This is a structural engineering detail drawing (S-FD-S-801) showing various foundation and support details for equipment and structures at the Long-Baseline Neutrino Facility (LBNF) at Fermilab. The drawing includes seven detailed sections showing specifications for equipment mat foundations, bollard installations, exterior pipe supports, and platform details.
The drawing provides specific construction requirements including concrete pad thicknesses, reinforcement specifications, insulation requirements, and dimensional details for various foundation elements. Key features include frost protection measures with extruded polystyrene insulation, properly compacted subgrade preparation requirements, and detailed specifications for steel components like bollards, pipe supports, and platform structures. The drawing is stamped by Professional Engineer Alex R. Weiers and was most recently revised on November 10, 2023 as part of the LBNF-FSCF-BSI Surface project construction documents.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11332
ALEX R.
WEIERS
R
EG
IS
TE
RED PROFESSIONAL ENG
IN
E ER
REG. NO.
S
O
U TH D A KO
T
A
DATE:
EQUIPMENT
(REF PLAN)
KE
YN
O
TE
S R
EF
P
LA
N
[0 .0 m
3"
C
LR
REF CIVIL SITE PLANMAT ELEV
REF PLAN
1" RADIUS BULLNOSE
EQUIPMENT- COORDINATE
UTILITY SLEEVES WITH
FIELD PIPING/CONDUIT
(REF MECH/ELEC)
[0 .4 m
1'
6"
M
IN
[0 .1 m
6"
PROPERLY COMPACTED
EXISTING SUBGRADE SOILS OR
ENGINEERED FILL AS APPROVED
BY TESTING SERVICE (REF 312000
EARTHMOVING SPEC FOR
ADDITIONAL REQUIREMENTS)
3" THICK TYPE V EXTRUDED
POLYSTYRENE (XPS) RIGID INSULATION-
REFERENCE S-002
6"(MIN) GRAVEL/DRAINAGE
COURSE, NON-FROST
SUSCEPTIBLE LAYER
#6 L-BAR @ 10"OC
4'-0" (MIN)
EQUIPMENT ANCHORAGE TO MAT
FOUNDATION- COORDINATE
REQUIREMENTS WITH
EQUIPMENT SUPPLIER & EOR
11/10/2023
TOC
REF PLAN
IJ W/ SEALANT & BACKER ROD
[0 .0 m
3"
C
LR
PAVEMENT SECTION-
REF CIVIL PLANS
REMOVABLE BOLLARD W/ SLEEVE
SHOWN. REF CIVIL SHEETS C-201 &
C-802 FOR ADDITIONAL INFORMATION
& DETAILS. OWNER TO SELECT
LOCATIONS FOR REMOVABLE VERSUS
NON-REMOVABLE BOLLARDS.
(4)#5 X 24" @ 45º (T&B) @
BOLLARD (8 TOTAL BARS)
MAT ELEV
REF PLAN
10" TYP
REF PLANS & KEYNOTES FOR
THICKNESS & REINFORCEMENT
ST
AN
D
AR
D
" E M
BE
D
[0 .1 m
6"
1" RADIUS BULLNOSE
PROPERLY COMPACTED EXISTING SUBGRADE
SOILS OR ENGINEERED FILL AS APPROVED BY
TESTING SERVICE (REF 312000 EARTHMOVING
SPEC FOR ADDITIONAL REQUIREMENTS)
3" THICK TYPE V EXTRUDED
POLYSTYRENE (XPS) RIGID
INSULATION- REFERENCE S-002
#6 L-BAR @ 10"OC
4'-0" MIN
6"(MIN) GRAVEL/DRAINAGE
COURSE, NON-FROST
SUSCEPTIBLE LAYER
[0 .4 m
1'
6"
(2)L4"X4"X1/4" X 0'-6" W/ (2)3/4"Ø A325
BOLTS EA LEG
BEAMS- REF PLAN
3/16"
TYP
1/4"
1/4" KICK PLATE & 1/4” COLUMN CAP (BEYOND)
COLUMN- REF PLAN
3/4"X10"X10" BASE PLATE
W/(4) 3/4"Ø X 12" EMBED AB
ATOP 1-1/2" NSNM GROUTTO PIER
FIELD VERIFY
5' -0
" B
EL
O W
G R
AD
E
[0 .1 m
6"
#4 TIES @ 12" OC
(8) #6 VERTS
(3) #4 TIES IN TOP 9" OF PIER
REF PLAN
BAR GRATE- REF PLAN
[0 .1 m
4"
RAILING- REF ARCH
