11005R_SPECS_Final-EBS_04.13.12_Vol_1.pdf
PDF 3 MB Posted
- Solicitation number
- N33191-15-R-0802
About this file
Specs Vol I
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORK ORDER NO.
At the
PREPARED BY:
Architectural: Mechanical:
Civil: Electrical:
Structural:
APPROVED BY:
Specifications:
For Commander, NAVFAC:
Date:
Submitted By: Date:
NAVFAC ATLANTIC
1118648
CONTRACT NO. N62470-09-R-9034
UAS SATCOM
Relay Pads and Facility
NAS II Sigonella, Sicily, Italy
RLF, Inc.
145 Lincoln Avenue
Winter Park, FL 32789
A/E Contract Number N62470-11-D-1008
Charles Hutchison, AIA Robert Silver, PE Rob Snyder, PE
Scott Fote, PE Ken Mason, PE Buford Lovett, PEFire Protection:
04/13/2012
V ia d i Sacco Pas to re n . 4 -00141 Roma Tel. +39 0697848042 Fax +39 0697848175 Mob. +39 3774246313 E-mail: n.spini@nesco.it �
HAVING REVIEWED THE INTEGRATION PACKAGE DOCUMENTS FOR THE
PROJECT “UAS SATCOM RELAY AND FACILITY, NAVAL AIR STATION II,
SIGONELLA, SICILY, ITALY”, I DECLARE THAT THE INTEGRATION DESIGN
DOCUMENTS INCLUDED HEREIN COMPLY WITH THE PRESCRIPTIONS
CONTAINED IN THE APPROVAL LETTER DATED 19/12/2013, PROT. No.
55499, RELEASED BY REGION OF SICILY ENVIRONMENTAL DEPT.,
SERVIZIO 1-VAS – V.I.A., AND WITH ALL APPLICABLE ITALIAN CODES
AND NORMS.
AVENDO ESAMINATO I DOCUMENTI DELL’INTEGRATION PACKAGE
RELATIVI AL PROGETTO “UAS SATCOM RELAY AND FACILITY, NAVAL
AIR STATION II, SIGONELLA, SICILIA, ITALIA”, ATTESTO CHE I
DOCUMENTI DELL’INTEGRATION PACKAGE QUI’ INCLUSI SONO
CONFORMI ALLE PRESCRIZIONI CONTENUTE NELLA LETTERA DI
APPROVAZIONE DATATA 19/12/2013, PROT. No. 55499, RILASCIATA DAL
DIPARTIMENTO DELL’AMBIENTE DELLA REGIONE SICILIA, SERVIZIO 1-
VAS – V.I.A., ED A TUTTE LE NORME E LEGGI ITALIANE APPLICABILI.
DATE : JULY 25, 2014
Sede Legale: Via Aldo Moro 28, 03013 Ferentino (FR) C.F. e P.IVA 02812400600 – Registro Imprese C.C.I.A.A n. 146590896 del 27/12/2013
NESCO ENGINEERING
SERVICES SRLS
V ia d i Sacco Pas to re n . 4 -00141 Roma Tel. +39 0697848042 Fax +39 0697848175 Mob. +39 3774246313 E-mail: n.spini@nesco.it �
HAVING PARTICIPATED IN THE DESIGN OF PROJECT UAS SATCOM
RELAY PADS AND FACILITY, NAVAL AIR STATION II, SIGONELLA, SICILY,
ITALY, AND HAVING THOROUGHLY REVIEWED THE COMPLETE
PROJECT DOCUMENTS, I DECLARE THAT THE FACILTY DESIGN
INCLUDED HEREIN COMPLIES WITH ALL APPLICABLE ITALIAN CODES
AND LAWS.
AVENDO PARTECIPATO ALLA PROGETTAZIONE DEL PROGETTO UAS
SATCOM RELAY PADS AND FACILITY, NAVAL AIR STATION II,
SIGONELLA,SICILY, ITALY, E AVENDO ESAMINATO ACCURATAMENTE I
DOCUMENTI CONTRATTUALI COMPLETI, DICHIARO CHE IL PROGETTO
DELLE INFRASTRUTTURE QUI INCLUSE E’ CONFORME A TUTTE LE
NORME E LEGGI ITALIANE APPLICABILI.
DATE : JULY 25, 2014
Sede Legale: Via Aldo Moro 28, 03013 Ferentino (FR) C.F. e P.IVA 02812400600 – Registro Imprese C.C.I.A.A n. 146590896 del 27/12/2013
NESCO ENGINEERING
SERVICES SRLS
Issued for Construction 13 April 2012
UAS SATCOM RELAY PADS AND FACILITY 11005
Architect Charles A. Hutchison, AIA Rogers, Lovelock & Fritz, Inc.
4750 New Broad Street Orlando, FL 32814 407-730-8600
Civil Wesley Baker, P.E.
TRANSYSTEMS
World Trade Center 101 W. Main St., Suite 900 Norfolk, VA 23510
(747) 627-1112
Landscape Architect Deborah Monteferrante mai Landscape Architects, Inc.
605 Delaney Avenue Orlando, FL 32801 407-428-0654
UAS SATCOM RELAY PADS AND FACILITY 11005
Interiors Loraine A. Black, LEED AP Rogers, Lovelock & Fritz, Inc.
4750 New Broad Street Orlando, FL 32814 407-730-8600
Structural Robert D. Snyder
TRANSYSTEMS
World Trade Center 101 W. Main St., Suite 900 Norfolk, VA 23510
(747) 627-1112
Fire Protection Bufford Lovett, P.E., CBO Lovett Consultants 4455 Morris Park Drive Suite H Mint Hill, NC 28227 704-545-8383
UAS SATCOM RELAY PADS AND FACILITY 11005
Plumbing/Mechanical John E. Ball, P.E., LEED AP Rogers, Lovelock & Fritz, Inc.
4750 New Broad Street Orlando, FL 32814 407-730-8600
Electrical Kendall Mason, P.E., LEED AP Rogers, Lovelock & Fritz, Inc.
4750 New Broad Street Orlando, FL 32814 407-730-8600
Italian Consultant Nicola Pezzetta
NESCO INTERNATIONAL
Via Conca D’Oro 300/C 00141 Rome, Italy +39 (06) 886 3043
UAS SATCOM RELAY PADS AND FACILITY 11005
SECTION 00 01 15
LIST OF DRAWINGS
02/11
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
NAVFAC DRAWING TITLE
NO. NO.
