUANTITY
RA RETURN AIR
REQD REQUIRED
RH RELATIVE HUMIDITY
RPM REVOLUTIONS PER MINUTE
SA SUPPLY AIR, SOUND ATTENUATOR
SCFM STANDARD CUBIC FEET PER MINUTE
SF SUPPLY FAN, SQUARE FEET
SP STATIC PRESSURE
SQ SQUARE
TD TEMPERATURE DIFFERENTIAL
TEMP TEMPERATURE, TEMPORARY
TYP TYPICAL
UH UNIT HEATER
UNO UNLESS NOTED OTHERWISE
V VOLTS
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
W WATTS
WB WET BULB
WC WATER COLUMN
WPD WATER PRESSURE DROP
1. PROVIDE AND INSTALL ALL MECHANICAL SYSTEMS IN ACCORDANCE
WITH THE UNIFIED FACILITIES CRITERIA, INTERNATIONAL
MECHANICAL CODE, AND ALL OTHER APPLICABLE STATE AND LOCAL
CODES.
2. CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK (HVAC)
ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND
GENERAL ARRANGEMENT ONLY. PLANS SHOULD NOT BE SCALED.
3. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN
ACCORDANCE WITH MANUFACTURERS' RECOMMENDATIONS.
4. VERIFY ALL CLEARANCES BEFORE FABRICATING AND INSTALLING
WORK. COORDINATE WITH ALL OTHER TRADES.
5. DRAWINGS REFLECT DIMENSIONS OF DESIGN MFG. EQUIPMENT.
ALLOWABLE ALTERNATES, WHILE EQUAL IN OUTPUT CAPACITY WILL
BE THE RESPONSIBILITY OF THE CONTRACTOR TO MEET THE SPACE
REQUIREMENTS AND PROVE EQUALITY WITH DESIGN MFG.
EQUIPMENT.
6. TESTING, ADJUSTING, AND BALANCING AGENCY SHALL BE A
MEMBER OF THE ASSOCIATED AIR BALANCE COUNCIL (AABC) OR
THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB).
TESTING ADJUSTING AND BALANCING SHALL BE PERFORMED IN
ACCORDANCE WITH THE AABC STANDARDS.
7. COORDINATE ALL EQUIPMENT CONNECTIONS WITH
MANUFACTURER'S CERTIFIED DRAWINGS. COORDINATE AND
PROVIDE ALL DUCT AND PIPING TRANSITIONS REQUIRED FOR FINAL
EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD
VERIFY AND COORDINATE ALL DUCT AND PIPING DIMENSIONS
BEFORE FABRICATION.
8. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE
INTERNATIONAL ELECTRICAL CODE (IEC) AND NFPA 70.
9. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER
INSTALLATION AND AS SHOWN IN DETAILS FOR PIPING, DUCTWORK,
AND EQUIPMENT (UNLESS OTHERWISE NOTED) SHALL BE
FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR.
10. PROVIDE ACCESS PANELS FOR INSTALLATION IN DUCTWORK,
WALLS AND CEILINGS, WHERE REQUIRED, TO SERVICE CONTROLS
DEVICES, DAMPERS, VALVES, DUCTWORK, SMOKE DETECTORS,
AND OTHER CONCEALED MECHANICAL EQUIPMENT. ACCESS PANEL
INSTALLATION SHALL BE COORDINATED WITH PROCESS
REQUIREMENTS, ARCHITECTURAL WORK TO MATCH MATERIALS AND
FINISHES.
11. ALL DUCTWORK, PIPING, AND EQUIPMENT SUPPORTED FROM
STRUCTURAL STEEL SHALL BE COORDINATED WITH ALL TRADES.
ALL ATTACHMENTS TO STEEL BAR JOISTS, TRUSSES, OR JOIST
GIRDERS SHALL BE AT PANEL POINTS OR AS SHOWN ON THE
MECHANICAL AND STRUCTURAL DRAWINGS. PROVIDE BEAM
CLAMPS MEETING MSS STANDARDS. WELDING TO STRUCTURAL
MEMBERS SHALL NOT BE PERMITTED.
12. PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK AND PIPING
SYSTEMS CONNECTED TO FANS, PUMPS AND OTHER EQUIPMENT
WHICH REQUIRE VIBRATION ISOLATION.
13. DUCTWORK SHALL BE FABRICATED AND INSTALLED PER LATEST
SMACNA STANDARDS.
