J-4 - ARF - Appendix B - Argon Receiving Facilities Interface Matrix.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
LBNF Argon Receiving System
Solicitation number
LBNF-357714-JD
Issued by

About this file

This document is an interface matrix that provides technical details for the Argon Receiving Facilities as part of the LBNF (Long-Baseline Neutrino Facility) project. It outlines the interface requirements and operating parameters for the various piping, equipment, and systems that will comprise the Argon Receiving Facilities at the Sanford Underground Research Facility (SURF) in Lead, South Dakota. The key details include the maximum allowable operating conditions, fluid types, flow rates, and interface connections for equipment such as LAr (Liquid Argon) delivery trucks, LAr storage tanks, and GAr (Gaseous Argon) transfer to other LBNF subsystems. This interface matrix serves as a technical reference for the LBNF Argon Receiving System, which is the subject of a separate federal contract opportunity (Solicitation Number LBNF-357714-JD) to engineer, manufacture, and install the required equipment and systems.

View the file

Other files

File Type Posted
J-2 2025 INSURANCE REQUIREMENTS FOR FRA SUBCONTRACTED WORK AT SURF Risk category 3 (Rev 01.pdf PDF
Amendment 06--RFP LBNF-357714-JD.pdf PDF
J-1 FFDG General Terms and Conditions for Subcontracts Combining Supplies and Services Performed at SURF (01.2025).pdf PDF
Amendment 05--RFP LBNF-357714-JD.pdf PDF
Amendment 04--RFP LBNF-357714-JD.pdf PDF
S-FD-S-701.08.IFC.08.01.pdf PDF
S-FD-S-801.10.IFC.10.01.pdf PDF
S-FD-S-401.10.IFC.10.01.pdf PDF
S-FD-C-401.08.IFC.08.01.pdf PDF
QA - Appendix 1 - ARF Layout with labels.png PNG image
S-FD-A-103.09.IFC.09.01.pdf PDF
S-FD-A-104.09.IFC.09.01.pdf PDF
S-FD-S-002.09.IFC.09.01.pdf PDF
Amendment 03--RFP LBNF-357714-JD-Approved.pdf PDF
S-FD-C-402.05.IFC.05.01.pdf PDF
Amendment 02--RFP LBNF-357714-JD.pdf PDF
Amendment 01--RFP LBNF-357714-JD.pdf PDF
F10028336.04_Receiving_Facilities._Gas_Analyzers_.pdf PDF
F10028336.02_Receiving_Facilities._Storage_Ar_Dewars_1_and_2.pdf PDF
F10028336.01_Receiving_Facilities._Track_Connections.pdf PDF
F10028336.03_Receiving_Facilities._Storage_Ar_Dewars_3_and_4.pdf PDF
J-2 INSURANCE REQUIREMENTS FOR FRA SUBCONTRACTED WORK AT SURF Risk category 3 (Rev 8.2024).pdf PDF
J-3 SDSTA Risk Transfer Protocols with Exhibits Final.pdf PDF
J-4 - SOW Appendix A - Instructions for Downloading.docx DOCX document
J-5 - Exhibit A 7020 For Supply and Services SURF-ARF.pdf PDF
J-7 Section 013300 Submittals 02-14-2024.pdf PDF
RFP LBNF-357714-JD 09-13-2024 final.pdf PDF
J-1 FRA General Terms and Conditions for Subcontracts Combining Supplies and Services Performed at SURF (03.2024).pdf PDF
J-4 Statement of Work - Argon Receiving 07-16-2024.pdf PDF
J-4 - ARF - Appendix C - Tanks from CERN - Datasheet.pdf PDF
J-8 - Section 014100 Cryo Quality Requirements_02-16-2024.pdf PDF
PUR-466_Proposal Certifications.pdf PDF
SMALL BUSINESS SUBCONTRACTING PLAN template Far 52.219-9.docx DOCX document
FRA Safety Questionnaire (Rev. 08-17)_URV.pdf PDF
J-6 - Section 010010 General Requirements Installation Feb 2024.pdf PDF
J-13 Project Schedule - ARF 07-18-2024.pdf PDF
Mandatory Site Visit Registration Questionnaire_ARF_Sept 2024.docx DOCX document
SARC_Subcontractor Annual RepsCerts Rev 3.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Interface Sheet

n.a.Not applicable
(*)Not a Process Pipe
EquipmentInterfacing TAGInterfacing portInterfacing typeProcess PipeProcess DescriptionMaximum allowableOperating conditionsMaximum allowable mechanical loadsFluidNotes
PressureTemperaturePressureTemperatureNominal Mass flow rateMax Mass flow rateFxFyFzMxMyMz
[psig][barg][K][psig][barg][K][kg/s][kg/s][N][N][N][N.m][N.m][N.m]
??XLAr delivery from Ar truck station 11319.0030049.73.4307716.7025.05TBDTBDTBDTBDTBDTBDLArNominal based on offloading two trucks at 30 ton/h each.
vacuum(*)70.50300vacuumvacuum77n/an/aTBDTBDTBDTBDTBDTBDVacuum
??XLAr delivery from Ar truck station 21319.0030049.73.4307716.7025.05TBDTBDTBDTBDTBDTBDLArNominal based on offloading two trucks at 30 ton/h each.
vacuum(*)70.50300vacuumvacuum77n/an/aTBDTBDTBDTBDTBDTBDVacuum
??XLAr from dewars1319.0030049.73.430770.831.10TBDTBDTBDTBDTBDTBDLAr
vacuum(*)70.50300vacuumvacuum77n/an/aTBDTBDTBDTBDTBDTBDVacuum
??XGAr to Ross Shaft1319.0030015.01.0342900.831.10GArBased on maximum liquefaction in condensers for Cryostat 1
??XGAr from dewars to Ar truck station1319.0030049.73.430290n/an/aGAr
??XContaminated LAr rejection1319.0030049.73.430778.3012.45LArBased on offloading at 30 ton/h
??XGAr to Purity Monitors20.143002.00.1382902.23E-065.95E-06GArFor each LAr truck station and all LAr dewars

TL Process Pipes Parameters Note: the values come from the spreadsheet "Interface sheet". If they are updated there, they are automatically udpated here as well.

DescriptionMax Mass Flow Rate
[ - ]kg/s
LAr delivery from Ar truck station 125.05
LAr from dewars1.10
GAr to Ross Shaft1.10
GAr from dewars to Ar truck stationn/a
Contaminated LAr rejection12.45
GAr to Purity Monitors5.95E-06
Note 1: Some transfer lines may have manifolds and branches into which flow diverts; the values listed here are for the combined throughput and do not reflect any extensions where the flow may be a fraction of that listed.

TL Interfaces

Pressure Rating, bargTemperature Rating, KFlow Rating, kg/s
DescriptionFluidTypeType of InsulationOperatingDesign MaximumOperatingDesign MaximumOperatingDesign MaximumNotes
Provided LAr dewar fillingLArNPS 1 in Process x 1.5 in JacketVacuum-Jacketed3.4397730016.725.05See Appendix C for tank datasheet.
Provided LAr dewar dischargeLArNPS 1 in Process x 1.5 in JacketVacuum-Jacketed3.439773000.831.1See Appendix C for tank datasheet.
LAr delivery from Ar truck station 1LArTBDVacuum-Jacketed3.4397730016.725.05
LAr delivery from Ar truck station 2LArTBDVacuum-Jacketed3.4397730016.725.05
GAr to Ross ShaftGAr8 in SCH 40 Pipe Stubn/a3.4392903000.831.1Welded connection