UAS SATCOM RELAY PADS AND FACILITY 11005
SECTION 00 01 15
LIST OF DRAWINGS
02/11
REVISED MARCH 6, 2015
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
NAVFAC DRAWING [REVISION NAVFAC TITLE
NO. NO. NO.] DWG NO.
GENERAL
1 14024651 GI000 COVER SHEET
2 14024652 GI001 INDEX OF DRAWINGS
3 14024653 GI002 INDEX OF DRAWINGS
4 14024654 GI010 GENERAL AND ARCHITECTURAL SYMBOLS
5 14024655 GI011 ARCHITECTURAL ABBREVIATIONS
6 14024656 GI012 REGIONAL, VICINITY, AND LOCATION MAPS
7 14024657 GC100A COMPOSITE GROUND FLOOR PLAN - LIFE
SAFETY
8 14024658 GC201 LIFE SAFETY ANALYSIS
9 14024659 GC202 LIFE SAFETY NOTES
CIVIL
10 14024660 C-001 CIVIL LEGEND AND ABBREVIATIONS
11 14024661 C-002 SURVEY CONTROL PLAN AND NOTES
12 14024662 C-003 EXISTING UTILITY STRUCTURE DATA
13 14024663 CD101 SITE DEMOLITION PLAN
14 14024664 CD102 SITE DEMOLITION PLAN
15 14024665 CD103 SITE DEMOLITION PLAN
16 14024666 CD104 SITE DEMOLITION PLAN
17 14024667 CS100 SITE LAYOUT CONTROL PLAN
18 14024668 CS101 SITE LAYOUT PLAN
19 14024669 CS102 SITE LAYOUT PLAN
20 14024670 CS103 SITE LAYOUT PLAN
21 14024671 CS104 SITE LAYOUT PLAN
22 14024672 CG101 SITE GRADING AND DRAINAGE PLAN
23 14024673 CG102 SITE GRADING AND DRAINAGE PLAN
24 14024674 CG103 SITE GRADING AND DRAINAGE PLAN
25 14024675 CG104 SITE GRADING AND DRAINAGE PLAN
26 14024676 CU101 SITE UTILITY PLAN
27 14024677 CU102 SITE UTILITY PLAN
28 14024678 CU103 SITE UTILITY PLAN
29 14024679 CU104 SITE UTILITY PLAN
30 14024680 C-400 CONCRETE PAVEMENT JOINTING PLAN AND
DETAILS
31 14024681 C-500 SITE DETAILS
DOCUMENT 00 01 15 Page 1 Amendment 2
NAVFAC DRAWING [REVISION NAVFAC TITLE
NO. NO. NO.] DWG NO.
32 14024682 C-501 SITE DETAILS
33 14024683 C-502 POWERED SLIDING CRASH GATE DETAIL
34 14024684 C-503 FENCE DETAILS
35 14024685 C-504 SITE DETAILS
36 14024686 C-505 FENCE DETAILS
37 14024687 C-506 FENCE DETAILS
38 14024688 C-507 EROSION AND SEDIMENT CONTROL DETAILS
39 14024689 C-508 EROSION AND SEDIMENT CONTROL DETAILS
40 14024690 C-509 MISCELLANEOUS DETAILS
41 14024691 C-601 UTILITY DETAILS - WATER
42 14024692 C-602 UTILITY DETAILS - SANITARY AND STORM
GEOTECHNICAL
43 14024693 B-100 SOIL BORING LOCATION PLAN
44 14024694 B-101 SOIL BORING LOGS
45 14024695 B-102 SOIL BORING LOGS
46 14024696 B-103 SOIL BORING LOGS
47 14024697 B-104 SOIL BORING LOGS
LANDSCAPE
48 14024698 LP101 LANDSCAPE PLAN
49 14024699 LP102 LANDSCAPE PLAN
50 14024700 LP103 LANDSCAPE PLAN
51 14024701 LP104 LANDSCAPE PLAN
52 14024702 LP501 LANDSCAPE DETAILS
STRUCTURAL
53 14024703 SE001 GENERAL NOTES
54 14024704 SE002 GENERAL NOTES (CONTINUED)
55 14024705 SE003 COMPONENTS AND CLADDING WIND PRESSURES
DIAGRAMS
56 14024706 SE004 TYPICAL SLAB DETAILS
57 14024707 SE005 TYPICAL WALL REINFORCING DETAILS
58 14024708 SE100A FOUNDATION/SLAB PLAN
59 14024709 SE123A ROOF TOP CHORD FRAMING PLAN
60 14024710 SE201A WALL REINFORCEMENT ELEVATIONS
61 14024711 SE202A WALL REINFORCEMENT ELEVATIONS
62 14024712 SE203A 3D VIEW ROOF FRAMING
63 14024713 SE501A SECTIONS AND DETAILS
64 14024714 SE502A SECTIONS AND DETAILS
65 14024715 SE510A SECTIONS AND DETAILS
66 14024716 SE511A SECTIONS AND DETAILS
67 14024717 SE100B GUARDHOUSE FOUNDATION/SLAB AND ROOF
FRAMING PLANS
68 14024718 SE401B WALL REINFORCEMENT ELEVATIONS
69 14024719 SE501B SECTIONS AND DETAILS
70 14024720 SE510B SECTIONS AND DETAILS
71 14024721 SE511B SECTIONS AND DETAILS
72 14024722 SE100C RADOME FOUNDATION / SLAB PLAN,
SECTIONS, AND DETAIL
73 14024723 SE401C RADOME FOUNDATION REINFORCEMENT PLAN
AND DETAILS
ARCHITECTURE
DOCUMENT 00 01 15 Page 2
NO. NO. NO.] DWG NO.
