This document appears to be a Piping & Instrumentation Diagram (P&ID) related to the Argon Receiving System for the LBNF (Long-Baseline Neutrino Facility) project.
The key details are:
- The Argon Receiving System serves as the entry point for liquid argon (LAr) to the greater LBNF systems, located at the surface level of the Sanford Underground Research Facility (SURF) in Lead, South Dakota.
- The system includes two (2) dedicated truck stations to offload LAr, two (2) 50 m3 LAr storage tanks, and equipment to discharge LAr from the tanks, vaporize it, and transfer the gaseous argon (GAr) to the relevant LBNF cryogenics subsystems.
- The successful bidder shall engineer, manufacture, pack, deliver, install, and perform acceptance tests at SURF for the Argon Receiving System.
- This is part of the larger LBNF project, which will provide the infrastructure to support the Deep Underground Neutrino Experiment (DUNE) located deep underground at SURF.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GAr
TO LAr TRUCK STATIONS 1000.
LAr
FROM LAr TRUCK STATIONS 1002 .F10028336.01
F10028336.01
3" A-
NI
2" A-
NI
ZSC
50104A
ZSO
50104A
SV-50104A
AIR
PV
-5
A
ZSC
50103A
ZSO
50103A
SV-50103A
AIR
PV
-5
A
1/4 "A
-N
I
HV-50100A
PSE
50101A
PSE
50100A
PSV
50101A
PSV
50100A
1/4 "A
-N
I
1/4"A-?-NI
1/4"A-?-NI
LIT
50100A
PIT
50100A
DEWAR 1
TK-50100
2" A-
NI
ZSC
50110A
ZSO
50110A
SV-50110A
AIR
PV
-5
A
ZSC
50105A
ZSO
50105A SV-50105A
AIR
PV-50105A
1/2
HV
-5
A
PSV
50106A
1/2"A-?-NI
2"
CV
-5
A
2"
HV
-5
A
SAMPLE OF VENDOR PACKAGE
3" A-
NI
2" A-
NI
ZSC
50204A
ZSO
50204A
SV-50204A
AIR
PV
-5
A
ZSC
50203A
ZSO
50203A
SV-50203A
AIR
PV
-5
A
1/4 "A
-N
I
HV-50200A
PSE
50201A
PSE
50200A
PSV
50201A
PSV
50200A
1/4 "A
-N
I
1/4"A-?-NI
1/4"A-?-NI
LIT
50200A
PIT
50200A
TK-50200
2" A-
NI
ZSC
50210A
ZSO
50210A
SV-50210A
AIR
PV
-5
A
2"
CV
-5
A
2"
HV
-5
A
SAMPLE OF VENDOR PACKAGE
GAr
FROM LAr DEWARS 3, 4 1001.
LAr
TO LAr DEWARS 3, 4 1003 .
LAr
FROM LAr DEWARS 3, 4 1006.
LAr
TO LAr TRUCK STATIONS 1004.
2"A-?-NI
ZSC
50205A
ZSO
50205A SV-50205A
AIR
PV-50205A
1/2
HV
-5
A
PSV
50206A
1/2"A-?-NI
ZSC
50208A
ZSO
50208A SV-50208A
AIR
PV-50208A
ZSC
50108A
ZSO
50108A SV-50108A
AIR
PV-50108A
LAr
FROM LAr DEWARS 3, 4 1005.
F10028336.01 F10028326.03
PT
50105V
1/4
HV
-5
V
1/4"
HV-50202V
PT
50202V
1/4"
HV-50102V
PT
50102V
1/4"
HV-50209V
PT
50209V
1/4"
HV-50109V
PT
50109V
1/4
HV
-5
V
PT
50213V
3"A-?-NI
1"A-?-NI
DEWAR 2
2"A-?-NILAr CONNECTION
UNLOAD CONTAMINATED ARGON
HV-50114A
PCV
50116A
PCV
50115A
1/4"
HV-50116A
1/4"
HV-50115A1/4"
HV-50113A
(PURGE)
F10028336.03
F10028336.03
F10028326.03
F10028336.04F10028336.04
NC NC
NC
NC NC
NC NC
General Notes
SHEET NO. REV.SCALE
CREATED WITH: GROUP:
OFNONE
AutoCAD
DRAWING NUMBER
ORIGINATED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY FNAL: DATE:
M. DELANEY
DATE:
DATE:
DATE:SIGN:
SIGN:
SIGN:
SIGN:
FERMI NATIONAL ACCELERATOR LABORATORY
UNITED STATES DEPARTMENT OF ENERGY