GENERAL
1 14024651 GI000 COVER SHEET
2 14024652 GI001 INDEX OF DRAWINGS
3 14024653 GI002 INDEX OF DRAWINGS
4 14024654 GI010 GENERAL AND ARCHITECTURAL SYMBOLS
5 14024655 GI011 ARCHITECTURAL ABBREVIATIONS
6 14024656 GI012 REGIONAL, VICINITY, AND LOCATION MAPS
7 14024657 GC100A COMPOSITE GROUND FLOOR PLAN - LIFE
SAFETY
8 14024658 GC201 LIFE SAFETY ANALYSIS
9 14024659 GC202 LIFE SAFETY NOTES
CIVIL
10 14024660 C-001 CIVIL LEGEND AND ABBREVIATIONS
11 14024661 C-002 SURVEY CONTROL PLAN AND NOTES
12 14024662 C-003 EXISTING UTILITY STRUCTURE DATA
13 14024663 CD101 SITE DEMOLITION PLAN
14 14024664 CD102 SITE DEMOLITION PLAN
15 14024665 CD103 SITE DEMOLITION PLAN
16 14024666 CD104 SITE DEMOLITION PLAN
17 14024667 CS100 SITE LAYOUT CONTROL PLAN
18 14024668 CS101 SITE LAYOUT PLAN
19 14024669 CS102 SITE LAYOUT PLAN
20 14024670 CS103 SITE LAYOUT PLAN
21 14024671 CS104 SITE LAYOUT PLAN
22 14024672 CG101 SITE GRADING AND DRAINAGE PLAN
23 14024673 CG102 SITE GRADING AND DRAINAGE PLAN
24 14024674 CG103 SITE GRADING AND DRAINAGE PLAN
25 14024675 CG104 SITE GRADING AND DRAINAGE PLAN
26 14024676 CU101 SITE UTILITY PLAN
27 14024677 CU102 SITE UTILITY PLAN
28 14024678 CU103 SITE UTILITY PLAN
29 14024679 CU104 SITE UTILITY PLAN
30 14024680 C-400 CONCRETE PAVEMENT JOINTING PLAN AND
DETAILS
31 14024681 C-500 SITE DETAILS
32 14024682 C-501 SITE DETAILS
DOCUMENT 00 01 15 Page 1
NAVFAC DRAWING TITLE
NO. NO.
33 14024683 C-502 POWERED SLIDING CRASH GATE DETAIL
34 14024684 C-503 FENCE DETAILS
35 14024685 C-504 SITE DETAILS
36 14024686 C-505 FENCE DETAILS
37 14024687 C-506 FENCE DETAILS
38 14024688 C-507 EROSION AND SEDIMENT CONTROL DETAILS
39 14024689 C-508 EROSION AND SEDIMENT CONTROL DETAILS
40 14024690 C-509 MISCELLANEOUS DETAILS
41 14024691 C-601 UTILITY DETAILS - WATER
42 14024692 C-602 UTILITY DETAILS - SANITARY AND STORM
GEOTECHNICAL
43 14024693 B-100 SOIL BORING LOCATION PLAN
44 14024694 B-101 SOIL BORING LOGS
45 14024695 B-102 SOIL BORING LOGS
46 14024696 B-103 SOIL BORING LOGS
47 14024697 B-104 SOIL BORING LOGS
LANDSCAPE
48 14024698 LP101 LANDSCAPE PLAN
49 14024699 LP102 LANDSCAPE PLAN
50 14024700 LP103 LANDSCAPE PLAN
51 14024701 LP104 LANDSCAPE PLAN
52 14024702 LP501 LANDSCAPE DETAILS
STRUCTURAL
53 14024703 SE001 GENERAL NOTES
54 14024704 SE002 GENERAL NOTES (CONTINUED)
55 14024705 SE003 COMPONENTS AND CLADDING WIND PRESSURES
DIAGRAMS
56 14024706 SE004 TYPICAL SLAB DETAILS
57 14024707 SE005 TYPICAL WALL REINFORCING DETAILS
58 14024708 SE100A FOUNDATION/SLAB PLAN
59 14024709 SE123A ROOF TOP CHORD FRAMING PLAN
60 14024710 SE201A WALL REINFORCEMENT ELEVATIONS
61 14024711 SE202A WALL REINFORCEMENT ELEVATIONS
62 14024712 SE203A 3D VIEW ROOF FRAMING
63 14024713 SE501A SECTIONS AND DETAILS
64 14024714 SE502A SECTIONS AND DETAILS
65 14024715 SE510A SECTIONS AND DETAILS
66 14024716 SE511A SECTIONS AND DETAILS
67 14024717 SE100B GUARDHOUSE FOUNDATION/SLAB AND ROOF
FRAMING PLANS
68 14024718 SE401B WALL REINFORCEMENT ELEVATIONS
69 14024719 SE501B SECTIONS AND DETAILS
70 14024720 SE510B SECTIONS AND DETAILS
71 14024721 SE511B SECTIONS AND DETAILS
72 14024722 SE100C RADOME FOUNDATION / SLAB PLAN,
SECTIONS, AND DETAIL
73 14024723 SE401C RADOME FOUNDATION REINFORCEMENT PLAN
AND DETAILS
ARCHITECTURE
DOCUMENT 00 01 15 Page 2
NO. NO.
74 14024724 AS100 ARCHITECTURAL SITE PLAN
75 14024725 AS400 SITE ENLARGED PLANS, ELEVATIONS, AND
SECTIONS
76 14024726 AS401 GATE AND FENCE ENCLOSURE DETAILS
77 14024727 AE100A COMPOSITE GROUND FLOOR PLAN
78 14024728 AE110A COMPOSITE ROOF PLAN
79 14024729 AE120A COMPOSITE GROUND FLOOR REFLECTED
CEILING PLAN
80 14024730 AE201A EXTERIOR BUILDING ELEVATIONS
81 14024731 AE202A EXTERIOR BUILDING ELEVATIONS
82 14024732 AE301A BUILDING SECTIONS
83 14024733 AE311A WALL SECTIONS
84 14024734 AE312A WALL SECTIONS
85 14024735 AE100B GUARDHOUSE FLOOR PLANS
86 14024736 AE201B EXTERIOR BUILDING ELEVATIONS AND
BUILDING SECTIONS
87 14024737 AE311B WALL SECTIONS
88 14024738 AE401 ENLARGED FLOOR PLANS
89 14024739 AE402 ENLARGED FLOOR PLANS
90 14024740 AE403 FLOOR PATTERN PLANS
91 14024741 AE501 EXTERIOR PLAN DETAILS
92 14024742 AE505 EXTERIOR DETAILS
93 14024743 AE506 EXTERIOR DETAILS
94 14024744 AE507 EXTERIOR DETAILS
95 14024745 AE511 ROOF DETAILS
96 14024746 AE512 ROOF DETAILS
97 14024747 AE513 ROOF DETAILS
98 14024748 AE521 PARTITION TYPES
99 14024749 AE522 PARTITION TYPES
100 14024750 AE535 INTERIOR DETAILS
101 14024751 AE536 INTERIOR DETAILS
102 14024752 AE601 DOOR SCHEDULE
103 14024753 AE611 DOOR, FRAME, AND ALUMINUM FRAME
ELEVATIONS
104 14024754 AE621 DOOR DETAILS
105 14024755 AE622 DOOR DETAILS
106 14024756 AE623 ALUMINUM FRAME AND MISCELLANEOUS DOOR
DETAILS
107 14024757 AE631 WINDOW AND LOUVER ELEVATIONS
108 14024758 AE641 WINDOW DETAILS
109 14024759 AE642 WINDOW AND LOUVER DETAILS
110 14024760 AE701 MILLWORK ELEVATIONS AND DETAILS
111 14024761 AE702 MILLWORK ELEVATIONS AND DETAILS
112 14024762 AE703 INTERIOR / MILLWORK ELEVATIONS AND
DETAILS
113 14024763 AE704 INTERIOR ELEVATIONS
114 14024764 AE711 MISCELLANEOUS DETAILS
115 14024765 AE801 CEILING DETAILS
INTERIOR
116 14024766 AF601 FINISH SCHEDULE
117 14024767 AF610 FINISH IDENTIFICATION
118 14024768 AF611 FINISH IDENTIFICATION
119 14024769 AG100A SIGNAGE LOCATION PLAN- SATCOM FACILITY
120 14024770 AG100B SIGNAGE LOCATION PLAN AND ELEVATION -
GUARDHOUSE
DOCUMENT 00 01 15 Page 3
NO. NO.