74 14024724 AS100 ARCHITECTURAL SITE PLAN
75 14024725 AS400 SITE ENLARGED PLANS, ELEVATIONS, AND
SECTIONS
76 14024726 AS401 GATE AND FENCE ENCLOSURE DETAILS
77 14024727 AE100A COMPOSITE GROUND FLOOR PLAN
78 14024728 AE110A COMPOSITE ROOF PLAN
79 14024729 AE120A COMPOSITE GROUND FLOOR REFLECTED
CEILING PLAN
80 14024730 AE201A EXTERIOR BUILDING ELEVATIONS
81 14024731 AE202A EXTERIOR BUILDING ELEVATIONS
82 14024732 AE301A BUILDING SECTIONS
83 14024733 AE311A WALL SECTIONS
84 14024734 AE312A WALL SECTIONS
85 14024735 AE100B GUARDHOUSE FLOOR PLANS
86 14024736 AE201B EXTERIOR BUILDING ELEVATIONS AND
BUILDING SECTIONS
87 14024737 AE311B WALL SECTIONS
88 14024738 AE401 ENLARGED FLOOR PLANS
89 14024739 AE402 ENLARGED FLOOR PLANS
90 14024740 AE403 FLOOR PATTERN PLANS
91 14024741 AE501 EXTERIOR PLAN DETAILS
92 14024742 AE505 EXTERIOR DETAILS
93 14024743 AE506 EXTERIOR DETAILS
94 14024744 AE507 EXTERIOR DETAILS
95 14024745 AE511 ROOF DETAILS
96 14024746 AE512 ROOF DETAILS
97 14024747 AE513 ROOF DETAILS
98 14024748 AE521 PARTITION TYPES
99 14024749 AE522 PARTITION TYPES
100 14024750 AE535 INTERIOR DETAILS
101 14024751 AE536 INTERIOR DETAILS
102 14024752 AE601 DOOR SCHEDULE
103 14024753 AE611 DOOR, FRAME, AND ALUMINUM FRAME
ELEVATIONS
104 14024754 AE621 DOOR DETAILS
105 14024755 AE622 DOOR DETAILS
106 14024756 AE623 ALUMINUM FRAME AND MISCELLANEOUS DOOR
DETAILS
107 14024757 AE631 WINDOW AND LOUVER ELEVATIONS
108 14024758 AE641 WINDOW DETAILS
109 14024759 AE642 WINDOW AND LOUVER DETAILS
110 14024760 AE701 MILLWORK ELEVATIONS AND DETAILS
111 14024761 AE702 MILLWORK ELEVATIONS AND DETAILS
112 14024762 AE703 INTERIOR / MILLWORK ELEVATIONS AND
DETAILS
113 14024763 AE704 INTERIOR ELEVATIONS
114 14024764 AE711 MISCELLANEOUS DETAILS
115 14024765 AE801 CEILING DETAILS
INTERIOR
116 14024766 AF601 FINISH SCHEDULE
117 14024767 AF610 FINISH IDENTIFICATION
118 14024768 AF611 FINISH IDENTIFICATION
119 14024769 AG100A SIGNAGE LOCATION PLAN- SATCOM FACILITY
120 14024770 AG100B SIGNAGE LOCATION PLAN AND ELEVATION -
DOCUMENT 00 01 15 Page 3
NO. NO. NO.] DWG NO.
GUARDHOUSE
121 14024771 AG201 EXTERIOR SIGNAGE ELEVATIONS
122 14024772 AG202 EXTERIOR SIGNAGE ELEVATIONS
123 14024773 AG210 INTERIOR SIGNAGE ELEVATIONS
124 14024774 AG211 INTERIOR SIGNAGE SECTIONS
125 14024775 IF100A GROUND FLOOR FURNITURE PLAN -
SATCOM FACILITY
126 14024776 IF100B GROUND FLOOR FURNITURE PLAN -
GUARDHOUSE
FIRE PROTECTION
127 14024777 FX001 FIRE PROTECTION SITE PLAN
128 14024778 FX101 FIRE PROTECTION FLOOR PLAN
129 14024779 FX102 FIRE PROTECTION DETAILS
130 14024780 FX103 FIRE PROTECTION DETAILS
131 14024781 FG001 FIRE ALARM LEGEND
132 14024782 FA101 FIRE ALARM PLAN
133 14024783 FA102 ASPIRATING SMOKE DETECTOR LAYOUT
134 14024784 FA601 FIRE ALARM RISER DIAGRAM
135 14024785 FA701 FIRE ALARM SEQUENCE OF OPERATION
MATRIX
136 14024786 FA702 FIRE ALARM SCHEDULES
PLUMBING
137 14024787 PP001 PLUMBING SYMBOLS AND ABBREVIATIONS
138 14024788 PP100A GROUND FLOOR PLUMBING PLAN -
SATCOM FACILITY
139 14024789 PP110A ROOF PLUMBING PLAN - SATCOM FACILITY
140 14024790 PP100B GROUND/ROOF FLOOR PLUMBING - GUARD
HOUSE
141 14024791 PP501 PLUMBING DETAILS
142 14024792 PP502 PLUMBING DETAILS
143 14024793 PP503 PLUMBING DETAILS
144 14024794 PP504 PLUMBING DETAILS
145 14024795 PP505 PLUMBING DETAILS
146 14024796 PP506 PLUMBING DETAILS
147 14024797 PP507 PLUMBING DETAILS
148 14024798 PP508 PLUMBING DETAILS
149 14024799 PP509 PLUMBING DETAILS
150 14024800 PP601 SANITARY RISER DIAGRAMS
151 14024801 PP611 DOMESTIC WATER RISER DIAGRAMS
152 14024802 PP612 DOMESTIC WATER RISER DIAGRAMS
153 14024803 PP801 PLUMBING SCHEDULES
154 14024804 PP802 PLUMBING SCHEDULES
MECHANICAL
155 14024805 MH001 HVAC SYMBOLS AND ABBREVIATIONS
156 14024806 MH002 HVAC SYMBOLS AND ABBREVIATIONS
157 14024807 MH003 HVAC AND PIPING TYPICAL SHEET NOTES
158 14024808 MH101 GROUND LEVEL DUCTWORK PLAN
159 14024809 MH102 MECHANICAL ROOF PLAN
160 14024810 MH103 GROUND LEVEL GUARDHOUSE PLAN
161 14024811 MP101 GROUND LEVEL PIPING PLAN
DOCUMENT 00 01 15 Page 4
NO. NO. NO.] DWG NO.
