This document contains a Data Item Description (DID) for a Status Report. The DID provides instructions for contractors to report the status of their efforts in meeting contract objectives, including accomplishments, difficulties, progress against goals and resources expended. Reports are to be submitted monthly, interim or final using an 8x11 inch page size and identifying the contract number, period covered, and security classification if required. The report must summarize project status, milestone/task status including schedule adherence and percentage completion, future plans, itemized man-hours and costs for the period, contract deliverables status, and identify the report preparer. Appendices may also be included.

DiD

View the file

Other files

File Type Posted
M67854-18-R-2023 MCH CDRL D003.pdf PDF
DI-MISC-80508B.pdf PDF
M67854-18-R-2023 MCH CDRL D007.pdf PDF
M67854-18-R-2023 MCH CDRL D001.pdf PDF
M67854-18-R-2023 MCH CDRL B003.pdf PDF
DI-SESS-80639D.pdf PDF
DI-SESS-81758A.pdf PDF
M67854-18-R-2023 MCH CDRL D008.pdf PDF
Attachment_3_MCH_RCM_PSPEC.xlsx XLSX spreadsheet
DI-MGMT-82135 Tailored for M67854-18-R-2023 A009.pdf PDF
DI-IPSC-81430A.pdf PDF
DI-QCIC-80553A.PDF PDF
M67854-18-R-2023 MCH CDRL A00A.pdf PDF
M67854-18-R-2023 TDP Option Selection Worksheet.docx DOCX document
Combined_Synopsis.docx DOCX document
M67854-18-R-2023 MCH CDRL A00E.pdf PDF
Attachment_2_DD254.pdf PDF
DI-MGMT-82000 Tailored for M67854-18-R-2023 A008.pdf PDF
M67854-18-R-2023 MCH CDRL B001.pdf PDF
DI-SESS-81000E.pdf PDF
DI-TMSS-81815.pdf PDF
M67854-18-R-2023 MCH CDRL A006.pdf PDF
M67854-18-R-2023 MCH CDRL A00C.pdf PDF
DI-SESS-81248B.pdf PDF
Attachment_1_PWS_MCH_.docx DOCX document
M67854-18-R-2023 MCH CDRL A002.pdf PDF
M67854-18-R-2023 MCH CDRL D002.pdf PDF
M67854-18-R-2023 MCH CDRL A008.pdf PDF
M67854-18-R-2023 MCH CDRL B002.pdf PDF
M67854-18-R-2023 MCH CDRL A003.pdf PDF
Exhibit_1_Past_Performance_Questionnaire.docx DOCX document
M67854-18-R-2023 Tailored LOG Product Data Summaries.docx DOCX document
M67854-18-R-2023 MCH CDRL A001.pdf PDF
DI-QCIC-81891.pdf PDF
M67854-18-R-2023 MCH CDRL D006.pdf PDF
DI-MISC-81356A.pdf PDF
DI-IPSC-81432A.pdf PDF
M67854-18-R-2023 MCH CDRL A004.pdf PDF
DI-PSSS-82046.pdf PDF
Attachment_5_System_Volume_Pricing.xlsx XLSX spreadsheet
DI-MGMT-80894A.pdf PDF
M67854-18-R-2023 MCH CDRL D004.pdf PDF
M67854-18-R-2023 PPIP Special Instructions.docx DOCX document
DI-MGMT-81826C Tailored for M67854-18-R-2023 B002.pdf PDF
DI-SESS-81639.pdf PDF
DI-SESS-81759.pdf PDF
DI-SAFT-80102C.pdf PDF
DI-PSSS-81656B.pdf PDF
DI-IPSC-81442A.pdf PDF
M67854-18-R-2023 MCH CDRL D009.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: Status Report

Number: DI-MGMT-80368A Approval Date: 30 OCT 2006 AMSC Number: 7619 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/DA02 Applicable Forms: N/A

Use/relationship:

The Status Report documents the status of contractor effort towards achieving contract objectives. It identifies accomplishments to date and difficulties encountered, and compare the status achieved to planned goals and the resources expended. It is used by the Government to monitor and evaluate contractor performance.

This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

It is not intended that all requirements herein should be applied to every program.

Portions of the DID are subject to tailoring by deletion depending on the specific status reporting requirements of the project.

This DID is related to DI-FNCL-80331, Funds and Man-Hour Expenditure Report which can be used in conjunction with this report if paragraph 3.2.3 below is deleted.

This DID supersede DI-MGMT-80368.

Requirements:

1. Reference documents. None.

2. Format. The Status Report shall be in contractor format.

2.1 Identification. The data indicated below shall be contained on a title page or on the first page of the report.

a. Title/identification of the system/component/program/project.

Downloaded from http://www.everyspec.com

DI-MGMT-80368A

b. Type of report (e.g., monthly, interim, final).

c. Period covered by the report.

d. Contract number.

e. Preparing activity or contractor’s title.

f. Security classification, when required.

g. Distribution Statement.

2.2 Page size. The report shall be on 8 ½ by 11 inch (metric A4) paper.

3. Content. The report shall contain the following:

3.1 Summary. The summary shall include a brief statement of the overall project status , covering the accomplished technical activities and development, objectives of efforts, summary results of efforts, identification of major problems/deficiencies with impact, and recommended solutions.

3.2 Body of report. The Status Report shall contain the following items, where applicable:

3.2.1 Milestone/task status. The status of each milestone/task as defined by the statement of work or contract, as applicable:

a. A statement as to whether or not the program/project/task is on schedule; if not, the effort planned to meet the schedule shall be indicated. Include an overall status of each milestone, task, or unit of work. Include update schedule sheets, milestone charts, or task synopsis sheets identifying phase of task and percentage of completion of each task, technical instruction, or order.

b. A comparison of achieved end-product performance capabilities projected against contract baseline values, requirements, or allocations.

c. Effort expended on each task to date, and a brief description of technical developments and accomplishments.

d. Key dates in any testing program and description of tests performed and significant test results. If applicable, a description of the amount and type of down time on the equipment or system under test.

e. A list of all designs completed and a brief description of each item. For designs in process, provide estimated dates for design and drawing completion.

f. A narrative of outstanding problems existing as of the previous status report, and their resolution status. 2

DI-MGMT-80368A

g. New problem areas encountered or anticipated, their effect on the overall work effort/project and steps being taken to remedy problem situations.

h. Significant results of conferences, trips, or directives for the Contracting officer’s representatives.

i. Any other information which may cause significant changes in the program schedule.

3.2.2 Future plans. Summary of future plans, recommendations and proposals both for the next reporting period and for any long term plans.

3.2.3 Itemized man-hours and costs. Itemized man-hour and cost expenditure incurred for the reporting period by category and task, total contractual expenditures, and funds remaining as of the reporting date.

3.2.4 Contract deliveries status. The status of each deliverable end item, including data deliverables, as required by the contract. Provide item and contract identification, shipping/transmittal data, acceptance status, security classification, and schedule due date information.

3.2.5 Report preparer. Name of person(s) preparing report and telephone number(s).

3.3 Appendices. Appendices where applicable, for tables, references, charts, or other descriptive material. Each appendix shall be identified and referenced in the appropriate area of the report.

4. END OF DI-MGMT-80368A