121 14024771 AG201 EXTERIOR SIGNAGE ELEVATIONS
122 14024772 AG202 EXTERIOR SIGNAGE ELEVATIONS
123 14024773 AG210 INTERIOR SIGNAGE ELEVATIONS
124 14024774 AG211 INTERIOR SIGNAGE SECTIONS
125 14024775 IF100A GROUND FLOOR FURNITURE PLAN -
SATCOM FACILITY
126 14024776 IF100B GROUND FLOOR FURNITURE PLAN -
GUARDHOUSE
FIRE PROTECTION
127 14024777 FX001 FIRE PROTECTION SITE PLAN
128 14024778 FX101 FIRE PROTECTION FLOOR PLAN
129 14024779 FX102 FIRE PROTECTION DETAILS
130 14024780 FX103 FIRE PROTECTION DETAILS
131 14024781 FG001 FIRE ALARM LEGEND
132 14024782 FA101 FIRE ALARM PLAN
133 14024783 FA102 ASPIRATING SMOKE DETECTOR LAYOUT
134 14024784 FA601 FIRE ALARM RISER DIAGRAM
135 14024785 FA701 FIRE ALARM SEQUENCE OF OPERATION
MATRIX
136 14024786 FA702 FIRE ALARM SCHEDULES
PLUMBING
137 14024787 PP001 PLUMBING SYMBOLS AND ABBREVIATIONS
138 14024788 PP100A GROUND FLOOR PLUMBING PLAN -
SATCOM FACILITY
139 14024789 PP110A ROOF PLUMBING PLAN - SATCOM FACILITY
140 14024790 PP100B GROUND/ROOF FLOOR PLUMBING - GUARD
HOUSE
141 14024791 PP501 PLUMBING DETAILS
142 14024792 PP502 PLUMBING DETAILS
143 14024793 PP503 PLUMBING DETAILS
144 14024794 PP504 PLUMBING DETAILS
145 14024795 PP505 PLUMBING DETAILS
146 14024796 PP506 PLUMBING DETAILS
147 14024797 PP507 PLUMBING DETAILS
148 14024798 PP508 PLUMBING DETAILS
149 14024799 PP509 PLUMBING DETAILS
150 14024800 PP601 SANITARY RISER DIAGRAMS
151 14024801 PP611 DOMESTIC WATER RISER DIAGRAMS
152 14024802 PP612 DOMESTIC WATER RISER DIAGRAMS
153 14024803 PP801 PLUMBING SCHEDULES
154 14024804 PP802 PLUMBING SCHEDULES
MECHANICAL
155 14024805 MH001 HVAC SYMBOLS AND ABBREVIATIONS
156 14024806 MH002 HVAC SYMBOLS AND ABBREVIATIONS
157 14024807 MH003 HVAC AND PIPING TYPICAL SHEET NOTES
158 14024808 MH101 GROUND LEVEL DUCTWORK PLAN
159 14024809 MH102 MECHANICAL ROOF PLAN
160 14024810 MH103 GROUND LEVEL GUARDHOUSE PLAN
161 14024811 MP101 GROUND LEVEL PIPING PLAN
162 14024812 MP102 GROUND LEVEL PIPING PLAN BID OPTION 1
DOCUMENT 00 01 15 Page 4
NO. NO.
163 14024813 MH401 ENLARGED MECHANICAL PLANS
164 14024814 MH402 ENLARGED MECHANICAL PLANS BID OPTION 1
165 14024815 MH403 SECTIONS
166 14024816 MH404 AHU COMPONENT LAYOUT
167 14024817 MH501 HVAC DETAILS
168 14024818 MH502 HVAC DETAILS
169 14024819 MH503 HVAC DETAILS
170 14024820 MH504 HVAC DETAILS
171 14024821 MH505 HVAC DETAILS
172 14024822 MH506 HVAC DETAILS
173 14024823 MH507 HVAC DETAILS
174 14024824 MH508 HVAC DETAILS
175 14024825 MH509 HVAC DETAILS
176 14024826 MP501 HVAC PIPING DETAILS
177 14024827 MP502 HVAC PIPING DETAILS
178 14024828 MP503 HVAC PIPING DETAILS
179 14024829 MP504 HVAC PIPING DETAILS
180 14024830 MP505 HVAC PIPING DETAILS
181 14024831 MP506 HVAC PIPING DETAILS
182 14024832 MP507 HVAC PIPING DETAILS
183 14024833 MP508 HVAC PIPING DETAILS
184 14024834 MP509 HVAC PIPING DETAILS
185 14024835 MP510 HVAC PIPING DETAILS
186 14024836 MP511 HVAC PIPING DETAILS
187 14024837 MP512 HVAC PIPING DETAILS
188 14024838 MP513 HVAC PIPING DETAILS
189 14024839 MP601 SCHEMATIC FLOW DIAGRAMS
190 14024840 MP602 SCHEMATIC FLOW DIAGRAMS
191 14024841 MP603 SCHEMATIC FLOW DIAGRAMS
192 14024842 MP604 SCHEMATIC FLOW DIAGRAMS
193 14024843 MP605 SCHEMATIC FLOW DIAGRAMS
194 14024844 MP606 SCHEMATIC FLOW DIAGRAMS
195 14024845 MI701 HVAC CONTROLS
196 14024846 MI702 HVAC CONTROLS
197 14024847 MI703 HVAC CONTROLS
198 14024848 MI704 HVAC CONTROLS
199 14024849 MI705 HVAC CONTROLS
200 14024850 MI706 HVAC CONTROLS
201 14024851 MI707 HVAC CONTROLS
202 14024852 MI708 HVAC CONTROLS
203 14024853 MI709 HVAC CONTROLS
204 14024854 MI710 HVAC CONTROLS
205 14024855 MI711 HVAC CONTROLS
206 14024856 MI712 HVAC CONTROLS
207 14024857 MI713 HVAC CONTROLS
208 14024858 MI714 HVAC CONTROLS
209 14024859 MI715 HVAC CONTROLS
210 14024860 MI716 HVAC CONTROLS
211 14024861 MI717 SMOKE EXTRACTION DIAGRAM
212 14024862 MH801 MECHANICAL SCHEDULES
213 14024863 MH802 MECHANICAL SCHEDULES
214 14024864 MH803 MECHANICAL SCHEDULES
215 14024865 MH804 MECHANICAL SCHEDULES
216 14024866 MH805 MECHANICAL SCHEDULES
217 14024867 MH806 MECHANICAL SCHEDULES
218 14024868 MH807 MECHANICAL SCHEDULES
DOCUMENT 00 01 15 Page 5
NO. NO.