162 14024812 MP102 GROUND LEVEL PIPING PLAN BID OPTION 1
(NOT USED)
163 14024813 MH401 ENLARGED MECHANICAL PLANS
164 14024814 MH402 ENLARGED MECHANICAL PLANS BID OPTION 1
ENLARGED MECHANICAL ROOM PIPING PLAN
165 14024815 MH403 SECTIONS
166 14024816 MH404 AHU COMPONENT LAYOUT
167 14024817 MH501 HVAC DETAILS
168 14024818 MH502 HVAC DETAILS
169 14024819 MH503 HVAC DETAILS
170 14024820 MH504 HVAC DETAILS
171 14024821 MH505 HVAC DETAILS
172 14024822 MH506 HVAC DETAILS
173 14024823 MH507 HVAC DETAILS
174 14024824 MH508 HVAC DETAILS
175 14024825 MH509 HVAC DETAILS
176 14024826 MP501 HVAC PIPING DETAILS
177 14024827 MP502 HVAC PIPING DETAILS
178 14024828 MP503 HVAC PIPING DETAILS
179 14024829 MP504 HVAC PIPING DETAILS
180 14024830 MP505 HVAC PIPING DETAILS
181 14024831 MP506 HVAC PIPING DETAILS
182 14024832 MP507 HVAC PIPING DETAILS
183 14024833 MP508 HVAC PIPING DETAILS
184 14024834 MP509 HVAC PIPING DETAILS
185 14024835 MP510 HVAC PIPING DETAILS
186 14024836 MP511 HVAC PIPING DETAILS
187 14024837 MP512 HVAC PIPING DETAILS
188 14024838 MP513 HVAC PIPING DETAILS
189 14024839 MP601 SCHEMATIC FLOW DIAGRAMS
190 14024840 MP602 SCHEMATIC FLOW DIAGRAMSSITE PIPING
DETAILS
191 14024841 MP603 SCHEMATIC FLOW DIAGRAMS
192 14024842 MP604 SCHEMATIC FLOW DIAGRAMS
193 14024843 MP605 SCHEMATIC FLOW DIAGRAMS
194 14024844 MP606 SCHEMATIC FLOW DIAGRAMS(NOT USED)
195 14024845 MI701 HVAC CONTROLS
196 14024846 MI702 HVAC CONTROLS
197 14024847 MI703 HVAC CONTROLS
198 14024848 MI704 HVAC CONTROLS
199 14024849 MI705 HVAC CONTROLS
200 14024850 MI706 HVAC CONTROLS
201 14024851 MI707 HVAC CONTROLS(NOT USED)
202 14024852 MI708 HVAC CONTROLS
203 14024853 MI709 HVAC CONTROLS
204 14024854 MI710 HVAC CONTROLS
205 14024855 MI711 HVAC CONTROLS
206 14024856 MI712 HVAC CONTROLS
207 14024857 MI713 HVAC CONTROLS
208 14024858 MI714 HVAC CONTROLS
209 14024859 MI715 HVAC CONTROLS(NOT USED)
210 14024860 MI716 HVAC CONTROLS(NOT USED)
211 14024861 MI717 SMOKE EXTRACTION DIAGRAM
212 14024862 MH801 MECHANICAL SCHEDULES
213 14024863 MH802 MECHANICAL SCHEDULES
214 14024864 MH803 MECHANICAL SCHEDULES
DOCUMENT 00 01 15 Page 5
NO. NO. NO.] DWG NO.
215 14024865 MH804 MECHANICAL SCHEDULES
216 14024866 MH805 MECHANICAL SCHEDULES
217 14024867 MH806 MECHANICAL SCHEDULES
218 14024868 MH807 MECHANICAL SCHEDULES
219 14024947 MH808 MECHANICAL SCHEDULES
220 14024948 MH809 MECHANICAL SCHEDULES
ELECTRICAL
219 14024869 EG001 ELECTRICAL LEGEND
220 14024870 EG002 ELECTRICAL LEGEND
221 14024871 EG003 ELECTRICAL LEGEND
222 14024872 EG004 ELECTRICAL LEGEND
223 14024873 ES100 COMPOSITE SITE PLAN
224 14024874 ES101 ELECTRICAL SITE PLAN
225 14024875 ES102 ELECTRICAL SITE PLAN
226 14024876 ES103 ELECTRICAL SITE PLAN
227 14024877 ES104 ELECTRICAL SITE PLAN
228 14024878 ES105 ELECTRICAL SITE PLAN
229 14024879 ES106 ELECTRICAL SITE PLAN
230 14024880 ES107 ELECTRICAL SITE PLAN
231 14024881 ES108 SITE LIGHTING PLAN
232 14024882 ES109 COMPOSITE SITE GROUNDING PLAN
233 14024883 ES110 COMPOSITE SECURITY SITE PLAN
234 14024884 ES401 ENLARGED ELECTRICAL SITE PLANS
235 14024885 ES402 ENLARGED ELECTRICAL SITE PLANS
236 14024886 ES403 ENLARGED ELECTRICAL SITE PLANS
237 14024887 ES501 ELECTRICAL SITE DETAILS
238 14024888 ES502 ELECTRICAL SITE DETAILS
239 14024889 ES503 ELECTRICAL SITE DETAILS
240 14024890 ES504 ELECTRICAL SITE DETAILS
241 14024891 EL101 LIGHTING PLAN
242 14024892 EL501 LIGHTING DETAILS
243 14024893 EL502 LIGHTING DETAILS
244 14024894 EL503 LIGHTING DETAILS
245 14024895 EL504 LIGHTING DETAILS
246 14024896 EL505 LIGHTING DETAILS
247 14024897 EL506 LIGHTING DETAILS
248 14024898 EL601 LIGHTING WIRING DIAGRAMS
249 14024899 EL701 LIGHTING FIXTURE SCHEDULE
250 14024900 EP101 POWER PLAN
251 14024901 EP102 ROOF POWER PLAN
252 14024902 EP201 POWER ELEVATIONS
253 14024903 EP401 ENLARGED POWER PLANS
254 14024904 EP402 ENLARGED GUARD HOUSE POWER AND
LIGHTING PLANS
255 14024905 EP403 ENLARGED POWER PLANS
256 14024906 EP404 ENLARGED POWER PLANS
257 14024907 EP501 ELECTRICAL DETAILS
258 14024908 EP502 ELECTRICAL DETAILS
259 14024909 EP503 ELECTRICAL DETAILS
260 14024910 EP504 ELECTRICAL DETAILS
261 14024911 EP505 ELECTRICAL DETAILS
262 14024912 EP506 ELECTRICAL DETAILS
263 14024913 EP507 ELECTRICAL DETAILS
264 14024914 EP508 ELECTRICAL DETAILS
DOCUMENT 00 01 15 Page 6
NO. NO. NO.] DWG NO.