C
C
H
C
EP
R
D
X
EH
C
FB
C
VFD
CAV
VAV
EF
SF
GAS
ELECT
AI
AO
DI
DO
COMM
CT
STARTER
VFD
HP
DX
M
T
H
CO2
S
NG
AFMS
T
FRZ
ΔP
M
CO2FLOW SWITCHFS
PIPING SPECIALTIES
PRESSURE/TEMPERATURE TEST PLUG
PRESSURE GAUGE WITH
QUARTER TURN BALL VALVE
FLEXIBLE PIPE CONNECTION
STRAINER WITH BLOW DOWN
THERMOMETER
HEATING WATER SUPPLYHWS
HEATING WATER RETURNHWR
CLEAN OUT
EMERGENCY SHUTDOWN SWITCHESS
MANUAL AIR VENT
AUTOMATIC AIR VENT
A
UC UNDERCUT DOOR -
SEE ARCHITECTURAL
DOOR SCHEDULE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 17 APRIL 2018
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
C
A M
P L
E J E
U N
E
J A
C K
S O
N V
IL
L E
N
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
I E
D
440 S. CHURCH STREET, SUITE 1000
CHARLOTTE, NC 28202
TEL (704)338-6700
/2
/2
:4
:4
P
M C rv t\
\1
-M -C
E N
T R
A L
P
-1
M
A R
IN
E
H Q m a rk
.d im o ff .r v t
M-001
P
M
A R
IN
E
R A
ID
E
R H
E A
D Q
U A
R T
E R
S
LE
G
E N
D , A
B R
E V
IA
T
IO
N
S A
N D
N O
TE
S
CSW
12794372
MDD BNR
06/19/2020
Approved by Emily Sylvester, Director of Installation Development Division
SGL/RMS
1603164
JA
C
K S
O N
V
IL
LE
, N
O R
T H
C A
R O
LI
N
A M
A R
S O
C
EJA
A L G
ALG
S Y
M D
E S
C R
IP
T
IO
N
D A
TE
A
P
O U
TS
ID
E S W E P T P A
TH
IN
SI
D E
S W E P T P A
TH
.1 ft 4
.0 ft
.0 ft
.0 ft
.0 ft
.5 ft
ACC-1
CU-1
4" CWR
4" CWS
4" CWR
4" CWS
DIRECT BURIED
PRE-INSULATED PIPE
CU-2
HP-3
ANCHOR (TYP)
ANCHOR (TYP)
HEAT TRACE
CONTROLLER
ACC-HT-01
CU-4
ANCHOR PLATE =
OD + 2" MIN.
SECTION A - A
A
A
ANCHOR PLATE WELDS
CONCRETE
ANCHOR BLOCK
INSULATION
SERVICE PIPE
FRP SLEEVE
POLYURETHANE
1/2" ANCHOR PLATE
NOTE:
1. LOCATE ANCHORS AS REQUIRED BY
DIRECT BURIED PIPE MANUFACTURER
A
A
SECTION A - A
NOMINAL O.D +/- 1/2"
FIELD MEASURE TO
CORRECTLY SIZE LINK SEALS
POLYURETHANE
INSULATION
HEAT SHRINK END SEAL
24" FRP SLEEVE X 1/8"
THICK BY DIRECT BURIED
PIPE MANUFACTURER
6" WIDE HEAT SHRINK SLEEVE
FRP JACKET
SERVICE PIPE
FRP SLEEVE
SEE END SEAL DETAIL
LINK SEAL
FRP JACKET
FLOOR
(REF.)
1" MIN.
