This document provides details for a federal construction contract solicitation and erosion control plan. The solicitation seeks construction of 2,788 square meters of headquarters facilities for a Marine Raider Regiment in Camp Lejeune, North Carolina. The structures will include single-story steel frame buildings with brick, metal siding and roofs. Special requirements include withstanding soil surcharge loads and stormwater best management practices. Electrical, mechanical, information and site systems are also specified. The erosion control plan outlines ground stabilization timeframes, techniques, material handling practices and inspection requirements to comply with the North Carolina Construction General Permit for the project.

View the file

Other files

File Type Posted
C-514.pdf PDF
CG103.pdf PDF
CE106.pdf PDF
C-513.pdf PDF
CG107.pdf PDF
CD04-20201022 GER P1395 Marine Raider Bn HQS R4 -ALZ Sealed.pdf PDF
CG108.pdf PDF
REVISION 001.pdf PDF
B-104.pdf PDF
C-507.pdf PDF
B-103.pdf PDF
B-102.pdf PDF
CE103.pdf PDF
B-101.pdf PDF
CE102.pdf PDF
AMENDMAENT 0004 FOR P1395.pdf PDF
01 30 01.00 22.pdf PDF
P1395 08052020 Arch Revisions.pdf PDF
20_0622_P1395_Marine-Raider_HQ_FInal_Interior_Sheets.pdf PDF
P-1395-E-Revision 1_2020-08-05.pdf PDF
P1395 AMENDMENT 0003.pdf PDF
P1395 MARINE RAIDER FF-E Est Cost Summary_FINAL_20_0810.pdf PDF
09 69 13.pdf PDF
Part 1-P1395 BVD Request for Pricing Bid Form Spreadsheet.pdf PDF
UPDATED P1395 BID SCHEDULE.pdf PDF
P1395 PPI LOG 03.pdf PDF
AMENDMENT 0002 FOR P1395.pdf PDF
PPI LOG 02 Document..pdf PDF
P1395 SOF PPIs LOG 01.pdf PDF
10 51 00.pdf PDF
13 42 75.pdf PDF
AMENDMENT 0001 P1395.pdf PDF
1603164spc01of01.pdf PDF
Attachment E - Past Performance Questionnaire.docx DOCX document
Attachment F - Small Business Subcontracting Plan.docx DOCX document
1603164dwg01of03.pdf PDF
ATTACHMENT G P1395 PRICE PROPOSAL FORM.pdf PDF
1603164dwg03of03.pdf PDF
Attachment B - Construction Experience Project Data Sheet.docx DOCX document
Attachment D - Small Business Participation and Commitment Strategy.docx DOCX document
1603164dwg02of03.pdf PDF
P1395 RFP for N40085-19-R-9148.pdf PDF
Attachment A - Pre-Proposal Inquiries Form.xlsx XLSX spreadsheet
Attachment C - Small Business Subcontracting Record.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

440 S. CHURCH STREET, SUITE 1000

CHARLOTTE, NC 28202

TEL (704)338-6700

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O

F

T

H E

A V

Y N

A V

A L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

N D

DRAWFORM REVISION: 17 APRIL 2018

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

A

TL

A N

TI

C

C A

M P

L E

J E

U N

E

J A

C K

S O

N V

I L L E

N

C

UNCLASSIFIED

UNCLASSIFIED

U N

C L A

S S

I F

I E

D

M I D

L A

C

I

C

O R

E

P

M

A R

IN

E

R A

ID

E

R H

E A

D Q

U A

R

TE

R S

M A

R S

O C

J A

C K

S O

N V

I L

L E

N

O R

H

C

A R

O L

I N

A

1603164

S Y

M

D E

S C

R I P

T I O

N D

A T

E A

P P

R

SGL/RMS

EJA

DLB

C-515

AS NOTED

ER

O

SI

O

N

CO

NT

RO

L

DE

TA

IL

S

NCG01 GROUND STABILIZATION AND MATERIALS HANDLING

GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH

THE NCG01 CONSTRUCTION GENERAL PERMIT

Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction.