265 14024915 EP601 SINGLE LINE DIAGRAM
266 14024916 EP602 SINGLE LINE DIAGRAM
267 14024917 EP603 SINGLE LINE DIAGRAM
268 14024918 EP604 OVERALL GROUNDING DIAGRAM
269 14024919 EP701 ELECTRICAL SCHEDULES
270 14024920 EP702 ELECTRICAL SCHEDULES
271 14024921 EP801 PANEL SCHEDULE - EH1
272 14024922 EP802 PANEL SCHEDULE - EH2
273 14024923 EP803 PANEL SCHEDULE - EH3
274 14024924 EP804 PANEL SCHEDULE - EH4
275 14024925 EP805 PANEL SCHEDULE - EH5
276 14024926 EP806 PANEL SCHEDULE - EH6
277 14024927 EP807 PANEL SCHEDULE - EH7
278 14024928 EP808 PANEL SCHEDULE - EH8 AND EL8
279 14024929 EP809 PANEL SCHEDULE - ES1 AND G1
280 14024930 EP810 PANEL SCHEDULE - ES2
281 14024931 EP811 PANEL SCHEDULE - M1
282 14024932 EP812 PANEL SCHEDULE - B1
28 14024933 EP813 PANEL SCHEDULE - EL1
284 14024934 EP814 PANEL SCHEDULE - EL3
285 14024935 EP815 PANEL SCHEDULE - UPSP1
286 14024936 EP816 PANEL SCHEDULE - UPSP2.1
287 14024937 EP817 PANEL SCHEDULE - UPSP2.2
288 14024938 EP818 PANEL SCHEDULE - UPSP3.1
289 14024939 EP819 PANEL SCHEDULE - UPSP3.2
290 14024940 EP820 PANEL SCHEDULE - RAD1 - RAD12, SAT1 -
SAT12
291 14024941 EQ101 LIGHTNING PROTECTION PLAN
292 14024942 EQ501 LIGHTNING PROTECTION DETAILS
293 14024943 ET101 COMMUNICATIONS PLAN
294 14024944 ET401 ENLARGED COMMUNICATIONS PLANS
295 14024945 ET501 COMMUNICATIONS DETAILS
296 14024946 ET502 COMMUNICATIONS DETAILS
[1.3 SUPPLEMENTARY DRAWINGS
These supplementary drawings may not be a part of the contract but are included with the drawings for information.
[1.3.1 Reference Drawing[s]
The following reference drawing[s] [is] [are] intended only to show the original construction. Drawing[s] [is] [are] the property of the Government and shall not be used for any purpose other than that intended by the contract. [The drawing[s] [is] [are] [half] [full] size. Full-size drawings are available at the bidder's or Contractor's expense.
[Information on procuring these full-size drawings may be obtained from the Contracting Officer.] [Full size drawings may be inspected during regular working hours at [the office of the Contracting Officer.] [the station.]]
NAVFAC DRAWING NO. TITLE
DOCUMENT 00 01 15 Page 7
NAVFAC DRAWING NO. TITLE
][1.3.2 Boring Logs
The Government does not guarantee that borings indicate actual conditions, except for the exact locations and the time that they were made.
[Subsurface data, not specified or indicated, have been obtained by the Government at this station. The data are available for examination by prospective bidders [in the office of the Contracting Officer] [at the station].]
][1.3.3 Subsurface Data
Subsurface data, not specified or indicated, have been obtained by the Government at the station. The data are available for examination by prospective bidders [in the office of the Contracting Officer] [at the station]. [The soils report is included as part of the solicitation].
] -- End of Document --
DOCUMENT 00 01 15 Page 8
SECTION 00 22 13X
SUPPLEMENTARY INSTRUCTIONS TO BIDDERS
05/11
REVISED 16 JULY 2014
REVISED MARCH 6, 2015
PART 1 GENERAL
1.1 BID ITEM
The bid item shall be lump sum price for the following items:
0001. Price includes the following:
0001A. Price for the entire work, complete in accordance with the drawings and specifications, but excluding work described in Bid Items 0004 and 0005.
0002. Option Item No. 1 - Price includes the following (Text Deleted)
0003. Option Item No. 2 (Text Deleted)
0004. Option Item No. 3 - Price includes the following:
Price for providing infiltration storage areas and infiltration trench;
complete in accordance with the drawings and specifications.
0005. Option Item No. 4 - Price includes the following:
Price for substituting LED lighting fixtures for the exterior site lighting; complete in accordance with the drawings and specifications.
1.2 BID NOTES
a. The Government reserves the unilateral right to award the Option(s) to the contractor at the bid price within 30 calendar days after the contract award.
b. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for the Bid Item 0001. Evaluation of options will not obligate the Government to exercise the Option(s). (FAR 52.217-5).
c. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
PART 2 PRODUCTS
Not used.
DOCUMENT 00 22 13 Page 1
PART 3 EXECUTION
Not used.
-- End of Document --
DOCUMENT 00 22 13 Page 2
SECTION 01 91 13.00 50X
GENERAL COMMISSIONING REQUIREMENTS
01/11
REVISED MARCH 6, 2015
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. GREEN BUILDING COUNCIL (USGBC)
LEED (2002; R 2007) Leadership in Energy and Environmental Design(tm) Green Building Rating System for New Construction (LEED-NC, Version 2009)
1.2 SUMMARY
This Section includes general requirements that apply to implementation of commissioning without regard to systems, sub-systems, and equipment being commissioned. A Commissioning Agent appointed by the Government will direct the commissioning process.
1.2.1 Commissioning Activities
a. The commissioning activities have been developed to support requirements to meet guidelines for Federal Leadership in Environmental, Energy, and Economic Performance.
b. The commissioning activities have been developed to support the United States Green Building Council (USGBC) LEED™ rating program and to support delivery of project performance in accordance with NAVFAC requirements developed for the project.
(1) Commissioning activities and documentation for the LEED™ section on "Energy and Atmosphere" and the prerequisite of "Fundamental Building Systems Commissioning."
(2) Commissioning activities and documentation for the LEED™ section on "Energy and Atmosphere" requirements for the "Enhanced Building System Commissioning" credit.
(3) Activities and documentation for the LEED™ section on "Measurement and Verification" requirements for the Measurement and Verification credit.
1.2.2 Commissioning Description
a. This Section forms the basis of the construction phase commissioning process and procedures. The Commissioning Agent shall add, modify, and refine the commissioning procedures, as approved by the Contracting Officer, to suit field conditions and actual manufacturer's equipment, incorporate test data and procedure results, and provide detailed scheduling for all commissioning tasks.