FLOOR SLEEVE & LEAK PLATE
SERVICE PIPE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 17 APRIL 2018
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
C
A M
P L
E J E
U N
E
J A
C K
S O
N V
IL
L E
N
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
I E
D
440 S. CHURCH STREET, SUITE 1000
CHARLOTTE, NC 28202
TEL (704)338-6700
/2
/2
:4
:5
P
M C rv t\
\1
-M -C
E N
T R
A L
P
-1
M
A R
IN
E
H Q m a rk
.d im o ff .r v t
MS101
P
M
A R
IN
E
R A
ID
E
R H
E A
D Q
U A
R T
E R
S
M E
C H
A N
IC
A
L S
IT
E
P
LA
N
CSW
12794373
MDD BNR
06/19/2020
Approved by Emily Sylvester, Director of Installation Development Division
SGL/RMS
1603164
JA
C
K S
O N
V
IL
LE
, N
O R
T H
C A
R O
LI
N
A M
A R
S O
C
EJA
A L G
ALG
1" = 30'-0" A1
MECHANICAL SITE PLAN
NOT TO SCALE
C4
ROUND ANCHOR ASSEMBLY DETAIL -
DIRECT BURIED CHILLED WATER
NOT TO SCALE
B4
END SEAL FRP SLEEVE DETAIL -
DIRECT BURIED CHILLED WATER
NOT TO SCALE
A4
END SEAL LINK SEAL DETAIL -
DIRECT BURIED CHILLED WATER
PLAN
NORTH
S Y
M D
E S
C R
IP
T
IO
N
D A
TE
A
P
WALL RATING LEGEND
NON-RATED WALL
1 HR RATED PARTITION
SMOKE PARTITION
A
/ M H
A
/ M H
A
/ M -1
A
/ M H
MECHANICAL SPACE
OFFICE 4
OPEN OFFICE
BLUE OPS AREA
CONFERENCE
ROOM
OFFICE 10
OFFICE 11
JTAC
CORRIDOR
SECURITY
MENS RESTROOM
COMM
ELECTRICAL
FCU-04
FCU-06
FCU-07
FCU-08
FCU-10
FCU-11
FCU-14
OFFICE 3
OFFICE 2
OFFICE 5
OFFICE 6
OFFICE 7
OFFICE 9
SHARED
OFFICE
FCU-23
FCU-35
FCU-38
FCU-39 FCU-40
FCU-41 FCU-42
20x14
FCU-09
1 2 3 4 5 6 7
B
C
D
E
F
G
A
A
/ M H
FCU-05
ENTRY
VESTIBULE
20x16
ERU EXHAUST
AIR DUCT
ERU SUPPLY
AIR DUCT
M-401
A1
ERU EXHAUST
AIR DUCT
ERU SUPPLY
AIR DUCT
AC-1
AC-2
SD1- 8ø-145
(TYP OF 7)
10x10
RG2-145
(TYP OF 7)
8ø
SD1-200
10x8
RG2-200
SD1- 6x6-20
(TYP OF 8)
10x8
RG2-290
SD1- 6x6-35
FCU-02
12x12
RG2-435
8ø
SD1-135
(TYP OF 6)
20x12
RG1-810
(TYP OF 6)
SD1- 8ø-135
(TYP OF 6)
LD1- 8ø-120
(TYP OF 4)
10ø
SD1-180
10ø SD1-18012x10
RG2-360
10ø
SD1-220
(TYP OF 6)
(TYP OF 3)
SD1- 8ø-135
8ø
SD1-140
10x8
RG2-140
8ø
SD1-140
10x8
RG2-140
8ø
SD1-180
(TYP OF 4)
FCU-36
FCU-37
10x10
RG2-480
SD2- 8ø-145
10x10
RG2-100
SD1- 8ø-100
RD1- 8ø-220
(TYP OF 2)
x8 x8
12ø
SD1-320
10x10
EG1-450
8x8
EG1-220
12x12
EG1-690
6x6
EG2-100
14ø
SD1-480
14ø
SD1-480
6x6
SD1-20
4ø
2ø
12ø
SD1-350
0ø
10x10
SD2-275
6x6
SD1-25
8x8
EG3-125
8x8
EG3-100
8x8
EG3-100
(TYP OF 2)
(TYP OF 2)
8x8 x1
FCU-03
ESS
CAV-1
VAV-1
VAV-2
VAV-3
VAV-4
T
FCU-01
T
T
FCU-03
T
FCU-08
T FCU-07
T
FCU-06
T FCU-05
T
FCU-04
T
FCU-13
T FCU-23
T
T
FCU-11
T
FCU-10
T FCU-09
T
FCU-14
T
FCU-38
TFCU-37 T
FCU-36
T
T
FCU-35
VAV-1
VAV-2
VAV-4
VAV-3
T
FCU-39-FCU-42
20x10
20x10
20x10
20x10
12x10
14x12
8ø
8ø
8x10 x8
36x14
32x14 x1
20x12
RG1-810
10x10
RG2-480
20x12
RG1-810
20x12
RG1-1320
CO2
CO2
CO2
CO2
x1