ELECTRICAL
219 14024869 EG001 ELECTRICAL LEGEND
220 14024870 EG002 ELECTRICAL LEGEND
221 14024871 EG003 ELECTRICAL LEGEND
222 14024872 EG004 ELECTRICAL LEGEND
223 14024873 ES100 COMPOSITE SITE PLAN
224 14024874 ES101 ELECTRICAL SITE PLAN
225 14024875 ES102 ELECTRICAL SITE PLAN
226 14024876 ES103 ELECTRICAL SITE PLAN
227 14024877 ES104 ELECTRICAL SITE PLAN
228 14024878 ES105 ELECTRICAL SITE PLAN
229 14024879 ES106 ELECTRICAL SITE PLAN
230 14024880 ES107 ELECTRICAL SITE PLAN
231 14024881 ES108 SITE LIGHTING PLAN
232 14024882 ES109 COMPOSITE SITE GROUNDING PLAN
233 14024883 ES110 COMPOSITE SECURITY SITE PLAN
234 14024884 ES401 ENLARGED ELECTRICAL SITE PLANS
235 14024885 ES402 ENLARGED ELECTRICAL SITE PLANS
236 14024886 ES403 ENLARGED ELECTRICAL SITE PLANS
237 14024887 ES501 ELECTRICAL SITE DETAILS
238 14024888 ES502 ELECTRICAL SITE DETAILS
239 14024889 ES503 ELECTRICAL SITE DETAILS
240 14024890 ES504 ELECTRICAL SITE DETAILS
241 14024891 EL101 LIGHTING PLAN
242 14024892 EL501 LIGHTING DETAILS
243 14024893 EL502 LIGHTING DETAILS
244 14024894 EL503 LIGHTING DETAILS
245 14024895 EL504 LIGHTING DETAILS
246 14024896 EL505 LIGHTING DETAILS
247 14024897 EL506 LIGHTING DETAILS
248 14024898 EL601 LIGHTING WIRING DIAGRAMS
249 14024899 EL701 LIGHTING FIXTURE SCHEDULE
250 14024900 EP101 POWER PLAN
251 14024901 EP102 ROOF POWER PLAN
252 14024902 EP201 POWER ELEVATIONS
253 14024903 EP401 ENLARGED POWER PLANS
254 14024904 EP402 ENLARGED GUARD HOUSE POWER AND
LIGHTING PLANS
255 14024905 EP403 ENLARGED POWER PLANS
256 14024906 EP404 ENLARGED POWER PLANS
257 14024907 EP501 ELECTRICAL DETAILS
258 14024908 EP502 ELECTRICAL DETAILS
259 14024909 EP503 ELECTRICAL DETAILS
260 14024910 EP504 ELECTRICAL DETAILS
261 14024911 EP505 ELECTRICAL DETAILS
262 14024912 EP506 ELECTRICAL DETAILS
263 14024913 EP507 ELECTRICAL DETAILS
264 14024914 EP508 ELECTRICAL DETAILS
265 14024915 EP601 SINGLE LINE DIAGRAM
266 14024916 EP602 SINGLE LINE DIAGRAM
267 14024917 EP603 SINGLE LINE DIAGRAM
268 14024918 EP604 OVERALL GROUNDING DIAGRAM
269 14024919 EP701 ELECTRICAL SCHEDULES
270 14024920 EP702 ELECTRICAL SCHEDULES
DOCUMENT 00 01 15 Page 6
NO. NO.
271 14024921 EP801 PANEL SCHEDULE - EH1
272 14024922 EP802 PANEL SCHEDULE - EH2
273 14024923 EP803 PANEL SCHEDULE - EH3
274 14024924 EP804 PANEL SCHEDULE - EH4
275 14024925 EP805 PANEL SCHEDULE - EH5
276 14024926 EP806 PANEL SCHEDULE - EH6
277 14024927 EP807 PANEL SCHEDULE - EH7
278 14024928 EP808 PANEL SCHEDULE - EH8 AND EL8
279 14024929 EP809 PANEL SCHEDULE - ES1 AND G1
280 14024930 EP810 PANEL SCHEDULE - ES2
281 14024931 EP811 PANEL SCHEDULE - M1
282 14024932 EP812 PANEL SCHEDULE - B1
28 14024933 EP813 PANEL SCHEDULE - EL1
284 14024934 EP814 PANEL SCHEDULE - EL3
285 14024935 EP815 PANEL SCHEDULE - UPSP1
286 14024936 EP816 PANEL SCHEDULE - UPSP2.1
287 14024937 EP817 PANEL SCHEDULE - UPSP2.2
288 14024938 EP818 PANEL SCHEDULE - UPSP3.1
289 14024939 EP819 PANEL SCHEDULE - UPSP3.2
290 14024940 EP820 PANEL SCHEDULE - RAD1 - RAD12, SAT1 -
SAT12
291 14024941 EQ101 LIGHTNING PROTECTION PLAN
292 14024942 EQ501 LIGHTNING PROTECTION DETAILS
293 14024943 ET101 COMMUNICATIONS PLAN
294 14024944 ET401 ENLARGED COMMUNICATIONS PLANS
295 14024945 ET501 COMMUNICATIONS DETAILS
296 14024946 ET502 COMMUNICATIONS DETAILS
-- End of Document --
DOCUMENT 00 01 15 Page 7
SECTION 00 22 13
SUPPLEMENTARY INSTRUCTIONS TO BIDDERS
05/11
REVISED 16 JULY 2014
PART 1 GENERAL
1.1 BID ITEM
The bid item shall be lump sum price for the following items:
0001. Price includes the following:
0001A. Price for the entire work, complete in accordance with the drawings and specifications, but excluding work described in Bid Items 0002, 0003, 0004 and 0005.
0002. Option Item No. 1 - Price includes the following:
Price for providing fuel cell system, including related absorption chiller and cooling tower, and natural gas pipeline to north side of runway;
complete in accordance with the drawings and specifications.
(Text Deleted)
0003. Option Item No 2 - Price includes the following:
Price for providing infiltration storage areas and infiltration trench;
complete in accordance with the drawings and specifications.
0004. Option Item No. 3 - Price includes the following:
Price for substituting LED lighting fixtures for the exterior site lighting; complete in accordance with the drawings and specifications.
