This document is a Data Item Description (DID) for a Status Report, which is used by the government to monitor and evaluate contractor performance on a contract. The report documents the status of the contractor's efforts towards achieving contract objectives, including accomplishments to date, difficulties encountered, and a comparison of the achieved status against planned goals and resources expended. The report contains a summary, the body covering milestone/task status, future plans, itemized man-hours and costs, contract deliveries status, and appendices as applicable.

The related federal contract opportunity is a Request for Quotation (RFQ) for a High-Power Pulse Amplifier (X-Band Amplifier), Qty. 1, required for delivery no later than September 2026. The procurement will use Simplified Acquisition Procedures, with award based on Lowest Price Technically Acceptable. Proposals are due by 04 June 2024, 12:00 p.m. EST. The contract will be firm fixed price, and the requirement is not eligible for small business set-aside. Material must be Trade Agreements Act (TAA) compliant.

View the file

Other versions and copies of DI-MGMT-80368A

File Revision Posted Attached to
A8a DI-MGMT-80368A Status Report.pdf Rev. A RAMP Facilities Services BPA
DI-MGMT-80368A.pdf Rev. A Qualitative Data Methods & Narrative Impact Training
0224-01 - BAE DIGAR Support - DID DI-MGMT-80368A.pdf Rev. A BAE DIGAR Support
0217-06 HF E-Field Meter DID DI MGMT-80368A.pdf Rev. A HF-E Field Meter
DiD-DI-MGMT-80368A-Status Report.pdf Rev. A Repair of B-2 Transponder Set (KU Band)
CDRL FD2030-25-30244 DI-MGMT-80368A.pdf Rev. A F100-PW-220 Sprayring Manifold Assemblies
DI-MGMT-80368A.pdf Rev. A F100-PW-220 Sprayring Manifold Assemblies
DI_MGMT_80368A.pdf Rev. A 1st Stage Turbine Stator Support (TOBI)
DI-MGMT-80368A.pdf Rev. A Remanufacture F110-100 and F110-129 FDT Sensors
DI-MGMT-80368A.pdf Rev. A Remanufacture of F110-100 & F110-129 FDT Sensors
DI-MGMT-80368A.pdf Rev. A Repair/Overhall F-100-PW-220/229 Electro-Hydraulic Servo Valve (EHSV) Kits. Multiple NSNs
DI-MGMT-80368A.pdf Rev. A Remanufacture of Air Launched Cruise Missile (ALCM) Air Cycle Machine (ACM)
0616-03 - Leadership BPA - DID DI-MGMT-80368A (Status Rpt).pdf Rev. A Leadership BPA
7. DI-MGMT-80368A.pdf Rev. A CASE MANAGEMENT EXCELLENCE (CME) TRAINING PROGRAM SUPPORT
7. DI-MGMT-80368A Status Report.pdf Rev. A ELECTRONIC SECURITY SYSTEM TECHNICAL AND NETWORK ENGINEERING SUPPORT
Attachment 9 DI-MGMT-80368A (Status Report Update).pdf Rev. A BASE WIDE WI-FI AVIANO AIR BASE ITALY
CDRL 001 DI-MGMT-80368A - Status Report.pdf Rev. A HC-130J Paratroop Bubble Door Repair
DI-MGMT-80368A-Status Report.pdf Rev. A Repair of B-2 Tailpipe and Duct Assembly
DI-MGMT-80368A.pdf Rev. A CME Training Program
CDRL Attachment - Data Acquisition Document DI-MGMT-80368.pdf Revision not stated RFP- Technical Sensory Training (Amend 5)
Show all 20

Who attaches DI-MGMT-80368A

Other files

File Type Posted
N0017824RC608 0001 AMENDED SOLICITATION.pdf PDF
EVALUATION CRITERIA.docx DOCX document
CDRL A002 signed Redacted.pdf PDF
CDRL A004 Signed Redacted.pdf PDF
CDRL A001 Signed Redacted.pdf PDF
DI-TMSS-80527D.pdf PDF
Xband Perf Specs.docx DOCX document
N0017824RC608 SF1449.pdf PDF
DI-PSSS-80134B.pdf PDF
DI-SESS-81003F.pdf PDF
CDRL A003 Signed Redacted.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: Status Report