12x10 x1 x1
14x10 10x10
40x14
40x14
40x14
20x14
50x14
16x14
16x16
14x14
10ø
SD1-240
20x12
RG1-820
(TYP OF 2)
(TYP OF 2)
14x10
12ø
12ø
10ø
VAV-10
CO2
BREAKROOM
PRINTER
10x10
VAV-10
10ø
10ø
6ø
8ø
12x12LD1- 8ø-145
6x6
EG2-100
(TYP OF 2)
VAV-11
14x12
(TYP OF 3)
12x12
22x20
14x10
6x6
SD1-20
WOMENS
RESTROOM
SECURITY
BUNK
(TYP OF 2)
8ø
SD2-180
8x8 EG3-150 8ø
LD2-220
TG1- 8x8-170
(TYP OF 2)
10x10
FCU-23
10ø
SD1-220
(TYP OF 2)
SD1- 8ø-145
LD1- 8ø-210
8ø
SD1-145
x8
12x12
FCU-01
OFFICE 8
x1
12x1216x14
26x14
14x12
(TYP OF 2)
12x12
16x14
10x10
RG3-290
RG3- 10x10-360
RD1- 8ø-210
(TYP OF 3)
14x14
20x14 SD2- 10x10-425
FCU-12
FCU-13
8ø
SD1-100
14x10
12x12
14x12
14ø
16x14
LD1- 8ø-135
8ø
ED1-135
12x12
FCU-12
x1 x1 x1
FCU-02
16x12
46x14 x1
AC-4
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 17 APRIL 2018
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
C
A M
P L
E J E
U N
E
J A
C K
S O
N V
IL
L E
N
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
I E
D
440 S. CHURCH STREET, SUITE 1000
CHARLOTTE, NC 28202
TEL (704)338-6700
/2
/2
:4
:3
P
M C rv t\
\1
-M -C
E N
T R
A L
P
-1
M
A R
IN
E
H Q m a rk
.d im o ff .r v t
MH101
P
M
A R
IN
E
R A
ID
E
R H
E A
D Q
U A
R T
E R
S
D U
C
TW
O R
K F
LO
O
R P
LA
N
A
R E
A
A
CSW
12794374
MDD BNR
06/19/2020
Approved by Emily Sylvester, Director of Installation Development Division
SGL/RMS
1603164
JA
C
K S
O N
V
IL
LE
, N
O R
T H
C A
R O
LI
N
A M
A R
S O
C
EJA
A L G
ALG
GENERAL NOTES
KEY PLAN
A B
PLAN
NORTH
1. ALL DUCTWORK AND EQUIPMENT SHOWN ON THIS DRAWING IS
DIAGRAMMATIC. LOCATE ALL DUCTWORK AND EQUIPMENT SO AS TO
CLEAR ALL OBSTACLES.
2. ALL WORK TO BE PREFORMED IN ACCORDANCE WITH APPLICABLE
FEDERAL, STATE, AND LOCAL CODES.
3. COORDINATE ALL HVAC INSTALLATIONS WITH ALL APPLICABLE TRADES.
4. VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF
INSTALLATION OF ALL MECHANICAL AND PLUMBING EQUIPMENT.
CONSTRUCTION DISCREPANCIES TO BE BROUGHT TO THE IMMEDIATE
ATTENTION OF THE CONTRACTING OFFICER FOR A RESOLUTION.
5. COORDINATE ALL REQUIRED CONDUIT, PIPING AND CHASES FOR
GOVERNMENT FURNISHED GOVERNMENT INSTALLED EQUIPMENT WITH
THE GOVERNMENT.
6. REFER TO THE ARCHITECTURAL REFLECTED CEILING PLAN DRAWINGS
FOR LOCATION OF CEILING COMPONENTS INCLUDING DIFFUSERS,
REGISTERS, LIGHTS, SPRINKLERS, FIRE ALARM DEVICES, ETC.
7. ALL DUCT BRANCH RUNOUTS TO AIR TERMINAL SHALL BE FULL SIZE OF
DIFFUSER OR GRILLE CONNECTION UNLESS INDICATED OTHERWISE.
8. INSTALL MANUAL BALANCING DAMPERS IN ALL BRANCH RUNOUTS.
MANUAL BALANCING DAMPERS FOR DIFFUSERS AND GRILLES OFF
BOTTOM DUCT MAIN SHALL HAVE MANUAL BALANCING DAMPER
PROVIDED IN VERTICAL DUCT. MANUAL BALANCING DAMPERS SHALL BE
PROVIDED AT DUCT MAIN WHEN LOCATED ABOVE ACCESSIBLE CEILING.
