J-4 - ARF - Appendix B - Argon Receiving Facilities Interface Matrix.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- LBNF Argon Receiving System
- Solicitation number
- LBNF-357714-JD
About this file
This document is an interface matrix that provides technical details for the Argon Receiving Facilities as part of the LBNF (Long-Baseline Neutrino Facility) project. It outlines the interface requirements and operating parameters for the various piping, equipment, and systems that will comprise the Argon Receiving Facilities at the Sanford Underground Research Facility (SURF) in Lead, South Dakota. The key details include the maximum allowable operating conditions, fluid types, flow rates, and interface connections for equipment such as LAr (Liquid Argon) delivery trucks, LAr storage tanks, and GAr (Gaseous Argon) transfer to other LBNF subsystems. This interface matrix serves as a technical reference for the LBNF Argon Receiving System, which is the subject of a separate federal contract opportunity (Solicitation Number LBNF-357714-JD) to engineer, manufacture, and install the required equipment and systems.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Interface Sheet
| n.a. | Not applicable | ||||||||||||||||||||
| (*) | Not a Process Pipe | ||||||||||||||||||||
| Equipment | Interfacing TAG | Interfacing port | Interfacing type | Process Pipe | Process Description | Maximum allowable | Operating conditions | Maximum allowable mechanical loads | Fluid | Notes | |||||||||||
| Pressure | Temperature | Pressure | Temperature | Nominal Mass flow rate | Max Mass flow rate | Fx | Fy | Fz | Mx | My | Mz | ||||||||||
| [psig] | [barg] | [K] | [psig] | [barg] | [K] | [kg/s] | [kg/s] | [N] | [N] | [N] | [N.m] | [N.m] | [N.m] | ||||||||
| ?? | X | LAr delivery from Ar truck station 1 | 131 | 9.00 | 300 | 49.7 | 3.430 | 77 | 16.70 | 25.05 | TBD | TBD | TBD | TBD | TBD | TBD | LAr | Nominal based on offloading two trucks at 30 ton/h each. | |||
| vacuum | (*) | 7 | 0.50 | 300 | vacuum | vacuum | 77 | n/a | n/a | TBD | TBD | TBD | TBD | TBD | TBD | Vacuum | |||||
| ?? | X | LAr delivery from Ar truck station 2 | 131 | 9.00 | 300 | 49.7 | 3.430 | 77 | 16.70 | 25.05 | TBD | TBD | TBD | TBD | TBD | TBD | LAr | Nominal based on offloading two trucks at 30 ton/h each. | |||
| vacuum | (*) | 7 | 0.50 | 300 | vacuum | vacuum | 77 | n/a | n/a | TBD | TBD | TBD | TBD | TBD | TBD | Vacuum | |||||
| ?? | X | LAr from dewars | 131 | 9.00 | 300 | 49.7 | 3.430 | 77 | 0.83 | 1.10 | TBD | TBD | TBD | TBD | TBD | TBD | LAr | ||||
| vacuum | (*) | 7 | 0.50 | 300 | vacuum | vacuum | 77 | n/a | n/a | TBD | TBD | TBD | TBD | TBD | TBD | Vacuum | |||||
| ?? | X | GAr to Ross Shaft | 131 | 9.00 | 300 | 15.0 | 1.034 | 290 | 0.83 | 1.10 | GAr | Based on maximum liquefaction in condensers for Cryostat 1 | |||||||||
| ?? | X | GAr from dewars to Ar truck station | 131 | 9.00 | 300 | 49.7 | 3.430 | 290 | n/a | n/a | GAr | ||||||||||
| ?? | X | Contaminated LAr rejection | 131 | 9.00 | 300 | 49.7 | 3.430 | 77 | 8.30 | 12.45 | LAr | Based on offloading at 30 ton/h | |||||||||
| ?? | X | GAr to Purity Monitors | 2 | 0.14 | 300 | 2.0 | 0.138 | 290 | 2.23E-06 | 5.95E-06 | GAr | For each LAr truck station and all LAr dewars |
TL Process Pipes Parameters Note: the values come from the spreadsheet "Interface sheet". If they are updated there, they are automatically udpated here as well.
| Description | Max Mass Flow Rate |
| [ - ] | kg/s |
| LAr delivery from Ar truck station 1 | 25.05 |
| LAr from dewars | 1.10 |
| GAr to Ross Shaft | 1.10 |
| GAr from dewars to Ar truck station | n/a |
| Contaminated LAr rejection | 12.45 |
| GAr to Purity Monitors | 5.95E-06 |
| Note 1: Some transfer lines may have manifolds and branches into which flow diverts; the values listed here are for the combined throughput and do not reflect any extensions where the flow may be a fraction of that listed. |
TL Interfaces
| Pressure Rating, barg | Temperature Rating, K | Flow Rating, kg/s | ||||||||
| Description | Fluid | Type | Type of Insulation | Operating | Design Maximum | Operating | Design Maximum | Operating | Design Maximum | Notes |
| Provided LAr dewar filling | LAr | NPS 1 in Process x 1.5 in Jacket | Vacuum-Jacketed | 3.43 | 9 | 77 | 300 | 16.7 | 25.05 | See Appendix C for tank datasheet. |
| Provided LAr dewar discharge | LAr | NPS 1 in Process x 1.5 in Jacket | Vacuum-Jacketed | 3.43 | 9 | 77 | 300 | 0.83 | 1.1 | See Appendix C for tank datasheet. |
| LAr delivery from Ar truck station 1 | LAr | TBD | Vacuum-Jacketed | 3.43 | 9 | 77 | 300 | 16.7 | 25.05 | |
| LAr delivery from Ar truck station 2 | LAr | TBD | Vacuum-Jacketed | 3.43 | 9 | 77 | 300 | 16.7 | 25.05 | |
| GAr to Ross Shaft | GAr | 8 in SCH 40 Pipe Stub | n/a | 3.43 | 9 | 290 | 300 | 0.83 | 1.1 | Welded connection |