DOUBLE ANGLE BEAM-TO-BEAM
TYPICAL CONNECTIONS
TO BAR GRATE
REF PLAN
3/ 4"
EXISTING/PROPOSED
GROUND ELEVATION-
REF CIVIL
1/4" X 4" X 0'-6" TAB PL W/
(2)3/4"Ø A325N BOLTS
NOTE: ALL STEEL TO BE GALVANIZED
1/2"
1/4"X8"X8" BASE PLATE
W/(4) 3/8"⌀ X 2 1/2" EMBED AB
USE HILTI HUS EZ OR EQUAL
L3"X3"X1/4"
SU
PP
LI
ER
IN
ST
AL
LE
R
VE
R
IF
Y
W / E
Q
UI
PM
EN
T
3/16" 3"
GENERAL NOTES:
- SPACE PIPE STANDS @ 8'-0" (MAX)
- NO MORE THAN 3 PIPES PER PIPE STAND
- SPACE PIPE STANDS A MINIMUM OF 2'-0" FROM BUILDING
- ALL STEEL SHALL BE GALVANIZED
1/4"X8"X8" BASE PLATE
W/(4) 3/8"⌀ X 2 1/2" EMBED AB
USE HILTI HUS EZ OR EQUAL
L3"X3"X1/4"
3/16" 3"
MULTIPLE PIPES ON PIPE STAND SINGLE PIPE ON PIPE STAND
PIPE W/INSULATION
(REF PROCESS PIPE DWGS)
U BOLT
1/2" IJ W/ SEALANT & BACKER ROD
[0 .0 m
3"
C
LR
MAT ELEV
REF PLAN
REF PLANS & KEYNOTES FOR
THICKNESS & REINFORCEMENT
A
EXISTING
WAREHOUSE
FOUNDATION-
FIELD VERIFY
EXISTING
WAREHOUSE
WALL (FRAME
AS OCCURS)
REF 5/S-801
#6 L-BAR @ 10"OC
REINFORCED CAST-IN-PLACE CONCRETE
FOUNATION PAD- REF PLANS & KEYNOTES
3/4" CHAMFER
TOC ELEV
6" ABOVE GRADE
PROPERLY RECOMPACTED EXISTING
SUBGRADE SOILS OR ENGINEERED FILL AS
APPROVED BY GEOTECH/TESTING SERVICE
[0 .1 m
6"
[0 .0 m
2"
(M
IN
[0 .1 m
6"
[0 .3 m
1'
0"
NON-FROST SUSCEPTIBLE FILL
2" THICK TYPE IV (TYPE V, VI, VII ALSO
ACCEPTABLE) EXTRUDED
POLYSTYRENE (XPS) RIGID INSULATION
6"(MIN) GRAVEL/SAND DRAINAGE
COURSE LAYER
[0.30 m]
1' - 0" 4'-0" (TYP)
#5 CONT NOSING BAR
(2)#5 CONT [0
.1 m
6"
#4 L-BAR @ 12"OC
BEAMS- REF PLAN
1/4" KICK PLATE
COLUMN- REF PLAN &
4/S-801 FOR PIER DETAIL
BAR GRATE- REF PLAN
[0 .1 m
4"
RAILING- REF ARCH
TO BAR GRATE
REF PLAN
1/4" STIFFENER PLATE @ OUTSIDE
OF PERIMETER BEAMS ONLY
3/4" COLUMN CAP PLATE
W/ (4)3/4"Ø A325 BOLTS
1/4"
DOUBLE ANGLE PURLIN
CONNECTIONS (REF 4/S-801)
TSP, Inc.
600 Kansas City St.
Rapid City, SD 57701 phone: (605) 343-6102 fax: (605) 343-7159 www.teamtsp.com
Arup USA Inc 77 Water Street, New York NY 10005, T 212 896 3000 www.arup.com
DRAWING NO.
SCALE:
REV.
REVISIONS
DESIGNED
DRAWN
CHECKED
DESCRIPTIONDATEREV.
Fermilab Long-Baseline Neutrino Facility
/1 /2
/9
/2
4:
:4
P
M L:
T
S P
R ev it Lo ca l\0
9.
T
S P
L B
N F
S
_w ei er sa r@ te am ts p.
co m .r vt
1115-1-6J S-FD-S-801
SURFACE
LBNF - FSCF - BSI
TMH
ARW
ARW TSP
STRUCTURAL
DETAILS
TSP
TSP
AS NOTED
SCALE: 3/4" = 1'-0"
TYPICAL EQUIPMENT MAT
FOUNDATION
SCALE: 3/4" = 1'-0"
EQUIPMENT MAT
FOUNDATION W/ BOLLARD
SCALE: 3/4" = 1'-0"
4ROSS DRY PLATFORM
SCALE: 3/4" = 1'-0"
3EXTERIOR PIPE SUPPORT
SCALE: 3/4" = 1'-0"
EQUIPMENT MAT
FOUNDATION AT EXIST
SCALE: 3/4" = 1'-0"
TRANSFORMER FROST
PROTECTED CONCRETE
PAD 10
SCALE: 3/4" = 1'-0"
ROSS DRY PLATFORM
CONT BEAM/COL 10
2 11/16/18 60% FD SUBMISSION
3 02/22/19 90% FD SUBMISSION
4 05/03/19 100% FD SUBMISSION
5 07/24/19 100% FD UPDATE
6 08/21/20 90% DRAFT FD UPDATE
7 10/01/20 90% FD UPDATE
8 11/20/20 100% FD UPDATE
9 05/21/21 ISSUED FOR CONSTRUCTION - BSI HEADFRAME HEATERS
10 03/17/23 ADDENDUM 3
11 11/10/23 ISSUED FOR CONSTRUCTION