MANUAL BALANCING DAMPERS LOCATED ABOVE INACCESSIBLE CEILING
SHALL BE PROVIDED IN THE NECK OF THE DIFFUSER OR GRILLE
CONNECTION.
9. LINEAR DIFFUSERS SHALL BE EQUALLY SPACED AND ALIGNED WITH
ADJACENT DIFFUSERS.
0 4' 8' 16'SCALE: 1/8" = 1'-0" (M-301)
PLAN - DUCTWORK - AREA "A" - ELEV 23.5'
A1
S Y
M D
E S
C R
IP
T
IO
N
D A
TE
A
P
F
R E
F R
E F
R E
F
WALL RATING LEGEND
NON-RATED WALL
1 HR RATED PARTITION
SMOKE PARTITION
8 9
B
C
D
E
F
A
10 11 12 13 14
A
/ M H
OFFICE 6
CONFERENCE
ROOM
CORRIDOR
OFFICE 5
OFFICE 4
OFFICE 3
OFFICE 2
OFFICE 1
CO OFFICE
GREEN OPS AREA
PURPLE OPS
AREA
FIRE ALARM ROOM
RECEPTION
CONFERENCE
ROOM
PRINTER
OFFICE 8
TEAM ROOM
OFFICE 1
FCU-17
FCU-22
FCU-24
FCU-25
FCU-26
OFFICE 2
OFFICE 3
OFFICE 5
OFFICE 6
OFFICE 7
CO OFFICE
BREAKROOM
CONFERENCE
ROOM
FCU-30
FCU-31
FCU-18
14ø
FCU-32
A
/ M H
20x16
OFFICE 4
ERU EXHAUST
AIR DUCT
ERU SUPPLY
AIR DUCT
AC-1
AC-3
FCU-28
10ø
SD1-200
10x8
RG2-200
(TYP OF 7)
SD1- 8ø-145
(TYP OF 6)
RG2- 10x8-145
(TYP OF 6)
20x12
SD1- 8ø-185
20x12
FCU-1512x12
RG2-440
10ø
SD1-210
(TYP OF 4)
22x46
RG1-840
(TYP OF 4)
22x46
RG1-840
8ø
SD1-155
10x8
RG2-155
RG2- 10x8-85
SD1- 10ø-255
FCU-37
8ø
SD1-150
(TYP OF 3)
(TYP OF 6)
(TYP OF 6)
10x10
RG2-200
10ø
SD1-200
8ø
LD1-180
(TYP OF 3)
8ø
SD1-190
(TYP OF 2)
12x10
RG2-380
(TYP OF 3)
RD1- 8ø-210
(TYP OF 3)
10ø
SD1-360
6x6
SD1-115
6x6
SD1-70
6x6
SD1-20
(TYP OF 2)
8x8
TG1-170
(TYP OF 2)
12ø
SD1-320
14ø
SD1-410
8x8
20x16
12x10
8x8
EG1-85
8x8
EG1-170
10x10
EG1-410
FCU-33
CAV-2
CAV-3
CAV-4
VAV-5
VAV-6
VAV-8
VAV-7
8x8
EG1-180T
FCU-33
T
FCU-34
T
FCU-29
T
T
FCU-28
T
FCU-27
T
FCU-24
T
FCU-18
T
FCU-19
T FCU-22
T
FCU-24
T
FCU-31
T
FCU-32
T
T
FCU-16
T
FCU-15
T
FCU-25
T
FCU-26
VAV-5
VAV-7
VAV-8
VAV-9
VAV-9
VAV-6
FCU-16
12x12
RG2-450
20x12
RG1-1110
20x12
RG1-1110
16x14
RG2-290
x1
CO2
CO2
CO2
CO2
CO2
14x14
EG1-645
22x20
12x12 x1
12x12 14x10
14x10 10x10 26x14 x1 x1
12x12
FCU-17
x1
FCU-34
x1
10ø
SD1-360
10ø
SD1-220
x8 x1
12ø x6
14ø
10ø
0ø
6x8
8x10
6x8
8ø
9ø
6ø
10x8 x1
10x10
6x6
EG1-75
4ø
6ø
12ø
8ø 10x10
TEAM ROOM
(TYP OF 2)
HP-3
BREAKROOM
VAV-12 16x18
SD1- 8ø-185
6x6
6x6
SD1-20
(TYP OF 6)
x1 x1
CAV-5
18ø
6x6
6x8
22x20
26x14 x1
CU-2 CU-1
6x6
SD1-20
UC
8ø
SD1-85
10x10
RG2-255
UC
12x10
(TYP OF 5)
TRASH/MANT.
