S-FD-S-401.10.IFC.10.01.pdf

PDF 238 KB Posted

Attached to
LBNF Argon Receiving System
Solicitation number
LBNF-357714-JD
Issued by

About this file

This is a structural foundation plan drawing for the Fill Station at the Long-Baseline Neutrino Facility (LBNF) Surface Facility, dated November 10, 2023. The drawing shows specifications for a 24-inch thick mat foundation reinforced with #6 rebar at 10-inch on center each way (top and bottom), placed atop 3 inches of rigid insulation that extends 4 feet beyond the mat edge.

The plan details a structure with dimensions of 65 feet by 50 feet (19.81m x 15.24m), featuring nine existing isolated concrete piers atop bedrock, a 12-inch thick concrete transformer pad, and exterior supports for mechanical piping equipment. The drawing includes specifications for an argon pipe trench and includes electrical grounding requirements per Article 250 of the National Electrical Code. The foundation plan was prepared by TSP, Inc. in coordination with Arup USA Inc. for Fermilab's LBNF project, and has gone through multiple revisions from 60% design development to final construction issue.

View the file

Other files

File Type Posted
J-2 2025 INSURANCE REQUIREMENTS FOR FRA SUBCONTRACTED WORK AT SURF Risk category 3 (Rev 01.pdf PDF
Amendment 06--RFP LBNF-357714-JD.pdf PDF
J-1 FFDG General Terms and Conditions for Subcontracts Combining Supplies and Services Performed at SURF (01.2025).pdf PDF
Amendment 05--RFP LBNF-357714-JD.pdf PDF
Amendment 04--RFP LBNF-357714-JD.pdf PDF
S-FD-S-801.10.IFC.10.01.pdf PDF
S-FD-C-401.08.IFC.08.01.pdf PDF
S-FD-S-701.08.IFC.08.01.pdf PDF
Amendment 03--RFP LBNF-357714-JD-Approved.pdf PDF
S-FD-C-402.05.IFC.05.01.pdf PDF
QA - Appendix 1 - ARF Layout with labels.png PNG image
S-FD-A-103.09.IFC.09.01.pdf PDF
S-FD-A-104.09.IFC.09.01.pdf PDF
S-FD-S-002.09.IFC.09.01.pdf PDF
Amendment 02--RFP LBNF-357714-JD.pdf PDF
F10028336.02_Receiving_Facilities._Storage_Ar_Dewars_1_and_2.pdf PDF
Amendment 01--RFP LBNF-357714-JD.pdf PDF
F10028336.04_Receiving_Facilities._Gas_Analyzers_.pdf PDF
F10028336.03_Receiving_Facilities._Storage_Ar_Dewars_3_and_4.pdf PDF
F10028336.01_Receiving_Facilities._Track_Connections.pdf PDF
RFP LBNF-357714-JD 09-13-2024 final.pdf PDF
J-1 FRA General Terms and Conditions for Subcontracts Combining Supplies and Services Performed at SURF (03.2024).pdf PDF
J-4 Statement of Work - Argon Receiving 07-16-2024.pdf PDF
J-4 - ARF - Appendix C - Tanks from CERN - Datasheet.pdf PDF
J-2 INSURANCE REQUIREMENTS FOR FRA SUBCONTRACTED WORK AT SURF Risk category 3 (Rev 8.2024).pdf PDF
J-3 SDSTA Risk Transfer Protocols with Exhibits Final.pdf PDF
J-4 - SOW Appendix A - Instructions for Downloading.docx DOCX document
J-4 - ARF - Appendix B - Argon Receiving Facilities Interface Matrix.xlsx XLSX spreadsheet
J-5 - Exhibit A 7020 For Supply and Services SURF-ARF.pdf PDF
J-7 Section 013300 Submittals 02-14-2024.pdf PDF
J-6 - Section 010010 General Requirements Installation Feb 2024.pdf PDF
J-13 Project Schedule - ARF 07-18-2024.pdf PDF
Mandatory Site Visit Registration Questionnaire_ARF_Sept 2024.docx DOCX document
SARC_Subcontractor Annual RepsCerts Rev 3.pdf PDF
J-8 - Section 014100 Cryo Quality Requirements_02-16-2024.pdf PDF
PUR-466_Proposal Certifications.pdf PDF
SMALL BUSINESS SUBCONTRACTING PLAN template Far 52.219-9.docx DOCX document
FRA Safety Questionnaire (Rev. 08-17)_URV.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES:

KEY NOTES:

11332

ALEX R.

WEIERS

R

EG

IS

TE

RED PROFESSIONAL ENG

IN

EER

REG . NO.