SECTION E: GROUND STABILIZATION

Required Ground Stabilization Timeframes

Site Area Description

(a) Perimeter dikes, swales, ditches, and perimeter slopes

(b) High Quality Water (HQW) Zones

(c) Slopes steeper than 3:1

Stabilize within this many calendar days after ceasing land disturbance

Timeframe variations

None

None

If slopes are 10' or less in length and are not steeper than 2:1

(d) Slopes 3:1 to 4:1 7

-7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -7 days for Falls Lake Watershed

(e) Areas with slopes flatter than 4:1 7

-7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -7 days for Falls Lake Watershed unless there is zero slope

Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved.

GROUND STABILIZATION SPECIFICATION

Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below:

PAINT AND OTHER LIQUID WASTE

1. Do not dump paint and other liquid waste into storm drains, streams or wetlands.

2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available.

3. Contain liquid wastes in a controlled area.

4. Containment must be labeled, sized and placed appropriately for the needs of site.

5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites.

PORTABLE TOILETS

1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags.

2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas.

3. Monitor portable toilets for leaking and properly dispose of any leaked material.

Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit.

EARTHEN STOCKPILE MANAGEMENT

1. Show stockpile locations on plans. Locate earthen-material stockpile areas at least

50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available.

POLYACRYLAMIDES (PAMS) AND FLOCCULANTS

1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants.

2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures.

3. Apply flocculants at the concentrations specified in the NC DWR List of Approved

PAMS/Flocculants and in accordance with the manufacturer's instructions.

4. Provide ponding area for containment of treated Stormwater before discharging offsite.

5. Store flocculants in leak-proof containers that are kept under storm-resistant cover or surrounded by secondary containment structures.

2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile.

3. Provide stable stone access point when feasible.

4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs.

HERBICIDES, PESTICIDES AND RODENTICIDES

1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions.

2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning.

3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately.

4. Do not stockpile these materials onsite.

HAZARDOUS AND TOXIC WASTE

1. Create designated hazardous waste collection areas on-site.

2. Place hazardous waste containers under cover or in secondary containment.

3. Do not store hazardous chemicals, drums or bagged materials directly on the ground.

LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE

1. Never bury or burn waste. Place litter and debris in approved waste containers.

2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes.

3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available.

4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland.

5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers.

6. Anchor all lightweight items in waste containers during times of high winds.

7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow.

8. Dispose waste off-site at an approved disposal facility.

9. On business days, clean up and dispose of waste in designated waste containers.

CONCRETE WASHOUTS

1. Do not discharge concrete or cement slurry from the site.

2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility.

3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence.

4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail.

5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project.

6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow.

7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority.

8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location.

9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions.

10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout.

EQUIPMENT AND VEHICLE MAINTENANCE

1. Maintain vehicles and equipment to prevent discharge of fluids.

2. Provide drip pans under any stored equipment.

3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project.

4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible).

5. Remove leaking vehicles and construction equipment from service until the problem has been corrected.

6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials.

PART III

PART III

SELF-INSPECTION, RECORDKEEPING AND REPORTING

SECTION A: SELF-INSPECTION

Self-inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self-inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record.

SELF-INSPECTION, RECORDKEEPING AND REPORTING

SECTION B: RECORDKEEPING

1. E&SC Plan Documentation

The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit.

The following items pertaining to the E&SC plan shall be documented in the manner described:

PART III

SELF-INSPECTION, RECORDKEEPING AND REPORTING

SECTION C: REPORTING

1. Occurrences that must be reported

Permittees shall report the following occurrences:

(a) Visible sediment deposition in a stream or wetland.

(b) Oil spills if:

· They are 25 gallons or more,

· They are less than 25 gallons but cannot be cleaned up within 24 hours,

· They cause sheen on surface waters (regardless of volume), or

· They are within 100 feet of surface waters (regardless of volume).

(a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85.

(b) Anticipated bypasses and unanticipated bypasses.

(c) Noncompliance with the conditions of this permit that may endanger health or the environment.

2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300.

2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site-specific exemption based on unique site conditions that make this requirement not practical:

(a) This general permit as well as the certificate of coverage, after it is received.

(b) Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically-available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard-copy records.

NOTE: The rain inspection resets the required 7 calendar day inspection requirement.

(c) All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41]

NCG01 SELF INSPECTION SHEET

12794275

22856

RMBARM

JCC

Sheets and Views
C-515 EROSION CONTROL DETAILS

File details come from the government source that posted it. Updated .