8ø
LD1-180
8ø
LD2-90
8ø
LD1-210
6x6
SD1-35
6x6
SD1-25
FCU-29
T
FCU-43
14x12
FCU-44
FCU-20
T T
FCU-44 FCU-23
FCU-27
16x14 12x12
FCU-19
x1
CU-4
8ø
SD1-100
10x8
RG2-100
6x6
SD1-20
14x10 12x12
8ø
RD1-210
x1
(TYP OF 3)
8ø
LD1-210
(TYP OF 3)
x6
10x8 RG2-100SD1- 8ø-100
8ø
SD1-110
10x8
RG2-100
8ø
SD1-100
14ø
12x10
10x8
RG2-140
14x10 12x12
(TYP OF 3)
RD1- 8ø-210
14x10
32x14
12x12
FCU-21
FCU-43
FCU-30
SD1- 6ø-70
(TYP OF 2)
12x12
36x14
SD1- 6x6-20
12x12
14x10
40x14 x1
12x10
14x10
12x12
7ø
10ø
SD1-210
36x14
14x10
14x12
36x14
8ø
ED1-165
8ø
LD1-165
8ø
ED1-125
8ø
LD1-125
ED1- 8ø-135
8ø
LD1-135
SD1- 6ø-85
(TYP OF 5)
x1 x1 x1
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 17 APRIL 2018
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
C
A M
P L
E J E
U N
E
J A
C K
S O
N V
IL
L E
N
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
I E
D
440 S. CHURCH STREET, SUITE 1000
CHARLOTTE, NC 28202
TEL (704)338-6700
/2
/2
:5
:4
P
M C rv t\
\1
-M -C
E N
T R
A L
P
-1
M
A R
IN
E
H Q m a rk
.d im o ff .r v t
MH102
P
M
A R
IN
E
R A
ID
E
R H
E A
D Q
U A
R T
E R
S
D U
C
TW
O R
K F
LO
O
R P
LA
N
A
R E
A
B
CSW
12794375
MDD BNR
06/19/2020
Approved by Emily Sylvester, Director of Installation Development Division
SGL/RMS
1603164
JA
C
K S
O N
V
IL
LE
, N
O R
T H
C A
R O
LI
N
A M
A R
S O
C
EJA
A L G
ALG
GENERAL NOTES
KEY PLAN
A B
PLAN
NORTH
1. ALL DUCTWORK AND EQUIPMENT SHOWN ON THIS DRAWING IS
DIAGRAMMATIC. LOCATE ALL DUCTWORK AND EQUIPMENT SO AS TO
CLEAR ALL OBSTACLES.
2. ALL WORK TO BE PREFORMED IN ACCORDANCE WITH APPLICABLE
FEDERAL, STATE, AND LOCAL CODES.
3. COORDINATE ALL HVAC INSTALLATIONS WITH ALL APPLICABLE TRADES.
4. VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF
INSTALLATION OF ALL MECHANICAL AND PLUMBING EQUIPMENT.
CONSTRUCTION DISCREPANCIES TO BE BROUGHT TO THE IMMEDIATE
ATTENTION OF THE CONTRACTING OFFICER FOR A RESOLUTION.
5. COORDINATE ALL REQUIRED CONDUIT, PIPING AND CHASES FOR
GOVERNMENT FURNISHED GOVERNMENT INSTALLED EQUIPMENT WITH
THE GOVERNMENT.
6. REFER TO THE ARCHITECTURAL REFLECTED CEILING PLAN DRAWINGS
FOR LOCATION OF CEILING COMPONENTS INCLUDING DIFFUSERS,
REGISTERS, LIGHTS, SPRINKLERS, FIRE ALARM DEVICES, ETC.
7. ALL DUCT BRANCH RUNOUTS TO AIR TERMINAL SHALL BE FULL SIZE OF
DIFFUSER OR GRILLE CONNECTION UNLESS INDICATED OTHERWISE.
8. INSTALL MANUAL BALANCING DAMPERS IN ALL BRANCH RUNOUTS.
MANUAL BALANCING DAMPERS FOR DIFFUSERS AND GRILLES OFF
BOTTOM DUCT MAIN SHALL…