RECEIVING FACILITIES 02 of 04
PIPING & INSTRUMENTATION DIAGRAM
M. ADAMOWSKI
ISSUED FOR
REFERENCE 07/18/16
A 9219.000-ME
-489827-07
- JC
INTERNAL
RELEASE 07/15/12
E IFR MD
ISSUED FOR
REFERENCE 06/08/18F IFR MD
R. DOUBNIK
321 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
321 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q Q
ISSUED FOR
REFERENCE 12/13/18G IFR MD
ISSUED FOR REVIEW
06/03/19H IFR MD
M02
LBNF FERMILAB
ISSUED FOR
REFERENCE 04/15/22J F10028329.02 IFR MD
F10028329.02
F10028329.02
F10028329.02
F10028329.02
K F10028336.02 IFR MD
NEW TC DWG
NUMBER
SV-XXXXIA
PV-XXXXX
TYP. 1
TYP. 2
ZSO
XXXXXXX
ZSC
XXXXXXX
ZT
XXXXXXX
SV-XXXXIA
PCV
XXXXXXX
08/10/23
L F10028336.02 IFR MD 12/01/23ISSUED FOR
REFERENCE
M. MACIAZKA
FOR REVIEW
ISSUED
04/15/2024
04/15/24M F10028336.02 IFR MD
ISSUED FOR
REVIEW
MECHANICAL/ENG. LBNF/DUNE FDC PROJECT
AutoCAD SHX Text \pxt5;F10028336.01
AutoCAD SHX Text \pxt5;F10028336.01
AutoCAD SHX Text \pxt5;AIR
AutoCAD SHX Text \pxt5;AIR
AutoCAD SHX Text \pxt5;DEWAR 1
AutoCAD SHX Text \pxt5;AIR
AutoCAD SHX Text \pxt5;AIR
AutoCAD SHX Text \pxt5;SAMPLE OF VENDOR PACKAGE
AutoCAD SHX Text \pxt5;AIR
AutoCAD SHX Text \pxt5;AIR
AutoCAD SHX Text \pxt5;AIR
AutoCAD SHX Text \pxt5;SAMPLE OF VENDOR PACKAGE
AutoCAD SHX Text \pxt5;AIR
AutoCAD SHX Text \pxt5;AIR
AutoCAD SHX Text \pxt5;AIR
AutoCAD SHX Text \pxt5;F10028336.01\P\pxt5;
AutoCAD SHX Text \pxt5;F10028326.03
AutoCAD SHX Text \pxt5;DEWAR 2
AutoCAD SHX Text \pxqc,t5;LAr CONNECTION \PUNLOAD CONTAMINATED ARGON
AutoCAD SHX Text \pxt5;F10028336.03
AutoCAD SHX Text \pxt5;F10028336.03
AutoCAD SHX Text \pxt5;F10028326.03
AutoCAD SHX Text 50004
AutoCAD SHX Text 50004
AutoCAD SHX Text GAr TO GAS ANALYZERS
AutoCAD SHX Text GAr TO GAS ANALYZERS
AutoCAD SHX Text \pxt5;F10028336.04
AutoCAD SHX Text 50003
AutoCAD SHX Text 50003
AutoCAD SHX Text GAr TO GAS ANALYZERS
AutoCAD SHX Text GAr TO GAS ANALYZERS
AutoCAD SHX Text \pxt5;F10028336.04
AutoCAD SHX Text \pxt5;NC
AutoCAD SHX Text \pxt5;NC
AutoCAD SHX Text \pxt5;NC
AutoCAD SHX Text \pxt5;NC
AutoCAD SHX Text \pxqc;{\T0.85;DOCUMENT NO}
AutoCAD SHX Text \pxqc;{\T0.85;DOCUMENT NO}
AutoCAD SHX Text \pxql;{\T0.85;REV}
AutoCAD SHX Text \pxql;{\T0.85;REV}
AutoCAD SHX Text \pxql;{\T0.85;BY}
AutoCAD SHX Text \pxql;{\T0.85;BY}
AutoCAD SHX Text \pxqc;{\T0.85;REVISION DESCRIPTION}
AutoCAD SHX Text \pxqc;{\T0.85;REVISION DESCRIPTION}
AutoCAD SHX Text \pxql;{\T0.85;DATE}
AutoCAD SHX Text \pxql;{\T0.85;DATE}
AutoCAD SHX Text \pxql;{\T0.85;DATE}
AutoCAD SHX Text
{\T0.85;REV NO}
AutoCAD SHX Text
{\T0.85;REV NO}
AutoCAD SHX Text F10028336.02 {\fAgency FB|b0|i0|c0|p34;\H0.58333x;\C1; }
AutoCAD SHX Text F10028336.02 {\fAgency FB|b0|i0|c0|p34;\H0.58333x;\C1; }
AutoCAD SHX Text
AIR
AutoCAD SHX Text
AIR
AutoCAD SHX Text
AIR
AutoCAD SHX Text
AIR
| Sheets and Views |
| 02 |
File details come from the government source that posted it. Updated .