This document is a Piping and Instrumentation Diagram (P&ID) for the Argon Receiving Facilities as part of the LBNF (Long-Baseline Neutrino Facility) project.

The key details are:

The Argon Receiving system serves as the entry point for liquid argon (LAr) to the LBNF systems located at the Sanford Underground Research Facility (SURF) in Lead, South Dakota. The system includes two dedicated truck offloading stations, two 50 m3 LAr storage tanks, equipment to discharge LAr from the tanks and vaporize it into gaseous argon (GAr) for transfer to the LBNF cryogenics subsystems, and all interconnecting piping and equipment. The successful bidder will be responsible for engineering, manufacturing, delivering, installing, and performing acceptance testing of the Argon Receiving system. This is part of the broader LBNF project, which will provide the infrastructure to support the Deep Underground Neutrino Experiment (DUNE) neutrino detectors located deep underground at SURF.

View the file

Other files

File Type Posted
J-1 FFDG General Terms and Conditions for Subcontracts Combining Supplies and Services Performed at SURF (01.2025).pdf PDF
J-2 2025 INSURANCE REQUIREMENTS FOR FRA SUBCONTRACTED WORK AT SURF Risk category 3 (Rev 01.pdf PDF
Amendment 06--RFP LBNF-357714-JD.pdf PDF
Amendment 05--RFP LBNF-357714-JD.pdf PDF
Amendment 04--RFP LBNF-357714-JD.pdf PDF
S-FD-S-002.09.IFC.09.01.pdf PDF
S-FD-S-401.10.IFC.10.01.pdf PDF
S-FD-S-701.08.IFC.08.01.pdf PDF
S-FD-C-402.05.IFC.05.01.pdf PDF
S-FD-S-801.10.IFC.10.01.pdf PDF
S-FD-C-401.08.IFC.08.01.pdf PDF
Amendment 03--RFP LBNF-357714-JD-Approved.pdf PDF
S-FD-A-104.09.IFC.09.01.pdf PDF
S-FD-A-103.09.IFC.09.01.pdf PDF
QA - Appendix 1 - ARF Layout with labels.png PNG image
Amendment 02--RFP LBNF-357714-JD.pdf PDF
F10028336.04_Receiving_Facilities._Gas_Analyzers_.pdf PDF
Amendment 01--RFP LBNF-357714-JD.pdf PDF
F10028336.03_Receiving_Facilities._Storage_Ar_Dewars_3_and_4.pdf PDF
F10028336.02_Receiving_Facilities._Storage_Ar_Dewars_1_and_2.pdf PDF
J-4 - ARF - Appendix C - Tanks from CERN - Datasheet.pdf PDF
J-4 - ARF - Appendix B - Argon Receiving Facilities Interface Matrix.xlsx XLSX spreadsheet
RFP LBNF-357714-JD 09-13-2024 final.pdf PDF
PUR-466_Proposal Certifications.pdf PDF
J-4 - SOW Appendix A - Instructions for Downloading.docx DOCX document
FRA Safety Questionnaire (Rev. 08-17)_URV.pdf PDF
J-4 Statement of Work - Argon Receiving 07-16-2024.pdf PDF
J-5 - Exhibit A 7020 For Supply and Services SURF-ARF.pdf PDF
J-1 FRA General Terms and Conditions for Subcontracts Combining Supplies and Services Performed at SURF (03.2024).pdf PDF
J-7 Section 013300 Submittals 02-14-2024.pdf PDF
J-6 - Section 010010 General Requirements Installation Feb 2024.pdf PDF
SARC_Subcontractor Annual RepsCerts Rev 3.pdf PDF
J-2 INSURANCE REQUIREMENTS FOR FRA SUBCONTRACTED WORK AT SURF Risk category 3 (Rev 8.2024).pdf PDF
Mandatory Site Visit Registration Questionnaire_ARF_Sept 2024.docx DOCX document
J-13 Project Schedule - ARF 07-18-2024.pdf PDF
J-3 SDSTA Risk Transfer Protocols with Exhibits Final.pdf PDF
SMALL BUSINESS SUBCONTRACTING PLAN template Far 52.219-9.docx DOCX document
J-8 - Section 014100 Cryo Quality Requirements_02-16-2024.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3"A-?-VJ

ST-50002A3"

