C-513.pdf

PDF 1 MB Posted

Attached to
P1395 SOF MARINE RAIDER REGIMENT HQ, MCAS, CAMP LEJEUNE
Solicitation number
N40085-19-R-9148
Issued by

About this file

This document provides details for a federal construction contract solicitation and related contract opportunity. The solicitation seeks construction of Marine Raider Regiment headquarters facilities totaling 30,000 square feet in Camp Lejeune, North Carolina. The work includes steel frame buildings with brick and metal exteriors, standing seam roofs, building systems, site utilities, security fencing and gates, fiber/copper communications, stormwater management, parking and roadways. Requirements include sustainable building practices, antiterrorism protections, geospatial surveying and mapping. The contract opportunity is issued by the Naval Facilities Engineering Command for the Department of the Navy to construct the facilities in support of the Marine Raider Regiment headquarters at the Marine Corps Air Station in Camp Lejeune.

View the file

Other files

File Type Posted
C-514.pdf PDF
CG103.pdf PDF
CE106.pdf PDF
CG107.pdf PDF
CD04-20201022 GER P1395 Marine Raider Bn HQS R4 -ALZ Sealed.pdf PDF
CG108.pdf PDF
REVISION 001.pdf PDF
B-104.pdf PDF
C-507.pdf PDF
B-103.pdf PDF
B-102.pdf PDF
CE103.pdf PDF
B-101.pdf PDF
C-515.pdf PDF
CE102.pdf PDF
AMENDMAENT 0004 FOR P1395.pdf PDF
01 30 01.00 22.pdf PDF
P1395 08052020 Arch Revisions.pdf PDF
20_0622_P1395_Marine-Raider_HQ_FInal_Interior_Sheets.pdf PDF
P-1395-E-Revision 1_2020-08-05.pdf PDF
P1395 AMENDMENT 0003.pdf PDF
P1395 MARINE RAIDER FF-E Est Cost Summary_FINAL_20_0810.pdf PDF
09 69 13.pdf PDF
Part 1-P1395 BVD Request for Pricing Bid Form Spreadsheet.pdf PDF
UPDATED P1395 BID SCHEDULE.pdf PDF
P1395 PPI LOG 03.pdf PDF
AMENDMENT 0002 FOR P1395.pdf PDF
PPI LOG 02 Document..pdf PDF
P1395 SOF PPIs LOG 01.pdf PDF
10 51 00.pdf PDF
13 42 75.pdf PDF
AMENDMENT 0001 P1395.pdf PDF
1603164spc01of01.pdf PDF
Attachment E - Past Performance Questionnaire.docx DOCX document
Attachment F - Small Business Subcontracting Plan.docx DOCX document
1603164dwg01of03.pdf PDF
ATTACHMENT G P1395 PRICE PROPOSAL FORM.pdf PDF
1603164dwg03of03.pdf PDF
Attachment B - Construction Experience Project Data Sheet.docx DOCX document
Attachment D - Small Business Participation and Commitment Strategy.docx DOCX document
1603164dwg02of03.pdf PDF
P1395 RFP for N40085-19-R-9148.pdf PDF
Attachment A - Pre-Proposal Inquiries Form.xlsx XLSX spreadsheet
Attachment C - Small Business Subcontracting Record.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTES:

1. REFER TO NCESCPDM

SECTION #6.64 FOR

ADDITIONAL DESIGN

SPECIFICATIONS REGARDING

SKIMMER SEDIMENT BASINS.

2. REFER TO NCESCPDM

SECTION #6.65 FOR BAFFLE

SPACING AND INSTALLATION.

3. H = SPILLWAY ELEVATION -

SKIMMER INVERT ELEVATION.

4. USE FOR DRAINAGE AREAS

NOT EXCEEDING 10 ACRES.

5. EARTH BERM SHALL BE

STABILIZED WITH SEEDING

ACCORDING TO

SPECIFICATIONS.

DRAINAGE

AREA

(ACRES)

MIN.

LENGTH TO

WIDTH RATIO

MAX.

LENGTH TO

WIDTH RATIO

MIN.

VOLUME

REQUIRED

SURFACE

AREA

REQUIRED

< 5 AC.

2:1

6:1

(CU. FT.

PER AC.

DISTURBED)

(SQ. FT. PER

CFS Q10)

NOT TO SCALE

SKIMMER SEDIMENT BASIN

DESIGN CRITERIA

Z=5' MAX.

ANTI-SEEP

COLLAR

W=5' MIN.

10'

MIN.

INFLOW

SKIMMER

DEWATERING

DEVICE

EMBANKMENT

BAFFLES

AVERAGE

WIDTH

AREA*

LENGTH

* AREA OF BASIN WATER SURFACE

AT TOP OF PRIMARY SPILLWAY

EMERGENCY

SPILLWAY

1' FREEBOARD

EMBANKMENT

T

M

I N

BAFFLES

CLEANOUT

DEPTH

(H/2)

FILTER FABRIC

DEWATERING

ZONE

INFLOW

EMERGENCY

SPILLWAY

H

M

I N

6" MAX. DEPTH OF FLOW OVER

EMERGENCY SPILLWAY

LENGTH

SKIMMER ARM

LENGTH =

H x 1.5

(MIN. 5')

SEDIMENT

STORAGE ZONE

NOTES:

1. BAFFLE FABRIC SHALL CONSIST OF 700 G/M COIR EROSION CONTROL BLANKET OR APPROVED

SUBSTITUTE. A SINGLE CONTINUOUS LENGTH OF FABRIC SHALL EXTEND ACROSS THE FULL WIDTH

OF THE BASIN.