SECTION 01 91 13.00 50 Page 1
b. Various sections of the project specifications require equipment start-up, testing, and adjusting services. Requirements for start-up, testing, and adjusting services specified in the Division 7, Division 21, Division 22, Division 23, Division 26, and Division 27 series sections of these specifications are intended to be provided in coordination with the commissioning services and are not intended to duplicate services. The Contractor shall coordinate the work required by individual specification sections with the commissioning services requirements specified herein.
c. Where individual testing, adjusting, or related services are required in the project specifications and not specifically required by this commissioning requirements specification, the specified services shall be provided and copies of documentation, as required by those specifications, shall be submitted to the Contracting Officer and the Commissioning Agent to be indexed for future reference.
d. Where training or educational services are required and specified in the Division 7, Division 21, Division 22, Division 23 and Division 26, series Sections of the Specifications, these services are intended to be provided in addition to the training and educational services specified herein.
e. Commissioning is a systematic process of verifying that the building systems perform interactively according to the construction documents and User's operational needs. The commissioning process shall encompass and coordinate the system documentation, equipment startup, control system calibration, testing and balancing, performance testing and training.
Commissioning during the construction, acceptance, and warranty phases is intended to achieve the following specific objectives according to the contract documents:
(1) Verify that the applicable equipment and systems are installed in accordance with the contact documents and according to the manufacturer's recommendations.
(2) Verify and document proper integrated performance of equipment and systems.
(3) Verify that O&M documentation is complete.
(4) Verify that all components requiring servicing can be accessed, serviced and removed without disturbing nearby components including ducts, piping, cabling or wiring.
(5) Verify that the User's operating personnel are adequately trained.
(6) Document the successful achievement of the commissioning objectives listed above.
f. The commissioning process does not take away from or reduce the responsibility of the Contractor to provide a finished and fully functioning product.
1.3 DEFINITIONS
1.3.1 Architect/Engineer
Includes Architect/Engineer identified in the Contract for Construction
SECTION 01 91 13.00 50 Page 2 between the Government and Contractor, plus consultant/design professionals responsible for design of fire suppression, plumbing, HVAC, controls for HVAC systems, electrical, communications, electronic safety and security, as well as other related systems.
1.3.2 Commissioning Agent
Commissioning Agent appointed by the Government who will direct the commissioning process.
1.3.3 Commissioning Plan
Dynamic document that describes how the commissioning process will be applied to this project. It is an overall plan that provides the structure, schedule and coordination for the commissioning process.
1.3.4 Commissioning Issue
Condition in the installation or function of a component, piece of equipment or system that affects the system operations, maintenance, and/or repair.
1.3.5 Commissioning Observation
Condition in the installation or function of a component, piece of equipment or system that may not be in compliance with the Contract Documents, or may not be in compliance with the manufacturer's installation instruction, or may not be in compliance with generally accepted industry standards.
1.3.6 Systems Functional Performance Test
Test, or tests, of the dynamic function and operation of equipment and systems using manual (direct observation) or monitoring methods. Systems Functional Performance Testing is the dynamic testing of systems (rather than just components) under full operation (e.g., the chiller pump is tested interactively with the chiller functions to see if the pump ramps up and down to maintain the differential pressure setpoint). Systems are tested under various modes, such as during low cooling or heating loads, high loads, component failures, unoccupied, varying outside air temperatures, fire alarm, power failure, etc. The systems are run through all the control system's sequences of operation and components are verified to be responding as the sequences state. Traditional air or water test and balancing (TAB) is not functional testing, in the commissioning sense of the word. TAB's primary work is setting up the system flows and pressures as specified, while functional testing is verifying that which has already been set up. The Commissioning Agent develops the Systems Functional Test Procedures in a sequential written form, coordinates, directs and documents the actual testing. Systems Functional Testing is performed by the Contractor. Systems Functional Performance Tests are performed after System Readiness Checklists, startups, and control systems are complete and functional, and TAB functions are complete.
1.3.7 System
A system is defined as the entire complex which must be coordinated to work together during normal operation to produce results for which the complex is designed. For example, air conditioning supply air is only one component of an entire system which provides comfort conditions for a
SECTION 01 91 13.00 50 Page 3 building. Other related components are return air, exhaust air, steam supply, chilled water supply, refrigerant supply, hot water supply, controls and electrical service, etc. Another example of a complex which involves several components of different disciplines is a boiler installation. Efficient and acceptable boiler operation depends upon the coordination and proper operation of the fuel supply, combustion air, controls, steam, feedwater supply, condensate return and other related components.
1.3.8 System Readiness Checklist
List of items provided by the Commissioning Agent to the Contractor that require inspection and elementary component tests conducted to verify proper installation of equipment. System Readiness Checklists are primarily static inspections and procedures to prepare the equipment or system for initial operation (e.g., belt tension, oil levels OK, labels affixed, gages in place, sensors calibrated, etc.). However, some System Readiness Checklist items entail simple testing of the function of a component, a piece of equipment or system (such as measuring the voltage imbalance on a three-phase pump motor of a chiller system). The term "System Readiness" refers to before functional testing. System Readiness Checklists augment and are combined with the manufacturer's start-up checklist and the Contractor's Quality Control checklists.
1.3.9 Seasonal Performance Tests Functional Performance Test
Test or tests that are deferred until the system will experience conditions closer to their design conditions.
1.3.10 Owner
Includes the Contracting Officer, the User or other authorized representative of the Government.
1.3.11 TAB
Testing, Adjusting, and Balancing.
1.4 SYSTEMS TO BE COMMISSIONED
Commissioning of a system or systems specified for this project is part of the construction process. Documentation and testing of these systems, as well as training of the User's Operation and Maintenance personnel, is required in cooperation with the Contracting Officer and the Commissioning Agent.
1.4.1 Building Envelope (Division 7)
Section 07 08 00.00 50 COMMISSIONING OF BUILDING ENVELOPE.
a. Roof Systems (including flashing & sheet metal, metal roofing, roof specialties, and roof accessories).
b. Exterior Insulation and Finish Systems (EIFS).
c. Exterior Doors.
d. Exterior Windows.
SECTION 01 91 13.00 50 Page 4
e. Louvers and Vents.
g. Sealants (Caulking, mechanical seals, and wind and vapor barriers).
1.4.2 Fire Suppression (Division 21)
Section 21 08 00.00 50 COMMISSIONING OF FIRE PROTECTION SYSTEMS.
a. Fire Protection System (Fire pump, jockey pump, fire pump automatic transfer switch/controller, Wet-pipe fire suppression, Dry-pipe fire suppression, Pre-action fire suppression, dry system air compressors and motors, and clean agent fire suppression).
b. Smoke extraction systems.
