S-FD-A-103.09.IFC.09.01.pdf

PDF 759 KB Posted

Attached to
LBNF Argon Receiving System
Solicitation number
LBNF-357714-JD
Issued by

About this file

This is an architectural plan drawing showing the cryogen equipment layout for the Long-Baseline Neutrino Facility (LBNF) Surface Building at Fermilab. The drawing (S-FD-A-103) details the placement of key cryogenic components including fill stations, dewars, pumps, vaporizers, and a purity check building in relation to the existing Ross Warehouse.

The plan indicates specific dimensions and infrastructure elements including concrete equipment pads, pipe bollards, below-grade covered trenches for piping, and electrical components like transformers and luminaires. Notable features include heat-traced downspouts and gutters, gravel surfacing, and a design-build purity check building with performance requirements referenced on drawing A-104. The overall layout spans approximately 65' x 50' and includes detailed notes regarding symbols, equipment schedules, dimensions, and drainage specifications. The drawing was issued for construction on November 10, 2023 by TSP, Inc. and Arup USA Inc. for the Fermilab LBNF project.

View the file

Other files

File Type Posted
J-2 2025 INSURANCE REQUIREMENTS FOR FRA SUBCONTRACTED WORK AT SURF Risk category 3 (Rev 01.pdf PDF
Amendment 06--RFP LBNF-357714-JD.pdf PDF
J-1 FFDG General Terms and Conditions for Subcontracts Combining Supplies and Services Performed at SURF (01.2025).pdf PDF
Amendment 05--RFP LBNF-357714-JD.pdf PDF
Amendment 04--RFP LBNF-357714-JD.pdf PDF
S-FD-S-701.08.IFC.08.01.pdf PDF
QA - Appendix 1 - ARF Layout with labels.png PNG image
S-FD-A-104.09.IFC.09.01.pdf PDF
S-FD-S-002.09.IFC.09.01.pdf PDF
S-FD-S-801.10.IFC.10.01.pdf PDF
S-FD-S-401.10.IFC.10.01.pdf PDF
S-FD-C-401.08.IFC.08.01.pdf PDF
Amendment 03--RFP LBNF-357714-JD-Approved.pdf PDF
S-FD-C-402.05.IFC.05.01.pdf PDF
Amendment 02--RFP LBNF-357714-JD.pdf PDF
Amendment 01--RFP LBNF-357714-JD.pdf PDF
F10028336.04_Receiving_Facilities._Gas_Analyzers_.pdf PDF
F10028336.01_Receiving_Facilities._Track_Connections.pdf PDF
F10028336.02_Receiving_Facilities._Storage_Ar_Dewars_1_and_2.pdf PDF
F10028336.03_Receiving_Facilities._Storage_Ar_Dewars_3_and_4.pdf PDF
J-2 INSURANCE REQUIREMENTS FOR FRA SUBCONTRACTED WORK AT SURF Risk category 3 (Rev 8.2024).pdf PDF
J-3 SDSTA Risk Transfer Protocols with Exhibits Final.pdf PDF
J-4 - SOW Appendix A - Instructions for Downloading.docx DOCX document
J-4 - ARF - Appendix B - Argon Receiving Facilities Interface Matrix.xlsx XLSX spreadsheet
J-5 - Exhibit A 7020 For Supply and Services SURF-ARF.pdf PDF
J-7 Section 013300 Submittals 02-14-2024.pdf PDF
J-8 - Section 014100 Cryo Quality Requirements_02-16-2024.pdf PDF
PUR-466_Proposal Certifications.pdf PDF
SMALL BUSINESS SUBCONTRACTING PLAN template Far 52.219-9.docx DOCX document
FRA Safety Questionnaire (Rev. 08-17)_URV.pdf PDF
RFP LBNF-357714-JD 09-13-2024 final.pdf PDF
J-1 FRA General Terms and Conditions for Subcontracts Combining Supplies and Services Performed at SURF (03.2024).pdf PDF
J-4 Statement of Work - Argon Receiving 07-16-2024.pdf PDF
J-4 - ARF - Appendix C - Tanks from CERN - Datasheet.pdf PDF
J-6 - Section 010010 General Requirements Installation Feb 2024.pdf PDF
J-13 Project Schedule - ARF 07-18-2024.pdf PDF
Mandatory Site Visit Registration Questionnaire_ARF_Sept 2024.docx DOCX document
SARC_Subcontractor Annual RepsCerts Rev 3.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fill Station Fill Station

Dewar Dewar

P u m p

P u m p

Dewar Dewar

Vaporizer

Vaporizer

OUTLINE OF BELOW GRADE

PIPE IN COVERED TRENCH,

REF MECH, REF CIVIL

EXISTING ROSS

WAREHOUSE

V

IF

V

IF

PURITY CHECK BUILDING,

DESIGN-BUILD,

SEE A-104 FOR

PERFORMANCE

REQUIREMENTS

TRANSFORMER,

REFER TO ELECTRICAL

CONCRETE EQUIPMENT

PAD, REF. STRUCTURAL,

REF. CIVIL

PIPE BOLLARDS, REF.