1.2 BID NOTES
a. The Government reserves the unilateral right to award the Option(s) to the contractor at the bid price within 30 calendar days after the contract award.
b. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for the Bid Item 0001. Evaluation of options will not obligate the Government to exercise the Option(s). (FAR 52.217-5).
c. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
PART 2 PRODUCTS
Not used.
DOCUMENT 00 22 13 Page 1
PART 3 EXECUTION
Not used.
DOCUMENT 00 22 13 Page 2
SECTION 00 73 04
SUPPLEMENTARY CONDITIONS FOR PROJECTS IN MEDITERRANEAN AREA
08/08
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ITALIAN LAWS AND DECREES (D.M.)
LAW No. 1086 (May 11, 1971) Norms for Works in Reinforced Concrete and Steel and Application Instructions
D.P.R. 380 (6 June 2001) Consolidation Act of Legislative Norms and Reglations in Building Trade Matters
LAW 10/91 (9 January, 1991) Norms of the Implementation of the National Energy Plan on Energy Rational Use, Energy Saving and Development of Renewable Energy Sources
D.M. 37/2008 (22 January 2008) Requirements for System Installation Inside the Buildings
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Gate Entry Pass, Vehicle Pass; Application For; G
Contractor Employee Base Access Pass; G
Chamber of Commerce Certificate of Membership; G
Family Status and Residency Certificate; G
SD-11 Closeout Submittals
Certificate of compliance for all contract work; G
Certified credentials of proposed testing personnel; G
Certification of the static load tests results; G
Certification of actual testing personnel; G
DOCUMENT 00 73 04 Page 1
Certificate of conformity for electrical system; G
Certificate of compliance for heating system; G
Certificate of compliance for fire prevention system; G
Certificate for elevator system test(s); G
1.3 PUBLIC RELEASE OF INFORMATION
1.3.1 Prohibition
There shall be no public release of information or photographs concerning any aspect of the materials or services relating to this bid, contract, or purchase order or other documents resulting therefrom without the prior written approval of the Contracting Officer.
1.3.2 Subcontracts and Purchase Orders
The Contractor agrees to insert the substance of above paragraph "Prohibition" in each subcontract and purchase order generated for this contract.
1.4 ENGLISH SPEAKING REPRESENTATIVE
At all times when any performance of the work at the site is being conducted by any employee of the Contractor or his subcontractors, the Contractor shall have a representative present on the site who is capable of explaining the work operations and receiving instructions in the English language. The Contracting Officer shall have the right to determine without appeal of such decision, whether the proposed representative has sufficient technical and lingual capabilities and the Contractor shall immediately replace any individual not acceptable to the Contracting Officer. The Construction Contractor's qualified Project Manager, on-site Superintendent, Quality Control Manager, and Quality Control Specialist shall be fluent (can read, speak, and write) in both English and Italian languages.
1.5 NORMS AND LAWS
In case of differences between project specifications or the accompanying drawings and referenced norms and laws, norms and laws shall govern. In case of differences between project specifications and the accompanying drawings, the specifications shall govern.
1.6 INDUSTRY STANDARDS
When both U.S. and European, or Italian, Industry Standards are applicable to this project and the standards are in conflict with each other, the most stringent of the industry shall govern.
1.7 PROHIBITED ITEMS
Use of the following items in this construction project is prohibited:
a. Use of aluminum for electrical conductors.
b. Embedding aluminum conduit in concrete.
DOCUMENT 00 73 04 Page 2
c. Use of fluorescent light ballasts and other products containing PCB's.
d. Use of urea-formaldehyde foam insulation products.
e. Use of any paint/coatings having a lead content of over 0.06 percent by weight of non-volatile content. The use of ozone depleting chemicals is prohibited. The use of zinc-chromate is prohibited.
f. The use of materials containing asbestos is prohibited.
1.8 PROPRIETARY NAMES
Manufacturer's proprietary names indicated for colors, textures and patterns of materials are for the purpose of color, texture and pattern selection only. Other manufacturers materials are acceptable and provided they closely approximate colors, textures and patterns indicated and provided they conform to all other requirements subject to Contracting Officer's approval.
1.9 SUBMITTAL OF PROOF OF QUALIFICATIONS AND EXPERIENCE
Where qualifications or experience requirements are set forth in the specifications with respect to equipment and equipment installers, written proof of such qualifications or experience must be provided within thirty
(30) calendar days after Contract award, and before placing any order for such equipment or before dispatching equipment installers to the project site.
1.10 ORAL MODIFICATION
No oral statement of any person other than the Contracting Officer as provided in the clause in this Contract entitled FAR 52.243-4 "Changes" (AUG 1987), shall in any manner or degree modify or otherwise affect the terms of this Contract.
1.11 NO WAIVER BY GOVERNMENT
The failure of the Government, in any one or more instances, to insist upon the strict performance of any of the terms of this Contract or to exercise any option herein conferred shall not be construed as a waiver or relinquishment to any extent of the right to assert or rely upon such terms or option on any future occasion.
1.12 FINAL GOVERNING STANDARDS (FGS)
Final Governing Standards (FGS) for environmental protection at DOD installations and facilities in Italy went into effect June 1994. These standards were developed by comparing and adopting the more protective requirements of the Overseas Environmental Baseline Guidance Document (OEBGD), European Union and national, regional, and local environmental laws and regulations. The FGS are applicable to work under this contract.
The FGS (both English and local language versions) may be reviewed at the ROICC Office during normal business hours.
1.13 SECURITY REQUIREMENTS
The Contractor shall be responsible for furnishing each employee, and for
DOCUMENT 00 73 04 Page 3 requiring that each employee engaged in the project, display such identification as may be approved and directed by the Contracting Officer.
Every employee of the prime contractor, all subcontractor employees, and all material suppliers' employees, who require access to the base for any reason and for any length of time will be required to obtain a base access pass.
In order to obtain a base access pass, the Contractor must complete a "Gate Entry Pass, Vehicle Pass; Application For", available at the office of the Contracting Officer, and present to the Base Security Officer for approval. The following documents are required from each worker at time of presentation of completed application form:
a. "Carta di Identita" (Valid Italian Identification Card) or "Patente di Guida" (Obtain from the Ministero dei Trasporti e Dell'Aviazione Civile).
b. A valid Italian Vehicle Registration Card and proof of Minimum Vehicle Liability Insurance for each Contractor's official vehicle.
c. "Certificato Penale" - Obtain from any Court of Justice.
1.13.1 Contractor Employee Base Access Pass:
The Contractor shall be responsible for furnishing and requiring that each person employed in connection with this contract or any subcontract hereunder, be provided with a valid/current Contractor Employee Base Access Pass. All prescribed identification shall be immediately delivered and/or surrendered to the Contracting Officer for cancellation upon: (1) termination or release of any employee; (2) termination or completion of contract.
1.13.2 Responsibility for Physical Security
The Contractor shall be responsible for physical security of all construction materials, supplies, and equipment of every description (including property which may be Government furnished or owned) provided and/or utilized in the execution of this contract.