1.4.3 Plumbing (Division 22).
Section 22 08 00.00 50 COMMISSIONING OF PLUMBING SYSTEMS.
a. Domestic Hot Water systems (gas water heaters, hot water circulating pumps and motors, controls, combustion burners/fans/motors, backflow preventers, water meters).
b. Domestic Water Booster Pumps (controls, piping, compression tanks, pumps, motors, and Variable Speed Drives).
c. Sewage Ejection Pumps (sump level controls, pump alternator, alarms and alarm panel, pumps and motors).
d. Storm Sump Pumps (sump level controls, pump alternator, alarms and alarm panel, pumps and motors).
e. Domestic Water Filtration and Softener Systems (Tanks and casings, gages and instruments, controls, pumps and motors - if applicable, packaged piping, alarms).
f. Chemical Waste System & Equipment (waste storage tanks or sumps, controls and alarms, pumps and motors - if applicable).
g. Process Water Systems (controls, piping, tanks and casings, gages and instruments, pumps, motors, and Variable Speed Drives - if applicable for reverse osmosis (RO) and deionized water (DI) systems).
h. Emergency Plumbing Fixtures (showers, eye wash stations, water tempering valves, instruments and gages).
i. Solar energy system (Differential temperature controller, controls and pumps).
1.4.4 HVAC (Division 23)
Section 23 08 00.00 50 COMMISSIONING OF HVAC.
a. Air Handling Systems (supply and return fans, motors, Variable Speed Drives, terminal units, cooling coils and control valves, heating coils and control valves, filters, humidifiers, airflow measuring stations, dampers, safeties such as smoke detectors or freezestats and damper end switches, controls, gages, and
SECTION 01 91 13.00 50 Page 5 vibration isolation). Computer room unit system. Split Systems.
b. Heating Hot Water Systems (boilers, controls, instrumentation and gages, flues, flow meters, pressure gages, heating water pumps and motors, Variable Speed Drives, mixing valves).
c. Chilled Water Systems (air cooled water chillers, chilled water pumps and motors, flow meters, Variable Speed Drives, chiller motor/compressor, controls, instrumentation and safeties, isolation valves, pressure gages, blending valves, side stream water cleaners/scrubbers/filters).
d. Exhaust Fans (fan, motor, Variable Speed Drives, controls and safeties). Smoke extraction systems.
e. Direct Digital Control System (BACnet or similar Local Area Network (LAN), Operator Work Station hardware and software, building controller hardware and software, terminal unit controllers hardware and software, all sequences of operation, system accuracy and response time).
f. Air Ventilation Systems (unit heaters, fan coil units, split system fan coil units, fans, motors, Variable Speed Drives, cooling coils and control valves, radiators, heating coils and control valves, humidifiers, compressors and liquid-cooled condensers, filters, safeties, controls, gages, vibration isolation, condensate pumps, water/leak detection system and alarms, and shunt trip shut down).
g. HVAC Water Treatment Systems (Closed circuits - including shot feeders and final water analysis, open circuits - including water analysis, chemical/biocide tanks, injection piping, chemical/biocide pumps and motors, controls, water meter, and automatic blowdown).
h. Fuel oil system (pump controls lead lag, leak detection alarms, high/low monitoring system and emergency stop.
1.4.5 Electrical (Division 26)
Section 26 08 00.01 50 COMMISSIONING OF ELECTRICAL SYSTEMS.
a. Utility service entrance Switchgear (Fuses and circuit breaker settings, metering, mimic diagram, gages, and controls).
b. Utility power unit substations (Transformers and tap settings, fuses and circuit breaker settings, metering, gages, and controls).
c. Automatic Transfer Switches (Test with associated generator).
d. Normal power distribution systems (Grounding tests, coordination study review, major circuit breaker settings, meters and gages, and controls).
e. Life Safety power distribution systems (Automatic transfer on loss of normal power, grounding tests, coordination study review, major circuit breaker settings, meters and gages, and controls).
f. Critical power distribution systems (Automatic transfer on loss of
SECTION 01 91 13.00 50 Page 6 normal power, grounding tests, coordination study review, major circuit breaker settings, meters and gages, and controls).
g. Essential Equipment power distribution systems (Automatic transfer on loss of normal power, grounding tests, coordination study review, major circuit breaker settings, meters and gages, and controls).
h. Lighting controls (Control system hardware and software, scene settings, zone settings, occupancy sensor interface, and unoccupied cycle control).
i. Uninterruptible Power Supply Systems and UPS Power Distribution systems (Battery chargers, static and dynamic power generators -i.e. inverters, MG sets, metering and controls, system power displays, and distribution panel circuit breakers).
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-05 Design Data
Commissioning Plan; G
Preliminary Construction Commission Plan Construction Commissioning Final
Systems Functional Performance Test Procedures; G
System Readiness Checklists; G
Corrective Action Documents; G
Issues Log; G
SD-06 Test Reports
Test and Inspection Reports; G
SD-11 Closeout Submittals
Commissioning Report; G
Preliminary Submittal Final Submittal Addendum to Final Commissioning Report
Systems Manual; G
Training Module; G
SECTION 01 91 13.00 50 Page 7
1.6 COMMISSIONING TEAM
1.6.1 Appointed by Contractor
1.6.1.1 Contractor
The designated person, company, or entity that plans, schedules and coordinates the commissioning activities for the construction team.
1.6.1.2 Contractor's Commissioning Representative(s)
Individual(s), each having authority to act on behalf of the entity he or she represents, explicitly organized to implement the commissioning process through coordinated actions. The commissioning team shall consist of, but not be limited to, representatives of Contractor, including Project Superintendent and sub-contractors, installers, suppliers, and specialists deemed appropriate by the Contracting Officer and Commissioning Agent.
1.6.2 Appointed by the Government
1.6.2.1 Commissioning Agent
The designated person, company, or entity that plans, schedules, and coordinates the commissioning team to implement the commissioning process.
the Government will engage the Commissioning Agent under a separate contract.
1.6.2.2 Facility Users
Representatives of the facility User and Operation and Maintenance personnel.
1.6.2.3 Architect/Engineer
Architect and engineering design professionals.