CV-50001A 1/4"HV-50002A

PSV

50002A

ZSC

50003A

ZSO

50003A

SV-50003IA

AIR

PURGE

ZSC

50004A

ZSO

50004ASV-50004IA

AIRPV

-5

A

PV-50004A

PT

50005A

1/4"

HV-50006A PSV

50000A

PT

50008V

PSV

50008V

ZSC

50009A

ZSO

50009A

SV-50009IA

AIR

1/2 "A

-N

I

PSV

50010A

1/4

HV

-5

A

SV-50015IA

AIR

PCV

50015A

1"A-?-NI

ZSC

50012A

ZSO

50012A

SV-50012IA

AIR

PV

-5

A

ZSC

50022A

ZSO

50022A

SV-50022IA

AIR

PSV

50017A

1/4

HV

-5

A

PT

50018V

1/4

HV

-5

A

PRV

50013A

PI

50013A

PI

50014A

1/4"

HV-50019A

1/4

HV

-5

A

1/4

HV

-5

A

FE-50019A

FT

50019A

3"A-?-VJ

ST-50052A3"

CV-50051A 1/4"HV-50052A

PSV

50052A

ZSC

50053A

ZSO

50053A

SV-50053IA

AIR

PURGE

ZSC

50054A

ZSO

50054ASV-50054IA

AIRPV

-5

A

PV-50054A

PSV

50050A

PT

50058V

PSV

50058V

ZSC

50059A

ZSO

50059A

SV-50059IA

AIR

1/2 "A

-N

I

PSV

50060A

1/4

HV

-5

A

SV-50065A

AIR PCV

50065A

1"A-?-NI

ZSC

50062A

ZSO

50062A

SV-50062IA

AIR

PV

-5

A

PSV

50534A

1/4

HV

-5

A

PT

50068V

1/4

HV

-5

A

PRV

50063A

PI

50063A

PI

50064A

1/4"

HV-50069A

1/4

HV

-5

A

1/4

HV

-5

A

FE-50069A

FT

50069A

LAr

TO LAr DEWARS 1002 .

GAr

FROM LAr DEWARS 1000.

1/4"

HV-50021A

1/4"

HV-50071A

1/4"

HV-50023A

1/4"

HV-50073A

F10028336.02

LAr PUMPS 1

PDT

50525A

1/4"

HV-50525A

PU-50525

SV-50533IA

ZSC

50533A

ZSO

50533A

AIR

PV-50533A

1/4

HV

-5

A

1/4

HV

-5

A

PSV

50527APSV

50529A

1/4"

HV-50527A

1/4"

HV-50529A

TT

50535A

TI

50535A

ZSC

50543A

ZSO

50543ASV-50543IA

AIR

PV-50543A

1/4

HV

-5

V

PT

50530V

ELECTRIC BATH VAPORIZER

PSV

50578A

TT

50578A

TI

50578A

ZSC

50579A

ZSO

50579ASV-50579IA

AIR

PV-50579A

PSV

50512A

PDT

50500A

1/4"

HV-50500A

PU-50500

ZSC

50506A

ZSO

50506ASV-50506IA

AIR

PV-50506A

1/4

HV

-5

A

1/4

HV

-5

A

PSV

50506APSV

50511A

1/4"

HV-50506A

1/4"

HV-50511A

FE-50514A

FT

50514A

1/4"

HV-50514A

1/4

HV

-5

A

TT

50513A

TI

50513A

PT

50514A

1/4"

HV-50518A

1/4

HV

-5

A

1/4

HV

-5

A

1/4

HV

-5

A

1/4

HV

-5

A

ZSC

50519A

ZSO

50519ASV-50519IA

AIR

PV-50519A

1/4

HV

-5

A

PT

50503V

ELECTRIC BATH VAPORIZER

PSV

50553A

TT

50553A

TI

50553A

ZSC

50554A

ZSO

50554ASV-50554IA

AIR

PV-50554A

2"A-?-VJ

8"A-?-NI

PSV

50580A

TT

50583A

TI

50583A

LAr

FROM LAr DEWARS 1004.

8"

HV-50586A

8"A-?-NI

HV-50545A

PCV

50545A

PCV

50546A

1/4"

HV-50547A

1/4"

HV-50546A

LAr TRUCK STATION 1

1/4

HV

-5

A

1/4

HV

-5

A

PT

50016A

1/4"

HV-50017A

PSV

50025A

PSV

50024A

1/4

HV

-5

A

PT

50055A

1/4"

HV-50056A

1/4

HV

-5

A

PT

50066A

1/4"

HV-50067A

1/4

HV

-5

A

PT

50584A

1/4"

HV-50585A

LAr PUMPS 2

HV-50508A

PCV

50510A

PCV

50509A

1/4"

HV-50510A

1/4"

HV-50509A

GAr

TO GAr PURIFICATION 1-2 1010 .