S

O

U TH D A K O

T

A

DATE:

B

C

A

D

981 2 3 4 5 6 7

EXISTING WAREHOUSE SLAB-ON-GRADE

REFERENCE CIVIL DRAWINGS FOR PAVING

TYP

S-801

TO MAT EL

5355'-3"

TYP

S-801

(9) EXISTING ISOLATED

CONCRETE PIERS

ATOP EXISTING BEDROCK

(9) EXISTING ISOLATED

CONCRETE PIERS

ATOP EXISTING BEDROCK

[1 5.

m

[19.81 m] 65' - 0"

S-801

4 TYP

[1.22 m]

4' - 0" TYP

REFERENCE CIVIL FOR ARGON

PIPE TRENCH & DETAILS

4'

0" 4'

0"

10"

6' - 3" 14' - 0" 3' - 5" 14' - 0" 12' - 10" 12' - 10"

10"

8'

4'

0" 4'

0"

4'

0" 8'

0"

8'

0" 4'

0"

4'

0"

S-801

4'

0" 1'

0"

4'

0" 1'

0"

W

ID

TH

EQ

U

IP

4' - 0"

1' - 0"

LENGTH

EQUIP

1' - 0" 4' - 0"

CONTRACTOR VERIFY ALL EXISTING DIMENSIONS AND SIZESA.

FOUNDATION PLAN

FOUNDATION PLAN

1. 24" THICK MAT FOUNDATION REINFORCED W/#6 @ 10" OC EA WAY (T&B) ATOP

3" RIGID INSULATION BELOW ENTIRE MAT THAT EXTENDS 4'-0" BEYOND EDGE OF

MAT. REFERENCE PLAN AND DETAILS FOR ADDITIONAL REQUIREMENTS &

REFERENCE CIVIL PLANS FOR SITE GRADING AND ADDITIONAL INFORMATION.

2. 12" THICK CONCRETE TRANSFORMER PAD. REFERENCE DETAIL 6/S-701.

CONTRACTOR COORDINATE WITH ELECTRICAL FOR FINAL EQUIPMENT PAD

REQUIREMENTS AND SIZE.

3. EXTERIOR SUPPORTS FOR EQUIPMENT MECHANICAL PIPING. REFERENCE DETAIL

3/S-801 & COORDINATE ALIGNMENTS AND SPACING WITH SUPPLIERS / INSTALLERS.

4. PROVIDE REBAR-TYPE CONCRETE-ENCASED ELECTRODE PER ARTICLE 250 OF

THE NATIONAL ELECTRICAL CODE. COORDINATE WITH ELECTRICAL FOR EXACT

LOCATION AND ALL REQUIREMENTS FOR INSTALLATION OF ELECTRICAL GROUND.

11/10/2023

SCALE FEET

TSP, Inc.

600 Kansas City St.

Rapid City, SD 57701 phone: (605) 343-6102 fax: (605) 343-7159 www.teamtsp.com

Arup USA Inc 77 Water Street, New York NY 10005, T 212 896 3000 www.arup.com

DRAWING NO.

SCALE:

REV.

REVISIONS

DESIGNED

DRAWN

CHECKED

DESCRIPTIONDATEREV.

8 8 16 Fermilab Long-Baseline Neutrino Facility

/1 /2

/9

/2

4:

:4

P

M L:

T

S P

R ev it Lo ca l\0

9.

T

S P

L B

N F

S

_w ei er sa r@ te am ts p.

co m .r vt

1115-1-6J S-FD-S-401

SURFACE

LBNF - FSCF - BSI

TMH

ARW

ARW TSP

STRUCTURAL

FILL STATION FOUNDATION PLAN

TSP

TSP

SCALE: 1/8" = 1'-0"

FILL STATION FOUNDATION PLAN

PLAN

NORTH

E

S

W

2 11/16/18 60% FD SUBMISSION

3 02/22/19 90% FD SUBMISSION

4 05/03/19 100% FD SUBMISSION

5 07/24/19 100% FD UPDATE

6 08/21/20 90% DRAFT FD UPDATE

7 10/01/20 90% FD UPDATE

8 11/20/20 100% FD UPDATE

9 05/21/21 ISSUED FOR CONSTRUCTION - BSI HEADFRAME HEATERS

10 03/17/23 ADDENDUM 3

11 11/10/23 ISSUED FOR CONSTRUCTION

https://kiewit.teambinder.com/TeamBinderADFS/PROJNO103544/BlueBeamIntegration/Documents/S-FD-S-801_DETAILS.pdf https://kiewit.teambinder.com/TeamBinderADFS/PROJNO103544/BlueBeamIntegration/Documents/S-FD-S-801_DETAILS.pdf https://kiewit.teambinder.com/TeamBinderADFS/PROJNO103544/BlueBeamIntegration/Documents/S-FD-S-801_DETAILS.pdf https://kiewit.teambinder.com/TeamBinderADFS/PROJNO103544/BlueBeamIntegration/Documents/S-FD-S-801_DETAILS.pdf

File details come from the government source that posted it. Updated .