2. POSTS SHALL BE STEEL, MINIMUM 5 FEET LONG, AND OF THE SAME GENERAL TYPE AS THOSE

SPECIFIED FOR SILT FENCE CONSTRUCTION.

3. THE TOP EDGE OF THE BAFFLE FABRIC SHALL BE SUPPORTED BY A TENSIONED CABLE OR ROPE

EXTENDING ACROSS THE WIDTH OF THE BASIN AND ANCHORED ON EACH END.

4. THE BOTTOM EDGE OF THE BAFFLE FABRIC SHALL BE EMBEDDED IN A TRENCH EXCAVATED ALONG

THE BASIN BOTTOM AND SIDE SLOPES.

5. BAFFLE FABRIC SHALL BE ATTACHED TO SUPPORT POSTS WITH HEAVY-DUTY PLASTIC CABLE TIES, OR SIMILAR MEANS.

6. BAFFLES SHALL BE SPACED IN THE DIRECTION OF FLOW TO PROVIDE THE SURFACE AREAS SHOWN.

7. THE BASIN SLOPES SHALL BE SEEDED AND THE SLOPES SHALL BE MATTED IMMEDIATELY AFTER THE

BASIN IS CONSTRUCTED.

8. SEE THIS SHEET FOR ADDITIONAL BASIN INFORMATION.

SECTION A-A'

STAKE TO SUPPORT

TENSION WIRE

FABRIC TENSION WIRE

TO PREVENT SAGGING

SUPPORT POST, 24" INTO

BOTTOM OR SIDE

20 oz/sy COIR EROSION

BLANKET, COIR MESH OR SIMILAR,

TRENCHED INTO BOTTOM OR SIDE

4.

P

O

S

T

S

P

A

C

I

N

G

POROUS BAFFLE

FABRIC

INSTALLATION NOTES:

1.

2.

3.

POSTS TO BE MIN. OF 2'-0" IN

GROUND.

ATTACH FABRIC WIRE AND

POSTS WITH METAL RINGS ON

PLASTIC ZIP TIES (50 LB MIN.

TENSILE)

POST SHALL BE 5' (MIN.) METAL POST WEIGHING A

MIN. 1.25 LB PER LF, MANUFACTURED WITH CLIPS.

POROUS BAFFLE FABRIC SHALL BE

20 oz/sy COIR EROSION

BLANKET, COIR MESH OR SIMILAR,

TRENCHED INTO BOTTOM OR SIDE

O

C

GALVANIZED WOVEN

WIRE FIELD FENCE, 14

GAUGE, WITH 6"

MAXIMUM VERTICAL

STAY SPACING

9 GAUGE

FABRIC

TENSION

WIRE (TYP)

M

I N

FABRIC INSTALLATION

11 GAUGE LANDSCAPING

STAPLES

12" LONG

12" SPACING

MAINTENANCE NOTES:

1. INSPECT BAFFLES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL.

MAKE ANY REQUIRED REPAIRS IMMEDIATELY.

2. BE SURE TO MAINTAIN ACCESS TO THE BAFFLES. SHOULD THE FABRIC OF A

BAFFLE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE,

REPLACE IT PROMPTLY.

3. REMOVE SEDIMENT DEPOSITS WHEN IT REACHES HALF FULL, TO PROVIDE

ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE

PRESSURE ON THE BAFFLES.

4. TAKE CARE TO AVOID DAMAGING THE BAFFLES DURING CLEANOUT, AND

REPLACE IF DAMAGED.

5. DURING CLEANOUT OPERATIONS. SEDIMENT DEPTH SHOULD NEVER

EXCEED HALF THE DESIGNED STORAGE DEPTH.

6. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY

STABILIZED, REMOVE ALL BAFFLE MATERIALS AND UNSTABLE SEDIMENT

DEPOSITS, BRING THE AREA TO GRADE, AND STABILIZE IT

SKIMMER

A1

NOT TO SCALE

SKIMMER SEDIMENT BASIN

C1

NOT TO SCALE

SEDIMENT BAFFLE

A3

NOT TO SCALE

3'-0" MIN.

TEMPORARY STOCKPILE AREA

STOCKPILE

A4

NOT TO SCALE

440 S. CHURCH STREET, SUITE 1000

CHARLOTTE, NC 28202

TEL (704)338-6700

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N

O

F

T

H E

A V

Y N

A V

A L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

N D

DRAWFORM REVISION: 17 APRIL 2018

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

A

TL

A N

TI

C

C A

M P

L E

J E

U N

E

J A

C K

S O

N V

I L L E

N

C

UNCLASSIFIED

UNCLASSIFIED

U N

C L A

S S

I F

I E

D

M I D

L A

C

I

C

O R

E

P

M

A R

IN

E

R A

ID

E

R H

E A

D Q

U A

R

TE

R S

M A

R S

O C

J A

C K

S O

N V

I L

L E

N

O R

H

C

A R

O L

I N

A

1603164

S Y

M

D E

S C

R I P

T I O

N D

A T

E A

P P

R

SGL/RMS

EJA

DLB

C-513

AS NOTED

ER

O

SI

O

N

CO

NT

RO

L

DE

TA

IL

S

12794273

22854

RMBARM

JCC

Sheets and Views
C-513 EROSION CONTROL DETAILS