About this file

Amendment 005 Answers to PPI's and changes

View the file

Other files

File Type Posted
UAS_SATCOM_RELAY_PADS_AND_FACILITY_11005.docx DOCX document
AMENDMENT_0011_N33191-15-R-0802_SATCOM_Relay_Pads.pdf PDF
AMENDMENT_0010_N33191-15-R-0802_SATCOM_Relay_Pads.pdf PDF
AMENDMENT_009_N33191-15-R-0802_SATCOM_Relay_Pads.pdf PDF
AMENDMENT_008_N33191-15-R-0802_SATCOM_Relay_Pads.pdf PDF
AMENDMENT_007_N33191-15-R-0802_SATCOM_Relay_Pads.pdf PDF
1118648_SPC_03-09-2015.pdf PDF
1118648_DWG_03-09-2015.pdf PDF
AMENDMENT_006_N33191-15-R-0802_SATCOM_Relay_Pads.pdf PDF
1118648_Amendment_2_Continuation_Sheet_2015-03-06.doc DOC document
AMENDMENT_004_N33191-15-R-0802_SATCOM_Relay_Pads.pdf PDF
PPI_015__Response_Attachments.pdf PDF
AMENDMENT_003_N33191-15-R-0802_SATCOM_Relay_Pads.pdf PDF
AMENDMENT_002_N33191-15-R-0802_SATCOM_Relay_Pads.pdf PDF
N62470-09-R9034_Part10-FP.pdf PDF
N62470-09-R9034_Part03-CIV.pdf PDF
N62470-09-R9034_Part02-LS.pdf PDF
N62470-09-R9034_Part05-GEO.pdf PDF
11005R_SPECS_Final-EBS_04.13.12_Vol_1.pdf PDF
11005_SPECS_Final-EBS_04.13.12_Vol_2.pdf PDF
N62470-09-R9034_Part08-AR.pdf PDF
N62470-09-R9034_Part04-CIV_(CONT).pdf PDF
N62470-09-R9034_Part11-FP_(CONT).pdf PDF
N62470-09-R9034_Part09-IN.pdf PDF
N62470-09-R9034_Part06-LAND.pdf PDF
N62470-09-R9034_Part13-ME.pdf PDF
AMENDMENT_0001N33191-15-R-0802_SATCOM_Relay_Pads.pdf PDF
N62470-09-R9034_Part14-EL.pdf PDF
N62470-09-R9034_Part07-ST.pdf PDF
N62470-09-R9034_Part12-PL.pdf PDF
N62470-09-R9034_Part01-GEN.pdf PDF
N62470-09-R9034_Part08-AR.pdf PDF
N62470-09-R9034_Part03-CIV-revised.pdf PDF
Contract_Risk_Assessment_and_QA_Responsibility_Spreadsheet-.pdf PDF
N62470-09-R9034_Part01-GEN.pdf PDF
N33191-15-R-0802_SATCOM_Relay_Pads.pdf PDF
N62470-09-R9034_Part04-CIV.pdf PDF
N62470-09-R9034_Part14-EL 1 .pdf PDF
11005R_SPECS_Final-EBS_04.13.12_Vol_1.pdf PDF
11005_SPECS_Final-EBS_04.13.12_Vol_2.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 005 to answ er PPI's

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Mar-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N33191-15-R-0802

X 9B. DATED (SEE ITEM 11)

13-Jan-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Mar-2015

CODE

NAVFAC EUROPE AFRICA SOUTHWEST ASIA

PSC 817 BOX 51

FPO AE 09622-0001

N33191 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N33191-15-R-0802

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

SUMMARY OF CHANGES

AMENDMENT 005

AMENDMENT 005 is issued to incorporate the following changes and answer PPI questions:

This list of drawings that will be changed in the next Amendment they are as follows:

Drawings:

CS100

CS103

CG103

CU103

C-400

LP103

AS100

AS400

AE100A

AE120A

AE201A

AE201B

AE202A

AE401

AE601

AE631

AG100A

AG202

AG211

IF100A

FG001

FA101

FA102

FA601

FA701

FA702

PP001

PP100A

PP611

PP612

PP801

PP802

MH002

MH101

MH102

MH103

MP101

MP102

MH401

MH402

MH403

MH404

MH502

MH503

MH504

MH505

MH506

MH509

MP501

MP503

MP505

MP506

MP509

MP601

MP602

MP603

MP605

MP606

MI701

MI702

MI703

MI704

MI706

MI707

MI708

MI715

MI716

MI717

MH801

MH802

MH803

MH804

MH805

MH806

MH807

MH808 (New) MH809 (New)

EG001

ES101

ES403

EP101

EP401

EP403

EP404

EP504

EP602

EP701

EP702

EP804

EP805

EP806

EP811

EP812

EL101

ET101

Spec Sections:

00 22 13 01 91 13.00 50 09 96 00.00 50 (New) 10 73 26.00 50 (New) 22 00 00.00 42 23 07 00.00 42 23 08 00.00 42 23 08 00.00 50 23 09 23.13 20 23 11 13.00 42 23 20 23.0042 23 30 13.00 42 23 34 16.00 42 23 64 00 (Deleted) 23 65 00 (Deleted) 23 66 00 23 81 00.00 42

23 81 23.00 20 26 32 13.00 50 28 31 76 33 61 14.00 42 (New)

QUESTION: FUEL CELL

Dwg, EP 602 - Specification Section 48 18 13.0050 and Amendment 002.

We have contacted several manufacturers of Fuel Cells in Europe and in the U.S. but so far we have not located the manufacturer who may offer a product in compliance with the contract’s requirements. Could you please provide the name and contact information of one or more manufacturers who may supply the required system?

ANSWER: Per direction from the Navy, Fuel Cell Option will be removed from the project

QUESTION: Are the K‐12 "Manual" bollards (drawings page C ‐503 ‐C2) intended to be lowered and raised as individual bollards by hand, or in sets by a push button in a guard station?

ANSWER: Manual bollards are intended to be raised and lowered manually (by hand) or by a hydraulic pump as noted in paragraph 2.1.1 of Specification 34 71 13.19. The operation can be by individual bollard or as a group. There are no requirements to provide push button operation.

QUESTION: Section 00100, Page 16 of 50, Paragraph 1.10 PREAWARD SURVEY/RESPONSIBILITY DETERMINATION - FAR §9.104. It is required that the documentation are to be submitted in this phase or must be provided in case of award?

Section 00100, Page 17 of 50, Paragraph 1.11 ANTI-MAFIA LAW. Are the Anti-Mafia Law requirements to be provided with the offer documentation or they will be provided in case of award?

ANSWER: Yes, the Responsibility Determination documentation is to be submitted at the time your firm submits the proposal. Yes, the Anti-Mafia Law requirements documentation is also submitted at the time the proposals are due.

ALL OTHER ITEMS:

Proposal due date is March 19th 2015 1400 Central European Time Bid Option #1 Fuel Cell Gas Line is removed from the solicitation

PLEASE REMEMBER TO ACKNOWLEDGE THIS AMENDMENT ON YOUR BID

SCHEDULE

(End of Summary of Changes)