1.7 COMMISSIONING RESPONSIBILITIES
1.7.1 Owner's Commissioning Responsibilities
a. Appoint an individual, company or firm to act as the Commissioning Agent.
b. Assign operation and maintenance personnel and schedule them to participate in commissioning team activities including, but not limited to, the following:
(1) Coordination meetings.
(2) Training in operation and maintenance of systems, sub-systems, and equipment.
(3) Testing meetings.
(4) Witness and assist in systems functional testing.
(5) Demonstration of operation of systems, sub-systems, and equipment.
c. Provide the Construction Documents to the Commissioning Agent and for use in directing the commissioning process, developing the commissioning plan, systems manuals, and reviewing the operation and maintenance training plan.
SECTION 01 91 13.00 50 Page 8
1.7.2 Contractor's Commissioning Responsibilities
a. The Contractor shall assign a Commissioning Manager to manage commissioning activities of the Contractor, and sub-contractors.
b. The Contractor shall ensure that the commissioning responsibilities outlined in these specifications are included in all sub-contracts and that sub-contractors comply with the requirements of these specifications.
c. The Contractor shall ensure that each installing sub-contractor shall assign representatives with expertise and authority to act on behalf of the sub-contractor and schedule them to participate in and perform commissioning team activities including, but not limited to, the following:
(1) Participate in construction-phase commissioning coordination meetings.
(2) Conduct operation and maintenance training sessions in accordance with approved training plans.
(3) Verify that Work is complete and systems are operational according to the Contract Documents, including calibration of instrumentation and controls.
(4) Evaluate commissioning issues and commissioning observations identified in the Commissioning Issues Log, field reports, test reports or other commissioning documents. In collaboration with entity responsible for system and equipment installation, recommend corrective action.
(5) Review and comment on commissioning documentation.
(6) Participate in meetings to coordinate systems functional testing.
(7) Provide schedule for operation and maintenance data submittals, equipment startup, and testing to Commissioning Agent for incorporation into the commissioning plan. Update schedule on a weekly basis throughout the construction period.
(8) Provide information to the Commissioning Agent for developing construction-phase commissioning plan.
(9) Participate in training sessions for User's operation and maintenance personnel.
(10) Provide technicians who are familiar with the construction and operation of installed systems and who shall develop specific test procedures to conduct systems functional performance testing of installed systems.
1.7.3 Commissioning Agent's Responsibilities
a. Organize and lead the commissioning team.
b. Prepare the construction-phase commissioning plan. See Paragraph COMMISSIONING DOCUMENTATION, COMMISSIONING PLAN of this specification Section for further information.
c. Review and comment on selected submittals from the Contractor for general conformance with the Construction Documents. Review and comment on the ability to commission the system and/or equipment, including providing gages, controls and other components required to operate, maintain, and test the system. Review and comment on performance expectations of systems and equipment and interfaces
SECTION 01 91 13.00 50 Page 9 between systems relating to the Construction Documents.
d. At the beginning of the construction phase, conduct an initial construction-phase coordination meeting for the purpose of reviewing the commissioning activities and establishing tentative schedules for operation and maintenance submittals; operation and maintenance training sessions; TAB Work; Systems Readiness Checklists, Systems Functional Performance Testing; and Project completion.
e. Convene commissioning team meetings for the purpose of coordination, communication, and conflict resolution; discuss progress of the commissioning processes. Responsibilities include arranging for facilities, preparing agenda and attendance lists, and notifying participants. The Commissioning Agent shall prepare and distribute minutes to commissioning team members and attendees within five workdays of the commissioning meeting.
f. Observe construction and report progress, observations and issues. Observe systems and equipment installation for adequate accessibility for maintenance and component replacement or repair, and for general conformance with the Construction Documents.
g. Prepare Project-specific Systems Readiness Checklists and Systems Functional Performance Test procedures.
h. Coordinate Systems Functional Performance testing schedule with the Contractor. Witness selected systems startups. Verify selected Systems Readiness Checklists completed and submitted by the Contractor. Direct, witness, and document Systems Functional Performance testing.
i. Compile test data, inspection reports, and certificates and include them in the systems manual and commissioning report.
j. Review and comment on operation and maintenance (O&M) documentation and systems manual outline for compliance with the Contract Documents. Operation and maintenance documentation requirements are specified in Section 01 78 23 OPERATION AND
MAINTENANCE DATA.
k. Review operation and maintenance training program developed by the Contractor. Verify training plans provide qualified instructors to conduct operation and maintenance training.
l. Prepare commissioning reports.
m. Return to the site at 10 months into the 12 month warranty period and review with facility staff the current building operation and the condition of outstanding issues related to the original and seasonal commissioning. Also interview facility staff and identify problems or concerns they have operating the building as originally intended. Make suggestions for improvements and for recording these changes in the O&M manuals. Identify areas that may come under warranty or under the original construction contract. Assist facility staff in developing reports, documents and requests for services to remedy outstanding problems.
n. Assemble the final commissioning documentation, including the
SECTION 01 91 13.00 50 Page 10
Final Commissioning Report and Addendum to the Final Commissioning Report.
1.8 COMMISSIONING DOCUMENTATION
1.8.1 Commissioning Plan
A document, prepared by Commissioning Agent, that outlines the schedule, allocation of resources, and documentation requirements of the commissioning process, and shall include, but is not limited to the following:
a. Plan for delivery and review of submittals, systems manuals, and other documents and reports. Identification of the relationship of these documents to other functions and a detailed description of submittals that are required to support the commissioning processes. Submittal dates shall include the latest date approved submittals must be received without adversely affecting commissioning plan.
b. Description of the organization, layout, and content of commissioning documentation (including systems manual) and a detailed description of documents to be provided along with identification of responsible parties.
c. Identification of systems and equipment to be commissioned.
d. Description of schedules for testing procedures along with identification of parties involved in performing and verifying tests.
e. Identification of items that must be completed before the next operation can proceed.
f. Description of responsibilities of commissioning team members.
g. Description of observations to be made.
h. Description of requirements for operation and maintenance training, including required training materials.
i. Description of expected performance for systems, sub-systems, equipment, and controls.
j. Schedule for commissioning activities with specific dates coordinated with overall construction schedule.
k. Identification of installed systems, sub-systems, and equipment, including design changes that occurred during the construction phase.
l. Process and schedule for documenting changes on a continuous basis to appear in Project Record Documents.
m. Process and schedule for completing prestart and startup checklists for systems, sub-systems, and equipment to be verified and tested.
n. Step-by-step procedures for testing systems, sub-systems, and
SECTION 01 91 13.00 50 Page 11 equipment with descriptions for methods of verifying relevant data, recording the results obtained, and listing parties involved in performing and verifying tests.