1.13.3 Access to Operational Areas
Contractor personnel are expressly prohibited and shall be restricted from entering operational buildings or areas without the specific authorization of the Contracting Officer. To perform work, where "security escorts" are required for access to a facility, the Contractor shall coordinate with the Contracting Officer for access to such facilities.
1.13.4 Employment
Should the continued employment of any person in connection with this contract, or any subcontract thereunder, be deemed by the Contracting Officer to be prejudicial to the interests of the Government, that person shall immediately be removed from the work. In this connection the Contractor agrees that:
a. Cases which may involve disciplinary action against such persons, DOCUMENT 00 73 04 Page 4 or the necessity of reassignment or termination of their services, shall be investigated, processed, reported and disposed of, as directed by the Contracting Officer.
b. Employment contracts of all persons employed in connection with this contract, or any subcontract thereunder shall include clauses containing the substance of this clause.
1.13.5 Compliance
Compliance with the foregoing provisions of this clause by subcontractors shall be the responsibility of the Contractor.
1.14 ANTI-MAFIA LAW
1.14.1 Pre-Award Effect of Anti-Mafia Procedures
Inasmuch as the work of this solicitation is to be performed on land owned by the Italian State, the prospective contractor will be subject to Italian Law No. 646, of 13 September 1982, and subsequent integrations and amendments. The solicitation data will be made available only to firms that meet the related submittal requirements below in paragraph "Submittals".
As such, in the event that prior to award any disciplinary actions or proceedings for Mafia related matters exist against the apparent low bidder, no award will be made to said low bidder.
1.14.2 Termination Under Italian Law No. 646 (Anti-Mafia)
If during the life of this contract, any proceeding or disciplinary actions contemplated by Italian Law No. 646 of 13 September 1982 (and subsequent amendments and integrations) is undertaken against any component of the Contractor or any Subcontractor, the Government can consider this a failure to execute the work and terminate the contractor's right to proceed with the work under the "Default" clause of this contract.
1.14.3 Application of Italian Law No. 646 (Anti-Mafia) to Subcontractors
In addition to the requirement in the FAR Clause 52.244-1, SUBCONTRACTS, of this contract, before the Contracting Officer can consent to any subcontractors, the Contractor will be required to certify to the Contracting Officer that no disciplinary actions or proceedings for Mafia related matters exist against such Subcontractors.
1.14.4 Documentation Requirements
Contractor shall submit the following:
a. An original, unexpired and not older than 10 months at the time of the bid opening, of the Chamber of Commerce Certificate of Membership (Certificato di iscrizione alla Camera di Commercio).
b. Originals, unexpired and not older than one month at the time of the bid opening, of the Family Status and Residency Certificate of each member of the firm, as listed in the Chamber of Commerce Certificate of Membership (Per Decreto Legislativo n. 490 of 8 Aug 94, published in the Gazzetta Ufficiale n. 186 of 10 Aug 1994).
DOCUMENT 00 73 04 Page 5
1.15 CERTIFICATION OF COMPLIANCE WITH ITALIAN LAWS
1.15.1 Certification
As a condition of final acceptance of the work, the Contractor shall submit to the Contracting Officer a certificate of compliance for all contract work certifying that the work complies with Italian D.M. 37/2008 and that the provided work is adequate and safe for the designated use. The certification shall be made by the responsible technician of the installation firm who shall have been regularly registered on the Installation National Professional Rolls of Italy for at least the last three years.
1.15.2 Static Load and Final Testing
The Contractor shall comply with the pertinent articles of Italian LAW No. 1086 and D.P.R. 380. Because this construction will be performed on property owned by the Italian State, the LAW No. 1086 and D.P.R. 380 Articles pertaining to notification and participation by civil authorities are not applicable.
The Contractor shall be fully responsible for construction, supervision, static load tests, and final testing, and for all costs associated with this procedure and specifically follow Article 7 of Italian LAW No. 1086 and D.P.R. 380 in performing the test. Any fees for these tests shall be in accordance with Italian Professional Law No. 143 of 2 March 1949 as amended.
Article 2 of Italian LAW No. 1086 and D.P.R. 380 requires the static load tests to be performed under the supervision of an engineer or architect registered on the National Professional Verifier Rolls of Italy.
Since GENIODIFE intends to participate in static load and final testing, the Contractor shall notify the Contracting Officer at least 21 calendar days prior to any static load or final test to enable the Contracting Officer to notify GENIODIFE.
Prior to performing the tests, submit to the Contracting Officer the names and certified credentials of proposed testing personnel, engineer(s) or architects(s) they propose to perform the static load testing.
Upon completion of the tests, the Contractor shall submit to the Contracting Officer two original certification of the static load tests results of the static load tests together with a certification of actual testing personnel stating that each test was performed by the same engineer(s) or architects(s) whose certified credentials were previously submitted. The Contracting Officer will submit one original certification to GENIODIFE.
1.15.3 Other Tests
In addition to the certifications listed above, the Contractor shall provide with all other certifications and testing required by Italian Law.
The Contractor is also responsible for all permits required by Italian Law (See Contract Clause FAR 52.236-7, "Permits and Responsibilities". The Contractor shall submit to the Contracting Officer two originals of each certification required by Italian Law. Such certifications may include but not be limited by the following as applicable to the project:
DOCUMENT 00 73 04 Page 6
a. Certificate of conformity for electrical system in accordance with Italian D.M. 37/2008. Include a separate specific certificate of compliance for each electrical panel in accordance with Italian D.M. 37/2008.
b. Certificate of compliance for heating system above 100,000 Kal/hr in accordance with Italian LAW 10/91.
c. Certificate of compliance for fire prevention system in accordance with DM 16 February 1982 and DM 8 March 1985.
