This document contains responses to contractor questions on a solicitation for construction of Marine Raider Regiment headquarters facilities at Marine Corps Air Station Camp Lejeune in North Carolina. The solicitation requests construction of single-story steel frame buildings with brick veneer and standing seam metal roofs, along with miscellaneous supporting structures, utilities, parking, roadways, sidewalks, running trails and site work. Electrical, mechanical and information systems are also within scope. Bidders asked about acceptable wall systems, an extension to the bid due date, clarification of CLIN structures for furniture/AV design and purchase, valve and roof panel specifications, window references, and applicability of UFC and UFGS regulations. The government declined an extension and directed bidders to bid per the RFP, responding to technical questions within the amendments.

View the file

Other files

File Type Posted
C-514.pdf PDF
CG103.pdf PDF
CE106.pdf PDF
C-513.pdf PDF
CG107.pdf PDF
CD04-20201022 GER P1395 Marine Raider Bn HQS R4 -ALZ Sealed.pdf PDF
CG108.pdf PDF
REVISION 001.pdf PDF
B-104.pdf PDF
C-507.pdf PDF
B-103.pdf PDF
B-102.pdf PDF
CE103.pdf PDF
B-101.pdf PDF
C-515.pdf PDF
CE102.pdf PDF
AMENDMAENT 0004 FOR P1395.pdf PDF
01 30 01.00 22.pdf PDF
P1395 08052020 Arch Revisions.pdf PDF
20_0622_P1395_Marine-Raider_HQ_FInal_Interior_Sheets.pdf PDF
P-1395-E-Revision 1_2020-08-05.pdf PDF
P1395 AMENDMENT 0003.pdf PDF
P1395 MARINE RAIDER FF-E Est Cost Summary_FINAL_20_0810.pdf PDF
09 69 13.pdf PDF
Part 1-P1395 BVD Request for Pricing Bid Form Spreadsheet.pdf PDF
UPDATED P1395 BID SCHEDULE.pdf PDF
P1395 PPI LOG 03.pdf PDF
AMENDMENT 0002 FOR P1395.pdf PDF
P1395 SOF PPIs LOG 01.pdf PDF
10 51 00.pdf PDF
13 42 75.pdf PDF
AMENDMENT 0001 P1395.pdf PDF
1603164spc01of01.pdf PDF
Attachment E - Past Performance Questionnaire.docx DOCX document
Attachment F - Small Business Subcontracting Plan.docx DOCX document
1603164dwg01of03.pdf PDF
ATTACHMENT G P1395 PRICE PROPOSAL FORM.pdf PDF
1603164dwg03of03.pdf PDF
Attachment B - Construction Experience Project Data Sheet.docx DOCX document
Attachment D - Small Business Participation and Commitment Strategy.docx DOCX document
1603164dwg02of03.pdf PDF
P1395 RFP for N40085-19-R-9148.pdf PDF
Attachment A - Pre-Proposal Inquiries Form.xlsx XLSX spreadsheet
Attachment C - Small Business Subcontracting Record.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO. N40085‐19‐R‐9148

PROJECT TITLE/LOCATION: Q1395, MARINE RAIDERS REDIMENT HQ,

MARINE CORPS AIR STATION, CAMP LEJEUNE, NORTH CAROLINA

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

I‐615

Notes

Notes call out Dirtt Modular wall systems. Will other manufactures be allowed and if so will a specification be forthcoming .

SEE AMENDMENT

AMEND 0001 AND AMEND

With the amount of bids and bid packages at camp Lejeune subs are requesting a 2 week extension to be able to bid the project. With the limited supply of subcontractors available for bid it is imperative to get every bid possible for the government. The Bid Proposal due date will remains Unchanged AMEND 0002

BID form

Bid form Clins 0002 Option 1 Calls for price to provide best value

Furniture, fixtures and equipment FF&E package for the project. 0003

Option item 2 states design and provide the final best value A/V package for the project. 0004 Planned modification Item 1 is a goverment

Estimate modification for FF&E. 0005 Planned modification item 2 is a goverment Estimate for A/V. The bid form states that Award will be made on the total sum of 0001, 0002, 0003, 0004 and 0005. IS this correct? are 0002 and 0003 the same as 0004 and 0005 except for being best value? Please clarify CLIN 0002 and 0003 are for the FF&E Designer and AV

Designer Services. CLIN 0004 and 0005 is for the purchase of the FF&E and AV packages. AMEND 0002

Sheet M401shows Valves but are not labled some look like possible butterfly and some like ball valves could you please clarify?

All valves shown are isolation valves and shall be valve types per RFP specifications. AMEND 0002

13 34 19

“Please confirm the roofing metal panels including in the metal building spec section 13 34 19 are in fact suppose to be aluminum and not steel.

Metal roof manufactures do not provide aluminum metal panels as part of their assembly”.

PEMB is acceptable with aluminum panel enclosure system, see 13 34 19. AMEND 0002

CU 102

Sheet CU102 Keynote 15 Sewer Pump. Refer to Mechanical Plans.

Actually the Sewer Pump and Valve Box are shown on the Plumbing

Plans. Is this correct and if so is the plumber to pick up this section as it is also shown on Civil? General contrator is responsible for division of work AMEND 0002

On the landscape drawings, it is not shown where a meter and backflow preventor is located in order to water the sod and associated vegitation.

Please provide a drawing where this is located if needed.

Refer to Specification Sections (Exterior Improvements); Refer to Plumbing Drawing Series. AMEND 0002

Will there be a specification for the roof panels coming? PEMB is acceptable with aluminum panel enclosure system, see 13 34 19. AMEND 0002

We do not see the windows that are associated with specification section

08 56 63. Please advise. See A‐401 and A‐402, see keynote A56. AMEND 0002

Will there be an extension per previous question # 3 The bid proposal due date will remain unchanged. AMEND 0002

Because this facility is owned by the United States Federal Government, and is utilized as a Regiment HQ, we understand that Unified Facilities

Criteria (“UFC”) 3‐520‐01 and Unified Facilities Guide Specifications

(UFGS) Section 26 05 19.00 2.1.3.1 shall apply for purposes of competitive bidding and project execution. To ensure that the project is bid and constructed in accordance with the applicable regulations and requirements, please confirm that UFC 3‐520‐01 and UFGS 26 05 19.00

2.1.3.1 shall apply to this project. Specifically, please confirm that bidders are permitted to utilize the type(s) of material(s) described in

UFC 3‐520‐01 and UFGS 26 05 19.00 2.1.3.1 applicable to their scope of work despite any potentially contradictory provisions in the design plans and specifications.

Wayne J. Griffin Electric, Inc. requests that you advise us in writing by issuing an addendum to clarify these issues. A timely response will ensure an accurate and complete bid. Thank you for your immediate attention in this crucial matter. If you have any questions or need further information, please do not hesitate to contact me at (508) 306‐5480. I look forward to discussing the project with you in the near future.

James Burtt, Estimator ‐ Wayne J. Griffin Electric, Inc. 116 Hopping Brook

Road, Holliston, MA 01746 JBurtt@WJGEI.com Bid per RFP. AMEND 0002

Due to the subcontractors market with other bids and now with the upcoming Hurricane we are requesting a time extention of 2 weeks, Please The bid proposal due date will remain unchanged. AMEND 0002

Please consider releasing all PPIs submitted by other firms for consideration by all bidders.

All contractor PPIs are responded to and incorporated into the appropriate amendment. AMEND 0002

Posted on Amend No.

REFERENCE

QUESTION

GOVERNMENT RESPONSE

July 2011