1/4

HV

-5

A

PT

50581A

1/4"

HV-50582A

1/4

HV

-5

A

PT

50576A

1/4"

HV-50577A

1/4

HV

-5

A

PT

50551A

1/4"

HV-50552A

PSV

50550A

PSV

50575A

ZSC

50575A

ZSO

50575ASV-50575IA

AIR

PV-50575A

ZSC

50550A

ZSO

50550ASV-50550IA

AIR

PV-50550A

LAr TRUCK STATION 2

PI

50584A

1/4

HV

-5

A

PT

50505A

1/4"

HV-50505A

PI

50504A

1/4

HV

-5

A

PT

50531A

1/4"

HV-50532A

PI

50531A

PI

50514A

2"A-?-VJ

1/4"

HV-50544A

(PURGE)

1"

HV-50507A

(PURGE)

PV

-5

A

PV

-5

A

PSV

50067A

PV

-5

A

ZSC

50072A

ZSO

50072A

SV-50072IA

AIR

PV

-5

A

F10028336.02

F10028329.19

F10028336.02

TP

1/2

HV

-5

A

HX-50575

HX-50550

PCV

50580A

SV-50580IA

AIR ZT

50580A

F10028336.04

1/2

HV

-5

A

BF

1/2

HV

-5

A

BF

F10028336.04

1/2

HV

-5

A

FSCF SCOPE: UG PIPE, ROSS SHAFT, DRIFT

TRANSFER LINE

M. MACIAZKA

General Notes

SHEET NO. REV.SCALE

CREATED WITH: GROUP:

OFNONE

AutoCAD LBNF FERMILAB

DRAWING NUMBER

ORIGINATED BY:

DRAWN BY:

CHECKED BY:

APPROVED BY FNAL: DATE:

M. DELANEY

DATE:

DATE:

DATE:SIGN:

SIGN:

SIGN:

SIGN:

FERMI NATIONAL ACCELERATOR LABORATORY

UNITED STATES DEPARTMENT OF ENERGY

MECHANICAL/ENG. LBNF/DUNE FDC PROJECT

RECEIVING FACILITIES 01 of 04

PIPING & INSTRUMENTATION DIAGRAM

M. ADAMOWSKI

ISSUED FOR

REFERENCE 07/18/16

A 9219.000-ME

-489827-07

- JC

INTERNAL

RELEASE 07/15/12

E F10028329.05 IFR MD

ISSUED FOR

REFERENCE 06/08/18F F10028329.05 IFR MD

1.X

R. DOUBNIK

M

321 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

321 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

Q Q

ISSUED FOR

REFERENCE 12/13/18G F10028329.05 IFR MD

ISSUED FOR

REVIEW 06/03/19H F10028329.00 IFR MD

01 04

NOTES:

1. ANY INSTRUMENT AIR EQUIPMENT

PROVIDED BY VENDOR;

2. THIS DRAWING WILL BE UPDATED/

PROVIDED BY VENDOR.

