CG103.pdf

PDF 2 MB Posted

Attached to
P1395 SOF MARINE RAIDER REGIMENT HQ, MCAS, CAMP LEJEUNE
Solicitation number
N40085-19-R-9148
Issued by

About this file

This solicitation is for the construction of Marine Raider Regiment Headquarters facilities at Marine Corps Air Station Camp Lejeune. The project scope includes constructing 2,788 square meters of headquarters buildings and support structures, along with associated site utilities, parking, roadways, trails, and stormwater management features. The structures will be single-story steel buildings with brick, metal panels and standing seam roofs. Special requirements include withstanding soil surcharge loads and implementing stormwater best management practices. Electrical, mechanical, plumbing and information systems will be designed and installed to support the facilities. The project will provide antiterrorism/force protection features and adhere to Department of Defense and Marine Corps security standards. Low-impact development approaches and geospatial data surveying services are also included. The Department of the Navy Naval Facilities Engineering Command issued the solicitation.

View the file

Other files

File Type Posted
C-514.pdf PDF
CE106.pdf PDF
C-513.pdf PDF
CG107.pdf PDF
CD04-20201022 GER P1395 Marine Raider Bn HQS R4 -ALZ Sealed.pdf PDF
CG108.pdf PDF
REVISION 001.pdf PDF
B-104.pdf PDF
C-507.pdf PDF
B-103.pdf PDF
B-102.pdf PDF
CE103.pdf PDF
B-101.pdf PDF
C-515.pdf PDF
CE102.pdf PDF
AMENDMAENT 0004 FOR P1395.pdf PDF
01 30 01.00 22.pdf PDF
P1395 08052020 Arch Revisions.pdf PDF
20_0622_P1395_Marine-Raider_HQ_FInal_Interior_Sheets.pdf PDF
P-1395-E-Revision 1_2020-08-05.pdf PDF
P1395 AMENDMENT 0003.pdf PDF
P1395 MARINE RAIDER FF-E Est Cost Summary_FINAL_20_0810.pdf PDF
09 69 13.pdf PDF
Part 1-P1395 BVD Request for Pricing Bid Form Spreadsheet.pdf PDF
UPDATED P1395 BID SCHEDULE.pdf PDF
P1395 PPI LOG 03.pdf PDF
AMENDMENT 0002 FOR P1395.pdf PDF
PPI LOG 02 Document..pdf PDF
P1395 SOF PPIs LOG 01.pdf PDF
10 51 00.pdf PDF
13 42 75.pdf PDF
AMENDMENT 0001 P1395.pdf PDF
1603164spc01of01.pdf PDF
Attachment E - Past Performance Questionnaire.docx DOCX document
Attachment F - Small Business Subcontracting Plan.docx DOCX document
1603164dwg01of03.pdf PDF
ATTACHMENT G P1395 PRICE PROPOSAL FORM.pdf PDF
1603164dwg03of03.pdf PDF
Attachment B - Construction Experience Project Data Sheet.docx DOCX document
Attachment D - Small Business Participation and Commitment Strategy.docx DOCX document
1603164dwg02of03.pdf PDF
P1395 RFP for N40085-19-R-9148.pdf PDF
Attachment A - Pre-Proposal Inquiries Form.xlsx XLSX spreadsheet
Attachment C - Small Business Subcontracting Record.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L O

D

L O

D

L

O

D

L O

D

L O

D

L O

D

L O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

X

X

X

X

X

X

X

X

X

X

X

X

WETLAND

WETLAND

50' WETLAND BUFFER (TYP)

B

U

F

F

E

R

100' STREAM BUFFER (TYP)