1.8.2 Systems Functional Performance Test Procedures
The Commissioning Agent will develop Systems Functional Performance Test Procedures for each system to be commissioned, including sub-systems, or equipment and interfaces or interlocks with other systems. Systems Functional Performance Test Procedures will include a separate entry, with space for comments, for each item to be tested. Preliminary Systems Functional Performance Test Procedures will be provided to the Contracting Officer, Architect/Engineer, and Contractor for review and comment. The Systems Performance Test Procedure will include test procedures for each mode of operation and provide space to indicate whether the mode under test responded as required. Each System Functional Performance Test procedure, regardless of system, sub-system, or equipment being tested, shall include, but not be limited to, the following:
a. Name and identification code of tested item.
b. Test number.
c. Time and date of test.
d. Indication of whether the record is for a first test or retest following correction of a problem or issue.
e. Dated signatures of the person performing test and of the witness, if applicable.
f. Individuals present for test.
g. Observations and Issues.
h. Issue number, if any, generated as the result of test.
1.8.3 System Readiness Checklists
The Commissioning Agent will prepare Systems Readiness Checklists that describe the minimum conditions necessary prior to testing. System Readiness Checklists shall be completed and signed by the Contractor, verifying that systems, sub-systems, equipment, and associated controls are ready for testing. The Commissioning Agent will spot check System Readiness Checklists to verify accuracy and readiness for testing.
Inaccurate System Readiness Checklists shall be returned to the Contractor for correction and resubmission.
1.8.4 Test and Inspection Reports
The Commissioning Agent will record test data, observations, and measurements on Systems Functional Performance Test Procedure forms.
Photographs, forms, and other means appropriate for the application shall be included with data. Commissioning Agent shall compile test and inspection reports and test and inspection certificates and include them in systems manual and commissioning report.
SECTION 01 91 13.00 50 Page 12
1.8.5 Corrective Action Documents
The Commissioning Agent will document corrective action taken for systems and equipment that fail tests. The documentation will include any required modifications to systems and equipment and/or revisions to test procedures, if any. The Commissioning Agent will direct and document any retesting of systems and/or equipment requiring corrective action and document retest results.
1.8.6 Issues Log
The Commissioning Agent will prepare and maintain Master Commissioning Issues Log that describes Commissioning Issues and Commissioning Observations that are identified during the Commissioning process. These observations and issues include, but are not limited to, those that are at variance with the Contract Documents. The Master Commissioning Issues Log will identify and track issues as they are encountered, the party responsible for resolution, progress toward resolution, and documenting how the issue was resolved. The Master Commissioning Issues Log will also track the status of unresolved and resolved issues.
1.8.6.1 Creating an Issues Log Entry
a. Identify the issue with unique numeric or alphanumeric identifier by which the issue may be tracked.
b. Assign a descriptive title of the issue.
c. Identify date and time of the issue.
d. Identify test number of test being performed at the time of the observation, if applicable, for cross-reference.
e. Identify system, sub-system, and equipment to which the issue applies.
f. Identify location of system, sub-system, and equipment.
g. Include information that may be helpful in diagnosing or evaluating the issue.
h. Note recommended corrective action.
i. Identify commissioning team member responsible for corrective action.
j. Identify expected date of correction.
k. Identify person documenting the issue.
1.8.6.2 Documenting Issue Resolution
a. Log date correction is completed or the issue is resolved.
b. Describe corrective action or resolution taken. Include description of diagnostic steps taken to determine root cause of the issue, if any.
c. Identify changes to the Contract Documents that may require action.
SECTION 01 91 13.00 50 Page 13
d. State that correction was completed and system, sub-system, and equipment are ready for retest, if applicable.
e. Identify person(s) who corrected or resolved the issue.
f. Identify person(s) documenting the issue resolution.
1.8.7 Commissioning Report
1.8.7.1 Final Commissioning Report
The Commissioning Agent will document results of the commissioning process, including unresolved issues, and performance of systems, sub-systems, and equipment. The Commissioning Report will indicate whether systems, sub-systems, and equipment have been completed and are performing according to the Contract Documents. The commissioning report will include, but is not limited to, the following:
a. Lists and explanations of substitutions; compromises; variances with the Contract Documents; record of conditions; and, if appropriate, recommendations for resolution. This report will be used by the Contracting Officer when determining that systems will be accepted. This report will be used to evaluate systems, sub-systems, and equipment and will serve as a future reference document during Owner occupancy and operation. It shall describe components and performance that exceed requirements of the Contract Documents and those that do not meet requirements of the Contract Documents. It may also include a recommendation for accepting or rejecting systems, sub-systems, and equipment.
b. Owner's Project Requirements.
c. Commissioning plan.
d. System Readiness Checklists completed by the Contractor, with annotation of the Commissioning Agent review and spot-check.
e. Systems Functional Performance Test Procedures, with annotation of test results.
f. Corrective Action Reports with annotation of corrective action taken by the Contractor.
g. Commissioning Master Issues Log.
h. Listing of deferred or off-season test(s) not performed, including the schedule for their completion.
1.8.7.2 Addendum to Final Commissioning Report
The Commissioning Agent will prepare an Addendum to the Final Commissioning Report near the end of the Warranty Period. The Addendum will indicate whether systems, sub-systems, and equipment are complete and continue to perform according to the Contract Documents. The Addendum to the Final Commissioning Report shall include, but is not limited to, the following:
a. Documentation of deferred or off-season test(s) results.
SECTION 01 91 13.00 50 Page 14
b. Completed Systems Functional Test Procedures for off-season test(s).
c. Updated status of unresolved issues.
d. Documentation that unresolved system performance issues have been resolved.
e. Updated Commissioning Master Issues Log.
f. Identification of potential Warranty Claims to be corrected by the Contractor.
1.8.8 Systems Manual
The Commissioning Agent will gather required information and compile the Systems Manual. The Systems Manual will include, but is not limited to, the following:
a. Owner's Project Requirements.
b. Design Narrative, including system narratives, schematics, single-line diagrams, flow diagrams, equipment schedules, and changes made throughout the Project.
c. Reference to the Final commissioning plan.
d. Reference to the Final Commissioning report.
e. Operation and maintenance data as specified in Section 01 78 23
OPERATION AND MAINTENANCE DATA.
1.9 COMMISSIONING PROCESS
a.