AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0011 to answ er PPI price schedule
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-Mar-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N33191-15-R-0802
X 9B. DATED (SEE ITEM 11)
13-Jan-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-Mar-2015
CODE
NAVFAC EUROPE AFRICA SOUTHWEST ASIA
PSC 817 BOX 51
FPO AE 09622-0051
N33191 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N33191-15-R-0802
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
SUMMARY OF CHANGES
AMENDMENT 0011
AMENDMENT 0011 is issued to clarify a PPI question regarding the CLINs.
PPI QUESTION:
19. This is a request for clarification. Ref. Specifications published with Amendment #6, Section 00 22 13 (page 9 of
425). Paragraph 1 makes reference to CLIN 0002 and CLIN 0003 as empty, “text deleted”. This paragraph also describes CLIN 0004 and CLIN 0005 as containing two (2) Option Bid Items.
This is not reflected in the Solicitation Price Schedule. Section 00010 (page 3 of 50) contains only four (4) CLIN’s
vs. five (5) in the Specs. Additionally, their descriptions differ from Specifications Section 00 22 13 of March 6, 2015.
Could the Government please clarify which Pricing CLIN’s are to be considered?
GOVERNMENT RESPONSE:
In the Section 00 22 13 (page 9 of 425) is incorrect there is no (5) CLINS. Just price the following on the price schedule on page 3 of 50 of the solicitation, bid option #1 was removed from the solicitation.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lot
-UAS SATCOM, RELAY PADS, SIGONELLA, ITAL
FFP
The work includes demolition and removal, site work for SATCOM relay structural pads and foundations with access roads, utilities and underground conduit connectivity to main facility, special security features such as perimeter fence, vehicle Sally Port, access control point pedestrian Sally Port and turnstile, reinforced concrete wall supported guardhouse with steel framed metal panel roofing system and bullet resistant windows, provisions for a single story reinforced concrete wall supported building with steel framed sloped metal panel roofing system, concrete slab, a continuous reinforced concrete foundation footing, interior finishes, raised flooring system, fire protection sprinkler and alarm system, HVAC, plumbing, electrical and incidental related work. This building shall qualify for LEED Silver Certification.
FOB: Destination
NET AMT
0003 1 Lot
BID OPTION #2 - LID INFILTRATION
FFP
SITE PREPARATION, SITE CIVIL/MECHANICAL UTILITIES
0004 1 Lot
-BID OPTION #3 - LED SITE LIGHTING
FFP
SITE ELECTRICAL UTILITIES
ALL OTHER ITEMS REMAIN THE SAME:
Proposal due date is April 1 st 2015 at 14:00 Central European Time (CET). There will be no other PPI questions answered.
PLEASE REMEMBER TO ACKNOWLEDGE THIS AMENDMENT ON YOUR BID SCHEDULE