TOP OF LEVEL

SPREADER = 16.00

S

L O

P

E

P

R

O

T

E

C

T

I O

N

C

O

CO

CO

C

O

D

P-1395

SKIMMER SEDIMENT

BASIN/SAND FILTER

FOREBAY

SANDFILTER

LEVEL

SPREADER/

VEGETATED

FILTER

STRIP

C

B

C

B

C

B

FFE = 27.5

W

W

W

W

W

W

W

W

W

R

C

P

18" RCP

R

C

P

P

P

P

P

P

P

P

P

P

G

G

G

G

G

6" PVC COLLECTOR PIPE @ 0.5%

P

E

R

F

O

R

A

T

E

D

P

V

T

Y

P

R

E

F

O

T

A

I L

A

C

27.50

27.40

27.50

27.50

27.30

27.35

27.35

27.35

27.35

27.50

27.40

DI-A5

DI-A4

DI-A6

DI-A2

CB-B3

DI-B3.1

DI-B2.2

CB-B2

CB-B2.1

SF OCS

FES-A1

FES-B1

SF MH

DI-A3

27.50

27.50

27.50

27.50

27.50

27.50

27.20

26.60

26.75

26.45

26.75

26.75

26.85

26.85

26.80

26.60

H

L

L

E

C

T

I

F

U

N

D

A

T

I

N

A

I

N

A

G

E

OUTLET

PROTECTION

A5

C-509

OUTLET

PROTECTION

A5

C-509

23.76

23.46

22.84

22.50

23.50

23.50

25.50

23.69

24.33

14.50

26.50

23.50

22.75

22.13

CO

CO-C1

CO

CO-C2

CO

CO-C3

CO

CO-C4

18" RCP

CO

CO-C9

SF FES

'STORM B' STRUCTURE DATA

STRUCTURE RIM

CB-B2

CB-B2.1

CB-B3

CB-B4

DI-B2.2

DI-B3.1

DI-B4.1

DI-B5

302723.69

302852.13

302758.78

302707.27

302863.07

302888.76

2468529.19

2468456.11

2468591.17

2468511.71

2468384.86

2468492.09

23.00

26.70

22.90

23.10

26.10

26.50

18.44 (SW) 18" RCP

18.44 (NW) 18" RCP

21.43 (NE) 18" RCP

21.43 (W) 18" RCP

18.60 (SW) 8" HDPE COLLECTOR

17.90 (SE) 24" RCP

21.23 (SE) 18" RCP

18.28 (S) 18" RCP

18.56 (NE) 18" RCP

21.70 (E) 18" RCP

21.69 (SW) 18" RCP

FES-B1 302642.33 2468532.26 17.00 (NE) 24" RCP

302680.74 2468562.05 22.00

17.36 (NW) 24" RCP

17.86 (E) 18" RCP

17.86 (N) 18" RCP

17.26 (SW) 24" RCP

302673.00 2468598.83 21.80

18.05 (W) 18" RCP

NORTHING EASTING

INV. IN INV. OUT

'STORM B' PIPE DATA

PIPE DESC LENGTH SLOPE

START

STRUCTURE

END

STRUCTURE

24" RCP

24" RCP

18" RCP

18" RCP

18" RCP

18" RCP

18" RCP

18" RCP

0.53%

1.0%

0.5%

1.89%

0.5%

0.38%

0.5%

0.5%

FES-B1

CB-B2

CB-B2

CB-B3

CB-B2

CB-B4

CB-B3

CB-B4

CB-B2

CB-B3

DI-B2.2

CB-B4

CB-B2.1

DI-B4.1

DI-B3.1

DI-B5

4" HDPE

4" HDPE

4" HDPE

4" HDPE

1.00%

1.00%

1.00%

1.00%

CO-C2

CO-C1

CO-C4

CO-C3

8" HDPE COLLECTOR

8" HDPE COLLECTOR

8" HDPE COLLECTOR

8" HDPE COLLECTOR

'STORM C' PIPE DATA

PIPE DESC LENGTH SLOPE

START

STRUCTURE

END

STRUCTURE

8" HDPE 152 2.00% CO-C9 DI-B3.1

'STORM C' STRUCTURE DATA

STRUCTURE RIM

CO-C2

CO-C3

CO-C4

CO-C1

NORTHING

302665.67

302650.48

302634.29

302680.87

EASTING

2468444.78

2468424.93

2468405.08

2468464.64

26.78

26.78

26.78

INV. IN

20.16 (NW) 4" HDPE

20.66 (NW) 4" HDPE

21.16 (NW) 4" HDPE

19.66 (SE) 4" HDPE

INV. OUT

20.16 (SE) 4" HDPE

20.66 (SE) 4" HDPE

21.16 (SE) 4" HDPE

26.77

19.66 (NW) 4" HDPE

CO-C9

302614.15 2468390.15 26.38

21.64 (SE) 8" HDPE

'SF STORM' PIPE DATA

PIPE DESC

18" RCP

18" RCP

LENGTH

SLOPE

1.10%

2.46%

START

STRUCTURE

SF MH

SF MH

END

STRUCTURE

SF FES

SF OCS

'SF STORM' STRUCTURE DATA

STRUCTURE

SF FES

SF MH

SF OCS

NORTHING

302491.17

302479.87

302490.13

EASTING

2468604.76

2468600.85

2468567.08

RIM

19.38

19.00

INV. IN

14.50 (S) 18" RCP

14.63 (W) 18" RCP

INV. OUT

14.63 (N) 18" RCP

15.50 (E) 18" RCP

REFER TO SHEET CG102 FOR STORM SYSTEM 'A' AND CONTINUANCE

OF STORM SYSTEM 'C' DATA TABLES.