d. Certificate for elevator system test(s) in accordance with Italian Law 1415 of 24 October 1942.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
DOCUMENT 00 73 04 Page 7
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 LIST OF DRAWINGS
00 22 13 SUPPLEMENTARY INSTRUCTIONS TO BIDDERS
00 73 04 SUPPLEMENTARY CONDITIONS FOR PROJECTS IN MEDITERRANEAN
AREA
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00.00 42 WORK RESTRICTIONS
01 20 00.00 20 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 17.00 20 NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00 SUBMITTAL PROCEDURES
01 33 29 LEED(TM) DOCUMENTATION
01 35 16.00 50 CUTTING AND PATCHING PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 00.00 20 QUALITY CONTROL
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19.00 42 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
01 58 00 PROJECT IDENTIFICATION
01 62 35 RECYCLED / RECOVERED MATERIALS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 13.00 50 GENERAL COMMISSIONING REQUIREMENTS
DIVISION 02 - EXISTING CONDITIONS
02 41 00.00 42 SITE DEMOLITION
DIVISION 03 - CONCRETE
03 30 00.00 42 CAST-IN-PLACE CONCRETE
03 49 00.00 50 GLASS-FIBER-REINFORCED-CONCRETE
DIVISION 05 - METALS
05 12 00.00 42 STRUCTURAL STEEL
05 31 00.00 42 STEEL DECKS
05 40 00.00 42 COLD-FORMED METAL FRAMING
05 50 00 METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00.00 42 ROUGH CARPENTRY
06 20 00.00 42 FINISH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 08 00.00 50 COMMISSIONING OF BUILDING ENVELOPE
07 21 13.00 42 BOARD INSULATION
07 21 16.00 42 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS
PROJECT TABLE OF CONTENTS Page 1
07 41 63 FABRICATED ROOF PANEL ASSEMBLIES
07 60 00.00 42 FLASHING AND SHEET METAL
07 72 20.00 42 ROOF ACCESSORIES
07 81 00 SPRAY-APPLIED FIREPROOFING
07 84 00 FIRESTOPPING
07 92 00.00 42 JOINT SEALANTS
07 95 00.00 50 EXPANSION CONTROL
DIVISION 08 - OPENINGS
08 11 13.00 42 STEEL DOORS AND FRAMES
08 11 16.00 42 ALUMINUM DOORS AND FRAMES
08 14 00.00 42 WOOD DOORS
08 31 13.00 50 ACCESS DOORS AND FRAMES
08 34 02 BULLET-RESISTANT COMPONENTS
08 34 80.00 42 VERTICAL BI-FOLD DOORS
08 51 13.00 42 ALUMINUM WINDOWS
08 56 73.00 50 SOUND CONTROL WINDOW
08 71 00.00 42 DOOR HARDWARE
08 81 00.00 42 GLAZING
08 91 00.00 42 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00.00 42 METAL SUPPORT ASSEMBLIES
09 24 23 STUCCO
09 26 00 VENEER PLASTER
09 29 00.00 42 GYPSUM BOARD
09 30 00.00 42 TILING
09 51 00.00 42 ACOUSTICAL CEILINGS
09 65 10.00 42 RESILIENT FLOORING
09 68 16.00 42 CARPET
09 69 13 RIGID GRID ACCESS FLOORING
09 84 13.00 50 FIXED SOUND ABSORBING PANELS
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 10 00 VISUAL COMMUNICATIONS SPECIALTIES
10 14 01 EXTERIOR SIGNAGE
10 14 02 INTERIOR SIGNAGE
10 21 13.00 42 TOILET PARTITIONS
10 22 26.33 FOLDING PANEL PARTITIONS
10 28 00.00 42 TOILET AND BATH ACCESSORIES
10 44 00.00 42 FIRE EXTINGUISHER CABINETS
10 51 29.00 42 PHENOLIC CLOTHING LOCKERS
10 90 00.00 50 MISCELLANEOUS SPECIALTIES
DIVISION 11 - EQUIPMENT
11 31 13 ELECTRIC KITCHEN EQUIPMENT
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 48 16.00 50 WALK-OFF MAT
12 93 00.00 42 SITE FURNISHINGS
DIVISION 21 - FIRE SUPPRESSION
PROJECT TABLE OF CONTENTS Page 2
21 08 00.00 50 COMMISSIONING OF FIRE SUPPRESSION SYSTEMS
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00.00 42 PLUMBING SYSTEMS
22 08 00.00 50 COMMISSIONING OF PLUMBING SYSTEMS
22 15 13.00 42 LOW PRESSURE COMPRESSED AIR PIPING (NON-BREATHING AIR
TYPE)
22 33 30.00 10 SOLAR WATER HEATING EQUIPMENT
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 03 00.00 42 BASIC MECHANICAL MATERIALS AND METHODS
23 07 00.00 42 MECHANICAL INSULATION
23 08 00.00 42 HVAC TESTING/ADJUSTING/BALANCING
23 08 00.00 50 COMMISSIONING OF HVAC
23 08 93.00 42 INSPECTION, TESTING, AND CERTIFICATION OF BOILERS
23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC
23 11 13.00 42 FUEL OIL PIPING AND PETROLEUM STORAGE TANK
23 20 23.00 42 CHILLED, CONDENSER, OR DUAL SERVICE WATER PIPING
23 30 13.00 42 DUCTWORK AND DUCTWORK ACCESSORIES
23 34 16.00 42 AIR HANDLING UNITS
23 52 46.00 42 LOW PRESSURE WATER HEATING BOILERS (OVER 234 kW OUTPUT)
23 64 00 PACKAGED WATER CHILLERS, ABSORPTION TYPE
23 65 00 COOLING TOWERS
23 66 00 CENTRAL REFRIGERATION EQUIPMENT FOR AIR CONDITIONING
23 81 00.00 42 UNITARY AIR CONDITIONING EQUIPMENT
23 81 23.00 20 COMPUTER ROOM AIR CONDITIONING UNITS
DIVISION 26 - ELECTRICAL
26 00 00.00 42 BASIC ELECTRICAL MATERIALS AND METHODS
26 08 00.00 42 APPARATUS INSPECTION AND TESTING
26 08 00.01 50 COMMISSIONING OF ELECTRICAL SYSTEMS
26 11 13.00 42 HIGH VOLTAGE/LOW VOLTAGE PREFABRICATED SUBSTATIONS
26 20 00.00 42 INTERIOR DISTRIBUTION SYSTEM
26 23 00.00 42 SWITCHBOARDS, LOW-VOLTAGE
26 24 13.00 42 LOW VOLTAGE SWITCHGEAR AND CONTROLGEAR
26 29 23.00 42 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 32 13.00 50 DIESEL ENGINE-GENERATOR SETS AND PARALLELING SWITCHGEAR
26 36 23.00 20 AUTOMATIC TRANSFER SWITCHES
26 41 00.00 42 LIGHTNING PROTECTION SYSTEM
26 51 00.00 42 INTERIOR LIGHTING
26 56 00.00 42 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00.00 42 STRUCTURED TELECOMMUNICATIONS CABLING AND PATHWAY SYSTEM
27 54 00.00 42 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 05 19 GEOTEXTILE
PROJECT TABLE OF CONTENTS Page 3
31 21 13.01 50 RADON TESTING
31 23 00.00 42 EXCAVATION AND FILL
31 31 16.00 42 SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 10 00.00 42 BITUMINOUS CONCRETE PAVEMENT
32 11 16 SUBBASES FOR PAVING
32 11 24.00 42 GRADED CRUSHED AGGREGATE BASE COURSE
32 12 12.06 42 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 12 19.00 42 UNIT PAVERS
32 31 13.00 42 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING NATIVE WILDFLOWERS & GRASSES
32 92 23 SODDING
DIVISION 33 - UTILITIES
33 11 00.00 42 WATER DISTRIBUTION
33 11 23.00 42 NATURAL GAS AND LIQUID PETROLEUM PIPING
33 30 00.00 42 SANITARY SEWERAGE
33 40 01.00 42 STORM DRAINAGE
33 71 02.00 42 UNDERGROUND ELECTRICAL WORK
DIVISION 34 - TRANSPORTATION
34 71 13.19 ACTIVE VEHICLE BARRIERS
DIVISION 48 - ELECTRICAL POWER GENERATION
48 18 13.00 50 ELECTRICAL POWER GENERATION FUEL CELLS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
SECTION 01 11 00
SUMMARY OF WORK
01/08
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ITALIAN LAW AND NORMS
D.L. 81/2008 (9 April 2008) Operativeness of Art. 1 of Law 123, 3 August 2007 Concerning Health and Safety Protective Measures in the Workplaces
1.2 WORK COVERED BY CONTRACT DOCUMENTS
All work shall be accomplished in accordance with D.L. 81/2008:
1.2.1 General Intention
It is the declared and acknowledged intention and meaning to provide and secure construction of UAS SATCOM Relay Pads and Facility, and incidental related work.