ISSUED FOR

REVIEW 03/25/20I F10028329.01 IFR MD

04/15/22J F10028329.01 IFR MD

ISSUED FOR

REVIEW

NEW TC DWG

NUMBER 08/10/23K F10028336.01 IFR MD

FOR REVIEW

ISSUED

04/15/2024

SV-XXXXIA

PV-XXXXX

TYP. 1

TYP. 2

ZSO

XXXXXXX

ZSC

XXXXXXX

ZT

XXXXXXX

SV-XXXXIA

PCV

XXXXXXX

NEW TC DWG

NUMBER 12/01/23L F10028336.01 IFR MD

04/15/24M IFR MD

ISSUED FOR

REVIEWF10028336.01

AutoCAD SHX Text \pxt5;AIR

AutoCAD SHX Text \pxt5;PURGE

AutoCAD SHX Text \pxt5;AIR

AutoCAD SHX Text \pxt5;AIR

AutoCAD SHX Text \pxt5;AIR

AutoCAD SHX Text \pxt5;AIR

AutoCAD SHX Text \pxt5;AIR

AutoCAD SHX Text \pxt5;AIR

AutoCAD SHX Text \pxt5;PURGE

AutoCAD SHX Text \pxt5;AIR

AutoCAD SHX Text \pxt5;AIR

AutoCAD SHX Text \pxt5;AIR

AutoCAD SHX Text \pxt5;AIR

AutoCAD SHX Text \pxt5;F10028336.02

AutoCAD SHX Text \pxt5;AIR

AutoCAD SHX Text \pxt5;AIR

AutoCAD SHX Text \pxt5;AIR

AutoCAD SHX Text \pxt5;AIR

AutoCAD SHX Text \pxt5;AIR

AutoCAD SHX Text \pxt5;AIR

AutoCAD SHX Text

ROSS\PSHAFT

AutoCAD SHX Text

ROSS\PSHAFT

AutoCAD SHX Text

ROSS\PSHAFT

AutoCAD SHX Text

ROSS\PSHAFT

AutoCAD SHX Text

DRIFT

AutoCAD SHX Text

DRIFT

AutoCAD SHX Text

DRIFT

AutoCAD SHX Text

DRIFT

AutoCAD SHX Text \pxt5;{\fPalatino Linotype|b1|i0|c0|p18;LAr TRUCK STATION 1}

AutoCAD SHX Text \pxqc;RECEIVING FACILITY

AutoCAD SHX Text \pxqc;RECEIVING FACILITY

AutoCAD SHX Text \pxt5;AIR

AutoCAD SHX Text \pxt5;AIR

AutoCAD SHX Text \pxt5;{\fPalatino Linotype|b1|i0|c0|p18;LAr TRUCK STATION 2}

AutoCAD SHX Text \pxt5;AIR

AutoCAD SHX Text \pxt5;F10028336.02

AutoCAD SHX Text \pxt5;F10028329.19

AutoCAD SHX Text \pxt5;F10028336.02

AutoCAD SHX Text \pxqc;UG\PPIPE

AutoCAD SHX Text \pxqc;UG\PPIPE

AutoCAD SHX Text \pxqc;UG\PPIPE

AutoCAD SHX Text

HTR

AutoCAD SHX Text

HTR

AutoCAD SHX Text

HTR

AutoCAD SHX Text

HTR

AutoCAD SHX Text 50002

AutoCAD SHX Text 50002

AutoCAD SHX Text GAr TO GAS ANALYZERS

AutoCAD SHX Text GAr TO GAS ANALYZERS

AutoCAD SHX Text \pxt5;F10028336.04

AutoCAD SHX Text \pxt5;BF

AutoCAD SHX Text \pxt5;BF

AutoCAD SHX Text 50001

AutoCAD SHX Text 50001

AutoCAD SHX Text GAr TO GAS ANALYZERS

AutoCAD SHX Text GAr TO GAS ANALYZERS

AutoCAD SHX Text \pxt5;F10028336.04

AutoCAD SHX Text 1.2

AutoCAD SHX Text 1.2

AutoCAD SHX Text 1.1

AutoCAD SHX Text 1.1

AutoCAD SHX Text 1.0

AutoCAD SHX Text 1.0

AutoCAD SHX Text {\T0.9;F10028336.01}

AutoCAD SHX Text {\T0.9;F10028336.01}

AutoCAD SHX Text \pxqc;{\T0.85;DOCUMENT NO}

AutoCAD SHX Text \pxqc;{\T0.85;DOCUMENT NO}

AutoCAD SHX Text \pxql;{\T0.85;REV}

AutoCAD SHX Text \pxql;{\T0.85;REV}

AutoCAD SHX Text \pxql;{\T0.85;BY}

AutoCAD SHX Text \pxql;{\T0.85;BY}

AutoCAD SHX Text \pxqc;{\T0.85;REVISION DESCRIPTION}

AutoCAD SHX Text \pxqc;{\T0.85;REVISION DESCRIPTION}

AutoCAD SHX Text \pxql;{\T0.85;DATE}

AutoCAD SHX Text \pxql;{\T0.85;DATE}

AutoCAD SHX Text \pxql;{\T0.85;DATE}

AutoCAD SHX Text

{\T0.85;REV NO}

AutoCAD SHX Text

{\T0.85;REV NO}

AutoCAD SHX Text

AIR

AutoCAD SHX Text

AIR

AutoCAD SHX Text

AIR

AutoCAD SHX Text

AIR

Sheets and Views
01

File details come from the government source that posted it. Updated .