STRUCTURAL & CIVIL, TYPICAL

A-2011

GRAVEL, TYPICAL, REF. CIVIL

POST MOUNTED LUMINAIRE,

TYPICAL, REF. ELECTRICAL

EQUIPMENT AND DEVICES,

REF. ELEC.

/8

10' - 1" 15' - 1" 14' - 11 3/4" 14' - 11 3/4" 9' - 10 1/2"

4' - 4"

DOWNSPOUT WITH HEAT

TRACE, REF ELEC

NEW GUTTER WITH HEAT TRACE

AT EXISTING BUILDING

DOWNSPOUT WITH HEAT

TRACE, REF ELEC; RUN

DUCT AT AN ANGLE TO

OUTLET AT THE NORTH END

OF THE PAD

A-518

E1

E1

E3E3

E5E5

E1E1

65' - 0"

EXISTING WALL MOUNTED LUMINAIRE,

TYPICAL, REF.ELECTRICAL

WORK AT EXISTING ROSS WAREHOUSE IS

LIMITED TO GUTTERS, DOWNSPOUTS WITH

HEAT TRACE, SNOWGUARDS, AND WALL

MOUNTED LUMINAIRES

/4

/6

"POST MOUNTED LUMINAIRE,

TYPICAL, REF. ELECTRICAL

E2E2

CRYOGEN PLAN NOTES

1. REFER TO SHEET A-000 FOR SYMBOLS &

ABBREVIATIONS.

2. REFER TO SHEET A-601 FOR OFOI EQUIPMENT

SCHEDULE, PROVIDED FOR CONVENIENCE.

3. DIMENSIONS ARE TO EXTERIOR FACE OF

BUILDING & CLEAR BETWEEN EQUIPMENT,

UNLESS NOTED OTHERWISE.

4. ROOF DRAINAGE SLOPES SHOWN ARE

APPROXIMATE. REFER TO CIVIL FOR SITE

DRAINAGE INFORMATION.

5. ELECTRICAL AND MECHANICAL EQUIPMENT IS

NOTED FOR REFERENCE. SEE ELECTRICAL

AND MECHANICAL DRAWINGS AND

SPECIFICATIONS FOR MORE INFORMATION.

BRADLEY RYAN

MITZELFELT

R

EG

IS

T

E R

ED

P ROF E S S I ONA L

AR

C H

IT

E

C T

REG. NO.

S

O

U TH D A KO

T

A

15208

DATE:

TSP, Inc.

600 Kansas City St.

Rapid City, SD 57701 phone: (605) 343-6102 fax: (605) 343-7159 www.teamtsp.com

Arup USA Inc

77 Water Street, New York NY 10005, T 212 896 3000 www.arup.com

DRAWING NO.

SCALE:

REV.

REVISIONS

DESIGNED

DRAWN

CHECKED

DESCRIPTIONDATEREV.

Fermilab Long-Baseline Neutrino Facility

11/10/2023

SURFACE

ARCHITECTURAL

/1 /2

/9

/2

:0 :3

P

M L T

S P

R e v it L o c a l\ L

B N

F C ry o g e n S u rf a c e B u ild in g v o s te rl o o k a te a m ts p .c o m

.r v t

1015-1-6J S-FD-A-103

LBNF - FSCF - BSI

BRM

AH

SD DKa

CRYOGEN EQUIPMENT - PLANSDKa

TSP

SCALE: 1/8" = 1'-0"

CRYOGEN EQUIPMENT

PLAN

1 07/27/18 30% FD SUBMISSION

8 05/21/21 ISSUED FOR CONSTRUCTION - BSI HEADFRAME HEATERS

7 11/20/20 100% FD UPDATE

2 11/16/18 60% FD SUBMISSION

3 02/22/19 90% FD SUBMISSION

4 05/03/19 100% FD SUBMISSION

5 08/21/20 90% DRAFT FD UPDATE

6 10/01/20 90% FD UPDATE

9 03/17/23 ADDENDUM 3

10 11/10/23 ISSUED FOR CONSTRUCTION

AS NOTED

https://kiewit.teambinder.com/TeamBinderADFS/PROJNO103544/BlueBeamIntegration/Documents/S-FD-A-518_ROSS HEADFRAME AND WAREHOUSE -DETAILS.pdf https://kiewit.teambinder.com/TeamBinderADFS/PROJNO103544/BlueBeamIntegration/Documents/S-FD-A-518_ROSS HEADFRAME AND WAREHOUSE -DETAILS.pdf https://kiewit.teambinder.com/TeamBinderADFS/PROJNO103544/BlueBeamIntegration/Documents/S-FD-A-201_CRYOGEN EQUIPMENT -ELEVATIONS.pdf

File details come from the government source that posted it. Updated .