1.2.2 Project Description
The work includes demolition and removal, site work for SATCOM relay structural pads and foundations with access roads, utilities and underground conduit connectivity to main facility, special security features such as perimeter fence, vehicle Sally Port, access control point pedestrian Sally Port and turnstile, reinforced concrete wall supported guardhouse with steel framed metal panel roofing system and bullet resistant windows, provisions for a single story reinforced concrete wall supported building with steel framed sloped metal panel roofing system, concrete slab, a continuous reinforced concrete foundation footing, interior finishes, raised flooring system, fire protection sprinkler and alarm system, HVAC, plumbing, electrical and incidental related work. This building shall qualify for LEED Silver Certification.
1.2.3 Location
The work shall be located at the Naval Air Station II, Sigonella, Sicily, Italy, approximately as indicated. The exact location will be shown by the Contracting Officer.
1.3 LOCATION OF UNDERGROUND FACILITIES
Obtain digging permits prior to start of excavation. Scan the construction site with electromagnetic or sonic equipment, and mark the surface of the ground where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated to be specified or removed but indicated
SECTION 01 11 00 Page 1 or discovered during scanning in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.3.1 Notification Prior to Excavation
Notify the Contracting Officer at least 15 days prior to starting excavation work.
PART 2 PRODUCTS
2.1 SOURCE PRODUCTS AND MANUFACTURERS
Source products and manufacturers named in a specification Section are listed as standards of quality to which other products will be compared and are generally capable of manufacturing products that may conform to the specified requirements. However, manufacturers being listed does not guarantee or imply that any or all of their products meet these particular project requirements or that they will be considered as equal to the specified requirements.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 2
SECTION 01 14 00
WORK RESTRICTIONS
05/11
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Vehicle list; G
Passes; G
1.2 CONTRACTOR ACCESS AND USE OF PREMISES
1.2.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. The Contractor's equipment shall be conspicuously marked for identification.
1.2.2 Working Hours
Regular working hours shall consist of an 8 1/2 hour period established by the Contractor Officer, Monday through Friday, excluding Government and Italian holidays.
1.2.2.1 U.S. Government Holidays
a. New Year's Day.
b. Martin Luther King Jr. birthday.
c. George Washington's birthday.
d. Memorial Day.
e. Independence Day.
f. Labor Day.
g. Columbus Day.
h. Veteran's Day.
i. Thanksgiving Day.
j. Christmas Day.
SECTION 01 14 00.00 42 Page 1
1.2.2.2 Italian Holidays
a. New Year's Day.
b. Epiphany.
c. Easter Monday.
d. Liberation Day.
e. Labor Day.
f. Assumption Day
g. All Saint's Day.
h. Immaculate Conception Day.
i. Christmas Day.
j. St. Stephen's Day.
1.2.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work shall be lighted in a manner approved by the Contracting Officer.
1.2.4 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in the paragraph "Work Outside Regular Hours."
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, and other utilities as applicable shall be considered utility cutovers pursuant to the paragraph entitled "Work Outside Regular Hours." Such interruption shall be further limited to 12 hours, unless stipulated by the Contracting Officer.
This time limit includes time for deactivation and reactivation.
1.3 SECURITY REQUIREMENTS
Contract Clause "FAR 52.204-2, Security Requirements and Alternate II," "FAC 5252.236-9301, Special Working Conditions and Entry to Work Area," and the following apply:
SECTION 01 14 00.00 42 Page 2
1.3.1 Vehicle Security Inspection
All contractor and subcontractor vehicles entering the Station including, but not limited to, service vehicles, material delivery vehicles, equipment delivery vehicles, and various other support vehicles, shall first undergo a security inspection.
1.3.2 Vehicle List
Submit an original list of vehicles to be utilized at the work site with the following information for each vehicle:
a. Make.
b. Year.
c. Model.
d. License number.
e. Registered owner.
Refer to Section 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS for additional vehicle restrictions.
1.3.3 Passes
Submit request for personnel and vehicle passes together. Include the Certificate of Insurance for Contractor and Subcontractors and the Statement of Acknowledgement Form SF 1413 with the submittal. Passes will normally be issued within 15 days for the U.S. Government controlled gate and within 30 days for the Italian Government controlled gate.
1.3.4 Control
Maintain strict accountability over passes. Immediately report to the source of issue, passes missing or lost and circumstances. If the Contractor has another active contract and one commencing immediately, employees' names may be transferred from one contract to the other. Final payment will not be effected until employees are transferred to another contract or the records are cleared. Furnish a signed letter, countersigned by the source of issue, stating that passes have been turned in.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
SECTION 01 14 00.00 42 Page 3
SECTION 01 20 00.00 20
PRICE AND PAYMENT PROCEDURES
02/10
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EP-1110-1-8 (2009) Construction Equipment Ownership and Operating Expense Schedule, Volumes 1
- 12 (Regions I - XII)
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Earned Value Report; G
1.3 EARNED VALUE REPORT
1.3.1 Data Required
This contract requires the use of a cost-loaded Network Analysis Schedule.
The information required for the Schedule of Prices will be entered as an integral part of the Network Analysis Schedule (NAS) within 30 calendar days of notice of award, unless stipulated otherwise in the construction Contract prepare and deliver to the Contracting Officer an Earned Value Report on the forms furnished by the Government. Provide a detailed breakdown of the contract price, giving quantities for each of the various kinds of work, unit prices, and extended prices.
1.3.2 Schedule Instructions
Payments will not be made until the cost-loaded NAS has been submitted to and accepted by the Contracting Officer. Identify the cost for site work, and include incidental work to the 1.5 m line. Identify costs for the building(s), and include work out to the 1.5 m line. Work out to the 1.5 m line shall include construction encompassed within a theoretical line 1.5 m from the face of exterior walls and shall include attendant construction, such as cooling towers, placed beyond the 1.5 m line.
1.3.3 Schedule Requirements for HVAC TAB
The field work Section 23 08 00.00 42 TESTING, ADJUSTING AND BALANCING shall be broken down in the cost-loaded NAS by separate line items which reflect measurable deliverables. Specific payment percentages for each
SECTION 01 20 00.00 20 Page 1 line item shall be determined on a case by case basis for each contract.
The line items shall be as follows:
a. Approval of Design Review Report: The TABS Agency is required to conduct a review of the project plans and specifications to identify any feature, or the lack thereof, that would…