AMENDMENT_005_N33191-15-R-0802_SATCOM_Relay_Pads.pdf
PDF 100 KB Posted
- Solicitation number
- N33191-15-R-0802
About this file
Amendment 005 Answers to PPI's and changes
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 005 to answ er PPI's
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Mar-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N33191-15-R-0802
X 9B. DATED (SEE ITEM 11)
13-Jan-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Mar-2015
CODE
NAVFAC EUROPE AFRICA SOUTHWEST ASIA
PSC 817 BOX 51
FPO AE 09622-0001
N33191 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N33191-15-R-0802
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
SUMMARY OF CHANGES
AMENDMENT 005
AMENDMENT 005 is issued to incorporate the following changes and answer PPI questions:
This list of drawings that will be changed in the next Amendment they are as follows:
Drawings:
CS100
CS103
CG103
CU103
C-400
LP103
AS100
AS400
AE100A
AE120A
AE201A
AE201B
AE202A
AE401
AE601
AE631
AG100A
AG202
AG211
IF100A
FG001
FA101
FA102
FA601
FA701
FA702
PP001
PP100A
PP611
PP612
PP801
PP802
MH002
MH101
MH102
MH103
MP101
MP102
MH401
MH402
MH403
MH404
MH502
MH503
MH504
MH505
MH506
MH509
MP501
MP503
MP505
MP506
MP509
MP601
MP602
MP603
MP605
MP606
MI701
MI702
MI703
MI704
MI706
MI707
MI708
MI715
MI716
MI717
MH801
MH802
MH803
MH804
MH805
MH806
MH807
MH808 (New) MH809 (New)
EG001
ES101
ES403
EP101
EP401
EP403
EP404
EP504
EP602
EP701
EP702
EP804
EP805
EP806
EP811
EP812
EL101
ET101
Spec Sections:
00 22 13 01 91 13.00 50 09 96 00.00 50 (New) 10 73 26.00 50 (New) 22 00 00.00 42 23 07 00.00 42 23 08 00.00 42 23 08 00.00 50 23 09 23.13 20 23 11 13.00 42 23 20 23.0042 23 30 13.00 42 23 34 16.00 42 23 64 00 (Deleted) 23 65 00 (Deleted) 23 66 00 23 81 00.00 42
23 81 23.00 20 26 32 13.00 50 28 31 76 33 61 14.00 42 (New)
QUESTION: FUEL CELL
Dwg, EP 602 - Specification Section 48 18 13.0050 and Amendment 002.
We have contacted several manufacturers of Fuel Cells in Europe and in the U.S. but so far we have not located the manufacturer who may offer a product in compliance with the contract’s requirements. Could you please provide the name and contact information of one or more manufacturers who may supply the required system?
ANSWER: Per direction from the Navy, Fuel Cell Option will be removed from the project
QUESTION: Are the K‐12 "Manual" bollards (drawings page C ‐503 ‐C2) intended to be lowered and raised as individual bollards by hand, or in sets by a push button in a guard station?
ANSWER: Manual bollards are intended to be raised and lowered manually (by hand) or by a hydraulic pump as noted in paragraph 2.1.1 of Specification 34 71 13.19. The operation can be by individual bollard or as a group. There are no requirements to provide push button operation.
QUESTION: Section 00100, Page 16 of 50, Paragraph 1.10 PREAWARD SURVEY/RESPONSIBILITY DETERMINATION - FAR §9.104. It is required that the documentation are to be submitted in this phase or must be provided in case of award?
Section 00100, Page 17 of 50, Paragraph 1.11 ANTI-MAFIA LAW. Are the Anti-Mafia Law requirements to be provided with the offer documentation or they will be provided in case of award?
ANSWER: Yes, the Responsibility Determination documentation is to be submitted at the time your firm submits the proposal. Yes, the Anti-Mafia Law requirements documentation is also submitted at the time the proposals are due.
ALL OTHER ITEMS:
Proposal due date is March 19th 2015 1400 Central European Time Bid Option #1 Fuel Cell Gas Line is removed from the solicitation
PLEASE REMEMBER TO ACKNOWLEDGE THIS AMENDMENT ON YOUR BID
SCHEDULE
(End of Summary of Changes)
File details come from the government source that posted it. Updated .