Number: DI-MGMT-80368A Approval Date: 30 OCT 2006 AMSC Number: 7619 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/DA02 Applicable Forms: N/A

Use/relationship:

The Status Report documents the status of contractor effort towards achieving contract objectives. It identifies accomplishments to date and difficulties encountered, and compare the status achieved to planned goals and the resources expended. It is used by the Government to monitor and evaluate contractor performance.

This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

It is not intended that all requirements herein should be applied to every program.

Portions of the DID are subject to tailoring by deletion depending on the specific status reporting requirements of the project.

This DID is related to DI-FNCL-80331, Funds and Man-Hour Expenditure Report which can be used in conjunction with this report if paragraph 3.2.3 below is deleted.

This DID supersede DI-MGMT-80368.

Requirements:

1. Reference documents. None.

2. Format. The Status Report shall be in contractor format.

2.1 Identification. The data indicated below shall be contained on a title page or on the first page of the report.

a. Title/identification of the system/component/program/project.

Source: http://assist.dla.mil -- Downloaded: 2024-04-19T10:35Z Check the source to verify that this is the current version before use.

DI-MGMT-80368A

b. Type of report (e.g., monthly, interim, final).

c. Period covered by the report.

d. Contract number.

e. Preparing activity or contractor’s title.

f. Security classification, when required.

g. Distribution Statement.

2.2 Page size. The report shall be on 8 ½ by 11 inch (metric A4) paper.

3. Content. The report shall contain the following:

3.1 Summary. The summary shall include a brief statement of the overall project status , covering the accomplished technical activities and development, objectives of efforts, summary results of efforts, identification of major problems/deficiencies with impact, and recommended solutions.

3.2 Body of report. The Status Report shall contain the following items, where applicable:

3.2.1 Milestone/task status. The status of each milestone/task as defined by the statement of work or contract, as applicable:

a. A statement as to whether or not the program/project/task is on schedule; if not, the effort planned to meet the schedule shall be indicated. Include an overall status of each milestone, task, or unit of work. Include update schedule sheets, milestone charts, or task synopsis sheets identifying phase of task and percentage of completion of each task, technical instruction, or order.

b. A comparison of achieved end-product performance capabilities projected against contract baseline values, requirements, or allocations.

c. Effort expended on each task to date, and a brief description of technical developments and accomplishments.

d. Key dates in any testing program and description of tests performed and significant test results. If applicable, a description of the amount and type of down time on the equipment or system under test.

e. A list of all designs completed and a brief description of each item. For designs in process, provide estimated dates for design and drawing completion.

f. A narrative of outstanding problems existing as of the previous status report, and their resolution status. 2

DI-MGMT-80368A

g. New problem areas encountered or anticipated, their effect on the overall work effort/project and steps being taken to remedy problem situations.

h. Significant results of conferences, trips, or directives for the Contracting officer’s representatives.

i. Any other information which may cause significant changes in the program schedule.

3.2.2 Future plans. Summary of future plans, recommendations and proposals both for the next reporting period and for any long term plans.

3.2.3 Itemized man-hours and costs. Itemized man-hour and cost expenditure incurred for the reporting period by category and task, total contractual expenditures, and funds remaining as of the reporting date.

3.2.4 Contract deliveries status. The status of each deliverable end item, including data deliverables, as required by the contract. Provide item and contract identification, shipping/transmittal data, acceptance status, security classification, and schedule due date information.

3.2.5 Report preparer. Name of person(s) preparing report and telephone number(s).

3.3 Appendices. Appendices where applicable, for tables, references, charts, or other descriptive material. Each appendix shall be identified and referenced in the appropriate area of the report.

4. END OF DI-MGMT-80368A

DATA ITEM DESCRIPTION
Requirements:

File details come from the government source that posted it. Updated .