REFER TO SHEET CG201 AND CG202 FOR STORM SYSTEM PROFILES

COMPLETE WITH DETAILED STATIONING, INVERT, PIPE CROSSING, AND

GRADE INFORMATION OF THE STORM SYSTEMS.

440 S. CHURCH STREET, SUITE 1000

CHARLOTTE, NC 28202

TEL (704)338-6700

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

T

A V

Y N

A V

A L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

N D

DRAWFORM REVISION: 17 APRIL 2018

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

A

TL

A N

TI

C

C A

M

L

J E

U N

E

J A

C K

S O

N V

I L L E

N

C

UNCLASSIFIED

UNCLASSIFIED

U N

C L A

S S

I F

I E

D

M I D

L A

I

C

O R

E

P

M

A R

IN

E

R A

ID

E

R H

E A

D Q

U A

R

TE

R S

M A

R S

O C

J A

C K

S O

N V

I L

L E

N

O R

A R

O L

I N

A

1603164

S Y

M

D E

S C

R I P

T I O

N D

A T

E A

P P

R

SGL/RMS

EJA

DLB

MATCHLINE: SEE SHEET CG102 FOR CONTINUATION

1. SEE SHEETS CS201 FOR CENTERLINE PROFILES.

2. SEE SHEETS CG201 AND CG202 FOR STORM SYSTEM

PROFILES.

3. TWO (2) 12" DIP STORM LINES @ 0% SLOPE WITH

INVERTS OF 17.00. BASINS ARE TO REMAIN

SEPARATE UNTIL EXCESS SEDIMENT HAS BEEN

REMOVED FROM THE SKIMMER SEDIMENT BASIN

AND PERMANENT STABILIZATION HAS BEEN

INSTALLED THROUGHOUT THE ENTIRE SITE. PIPES

ARE TO BE INSTALLED ONLY FOLLOWING AN INITIAL

INSPECTION FROM NCDEQ DEEMING THE

INSTALLATION OF THE PIPES ACCEPTABLE BASED

ON PERMANENT STABILIZATION OF THE SITE.

4. TRANSFORMER PAD, REFER TO ELECTRICAL

DRAWINGS. PAD ELEVATION = 27.0

5. GENERATOR PAD, REFER TO ELECTRICAL

DRAWINGS. PAD ELEVATION = 27.0

6. CHILLER PAD, REFER TO ELECTRICAL DRAWINGS.

PAD ELEVATION = 27.0

7. TREELINE SHOWN OFFSET FROM LIMITS OF

DISTURBANCE FOR GRAPHICAL CLARITY. NO

DISTURBANCE IS TO OCCUR WITHIN THE 50'

WETLAND BUFFER.

8. EMERGENCY SPILLWAY.

9. HDPE FOUNDATION UNDER SLAB DRAINAGE. SEE

SHEET A-100 FOR MORE INFORMATION.

10. HDPE FOUNDATION FRENCH DRAIN. SEE SHEET

A-100 FOR MORE INFORMATION.

11. TIE FOUNDATION DRAINAGE COLLECTOR PIPE TO

STORM DRAINAGE STRUCTURE. ENSURE POSITIVE

DRAINAGE OF OF FOUNDATION DRAINAGE PIPING.

12. BMP UNDERDRAIN. DAYLIGHT AT ELEV. 16.0 AS

SHOWN.

NOT TO SCALE

KEYMAP

RMBARM

JCC

CG103

1" = 30'

G

RA

DI

NG

A

ND

D

RA

IN

AG

E

PL

AN

CG101

CG102

CG103

30' 60'0

GRADING AND DRAINAGE PLAN 3

1" = 30'

GENERAL SHEET NOTES

NEW WORK KEYNOTES

A2

C-507

C1

C-511

N

C1

C-507

D3

C-507

A2

C-507

12794241

22822

A. SEE GRADING AND DRAINAGE NOTES ON SHEET

CG101.

B. REFER TO SHEET CG102 FOR STORM PIPE AND

STRUCTURE TABLE FOR STORM SYSTEM 'A'.

C. REFER TO DETAIL A4/C-502 FOR DI.

D. REFER TO DETAIL A1/C-503 AND C1/C-503 FOR CB.

E. REFER TO DETAIL A4/C-503 AND C4/C-503 FOR MH.

F. REFER TO DETAIL D2/C-505 FOR CO.

G. REFER TO DETAIL C1/C-504 FOR FES.

H. ALL DRAINAGE STRUCTURES MUST BE

SUPPORTED ON 12" MINIMUM BEDDING OF #57

STONE UNDERLAIN BY DRAINAGE GEOTEXTILE.

C2

C-505

Sheets and Views
CG103 GRADING AND DRAINAGE PLAN 3

File details come from the government source that posted it. Updated .