This document contains responses to contractor questions on a solicitation for construction of Marine Raider Regiment headquarters facilities at Marine Corps Air Station Camp Lejeune in North Carolina. The solicitation requests construction of single-story steel frame buildings with brick veneer and standing seam metal roofs, along with miscellaneous supporting structures, utilities, parking, roadways, sidewalks, running trails and site work. Electrical, mechanical and information systems are also within scope. Bidders asked about acceptable wall systems, an extension to the bid due date, clarification of CLIN structures for furniture/AV design and purchase, valve and roof panel specifications, window references, and applicability of UFC and UFGS regulations. The government declined an extension and directed bidders to bid per the RFP, responding to technical questions within the amendments.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO. N40085‐19‐R‐9148
PROJECT TITLE/LOCATION: Q1395, MARINE RAIDERS REDIMENT HQ,
MARINE CORPS AIR STATION, CAMP LEJEUNE, NORTH CAROLINA
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
I‐615
Notes
Notes call out Dirtt Modular wall systems. Will other manufactures be allowed and if so will a specification be forthcoming .
SEE AMENDMENT
AMEND 0001 AND AMEND
With the amount of bids and bid packages at camp Lejeune subs are requesting a 2 week extension to be able to bid the project. With the limited supply of subcontractors available for bid it is imperative to get every bid possible for the government. The Bid Proposal due date will remains Unchanged AMEND 0002
BID form
Bid form Clins 0002 Option 1 Calls for price to provide best value
Furniture, fixtures and equipment FF&E package for the project. 0003
Option item 2 states design and provide the final best value A/V package for the project. 0004 Planned modification Item 1 is a goverment
Estimate modification for FF&E. 0005 Planned modification item 2 is a goverment Estimate for A/V. The bid form states that Award will be made on the total sum of 0001, 0002, 0003, 0004 and 0005. IS this correct? are 0002 and 0003 the same as 0004 and 0005 except for being best value? Please clarify CLIN 0002 and 0003 are for the FF&E Designer and AV
Designer Services. CLIN 0004 and 0005 is for the purchase of the FF&E and AV packages. AMEND 0002
Sheet M401shows Valves but are not labled some look like possible butterfly and some like ball valves could you please clarify?
All valves shown are isolation valves and shall be valve types per RFP specifications. AMEND 0002
13 34 19
“Please confirm the roofing metal panels including in the metal building spec section 13 34 19 are in fact suppose to be aluminum and not steel.
Metal roof manufactures do not provide aluminum metal panels as part of their assembly”.
PEMB is acceptable with aluminum panel enclosure system, see 13 34 19. AMEND 0002
CU 102
Sheet CU102 Keynote 15 Sewer Pump. Refer to Mechanical Plans.
Actually the Sewer Pump and Valve Box are shown on the Plumbing
Plans. Is this correct and if so is the plumber to pick up this section as it is also shown on Civil? General contrator is responsible for division of work AMEND 0002
On the landscape drawings, it is not shown where a meter and backflow preventor is located in order to water the sod and associated vegitation.
Please provide a drawing where this is located if needed.
Refer to Specification Sections (Exterior Improvements); Refer to Plumbing Drawing Series. AMEND 0002
Will there be a specification for the roof panels coming? PEMB is acceptable with aluminum panel enclosure system, see 13 34 19. AMEND 0002
We do not see the windows that are associated with specification section
08 56 63. Please advise. See A‐401 and A‐402, see keynote A56. AMEND 0002
Will there be an extension per previous question # 3 The bid proposal due date will remain unchanged. AMEND 0002
Because this facility is owned by the United States Federal Government, and is utilized as a Regiment HQ, we understand that Unified Facilities
Criteria (“UFC”) 3‐520‐01 and Unified Facilities Guide Specifications
(UFGS) Section 26 05 19.00 2.1.3.1 shall apply for purposes of competitive bidding and project execution. To ensure that the project is bid and constructed in accordance with the applicable regulations and requirements, please confirm that UFC 3‐520‐01 and UFGS 26 05 19.00
2.1.3.1 shall apply to this project. Specifically, please confirm that bidders are permitted to utilize the type(s) of material(s) described in
UFC 3‐520‐01 and UFGS 26 05 19.00 2.1.3.1 applicable to their scope of work despite any potentially contradictory provisions in the design plans and specifications.
Wayne J. Griffin Electric, Inc. requests that you advise us in writing by issuing an addendum to clarify these issues. A timely response will ensure an accurate and complete bid. Thank you for your immediate attention in this crucial matter. If you have any questions or need further information, please do not hesitate to contact me at (508) 306‐5480. I look forward to discussing the project with you in the near future.
James Burtt, Estimator ‐ Wayne J. Griffin Electric, Inc. 116 Hopping Brook
Road, Holliston, MA 01746 JBurtt@WJGEI.com Bid per RFP. AMEND 0002
Due to the subcontractors market with other bids and now with the upcoming Hurricane we are requesting a time extention of 2 weeks, Please The bid proposal due date will remain unchanged. AMEND 0002
Please consider releasing all PPIs submitted by other firms for consideration by all bidders.
All contractor PPIs are responded to and incorporated into the appropriate amendment. AMEND 0002